Federal Register / Vol. 70, No.

10 / Friday, January 14, 2005 / Notices 2629

motion for late intervention in this and interventions may be filed A copy of the application may be
proceeding. On April 19, 2004, Puget electronically via the Internet in lieu of obtained by agencies directly from the
filed an answer in opposition to the paper. See, 18 CFR 385.2001(a)(1)(iii) Applicant. If an agency does not file
motion. and the instructions on the comments within the time specified for
3. Granting the motions to intervene Commission’s Web site under the ‘‘e- filing comments, it will be presumed to
will not unduly delay or disrupt the Filing’’ link. The Commission strongly have no comments. One copy of an
proceeding or prejudice other parties to encourages e-filings. agency’s comments must also be sent to
it. Therefore, pursuant to Rule 214, 18 k. Description of Request: Brazos the Applicant’s representatives.
CFR 385.214 (2004), all timely motions River Authority (Authority) is seeking q. Comments, protests and
to intervene filed in this amendment Commission approval to permit the interventions may be filed electronically
proceeding are granted, and the motion existing 60-slip facility and the addition via the Internet in lieu of paper. See, 18
for late intervention filed by Skagit of 24 boat slips at The Breakers Marina CFR 385.2001(a)(1)(iii) and the
County is granted, subject to the (P–1490–038). The Authority is also instructions on the Commission’s Web
Commission’s rules and regulations. seeking Commission approval to permit site at http://www.ferc.gov under the ‘‘e-
the existing 120 slip facility and the Filing’’ link.
Magalie R. Salas, addition of 76 boat slips at the Hill
Secretary. Magalie R. Salas,
Country Harbor Marina (P–1490–039).
[FR Doc. E5–140 Filed 1–13–05; 8:45 am] l. Location of the Application: The Secretary.
BILLING CODE 6717–01–P filing is available for review at the [FR Doc. E5–139 Filed 1–13–05; 8:45 am]
Commission in the Public Reference BILLING CODE 6717–01–P
Room, located at 888 First Street, NE.,
DEPARTMENT OF ENERGY Room 2A, Washington, DC 20426, or
may be viewed on the Commission’s DEPARTMENT OF ENERGY
Federal Energy Regulatory Web site at http://www.ferc.gov using
Commission Federal Energy Regulatory
the ‘‘eLibrary’’ link. Enter the docket
Commission
number excluding the last three digits in
Notice of Application for Non-Project the docket number field to access the [Docket Nos. ER04–433–000 and ER04–433–
Use of Project Lands and Soliciting document. For assistance, please contact 001, ER04–432–000 and ER04–432–001]
Comments, Motions To Intervene, and FERC Online support at
Protests FERCOnLineSupport@ferc.gov or toll New England Power Pool Bangor
free (866) 208 3676 or TTY, contact Hydro-Electric Company, et al.; Notice
January 7, 2005.
(202) 502–8659. of Technical Conference
Take notice that the following
applications have been filed with the m. Individuals desiring to be included January 7, 2005.
Commission and is available for public on the Commission’s mailing list should Take notice that on January 14, 2005,
inspection: so indicate by writing to the Secretary at 1 p.m., at the offices of the Federal
a. Application Type: Non-Project Use of the Commission. Energy Regulatory Commission, 888
of Project Lands. n. Comments, Protests, or Motions to
First Street, NE., Washington, DC 20426,
b. Project Nos: 1490–038 and 039. Intervene—Anyone may submit
a technical conference will be held, as
c. Date Filed: November 24, 2004. comments, a protest, or a motion to
requested in a January 5, 2005, motion
d. Applicant: Brazos River Authority. intervene in accordance with the
filed by the New England Transmission
e. Name of Project: Morris Sheppard requirements of Rules of Practice and
Owners and ISO New England Inc. (ISO
Project. Procedure, 18 CFR 385.210, .211, .214.
New England).
f. Location: The project is located on In determining the appropriate action to The purpose of the technical
the Possum Kingdom Reservoir on the take, the Commission will consider all conference will be to address
Brazos River in Palo Pinto County, protests or other comments filed, but compliance issues (the form and manner
Texas. This project does not occupy any only those who file a motion to of compliance) relating to the
federal or tribal lands. intervene in accordance with the Commission’s directive in these
g. Filed Pursuant to: Federal Power Commission’s Rules may become a proceedings that the New England
Act, 16 U.S.C. 791(a) 825(r) and 799 and party to the proceeding. Any comments, Transmission Owners either: (i) Amend
801. protests, or motions to intervene must their Local Tariffs to include the pro
h. Applicant Contact: Mr. Phillip J. be received on or before the specified forma Standard Large Interconnection
Ford, General Manager/CEO, Brazos comment date for the particular Procedures (LGIP) and the Standard
River Authority, 4600 Cobbs Drive, P.O. application. Large Generator Interconnection
Box 7555, Waco, TX, 76714–7555, (254) o. Filing and Service of Responsive
Agreement (LGIA); or (ii) transfer to ISO
761–3100. Documents—Any filings must bear in
New England, or its successor RTO,
i. FERC Contacts: Any questions on all capital letters the title
control over the significant aspects of
this notice should be addressed to Mrs. ‘‘COMMENTS’’,
the Local Tariff interconnection
Jean Potvin at (202) 502–8928, or e-mail ‘‘RECOMMENDATIONS FOR TERMS
process.1 Specific issues to be addressed
address: jean.potvin@ferc.gov. AND CONDITIONS’’, ‘‘PROTEST’’, OR
at the technical conference include:
j. Deadline for Filing Comments and ‘‘MOTION TO INTERVENE’’, as (1) The nature and timing of a
or Motions: February 7, 2005. applicable, and the Project Number of compliance filing proposing to include
All Documents (Original and Eight the particular application to which the the pro forma LGIP and LGIA in the
Copies) Should be Filed With: Ms. filing refers. A copy of any motion to Local Tariffs, including what burden
Magalie R. Salas, Secretary, Federal intervene must also be served upon each must be met to demonstrate that any
Energy Regulatory Commission, 888 representative of the Applicant proposed variation meets the
First Street, NE., Washington DC 20426. specified in the particular application.
Please include the project number (P– p. Agency Comments—Federal, state, 1 See New England Power Pool and Bangor Hydro
1490–038 and/or 039) on any comments and local agencies are invited to file Electric Company, 109 FERC ¶ 61,155 (2004)
or motions filed. Comments, protests, comments on the described application. (November 8 Order), reh’g pending.

VerDate jul<14>2003 14:36 Jan 13, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1