Вы находитесь на странице: 1из 2

1886 Federal Register / Vol. 70, No.

7 / Tuesday, January 11, 2005 / Notices

17. American Electric Power Service This filing is accessible on-line at document. For assistance, contact FERC
Corporation http://www.ferc.gov, using the Online Support at
[Docket No. ER05–392–000]
‘‘eLibrary’’ link and is available for FERCOnlineSupport@ferc.gov or toll-
review in the Commission’s Public free at (866) 208–3676, or for TTY,
Take notice that on December 29,
Reference Room in Washington, DC. contact (202) 502–8659.
2004, the American Electric Power
There is an ‘‘eSubscription’’ link on the
Service Corporation (AEPSC), tendered Magalie R. Salas,
Web site that enables subscribers to
for filing an Interconnection and Local Secretary.
receive e-mail notification when a
Delivery Service Agreement designated [FR Doc. E5–44 Filed 1–10–05; 8:45 am]
document is added to a subscribed
as Original Service Agreement No. 621,
docket(s). For assistance with any FERC BILLING CODE 6717–01–P
under the Operating Companies of the
Online service, please e-mail
American Electric Power System’s FERC
FERCOnlineSupport@ferc.gov, or call
Electric Tariff, Third Revised Volume DEPARTMENT OF ENERGY
(866) 208–3676 (toll free). For TTY, call
No. 6. AEPSC requests an effective date
(202) 502–8659. Federal Energy Regulatory
of December 1, 2004.
Comment Date: 5 p.m. eastern time on Linda Mitry, Commission
January 19, 2005. Deputy Secretary. [Project No. 20–038]
18. El Paso Electric Company Public [FR Doc. E5–55 Filed 1–10–05; 8:45 am]
Service, Company of New Mexico and BILLING CODE 6717–01–P PacifiCorp; Notice of Application for
Texas-New Mexico Power Company Temporary Amendment of License and
Soliciting Comments, Motions To
[Docket No. ER05–393–000] DEPARTMENT OF ENERGY Intervene, and Protests
Take notice that on December 29,
2004, El Paso Electric Company, Public Federal Energy Regulatory January 4, 2005.
Service Company of New Mexico, and Commission Take notice that the following
Texas-New Mexico Power Company application has been filed with the
[Project No. 2232–455]
(collectively, the Parties) submitted the Commission and is available for public
New Mexico Transmission Operating Duke Power Company; Notice of inspection.
Procedures and First Revised Restated Availability of Environmental a. Type of Application: Request to
Letter of Understanding. The Parties Assessment temporarily amend the minimum flow
request an effective date of January 1, requirements of article 408 of the project
2005. January 4, 2005. license.
The Parties state that copies of the In accordance with the National b. Project Number: P–20–038.
agreement were served on Tri-State Environmental Policy Act of 1969, as c. Date Filed: December 12, 2004.
Generation and Transmission amended, and the Federal Energy d. Applicant: PacifiCorp.
Association, Inc., the only other party to Regulatory Commission’s (Commission) e. Name of Project: Bear River
the agreements. regulations (18 CFR part 380), Hydroelectric Project (FERC No. 20).
Comment Date: 5 p.m. eastern time on Commission staff have prepared an f. Location: The project is located on
January 19, 2005. environmental assessment (EA) that the Bear River in Caribou and Franklin
analyzes the environmental impacts of Counties, Idaho.
Standard Paragraph allowing Duke Power Company, g. Filed Pursuant to: Federal Power
Any person desiring to intervene or to licensee for the Catawba-Wateree Act, 16 U.S.C. 791(a) 825(r) and 799 and
protest this filing must file in Hydroelectric Project, to grant a lease of 801.
accordance with Rules 211 and 214 of two parcels of land, totaling 1.918 acres, h. Applicant Contacts: Monte Garrett,
the Commission’s Rules of Practice and to Lake James Properties, LLC, for the 825 NE. Multnomah, Suite 1500,
Procedure (18 CFR 385.211 and purpose of constructing a residential/ Portland, OR 97232. Phone: (503) 813–
385.214). Protests will be considered by commercial marina. The marina will be 6629.
the Commission in determining the located on Lake James, one of the i. FERC Contact: Any questions on
appropriate action to be taken, but will project’s 11 reservoirs, in McDowell this notice should be addressed to Mr.
not serve to make protestants parties to County, North Carolina. The facility will Robert Fletcher at (202) 502–8901, or e-
the proceeding. Any person wishing to accommodate a total of 110 boat slips, mail address: robert.fletcher@ferc.gov.
become a party must file a notice of and will provide access to the reservoir j. Deadline for filing comments and or
intervention or motion to intervene, as for the residents of The Arbor on Lake motions: February 7, 2005.
appropriate. Such notices, motions, or James subdivision. k. Description of Request: The parties
protests must be filed on or before the A copy of the EA is attached to a to the Bear River Settlement Agreement,
comment date. Anyone filing a motion Commission order titled ‘‘Order which include PacifiCorp, U.S. Fish and
to intervene or protest must serve a copy Modifying and Approving Non-Project Wildlife Service, U.S. Bureau of Land
of that document on the Applicant and Use of Project Lands and Waters,’’ Management, National Park Service,
all parties to this proceeding. which was issued on December 15, U.S. Forest Service, Shoshone-Bannock
The Commission encourages 2004, and is available for review and Tribes, Idaho Department of
electronic submission of protests and reproduction at the Commission’s Environmental Quality, Idaho
interventions in lieu of paper using the Public Reference Room, located at 888 Department of Fish and Game, Idaho
‘‘eFiling’’ link at http://www.ferc.gov. First Street, NE., Room 2A, Washington, Department of Parks and Recreation,
Persons unable to file electronically DC 20426. The EA may also be viewed Idaho Council of Trout Unlimited, Idaho
should submit an original and 14 copies on the Commission’s Web site at http:/ Rivers United, Greater Yellowstone
of the protest or intervention to the /www.ferc.gov using the ‘‘elibrary’’ link. Coalition, and American Whitewater,
Federal Energy Regulatory Commission, Enter the docket number (prefaced by propose to amend the Bear River
888 First Street, NE., Washington, DC P-) and excluding the last three digits, Settlement Agreement to include the
20426. in the docket number field to access the forthcoming Cove Agreement and

VerDate jul<14>2003 17:22 Jan 10, 2005 Jkt 205001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\11JAN1.SGM 11JAN1
Federal Register / Vol. 70, No. 7 / Tuesday, January 11, 2005 / Notices 1887

license amendment application which o. Filing and Service of Responsive DEPARTMENT OF ENERGY
the licensee will file with the Documents—Any filings must bear in
Commission for approval to all capital letters the title Federal Energy Regulatory
decommission the Cove project and ‘‘COMMENTS’’, Commission
amend article 408 of the project license ‘‘RECOMMENDATIONS FOR TERMS [Docket Nos. PL04–14–000, ER03–1141–004,
to reduce the minimum instream flow AND CONDITIONS’’, ‘‘PROTEST’’, OR EL03–222–004, EL04–102–004, EL04–102–
requirement in the Grace bypassed ‘‘MOTION TO INTERVENE’’, as 005, EL04–102–007, EL04–102–008, ER03–
reach from 80 cubic feet per second (cfs) applicable, and the Project Number of 563–025, ER03–563–027, ER03–563–033,
to 65 cfs. Currently, the licensee, on the particular application to which the ER03–563–036, ER03–563–043, ER03–563–
behalf of the settlement parties, requests 044, ER03–563–045, ER03–563–047, ER03–
filing refers (p–20–038). All documents 563–048, ER04–464–002, ER04–464–005,
that a temporary amendment to article (original and eight copies) should be
408 be given upon the Commission’s ER04–464–006, ER04–344–001, ER02–2463–
filed with: Magalie R. Salas, Secretary, 004, ER02–2330–031, ER02–2330–032,
receipt of the amendment application
Federal Energy Regulatory Commission, RT04–2–006, RT04–2–007, RT04–2–008,
(to be filed with the Commission by RT04–2–009, ER04–116–006, ER04–116–
888 First Street, NE., Washington DC
April 2005) that will allow the 007, ER04–116–008, ER04–116–009, ER04–
minimum flow requirement to be 20426. A copy of any motion to
157–008, ER04–157–009, ER04–157–011,
reduced from 80 cfs to 65 cfs during the intervene must also be served upon each EL01–39–006, EL01–39–007, EL01–39–008,
time that the Commission is conducting representative of the Applicant EL01–39–009]
its analysis to reach a decision on the specified in the particular application.
amendment application. The temporary p. Agency Comments—Federal, state, Connecticut Transmission
amendment will be necessary to permit and local agencies are invited to file Infrastructure; New England Power
the settlement parties to conduct aquatic comments on the described application. Pool and ISO New England, Inc., et al.;
habitat assessments, beginning in May A copy of the application may be Devon Power LLC, et al.; Exelon New
2005. obtained by agencies directly from the Boston LLC; ISO New England, Inc.;
l. Locations of the Application: A ISO New England, Inc. and Bangor
Applicant. If an agency does not file
copy of the application is available for Hydro, et al.; Notice of Technical
comments within the time specified for
inspection and reproduction at the Conference
filing comments, it will be presumed to
Commission’s Public Reference Room, have no comments. One copy of an January 3, 2005.
located at 888 First Street, NE., Room agency’s comments must also be sent to In a Notice of Technical Conference
2A, Washington, DC 20426, or by calling the Applicant’s representatives. issued October 29, 2004, the Federal
(202) 502–8371. This filing may also be Energy Regulatory Commission
viewed on the Commission’s Web site at q. Comments, protests and
interventions may be filed electronically announced that it would host a
http://www.ferc.gov using the technical conference on Thursday,
‘‘eLibrary’’ link. Enter the docket via the Internet in lieu of paper. See, 18
January 6, 2005, to discuss specific
number excluding the last three digits in CFR 385.2001(a)(1)(iii) and the
transmission proposals and cost issues
the docket number field to access the instructions on the Commission’s Web
for the State of Connecticut. The
document. You may also register online site at http://www.ferc.gov under the ‘‘e-
conference will be held in Room 2C of
at http://www.ferc.gov/docs-filing/ Filing’’ link. the Legislative Office Building, 300
esubscription.asp to be notified via e- Capitol Avenue, Hartford, Connecticut.
Magalie R. Salas,
mail of new filings and issuances Please take note that the workshop
related to this or other pending projects. Secretary.
schedule has changed, to begin at 10
For assistance, call 1–866–208–3676 or [FR Doc. E5–54 Filed 1–10–05; 8:45 am]
a.m. (EST) (instead of 9 a.m.) and end
e-mail FERCOnlineSupport@ferc.gov, BILLING CODE 6717–01–P
at approximately 1 p.m. (instead of 3
for TTY, call (202) 502–8659. A copy is p.m.). Members of the Federal Energy
also available for inspection and Regulatory Commission are expected to
reproduction at the address in item (h) participate, along with state regulators
above. from the New England region. An
m. Individuals desiring to be included agenda is attached to this notice.
on the Commission’s mailing list should This conference is a follow-up to the
so indicate by writing to the Secretary infrastructure conference that was held
of the Commission. on October 13, 2004. The goal of this
n. Comments, Protests, or Motions to technical conference is to provide a
Intervene—Anyone may submit forum for discussion of issues affecting
comments, a protest, or a motion to energy infrastructure in and around
intervene in accordance with the Connecticut. This discussion will take
requirements of Rules of Practice and place between federal, State and
Procedure, 18 CFR 385.210, .211, .214. regional leaders and industry
In determining the appropriate action to representatives. The January 6
take, the Commission will consider all conference will focus primarily on
protests or other comments filed, but proposals for new electric transmission,
only those who file a motion to and the costs of these proposals.
intervene in accordance with the The conference is a technical
Commission’s Rules may become a discussion between policy leaders,
party to the proceeding. Any comments, however, members of the public are
protests, or motions to intervene must welcome to attend. Registration is not
be received on or before the specified required; however, in-person attendees
comment date for the particular are asked to register for the conference
application. on-line by close of business on Tuesday,

VerDate jul<14>2003 17:22 Jan 10, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\11JAN1.SGM 11JAN1

Вам также может понравиться