This
Request
for
Proposals
(RFP)
seeks
to
establish
the
successful
contractor
to
conduct
the
required
contracted
driveway
plowing,
salting
and
ramp/step
shovelling
of
elders
and
compromised
health
community
members
of
Wallace
Hills
community
of
the
Sipeknekatik
Band
for
the
2015-2016
winter
season.
The
entire
RFP
can
be
found
online
at
shubenacadieband.ca/category/public
tenders/
The
complete
bid
submission
must
be
submitted
no
later
than
12:00
PM
local
time,
November
13,
2015.
Submissions
received
after
this
date
will
not
be
accepted.
Complete
bid
submissions
must
be
submitted
in
a
sealed
envelope
marked
RFP
#2015-24
to
the
address
below:
RPF
2015-14
Nathan
Sack
Director
of
Operations
Sipeknekatik
Band
522
Church
Street,
Indian
Brook
NS
B0N
1W0
The
lowest
or
any
bid
not
necessarily
accepted.
Sipeknekatik
reserves
the
right
to
refuse
any
and
all
proposals
Contents
1.
2.
Definitions 3
3.
4.
5.
Deliverables 4
6.
Specifications
7.
Submission Requirements
8.
Evaluation Criteria 8
9.
Receipt of Proposals
10.
11.
Conditions 9
12.
13.
5
8
1. Contact
Information
and
Timelines
Contact
Information:
Copies
of
the
RFP
document
are
available
at:
http://shubenacadieband.ca/catergory/public
-
tenders
Timelines:
Thursday,
October
30,
2015
RFP Advertised
2. Definitions
Bidder
any
individual,
company
or
corporation
that
has
submitted
a
bid
to
the
Band
Successful
Bidder
the
successful
bidder,
as
decided
by
the
Band,
from
the
bidders
to
perform
all
or
part
of
the
quotation
Contractor
interchangeable
with
successful
bidder
Band
The
Sipeknekatik
Band
3. Background
&
Context
The
Sipeknekatik
Band
is
seeking
proposals
from
qualified
contractors
to
conduct
Hammonds
Plain
Road
and
residential
household
driveway
snow
clearing
at
the
Wallace
Hills
reserve.
This
will
also
include
snow
clearing
the
parking
lot,
salt
and/or
sanding,
shoveling,
removal
of
snow
and
sanding
of
steps
and
ramps
at
the
commercial
lot
where
the
Gaming
Centre
is
located
during
the
2015
2016
Winter
Season.
The
Sipeknekatik
Band
has
a
fundamental
belief
that
a
strong
commitment
to
the
environment
as
well
as
the
health
and
safety
of
its
employees,
visitors
and
contractors
is
essential
to
the
optimal
operation
and
long-term
viability
of
its
business.
In
line
with
this
belief
is
the
Sipeknekatik
Bands
commitment
to
ensuring
that
its
employees
as
well
as
visitors
and
contractors
know
their
environmental,
health
and
safety
responsibilities
and
work
in
a
safe
a
manner
as
possible.
Moreover,
contractor
work
practices
are
on-site
activities
with
significant
implications
for
the
environment
and
the
management
of
health
and
safety
within
the
Sipeknekatik
Band.
The
Band
will
take
every
opportunity
to
align
itself
with
contractors
that
are
equally
committed
to
the
health
and
safety
of
their
employees
and
the
work
site
environment.
4. Objective
and
Purpose
The
purpose
of
the
RFP
is
to
receive
quotations
from
qualified
contractors
for
the
plowing
of
band
housing
units
driveways,
sanding/salting
of
each
driveway
and
removal
of
snow,
to
reduce
the
operating
and
liability
costs
of
the
Band.
Also,
the
commercial
driveway
and
parking
lot
of
the
Bands
Gaming
Centre
located
at
Wallace
Hills
will
also
be
included
in
the
scope
of
work.
The
Gaming
Centres
steps
and
ramp
must
be
sanded/salted
after
removal
of
snow.
The
contractor
will
be
responsible
for
all
environmental,
traffic
controls
and
any
necessary
equipment
and
materials.
The
main
objective
that
the
Band
hopes
to
achieve
are:
a. Proper
completion
of
all
required
winter
maintenance
operations
in
the
Wallace
Hills
community
b. Proper
controls
in
place
for
traffic,
health
and
safety.
c. Efficiencies
in
contracted
winter
maintenance
operations
5. Deliverables
The
contractor
will
be
required
to
provide
the
following:
a. Plowing
of
driveways
of
all
band-owned
Elder
or
Disabled
housing
units
of
the
Wallace
Hills
community
b. Salting
of
driveways
of
all
band-owned
Elder
or
Disabled
housing
units
of
the
Wallace
Hills
community
c. Plowing
of
access
road
and
parking
lot
of
the
Wallace
Hills
Gaming
Centre
d. Supply
their
own
equipment,
insurance,
vehicle,
fuel,
salt,
and
sand
at
their
own
expense
e. All
driveway
plowing
services
in
the
Wallace
Hills
community
is
to
be
completed
in
accordance
with
provincial
and
Band
standards
and
specifications.
f. All
required
Health
and
Safety
as
per
Nova
Scotia
Occupational
Health
and
Safety,
the
Band
and
the
contractors
own
programs
for
workers
and
public
alike.
6.
Specifications
a. The
Director
of
Operations,
or
his
designate,
will
notify
the
contractor
involved
(5)
five
days
prior
to
the
start
of
the
winter
season
of
any
additions
or
deletions
or
driveways.
b. Unless
otherwise
specified
or
requested,
the
new
accumulation
of
snow
for:
i. Driveways
shall
not
exceed
10.0
cm
(2.0
inches).
ii. Snow
clearing
shall
include
all
assigned
band
unit
driveways,
steps
and
ramps
to
the
doorways
and
walkways.
The
contractor
must
contact
the
Manager
of
Operations
&
Maintenance
to
confirm
the
exact
area
to
be
plowed
and
excess
piling.
c. All
driveways
require
sanding
after
snow
plowing.
d. All
contracted
Winter
Maintenance
Operations
shall
be
completed
in
accordance
to
governing
Nova
Scotia
Transportation
&
Public
Works
snow
and
Ice
control
on
Nova
Scotia
and
Band
specifications,
unless
otherwise
directed
by
the
Operations
and
Maintenance
Manager.
e. The
contractor
will
be
called
at
all
times
by
the
Operations
&
Maintenance
Department
when
driveways
are
to
cleared
of
snow
and
the
commencing
time
will
start
within
one
(1)
hour
of
the
call
and/or
be
completed
by
6:00
a.m.
f. The
contractors
personnel
shall
be
required
to
be
neat,
respectful
and
courteous
and
shall
perform
their
duties
in
a
manner
which
presents
a
high
level
of
public
relations
for
the
Bidder
and
the
Shubenacadie
Band.
g. Any
contractors
personnel
performing
works
associated
to
this
quotation
found
to
be
under
the
influence
of
drugs
and
alcohol
will
result
in
the
contractor
being
relieved
of
their
duties
and
responsibilities
immediately.
h. During
heavy
snow
falls,
blowing
conditions,
or
after
the
Sipeknekatik
Band
contractors
have
created
banks
at
the
entrances,
the
contractor
shall
be
required
to
clear
snow
from
the
designated
snow
clearing
areas
upon
request
of
the
Operations
&
Maintenance
Manager.
i. It
is
the
responsibility
of
the
contractor
to
clear
sufficient
areas
for
the
seasons
removal
and
excess
piling.
Snow
shall
not
be
piled
against
fences,
buildings
or
obstruct
visibility.
Any
damage
resulting
from
the
contractors
operations
will
be
the
responsibility
of
the
contractor.
Should
the
Band
be
require
to
make
restitution
for
damages,
any
such
costs
shall
be
deducted
from
the
contractors
next
invoice.
j. Visibility
must
be
maintained
at
entrances,
sidewalks
and
around
corners
to
allow
for
proper
sightlines
for
vehicle
and
pedestrian
traffic.
k. The
contractor
is
responsible
for
ensuring
snow
is
piled
to
provide
reasonable
run-off
away
from
the
buildings
to
access
drains
and
shall
move
snow
to
allow
drainage
if
necessary.
l. Equipment
a. The
Bidder
shall
provide
full
details
(serial
numbers,
make,
model,
attachments,
etc.)
of
equipment
with
this
Proposal.
The
fleet
proposed
shall
be
acceptable
to
the
Band
and
shall
be
made
available
for
inspection
by
the
Director
of
Operations,
or
his
designate,
upon
request.
Bidders
are
advised
that
for
the
unit
to
be
acceptable
for
this
quotation,
the
units
must
be:
i. In
good
mechanical
and
physical
condition,
and
be
subject
to
inspection
and
acceptance
by
the
Band;
ii. Comply
with
the
requirements
of
the
Highway
Traffic
Act
designating
safety
equipment,
lights
and
applicable
appurtenances
required
for
snow
removal
and
sanding.
b. The
units
shall
be
maintained
by
the
bidder
in
good
mechanical
and
physical
condition
for
the
duration
of
the
Proposal,
and
are
subject
to
periodic
inspections
and
approval
by
the
Operations
&
Maintenance
Manager
for
the
duration
of
the
Agreement.
c. The
acceptances
of,
or
continued
use,
of
any
piece
of
equipment
intended
for
the
Quotation
shall
be
at
the
sole
discretion
of
the
Director
of
Operations.
d. The
equipment
to
be
used
for
snow
removal
shall
be
available
for
inspection
by
the
Director
of
Operations
or
his
designate,
prior
to
proposal
acceptance.
e. All
attachments
shall
be
factory
supplied,
specifically
designed
for
use
with
the
quoted
unit
and
shall
be
operator
controlled
from
the
cab
unit.
f. The
Bidder
shall
demonstrate
prior
to
the
award
of
the
Proposal,
that
the
equipment
quoted
will
perform
the
required
work
to
the
satisfaction
of
the
Band.
m. Maintenance
and
Repairs
a. The
Bidder
shall
maintain
the
units
at
all
times
to
a
standard
acceptable
to
the
Band
and
in
accordance
with
the
requirements
of
the
Highway
Traffic
Act.
b. All
damage
to
the
Bidders
equipment
arising
from
operations
under
this
quotation
shall
be
repaired
at
the
Bidders
expense.
c. The
Band
must
approve
any
change
in
the
type
of
equipment
to
be
used
throughout
the
period
of
the
quotation
in
writing.
d. The
Bidder
shall
supply
all
required
items
for
the
operation
of
the
equipment
including
but
not
limited
to,
fuel,
lubricants,
cutting
edges,
sand,
salt,
etc.
n. Operators
a. The
Bidder
must
supply
the
names
and
qualifications
of
the
operators,
when
requested.
The
Operators
must
hold
a
valid
Nova
Scotia
Drivers
Licence
with
proper
classification
and
must
be
experienced
in
the
operation
of
the
equipment
and
performance
of
the
work.
b. The
Bidder
shall
employ
only
orderly,
competent
and
skillful
operators
to
ensure
that
the
works
are
carried
out
in
a
safe
and
timely
manner.
c. In
the
event
that
any
person
employed
by
the
Bidder
in
connection
with
the
work
arising
out
of
the
Proposal
gives,
in
the
opinion
of
the
Band,
just
cause
for
complaints,
the
Bidder,
upon
notification
by
the
Band
in
writing,
shall
not
permit
such
person
to
continue
in
any
future
work
arising
out
of
this
Proposal.
o. Invoices
are
to
be
forwarded
to:
Attn:
Steven
Knockwood
Sipeknekatik
522
Church
Street
Indian
Brook,
NS
B0N
1W0
Nathan
Sack
Director
of
Operations
Sipeknekatik
Band
522
Church
Street
Indian
Brook,
NS
B0N
1W0
Please
note
if
your
proposal
is
not
labelled
as
per
the
instructions
provided
above
it
will
be
automatically
rejected.
10.Contact
Person
for
Successful
bidder
Stephen
Knockwood
Operations
&
Maintenance
Manager
sknockwood@shubenacadieband.ca
Telephone:
902-758-3341
All
proposals
submitted
to
the
Sipeknekatik
Band
become
the
property
of
the
Band
and,
as
such,
are
subject
to
the
Bands
Confidentiality
Policy.
11.Conditions
a. The
Sipeknekatik
Band
shall
not
be
obligated
in
any
way
by
the
respondents
response
to
the
document.
Respondents
costs
related
to
the
preparation
of
a
response
to
the
RFP
document
shall
be
entirely
the
responsibility
of
the
respondent.
Expenses
of
any
natured
incurred
by
the
respondent
prior
to
the
signing
of
an
agreement
or
contract
shall
be
the
sole
responsibility
of
the
respondent
and
may
not
be
charged
to
or
claimed
form
the
Sipeknekatik
Band
in
any
manner.
b. The
Sipeknekatik
Band
reserves
the
right
to
reject
any
or
all
proposals.
# of Units
Price Quote
1 KM
PRICE
QUOTE
$
$
13.Appendix
B
Personnel,
Health
and
Safety
Submission
For
all
bidders
this
is
a
crucial
and
mandatory
component
for
all
submissions.
Any
submission
that
do
not
include
a
this
information
in
their
Proposal
shall
be
deemed
non-
compliant
and
rejected.
Requirements
Received
in
Proposal
YES
N
O
N/A
4.0 REFERENCES