CMO NI Site Engineering

SRT 1F
Type K-Shelf

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 1/116

COM_QMCO_M_003
ed.03 del 03.04.07

Field Line-up and Commissioning


Procedure

CMO NI Site Engineering


Index

REVISION LIST ....................................................................................................................... 5


SCOPE .................................................................................................................................... 5
SUPPORT DOCUMENTATION............................................................................................... 6
TEST INSTRUMENT LIST AND MEASUREMENT ACCESSORIES...................................... 7

4.1.
5

TEST INSTRUMENTS..................................................................................................... 7
SRT 1F BASIC REFERANCE RACK ...................................................................................... 8

5.1.

SRT 1F K SHELF SUB-RACK BLOCK STRUCTURE ................................................... 8

5.1.1.

SRT 1F K SHELF BRU COMPOSITION EXAMPLE ....................................................... 9

5.1.2.

SRT 1F K SHELF SCSU COMPOSITION EXAMPLE.................................................. 10

5.2.

TYPICAL BRANCHING WAVE GUIDE CONNECTION ................................................ 11

5.3.

TYPICAL WAVEGUIDE PATH AND ANTENNA CONNECTION .................................. 11

START UP ............................................................................................................................. 12

6.1.

PRELIMINARY ON BOTH TERMINAL STATIONS....................................................... 12

6.2.

EQUIPMENT CONFIGURATION IN BOTH TERMINAL STATIONS ............................ 12

BEFORE STARTING............................................................................................................. 14

7.1.

SHELF VISUAL INSPECTION ...................................................................................... 15

7.2.

FUSE/BREAKER FOR MAIN DC POWER DISTRIBUTION ......................................... 16

7.3.

DC POWER SUPPLY CHECK ...................................................................................... 16

7.4.

PC REQUIREMENTS.................................................................................................... 18

7.5.

CONNECTING THE PC TO THE NE ............................................................................ 19

7.6.

STARTING SRT1F WEB LT.......................................................................................... 19

BASIC EQUIPMENT CONFIGURATION .............................................................................. 21

8.1.

CONFIRMATION OF ALL SERVICE STATES = OOS ............................................... 25

8.2.

PROVISIONING OF THE BASIC CONFIGURATION PARAMETERS


(SYSTEM & COMMON MENU)..................................................................................... 26

8.2.1.

EDIT SYSTEM BUTTON (SETTING SYSTEM CONFIGURATIONS)........................... 27

8.2.2.

EDIT COMMON BUTTON (SETTING LED MODE) ...................................................... 29

8.3.

PROVISIONING OF THE RF CHANNEL PARAMETERS AND RADIO &


LINE ERROR STATES.................................................................................................. 30

8.3.1.

EDIT EQUIPMENT BUTTON (SETTING RADIO CHANNEL)....................................... 31

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 2/116

COM_QMCO_M_003
ed.03 del 03.04.07

1
2
3
4

CMO NI Site Engineering


8.3.2.

EDIT FACILITY GROUP BUTTON (SETTING FACILITY GROUP) .............................. 32

8.4.

PROVISIONING OF THE RSPI & RPS PARAMETERS ............................................... 33

8.4.1.

EDIT RSPI BUTTON (SETTING RSPI FACILITY) ........................................................ 33

8.4.2.

EDIT RPS BUTTON (SETTING SWITCH INITIATOR) ................................................. 36

8.5.

PROVISIONING OF THE RSC & RPS PARAMETERS ................................................ 37

8.5.1.

EDIT RSC BUTTON (SETTING RSC)........................................................................... 37

8.5.2.

EDIT RPS BUTTON (SETTING RPS GROUP)............................................................. 38

8.6.

PROVISIONING OF THE NETWORK PARAMETERS ................................................. 40

8.7.

PROVISIONING PF THE LAN AUX CONVERTER OPTIONAL CARD ........................ 42

8.8.

PROVISIONING OF THE DCC ..................................................................................... 44

8.9.

PROVISIONING OF THE BASE BAND INTERFACE (STM-1 INTERFACE SETTING) 46

8.10.

RELOAD BUTTON OF SERVICE STATE MENU ......................................................... 47

8.11.

PROVISIONING OF THE SYNCHRONIZATION, IF REQUESTED (WITH MS ONLY) 48

8.11.1.

EDIT SYNC MODE BUTTON (SETTING SYNC MODE) .............................................. 49

8.11.2.

EDIT SYNC PRIORITY BUTTON (SETTING SYNC PRIORITY).................................. 50

8.11.3.

EDIT SYNC PARAMETER BUTTON (SETTING SYNC PARAMETERS)..................... 52

8.12.

PROVISIONING OF THE ORDER WIRES, IF REQUESTED....................................... 54

8.12.1.

EDIT OW1 BUTTON (SETTING OW) ........................................................................... 55

8.12.2.

EDIT OW2 BUTTON (SETTING OW RESTORER) ...................................................... 56

8.12.3.

EDIT OW3 BUTTON (SETTING OW FUNCTION)........................................................ 57

8.13.

PROVISIONING OF THE DATE & TIME, IF REQUESTED .......................................... 59


MW LINK ANTENNA ALIGNMENT ....................................................................................... 60

9.1.

ANTENNA ALIGNMENT SUMMARIZED STEPS.......................................................... 61

9.2.

AGC MONITORING....................................................................................................... 61

9.3.

RECEIVE (RX) SIGNAL LEVEL .................................................................................... 63

9.3.1.

RECEIVE (RX) SIGNAL LEVEL WITH WEBLT MENU ................................................. 65

9.4.

CROSS POLAR DECOUPLING .................................................................................... 67

10

LOCAL TESTS AND MEASURE ........................................................................................... 72

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 3/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering


10.1.

MSTU TRANSMITTING POWER .................................................................................. 72

10.1.1.

MSTU TRANSMITTING POWER ADJUSTMENT......................................................... 73

10.2.

TRANSMITTER SPECTRUM MASK............................................................................. 76

10.3.

TX LOCAL OSCILLATOR FREQUENCY. ..................................................................... 77

10.4.

OPTICAL INTERFACE OUTPUT LEVEL (ON BSW UNITS). ....................................... 78

10.5.

RETURN LOSS FEEDER CHECK. ............................................................................... 80

10.5.1.

RETURN LOSS FEEDER WITH SITE MASTER. ......................................................... 81

10.5.2.

RETURN LOSS FEEDER WITH SPECTRUM ANALYZER .......................................... 83

11

LINK TESTS AND MEASURE............................................................................................... 86

11.1.

IF-IF TEST BASICS....................................................................................................... 86

11.1.1.

IF FREQUENCY RESPONSE AND GROUP DELAY IN SINGLE MODE. .................... 90

11.1.1.1. RESPONSE ON MAIN RX CHANNEL. ......................................................................... 92


11.1.1.2. RESPONSE ON DIVERSITY RX CHANNEL. ............................................................... 95
11.1.2.

SPACE DIVERSITY EQUALIZATION. .......................................................................... 97

11.1.2.1. STATIC DELAY EQUALIZATION BETWEEN MAIN AND DIVERSITY ........................ 98

11.1.3.

IF-IF TESTING BY USING SPECTRUM ANALYZER WITH MLA OPTION. ............... 106

11.2.

BER VS RECEIVER. ................................................................................................... 107

11.2.1.

TEST ON SINGLE RX MAIN CHANNEL (ATTENUATOR ON RX SIDE). .................. 109

11.2.2.

TEST ON SINGLE RX DIVERSITY CHANNEL (ATTENUATOR ON RX SIDE). ........ 109

11.2.3.

TEST IN COMBINED MODE (MAIN AND DIVERSITY) (ATTENUATOR


ON TX SIDE). .............................................................................................................. 110

11.3.

STM 1 RADIO PROTECTION SWITCHING................................................................ 111

11.4.

LINK QUALITY EVALUATION..................................................................................... 115

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 4/116

COM_QMCO_M_003
ed.03 del 03.04.07

11.1.2.2. MAIN AND DIVERSITY AMPLITUDE RESPONSE CHECK ....................................... 104

CMO NI Site Engineering

REVISION LIST
Date
11/2006
10/2007
03/2008

Ed
Description
01 Commissioning with SV unit (type TL1/OSI) (LCT)
02 NSN
03 Commissioning with SV unit (type SNMP/IP) (WebLT)

NOTE:
- Use Edition 2 of this document for the commissioning with SV unit (type TL1/OSI)
and the LCT.
- Use Edition 3 of this document for the commissioning with SV unit (type SNMP/IP)
and the WebLT.

SCOPE

This document is an helpful guide to put in service in field the SRT 1F type K-Shelf system, according to the
FIELD COMMISSIONING TEST SHEETS documents.
The procedure begins with the equipment switch on and settings of the radio link, and continues with the
line-up and the commissioning of both radio stations.
Note that this procedure is applicable for all system types, but some settings and figures must be different
according to the system SVR, System Type and configuration in field.
In any case refer to the UMN and OMN manuals and follow this procedure only for guide line.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 5/116

COM_QMCO_M_003
ed.03 del 03.04.07

In case of mismatch between the pictures used in this document and the equipment in field (layout and
WebLT Figures) refer to the corresponding manual with the S.V.R. of your system.

CMO NI Site Engineering

SUPPORT DOCUMENTATION

Suggested basic support documentation for Line-up and commissioning activities.


Standard Documentation
WebLT OMN Manual
UMN Manual
Installation Instructions
Field Test sheets Collection Document

Note
Related to the system SVR
Related to the system SVR
Related to the system SVR
Related to the system type

Note for Field commissioning tests sheets documents:


The Field tests protocols are composed by different documents related to the Shelf type and not related to
the system type.
Use only one of them related to the Shelf type present in field.
The complete list of document present in the Field Commissioning Test sheet Doc collection is:
Doc Type/Code

Description

902-110/12.doc

Full Commissioning Tests Sheets Document collection

902-110/12 2n+1
902-110/12 n+1x2
902-110/12 n+1
902-110/12 BBIU
909-040/12
909-039/52

Full Indoor Equipment, Installation Check List

902-110/12 spec

Guide line document with the specifications necessary for


Field commissioning

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 6/116

COM_QMCO_M_003
ed.03 del 03.04.07

Field Commissioning Tests Sheets for SRT 1F K-Shelf


equipped with 2x(N+1) Sub-rack and Expansion
Field Commissioning Tests Sheets for SRT 1F K-Shelf
equipped with 2x(N+1) Sub-rack without Expansion
Field Commissioning Tests Sheets for SRT 1F K-Shelf
equipped with N+1 Sub-rack structured with 2 rack
Field Commissioning Tests Sheets for SRT 1F K-Shelf
equipped with N+1 Sub-rack in one Rack
Additional Field Commissioning Tests Sheets for BBIU Subrack
Guide line document with the necessary information and
specifications for Test Instruments and accessories used for
Field commissioning

902-110/12 2n+1x2

CMO NI Site Engineering

TEST INSTRUMENT LIST AND MEASUREMENT ACCESSORIES

4.1.

Test Instruments

Select properly the test instrument related to the tributary Interface Type (Electrical/Optical), RF Frequency
range, WG Flange Type, and DDF Interface.
HP8593E Spectrum Analyzer with MLA option code 11770A, performs the group delay and phase adjustment measurement (in this case use two Spectrum Analyzers with MLA option and not the Link Analyzer instrument).
Site Master Anritsu and relevant accessories in alternative to the coupler for Return Loss measurements (in
this case use Site Master Test instrument and not Coupler and RF Sweep generator).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 7/116

COM_QMCO_M_003
ed.03 del 03.04.07

For more detailed information for test instrument, refer to the guide line document on the main index
collection document (Doc. P/N 902-040/12).

CMO NI Site Engineering

SRT 1F BASIC REFERANCE RACK

5.1.

SRT 1F K Shelf Sub-rack Block structure

Numero dOggetto/Document Number

909-041/12

Basic Rack Composition

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 8/116

COM_QMCO_M_003
ed.03 del 03.04.07

SRT 1F K-Shelf

CMO NI Site Engineering

SRT 1F K shelf BRU composition example

SRT 1F K-Shelf

SRT 1F K-Shelf

Numero dOggetto/Document Number

909-041/12

BRU Structure example

RF Flange output example

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 9/116

COM_QMCO_M_003
ed.03 del 03.04.07

5.1.1.

CMO NI Site Engineering

SRT 1F K Shelf SCSU Composition example

SRT 1F K-Shelf

SRT 1F K-Shelf

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

2xN+1 SCSU Shelf

N+1 SCSU Shelf

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 10/116

COM_QMCO_M_003
ed.03 del 03.04.07

5.1.2.

CMO NI Site Engineering

Typical Branching Wave Guide connection

SRT 1F K-Shelf

5.3.

Indoor Typical interconnection wave guide

Typical Waveguide path and antenna connection

SRT 1F K-Shelf

Numero dOggetto/Document Number

909-041/12

Outdoor Typical Wave Guide and antenna connection

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 11/116

COM_QMCO_M_003
ed.03 del 03.04.07

5.2.

CMO NI Site Engineering

START UP

In order to operate and configure the SRT 1F system follow strictly the following step by step procedure.

6.1.

Preliminary on both terminal stations


1.
2.
3.
4.
5.
6.
7.

Verify the correct installation.


Verify the system composition
Check the PSU Voltage and Breaker values.
Switch ON the main power and the relevant switch for all units.
Connect the PC
Start the connection with WebLT
Log In to the system using a proper User and Password

6.2.

Equipment Configuration in both terminal stations

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 12/116

COM_QMCO_M_003
ed.03 del 03.04.07

1. Provisioning of the basic configuration parameters (par. 8.2):


a. Set the RF band
b. Set the Frequency arrangement type
c. Set the Space Diversity
d. Set the NE mode (line operation)
e. Set the Group1 Max. channel number
f. Set the Group2 Max. channel number
g. Set the Group1 RPS
h. Set the Group2 RPS
i. Set the Additional HK unit
j. Set the TCU protection (only with MS)
k. Set the Mask Alarm Pch without OCC (with N+1 configuration)
l. Set the Mask Wch (with N+0 configuration)
m. Set the LED mode (for Alarm indication colors)
2. Provisioning of the RF channel parameters and Radio & Line Error States (par. 8.3):
a. Set the RF frequency
b. Set the Local Clock
c. Set the XPIC
d. Set the Error Attribute (with MS only)
3. Provisioning of the RSPI & RPS parameters (par 8.4):
a. Set the WS (SOH)
b. Set the WS (RFCOH)
c. Set the TPC
d. set the ATPC initiator
e. Set the Route ID
f. Set the BER initiator
g. Set the RPS switch initiator
4. Provisioning of the RSC & RPS parameters (par. 8.5):
a. Set the RSC use
b. Set the Max channel number

CMO NI Site Engineering

5.

6.
7.
8.
9.
10.
11.

c. Set the OCC use


d. Set the Priority Channel
e. Set the Wait To restore (WTR)
Provisioning of the Network parameters (par. 8.6):
a. Set the IP address
b. Set the Sub Netmask
c. Set the Gateway (if any)
Provisioning of the LAN AUX Converter optional card (ECU card) (par. 8.7)
a. Set the ECU card
Provisioning of the DCC (par. 8.8):
a. Set the Direction (Line/Radio)
b. Set the Selector (RSDCC/MSDCC)
Provisioning of the STM1 BB interface (par. 8.9)
a. Set the Interface (Electrical/Optical)
Provisioning of the Synchronization, if requested (with MS only) (par. 8.11)
Provisioning of the OW, if requested (par. 8.12)
Provisioning of the Date & Time, if requested (par. 8.13)

At the end of the provisioning and system configuration Phase (on both stations), prepare the system
configuration for Antennas adjustment phase (alignment).
12. Set on both station the Tx Power data with the ATPC in Disable mode with the Maximum
power transmission (Ptx High).
13. Start the Antenna adjustment
14. Check the Prx Value
15. Check, if required, the Cross Polar decoupling
16. Start with the Local test on both stations
17. Start with Link test on both stations
18. Check a short Term Quality evaluation
19. Measure a long term quality evaluation
Perform all the measurements and tests by following the filed commissioning tests sheets.
The next chapters of this document give a guide line for the operator in order to apply all the above
mentioned points.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 13/116

COM_QMCO_M_003
ed.03 del 03.04.07

In any case it is suggested to use also the UMN and OMN manual supplied with the equipment in order to
get additional information not inserted in this document.

CMO NI Site Engineering

BEFORE STARTING

The technician in charge of the installation and commissioning must have the following basic requirements:

SDH MW system knowledge


SRT 1F and Full Indoor equipment radio basic knowledge
Basic PC knowledge
Mechanical installation knowledge (antennas, Rack, Wave guide, cabling, etc.)

Note that if you dont know the SRT 1F system, it is recommended to read previously the system
manuals (UMN and OMN).
Before to switch ON the equipment, it is suggested to verify that all the installation Items are installed
properly and the systems are equipped as for Project specification.
For the system composition refers to the indications described in the paragraph "Mechanical Specification
on the UMN manual and according to the project specification.
For the installation Items, refer to the document code 909-039/52 (Full Indoor Installation Check List) and to
the summary of Installation check list reported in the field commissioning documents.
Basically all the external connections have been done by following the system specifications, in particular:

Primary supply voltage


Wave guide and related connectors
Wave Guide pressurization system
Tributary cable
Alarm cable (if requested)
Networking connection (if requested)
Auxiliary Channel (if requested)

The installation of all the Outdoor elements has been done by following the system specifications, in
particular:

Antenna Positioning
Antenna Fixing
Antenna Polarization and relevant Wave Guide connections
Wave Guide fixing
Wave Guide Grounding Connections

Acceptance tests are performed to ensure that the proper installation procedures (detailed in the installation
manual) have been applied.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 14/116

COM_QMCO_M_003
ed.03 del 03.04.07

At the start up of the installation phase it is fundamental that a proper power wiring has been provided to the
shelf and the equipment shelves are free of defects or damage.

CMO NI Site Engineering


7.1.

Shelf visual inspection

Locate the SRT 1F / shelf and rack that will house the equipment.
Position yourself at the front of the rack.
Check that no slide-in units are installed. Remove any units that are installed.
Check that the shelves are secure and free of defects or damage.
Check that all electrical connectors inside the shelves are properly secured and aligned in the shelf
slots.
Check that there are no broken, bent or mis-aligned contacts in the connectors.
Check that there are no mis-aligned, dented or twisted shelves.
Check that there is no broken or damaged equipment
(connectors, wiring, and back wiring boards, etc.).
Check that all cabling and wiring is terminated and secured in place.
Check that the wiring from the central office battery supply is connected to the power connector on
the SRT 1F rack.
Check that the SRT 1F rack connection to equipment outside of the rack has been made.
Check that the feeder connection is properly terminated.
Record the inspection results on the proper Form (the installation Check list are inserted in the Field
commissioning tests sheets collection document code 902-110/12).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 15/116

COM_QMCO_M_003
ed.03 del 03.04.07

Note: Report any problems to the installation group in order to solve the problem before the
Commissioning.

CMO NI Site Engineering

7.2.

Fuse/Breaker for Main DC power distribution

It is fundamental to verify that the installed Fuses/Breakers used on the PDB (Power Distribution Box) meet
the consumption of the SRT 1F. Note that the value of the system consumption depends on the type of shelf
and system type, refer to the installation manual (UMN) for the proper consumption value.
Open the cover of PDB and check, if the Breaker meets the required specification.
(Next image is given only for reference).

Breaker Visual check


Verify also that the Power supply DC cables meet the system specification.
It is recommended to use a 1x10 mm2 for the connection between PDB and UIA Block.

7.3.

DC power supply check

After the visual inspection of the installation verify the proper incoming DC Power Supply at SRT 1F Rack.
This procedure lists the steps required to check the incoming power supply to the SRT 1F + shelf.

Turn OFF all Fuse/Breakers on the units and shelves.


Turn ON the main power supply from the DC Main distribution Box.
With a Digital Multi-Meter (DMM) or equivalent, confirm that the voltage on the Power Supply Terminal of UIA block is 48 V nominal and in the nominal tolerance accepted by the equipment.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 16/116

COM_QMCO_M_003
ed.03 del 03.04.07

If OK, switch ON Fuse/Breakers on the units and shelves.


If NO, report the problem to the installation group.

CMO NI Site Engineering

DC Power connection on UIA

DC Power check
Warning
Due that the Positive poles on the Power supply are also the ground
reference, when you measure the DC voltage pay attention to the connection
of Multimeter.
Normally, if you connect the Common port of multimeter (Black cable) on the
ground or Positive voltage and the measurement port on the Negative voltage
(Red Cable), the measured values are negative:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 17/116

COM_QMCO_M_003
ed.03 del 03.04.07

- 48 Volt

CMO NI Site Engineering

7.4.

PC Requirements

To use the SRT1F Web LT, the PC hardware and software should meet or exceed the
requirements listed in the table below.
HTTP/1.0 or later

Client Requirements

JavaTM script (a)

Cascade Style Sheet (CSS2)


Least one working Ethernet port
supporting 10/100Base-T
1024x769 XGA Display or higher
Microsoft Internet Explorer (b), Version
6.0 or later

Recommended Browser

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 18/116

COM_QMCO_M_003
ed.03 del 03.04.07

(a) Java is a trademark of Sun Microsystems, Inc., and refer to Suns Java
programming language.
(b) Microsoft Internet Explorer is a trademark of Microsoft Corporation in the
United State and/or other countries.

CMO NI Site Engineering

7.5.

Connecting the PC to the NE

Connect your PC to a LAN port on the SV (Supervisory) card (unit) in SCSU (Supervisory, Control &
Switching Unit) shelf of the target NE (Network Element). Normally, crossover cable should be used for the
connection, if you want to connect the PC to the NE directly. The SV card (unit) supports both 10Base-T and
100Base-T Ethernet connection. It is recommended to use CAT5 (Category 5) UTP (Un-shielded Twisted
Pair) crossover cable for the connection. There are two Ethernet ports on the SV card (unit), and they are
connected to a HUB internally. Therefore, you can use whichever you like better.
The figure shows the connection between the PC and the NE.
SV

SV

UNIT

UNIT

LINE

LINE

MISC

MISC

ACS/SWDL

ACS/SWDL

NORM

NORM

NE ALM/RCI

NE ALM/RCI

MAINT

MAINT

CARD OUT

CARD OUT

ACO

ACO

CALL E1

CALL E1

CALL E2

CALL E2

DEBUG

SV for
GP1

SV for
GP1+GP2

DEBUG

LAN 1

LAN 1

LAN 2

LAN 2

SINT2
CLK

SINT2
CLK

2W E1

2W E1

2W E2

2W E2

LED TEST

LED TEST

ACO

ACO

BZ EN

BZ EN

Web LT

Connection between PC and NE showing LAN Ports on


the SV Card (Unit)

7.6.

Starting SRT1F Web LT

After making the appropriate cable connection to the NE, you can start the SRT1F Web LT:

Numero dOggetto/Document Number

909-041/12

NE

as

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

URL

(Uniform

Resource

Locator)

form.

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 19/116

COM_QMCO_M_003
ed.03 del 03.04.07

1. Open your web browser.


2. Enter the IP address of the
(Default: http://192.168.0.10/)

CMO NI Site Engineering

Entering IP address
3. In the logon screen enter the following default parameters:
Username:
srt1f
Password:
nokiasiemens
4. When the SRT1F Web LT successfully accesses to the NE, the SRT1F Web LT Start screen
appears

SRT1F Web LT Start Screen

Check followings, if you can not open the SRT1F Web LT:

Check the IP address and the Network mask of the PC. The Network mask should be
same as the NE setting and the IP address should be different from the target NE and
existing NE in the same subnet.
Check the connection cable type. It should be a crossover type, in case the PC and the NE
are connected directly.
Check connection speed and try to set the interface of the PC to 10 Mbit/s and half duplex
mode, although the SV card (unit) supports Auto Negotiation that detect the connection
speed and the mode of Ethernet interface automatically.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 20/116

COM_QMCO_M_003
ed.03 del 03.04.07

You can use Ping command for an aid to solve the problem through the PC. The SV card (unit)
can respond the Ping command.

CMO NI Site Engineering

BASIC EQUIPMENT CONFIGURATION

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 21/116

COM_QMCO_M_003
ed.03 del 03.04.07

On the first activation, the default configuration retrieved from the equipment as like a 1+1 FD configuration
with MST and in any case it is required to reconfigure all system parameter in order to insert on service the
equipment.

CMO NI Site Engineering


The WebLT Menu Trees are summarized on the following table:
Menu

All
MSTU

Condition

TCU
HK
SV
RPS & Loopback
Clock Source
RCI
Control HK

System & Common

Set Date

Sync

Revise Date

Equipment & Facility Group

Restart Network

Trace

Operate RPI

Service State

RPI Adjust

RSPI & UC & RPS

Control

Provisioning Menu

Provisioning

RUC & RSC & RPS


Order Wire

Received Trace
Physical Inventory Unit

Retrieve Data

Management Table Status


SSMB

HK Description
Physical Inventory NE
Network Setting 1
Network Setting 2

Condition

DCC Selector Setting

Control & Provisioning

Base Band Interface

PM Current Menu

Login Setting

History

PM Download
PM Threshold NA
PM Threshold 15Min

Performance

PM Threshold 1Day
Analog Monitor
PM Init Register
Help

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 22/116

COM_QMCO_M_003
ed.03 del 03.04.07

Menu Tree

CMO NI Site Engineering


A large part of the sub-menus necessary for the system configuration is available from the basic menu
called Provisioning.
This chapter describes the procedures for provision a network element (NE).
Provisioning sets up the operating parameters for each plug-in unit in the SRT 1F.
The Provisioning menu provides the commands shows in the table below.

Menu

Description

Condition
All

Display current (occurring) condition on NE

MSTU

Display current (occurring) condition on MSTU(s)

TCU

Display current (occurring) condition on TCU(s)

HK

Display current (occurring) condition on HK(s)

SV

Display current (occurring) condition on SV

Control
RPS & Loopback

Control RPS / Loopback (Line/Radio side of MSTU)

Clock Source

Control TCU switching / Sync switch (EC/LC)

RCI

Control RCI (Remote Card Identifier)

HK Control

Control HK (housekeeping) digital output port

Set Date

Set date and time to the real time clock on SV

Revise Date

Time adjustment by SNTP server

Restart Network

Restart network layer protocol sub program

Operate RPI

Operate - CW / ALCOFF / AGCOFF / SDDADE /


RXLCLINT / EPSOFF / DADEADJUST / XPICRST /
FMSR
Step Adjust TXPWR / TXGAIN / RXRFGAIN /
RFIFGAIN / SDGAIN / SDSLOPE

RPI Adjust

Provisioning
Provisioning Menu
System & Common

Sync

Equipment & Facility Group


Trace

Numero dOggetto/Document Number

909-041/12

Equipment / Facility-RS / Facility RSPI / RPS /


Maintenance
Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 23/116

COM_QMCO_M_003
ed.03 del 03.04.07

Service State

RF / Frequency (Alternated/Co-channel) / SD
(with/without) / NE Mode (MS/RS) / GP1 Max CH (1-7) /
GP2 Max CH (0-7) / GP1 RPS / GP2 RPS / HK (0,1,2) /
TCU Protection / Mask Alarm Pch without OCC / Mask
Alarm Wch with N:0 Configuration / Common LED Mode
Synchronization mode (Mode 1/2) / Clock Mode
(TCU/Through) / Timing Mode(EC/LC) /
Priority(No/CLKHZ-X/Y/CLKBIT-X/Y/ Internal) / Quality
Threshold / PBX Sync / Sync Parameter
RF channel (L/H) / Local CLK (Master/Slave) / XPIC Y/N /
Error Attribution (SD/SF)
Mode of Trace / Direction (Line/Radio) / Alarm Mask

CMO NI Site Engineering


RSPI & UC & RPS

WS / TPC / ATPC / Radio Route ID / BER Initiator / UC


(F1 Byte) / RPS Initiator Enable
RUC / RSC use / RPS maximum channel entry / OCC
use / RPS Priority channel / WTR time setting
OW use / OW Ring Restorer use / External TEL use /
Station Number Setting / Buzzer function use
Set description to HK digital input/output port

RUC & RSC & RPS


Order Wire
HK Description
Physical Inventory NE

Physical Inventory Data for NE - System Name / System


Contact / System Location / Site Code / Equipment Code
/ Local Number / Resource State / Equipment Note / NE
Type
IP address / Sub net address / Default Gateway

Network Setting 1
Network Setting 2

DCC Selector Setting

SNMP Manager #n / Type Community Name #n /


Community Name for Read-Write / Community Name for
Read-Only / SNTP Server Address / SNTP Revising
Time / Time Zone / Daylight Saving Time Mode / Term of
Daylight Saving Time / SV Firmware Version / MAC
Address
Set DCC applications

Base Band Interface

Base Band Interface Setting

Login Password Setting

User ID type / New ID / New Password / Enter again

Retrieve Data
Received Trace

Section Trace monitor - Send / Receive / Expect

Physical Inventory Unit

SIU Type / SIU Build Hardware / SIU Build Software / SIU


Serial No.
Static Table IP Address / Community Name / Trap Port
/ SNMP Version / Erase Time / Status

Management Table Status


Dynamic Table - IP Address /
Community Name / Trap Port
/ SNMP Version / Erase Time
/ Status
SSMB

Line S1 Quality / Radio S1 Quality

History
Condition

Show historical conditions on NE

Control & Provisioning

Show operation command history to NE

Performance
PM Current Menu

Show current register of performance monitor (PM GP1P/W1)


Download historical register of performance monitor

PM Download

SEV / NSES / Receive Level-1 / Receive Level-2 /


Transmit Level
15 minutes value RLTS-M-1 / RLTS-M-2 / RLTS-SD-1 /
RLTS-SD 2 / TLTS
1 day value - RLTS-M-1 / RLTS-M-2 / RLTS-SD-1 /
RLTS-SD 2 / TLTS
RL-M / RL-SD / TL

PM Threshold 15Min
PM Threshold 1Day
Analog Monitor
Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 24/116

COM_QMCO_M_003
ed.03 del 03.04.07

PM Threshold NA

CMO NI Site Engineering


PM Init Register

Clear current & Historical PM resister, historical Condition


and Control & Provisioning history
Download or display online help file. The help file has .pdf
format.

Help

Note
Changing the Equipment/Facility/Radio Protection System state, may
causes traffic loss

8.1.

Confirmation of All Service States = OOS

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the Service State link in the Provisioning Menu main frame, then the Service State
subwindow will appear.

Service State Main Frame

Confirm that all of Equipment State, Facility State including RPS and Maintenance State
are OOS (Out of Service).
TAKE NOTE

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 25/116

COM_QMCO_M_003
ed.03 del 03.04.07

Provisioning setting is only available when all Service States are OOS.

CMO NI Site Engineering

8.2.

Provisioning of the basic configuration parameters (System & Common menu)

Set and/or change the parameters, which are essential for the system.

Select the System & Common link in the Provisioning Menu main frame, then the
System & Common main frame will appear.

System & Common Main Frame

Item BBIU (optional Base Band Interface Unit) is being kept Disable.

Click the Edit System button, the Edit System subwindow will appear (par.8.2.1)
Then click the Edit Common button, the Edit Common subwindow will appear (par.8.2.2)

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 26/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

8.2.1.

Edit System button (Setting System Configurations)

Set the system configurations of the NE (Network Element).

Edit System Subwindow

Set all the following data according to the station configuration


RF
Click the pull-down menu button to select the operating RF frequency band.
xxG

L4G to 38G, Lower and upper band

XG

For special RF application except for ITU-R Recommendation

(Default)

L4GL (Lower half of the Lower 4 GHz frequency band)

Frequency
Alternate

Alternated (interleaved) operation

Co-Channel

Co-channel operation

(Default)

Alternate

Space Diversity
Enable

Enable space diversity reception.

Disable

Disable space diversity reception.

NE MODE
Click the pull-down menu button to select the operation mode of radio station.
:

Numero dOggetto/Document Number

909-041/12

Operation mode of MS (Terminal Configuration)

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 27/116

COM_QMCO_M_003
ed.03 del 03.04.07

MS

CMO NI Site Engineering


RS

Operation mode of RS (Regenerative Repeater Configuration)

(Default)

MS

GP1 Max Ch
Click the pull-down menu button to select the number of working channels (1 to 7) to be operated by
RPS Group 1.

GP2 Max Ch
Click the pull-down menu button to select the number of working channels (1 to 7) to be operated by
RPS Group 2. If RPS Group 2 is not applied, select 0.

GP1 RPS
Enable

Use radio protection channel in RPS Group 1.

Disable

Does not use radio protection channel in RPS Group 1.

Enable

Use radio protection channel in RPS Group 2.

Disable

Does not use radio protection channel in RPS Group 2. If RPS Group 2 is
not applied, select Disable.

GP2 RPS

HK
Click the pull-down menu button to select the number of items from following.
0

Do not use optional HK card, only HK items on SV.

Use one optional HK card to increase housekeeping items.

Use two optional HK cards to increase housekeeping items.

TCU Protection (only with MS)


Enable

Two TCU cards are equipped for card protection.

Disable

Only one TCU card is equipped without card protection. If RS mode is set
in NE MODE above, select Disable.

Mask Alarm Pch without OCC (with N+1 configuration)


Enable

Alarm is masked when PRT channel is without OCC.


the following alarms;
GPx-P-L STM1RS LOF
GPx-P-L STM1RS UAS-B1
GPx-P-L STM1MS UAS-B2
GPx-P-R STM1RS UAS-B1
GPx-P-R STM1RS AIS
GPx-P-R STM1MS UAS-B2

Enable inhibits

Disable

Alarm is not masked when PRT channel is without OCC.

Mask Alarm Wch with N:0 configuration


Enable

Alarm is masked when N+0 operation is activated.


Enable inhibits the following alarms:
GP1-Wx CNCT MN PIN-LOSS

Disable

Alarm is not masked when N+0 operation is activated.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 28/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window System setting will be changed. OK? will open:
confirm if evething is correct

CMO NI Site Engineering

8.2.2.

Edit Common button (Setting LED Mode)

Select the indication color of the LEDs for the NE (Network Element), all at once, as shown on the
following LED mode table.
It is suggested to set the operation to Green.

Edit Common Subwindow

LED mode
Unit
LED
SV Card UNIT
LINE

NORM
MAINT
ACS/SW
DL

Others

BACK UP
ACO
CALL
E1/2
UNIT/RCI
LINE

Yellow
G
V
G

Green
V
G
V

Status
On
Blinking
On

G
V
G

V
G
V

On
On
On

Description
Normal operation for SV card
Configuration mismatch for SV card
SINT(Serial Interface)/RSC(Radio
Service Channel)/DCC(Digital
Communication Channel) signals are
normal.
NE is in normal operation.
NE is in maintenance condition.
NE is logged on (accessed).

V
V
V
G

G
G
G
V

Blinking
On
On
Blinking

Software download is on progress.


Setting data back up is on progress.
Alarm cut off is activated.
OW is being called.

G
V
G

V
G
V

On
Blinking
On

Card is in normal operation.


Configuration mismatch for the card
Line signal is normal.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 29/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selection, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.3.

Provisioning of the RF channel parameters and Radio & Line Error States

Set the system parameters related to the RF channels, the local clock modes, the XPIC usage,
and the error status attributions for the lines and the radios.
First click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Then click the Equipment & Facility Group link, the Equipment & Facility Group main
frame will appear.

Equipment & Facility Group Main Frame

Click the Edit Equipment button in the Equipment & Facility Group main frame, then the
Edit Equipment subwindow will appear (par.8.3.1).
Click the Edit Facility Group button in the Equipment & Facility Group main frame, then
the Edit Facility Group subwindow will appear(par.8.3.2).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 30/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

8.3.1.

Edit Equipment button (Setting Radio Channel)

Set the RF channel parameters according to the station configuration:

Edit Equipment Subwindow

AID (Access Identification)


Click the pull-down menu button to select the facility you want. Selectable AIDs depend on the Edit system-Max CH setting.

Frequency
Click the pull-down menu button to select the operating RF channel number for the TX side. The RF
channel number for RX side will be set automatically to the same RF channel number in the opposite half
band used for the TX.
CH No.

CH1 to CH64, Lower and Upper

Master

Select Master for the MSTU that uses one (V or H) polarization for Cochannel operation. If the Co-channel operation is not applied, select Master for all MSTUs.

Slave

Select Slave for the MSTU that uses the other (H or V) polarization for
Co-channel operation.

Local Clock

XPIC (Cross Polarization Interference Canceller)


Enable

Use the XPIC for Co-channel operation.

Disable

Do not use the XPIC for Co-channel operation. If the XPIC is not installed, select Disable.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 31/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.3.2.

Edit Facility Group button (Setting Facility Group)

Set the attribute for Excessive Bit Error Rate B2 (E-ERR) (with MS only).

Edit Facility Group Subwindow

AID (Access Identification)


Click the pull-down menu button to select the facility you want. Selectable AIDs depend on the Edit system-Max CH setting.

Error Attribute (Line)/Error Attribute (Radio)


SD

Set attribute of the Excessive Bit Error Rate (E-ERR) for B2 bytes to Signal Degrade (SD) on the line side or the radio side.

SF

Set attribute of the Excessive Bit Error Rate (E-ERR) for B2 bytes to Signal Fail (SF) on the line side or the radio side.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 32/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.4.

Provisioning of the RSPI & RPS parameters

Set RSPI (Radio Section Physical Interface) and RPS (Radio Protection Switching) parameters
related to each radio channel.

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the RSPI & UC & RPS link, the RSPI & UC & RPS main frame will appear.

RSPI & UC & RPS Main Frame

Click the Edit RSPI button, then the Edit RSPI subwindow will appear (par.8.4.1)
Click the Edit RPS button, then the Edit RPS (Line) subwindow will appear(par.8.4.2).

8.4.1.

Edit RSPI button (Setting RSPI Facility)

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 33/116

COM_QMCO_M_003
ed.03 del 03.04.07

Set the parameters for the RSPI facilities related to each radio channel, such as WS (Wayside),
TPC (Transmitter Power Control), ATPC (Automatic Transmitter Power Control), Radio Route ID,
and BER Indicator.

CMO NI Site Engineering

Edit RSPI Subwindow

AID (Access Identification)


Click the pull-down menu button to select the facility you want. Selectable AIDs depend on the Edit system-Max CH setting.

WS (SOH)
Click the pull-down menu button to select the usage of WS using SOH (Section Overhead).
Disable

Do not use WS extra 2 Mbit/s traffic channel transmitted by the SOH


spare byte of the STM-1 signal.

Enable

Use WS extra 2 Mbit/s traffic channel transmitted by the SOH spare byte
of the STM-1 signal.

Hyphen ()

NA

(Default)

Disable

WS (RFCOH)

Disable

Do not use WS extra 2 Mbit/s traffic channel transmitted by the RFCOH


spare byte.

Enable

Use WS extra 2 Mbit/s traffic channel transmitted by the RFCOH spare


byte.

Hyphen ()

NA

(Default)

Disable

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 34/116

COM_QMCO_M_003
ed.03 del 03.04.07

Click the pull-down menu button to select the usage of WS using RFCOH (Radio Frame Complementary
Overhead).

CMO NI Site Engineering


TPC (Transmitter Power Control) Mode
Click the pull-down menu button to select the mode of the TPC.
Auto

The TX output power is variable between LOW and HIGH level according
to the propagation condition. The TX output power will be increased
when the RX receive level of the far-end station becomes lower than the
ATPC initiator level.

Low

The TX output power is set to LOW level (10 dB lower than HIGH level).

High

The TX output power is set to HIGH level.

(Default)

Auto

ATPC (Automatic Transmitter Power Control) Initiator


Click the pull-down menu button to select the initiator level of the ATPC.
-65 dBm

Select the ATPC initiator level of -65 dBm which is the threshold of RX
receive level to request TX power increment for the far end station.

-55 dBm

Select the ATPC initiator level of -55 dBm which is the threshold of RX
receive level to request. TX power increment for the far end station.

-45 dBm

Select the ATPC initiator level of -45 dBm which is the threshold of RX
receive level to request TX power increment for the far end station.

(Default)

-65 dBm

Route ID
Click the pull-down menu button to set the Radio Route ID. Radio Route ID should be match at both end.
(Range: 0-15)
(Default)

BER Initiator
Click the pull-down menu button to select the initiator threshold level of the RP ERR (Radio Portion Error)
alarm. This also is the initiator threshold level of the USW (Unipolar Switch) request.
1 bit error

BER initiation is 1 bit error for severely condition

1.0E-3

BER initiation is BER of 1.0x10-3 before FEC (forward error correction)

5.0E-3

BER initiation is BER of 5.0x10-3 before FEC (forward error correction)

1.0E-4

BER initiation is BER of 1.0x10-4 before FEC (forward error correction)

5.0E-4

BER initiation is BER of 5.0x10-4 before FEC (forward error correction)

1.0E-5

BER initiation is BER of 1.0x10-5 before FEC (forward error correction)

5.0E-5

BER initiation is BER of 5.0x10-5 before FEC (forward error correction)

1.0E-6

BER initiation is BER of 1.0x10-6 before FEC (forward error correction)

5.0E-6

BER initiation is BER of 5.0x10-6 before FEC (forward error correction)

(Default)

1x10E-4

Note: Suggested value for the commissioning is 1.0E-3

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 35/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.4.2.

Edit RPS button (Setting Switch Initiator)

Set the activity of RPS (Radio Protection Switching) initiator.

Edit RPS(Line) Subwindow

AID (Access Identification)


Click the pull-down menu button to select the facility you want.
Selectable AIDs depend on the Edit system-Max CH setting.

Initiator
Select Enable for all the channels configured in the system.
(Enable : Activate RPS initiator, then RPS will work if the switching initiator is driven.)

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 36/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.5.

Provisioning of the RSC & RPS parameters

Set the RSC (Radio Service Channel), and RPS (Radio Protection Switching) parameters
regarding the system configuration.

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the RUC & RSC & RPS link, the RUC & RSC & RPS subwindow will appear.

RUC & RSC & RPS Main Frame

Click the Edit RSC button, the Edit RSC subwindow will appear (par.8.5.1)
Click the Edit RPS button, the Edit RPS (GP) subwindow will appear (par.8.5.2).

8.5.1.

Edit RSC button (Setting RSC)

Set the parameters for the RSC.


The RSC is the service channel communicating control information such as RPS switching
information and ATPC (Automatic Transmitting Power Control) control signal, and also
communicating RUC using RFCOH (Radio Frame Complementary Overhead).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 37/116

COM_QMCO_M_003
ed.03 del 03.04.07

Edit RSC Subwindow

CMO NI Site Engineering


GP1-X/GP1-Y/GP2-X/GP2-Y
Click the pull-down menu button to select the AID (Access Identification) transmitting RSC for the protection or working channel. RSC has redundancy for RPS group. In the case of 1+0 system, GP1-W1
should be selected for GP1-X and Disable should be selected for GP1-Y.
Disable

Do not use RSC.

(Default)

GP1-X = GP1-P (Group1 - Protection)


GP1-Y = GP1-W1 (Group1 - Working 1)

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm
8.5.2.

Edit RPS button (Setting RPS Group)

Set the RPS functions regarding RPS Group and OCC (Occasional Traffic Channel) usage.

Edit RPS(GP) Subwindow

GP
Click the pull-down menu button to select the facility group you want (GP1 or GP2).

Max Ch
Click the pull-down menu button to select the number of working (main) RF channels which are entered
in the RPS group. Working channels not entered in the RPS group are not protected by the RPS facility.
For example, if you select Max Ch = 2 for 4+1 system, W1 and W2 are entered in the RPS group and
they will be protected by the RPS function, but W3 and W4 will not be protected.

OCC
:

Use OCC traffic function. To use OCC function, optional OCC card (unit)
should be installed in the NE (Network Element).

Disable

Do not use OCC traffic.

(Default)

Disable

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 38/116

COM_QMCO_M_003
ed.03 del 03.04.07

Enable

CMO NI Site Engineering


Priority Ch
Click the pull-down menu button to select the working RF channel that has priority to use the protection
channel. Disable should be selected for no priority application. If the alarm severity is same, the selected
Priority Ch has priority over other channels. If Disable is selected, the RPS will be operated according to
the alarm severity and sequential order.
(Default)

Disable

WTR
No
1-20

No wait-to-restore time setting

Wait-to-restore time setting from 1 to 20 minutes, 1 minute step.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 39/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.6.

Provisioning of the network parameters

Set or modify the network parameters of the NE (Network Element).

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the Network Setting link, the Network Setting subwindow will appear.

Network Setting Main Frame

Click the Edit Network button, the Edit Network subwindow will appear.

Edit Network Setting 1 subwindow for Network Setting

IP
Set the IP (Internet Protocol) address of the NE (Network Element) in dotted decimal notation.
(Default)

192.168.0.10

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 40/116

COM_QMCO_M_003
ed.03 del 03.04.07

Sub Netmask

CMO NI Site Engineering


Set Sub Netmask for the network in dotted decimal notation.
(Default)

255.255.255.0

Gate Way
Set the IP address of the default Gateway for the network in dotted decimal notation.
(Default)

192.168.0.1

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 41/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.7.

Provisioning pf the LAN AUX Converter optional card

Set the ECU optional card.

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the Network Setting link, the Network Setting subwindow will appear.

Network Setting Main Frame

Click the Edit Network button, the Edit Network subwindow will appear.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 42/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

Edit Network Setting 2 Subwindow for Network Setting

ECU Card
Enable the ECU card if the LAN Aux Converter has been installed.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 43/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.8.

Provisioning of the DCC

Set the DCC (Digital Communication Channel).

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the DCC Selector Setting link, the DCC Selector Setting subwindow will appear.

DCC Selector Setting Main Fram

Click the Edit DCC Selector Setting button, the Edit DCC Selector Setting subwindow
will appear.

Edit DCC Selector Setting Subwindow

Set the DCC configuration according to the DCN planning.


AID (Access Identification)
Click the pull-down menu button to select the facility you want. (In this application only GP1-W1 can be
selected.)
(Default)

GP1-W1

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 44/116

COM_QMCO_M_003
ed.03 del 03.04.07

Direction

CMO NI Site Engineering


Line

The NE (Network Element) applies the DCC to Line side.

Radio

The NE applies the DCC to Radio side.

(Default)

Radio

Selector
Click the pull-down menu button to select the mode of the DCC.
Through

The NE passes through the DCC signal.

RSDCC

The NE applies the DCC to the RS (Regenerative Section).

MSDCC

The NE applies the DCC to the MS (Multiplex Section).


Note*: When NE MODE is set to MS, RSDCC and MSDCC is selectable, but when NE MODE is set to RS, DCC is only RSDCC.

(Default)

Through

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm
In the next figure an example of the DCC final configuration is shown with RSDCC enabled both in
line side and radio side.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 45/116

COM_QMCO_M_003
ed.03 del 03.04.07

Example

CMO NI Site Engineering

8.9.

Provisioning of the Base Band Interface (STM-1 Interface Setting)

Set the STM-1 baseband interface for the NE (Network Element).

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the Base Band Interface Setting link, the Base Band Interface Setting subwindow
will appear.

Base Band Interface Setting Main Frame

Click the Edit Base Band Interface button, the Edit BaseBandInterface subwindow will
appear.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 46/116

COM_QMCO_M_003
ed.03 del 03.04.07

Edit Base Band Interface Setting Subwindow

CMO NI Site Engineering


AID (Access Identification)
Click the pull-down menu button to select the facility you want.
Selectable AIDs depend on the Edit system-Max CH setting.
GP1-P, Wn

Protection, Work1 to Work7 of GP1

GP2-P, Wn

Protection, Work1 to Work7 of GP2

ALL

All channels

No

In case of Protection CH (No baseband interface unit)

Electrical

STM-1 electrical interface

Optical

STM-1 optical interface without MSP

(Default)

STM-1 electrical interface

Base Band Interface

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

8.10.

Reload Button of Service State Menu

Push Reload button of Service State.


Confirm that the Equipment State, Facility State and Maintenance State will be changed to
IS (In-Service).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 47/116

COM_QMCO_M_003
ed.03 del 03.04.07

Service State

CMO NI Site Engineering


8.11.

Provisioning of the Synchronization, if requested (with MS only)

TAKE NOTE
When TCU unit is not equipped (RS mode),
No Sync setting is necessary.
Set the synchronization parameters such as synchronization mode, priority, and clock signal
format and detection.

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the Sync link in the Provisioning Menu main frame, then the Sync main frame will
appear.

Synchronization Main Frame

First click the Edit Sync Mode button, the Edit Sync Mode subwindow screen will appear
(par.8.11.1).
Then click the Edit Sync Priority button, the Edit Sync Priority subwindow screen will
appear (par.8.11.2).
Finally click the Edit Sync Parameters button, the Edit Sync Parameters subwindow
screen will appear (par.8.11.3).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 48/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

8.11.1.

Edit Sync Mode button (Setting Sync Mode)

Set the synchronization mode.

Edit Sync Mode Subwindow

Sync Mode
Mode 1

The NE does not use the SSU (Synchronization Source Unit).


The NE synchronizes to the EC (Equipment Clock) chosen from maximum
three entries which are tributary or external clock sources following SSM
(Synchronization Status Message) .

Mode 2

The NE uses the SSU.


The NE chooses the LC (Line Clock) from maximum three entries which
are tributary clock sources following SSM, then it outputs the clock to the
T4 External Clock Output port. The NE synchronizes to the EC chosen
from maximum two entries which are external clock sources following
SSM.

(Default)

Mode 1

Clock Mode
Through

This mode outputs the signal frames to the radio side, those signal frames
are synchronized to the clock recovered from incoming signal frames from
the line side. Another outgoing signal frames are synchronized to the EC
clock from the TCU card.

TCU

This mode outputs the signal frames synchronized to the EC clock from
the TCU card.

(Default)

TCU

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 49/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.11.2.

Edit Sync Priority button (Setting Sync Priority)

Set the synchronization priority.

Edit Sync Priority Subwindow

Timing Clock
EC

Set the EC (Equipment Clock) entry for synchronization priority.

LC

Set the LC (Line Clock) entry for synchronization priority.


When Mode1 is selected from the Sync Mode option in the Edit
Sync Mode subwindow, LC can not be selected.

(Default)

EC

Priority 1/Priority 2/Priority 3


Click the pull-down menu button to select the synchronization priority from the following items.
No

No clock source is selected.

CLKHZ-X/Y

The 2 MHz external clock input X or Y is selected.


When Mode2 is selected from the Sync Mode option in the Edit
Sync Mode subwindow, HZ-X or HZ-Y can not be selected for the
LC mode priority.

CLKBIT-X/Y

The 2 Mbit/s external clock input X or Y is selected.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 50/116

COM_QMCO_M_003
ed.03 del 03.04.07

When Mode2 is selected from the Sync Mode option in the Edit
Sync Mode subwindow, BIT-X or BIT-Y can not be selected for the
LC mode priority.

CMO NI Site Engineering


INTERNAL

Internal oscillator on the TCU card (unit) is selected.

Click the pull-down menu button to select the synchronization priority from the following items.
AIDs (Access
Identifications) for STM-1
signal from Line or Radio

Recovered clock from STM-1 stream is selected.


GP<1/2>-<W1-W7>-<L/R>
When Mode2 is selected from the Sync Mode option in the Edit
Sync Mode subwindow, STM-1 AIDs can not be selected for the EC
mode priority.

(Default)

Priority 1 = GP1-W1-L (Group 1-Work 1-Line)


Priority 2 = GP1-W1-R (Group 1-Work 1-Radio)
Priority 3 = No

Quality TH (Threshold)
Click the pull-down menu button to select the threshold level to initiate the clock quality down alarm.
(Range: 0-14)
(Default)

PBX (Private Branch Exchange) Sync


0

Set the bit 5 (C bit) of the timeslot 0 in the clock signal frame to 0 for
2 Mbit/s external output to PBX.

Set the bit 5 (C bit) of the timeslot 0 in the clock signal frame to 1 for
2 Mbit/s external output to PBX.

(Default)

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm
press the Cancel push-button to cancel the operation.
Mode 1

To NE

EC Pri 1
EC Pri 2
EC Pri 3

EC
Selection

LC Pri 1
LC Pri 2
LC Pri 3

LC
Selection

To T0 output

Mode 2
To T4 output

SSU
To NE

EC
Selection

EC Pri 1
EC Pri 2

To T0 output

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 51/116

COM_QMCO_M_003
ed.03 del 03.04.07

Provisioning for Sync Modes

CMO NI Site Engineering

8.11.3.

Edit Sync Parameter button (Setting Sync Parameters)

Set the synchronization parameters.

Edit Sync Parameter Subwindow

Hz Code X and/or Y
Click the pull-down menu button to select the assumed SSM (Synchronization Status Message) quality
level of the 2 MHz external clock input. (Range: 2-5)
(Default)

Bit Code X and/or Y


Click the pull-down menu button to select the assumed SSM quality level of the 2 Mbit/s external clock
input. (Range: 2-5)
(Default)

SRT1F does not support the SSM for the unformatted external clock input signal of 2 Mbit/s.

Error Free
Enable

Use WTR (Wait to Restore) for the recovery of synchronization failure. 30


sec error free period is required to restore the alarm.

Disable

Do not use WTR for the recovery of synchronization failure. The Clock
Quality Down alarm restores immediately.

(Default)

Enable

Detect frame in the 2 Mbit/s external clock input. The FAL (Frame Alignment Loss) will appear, if the frame can not be detected.

Enable

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 52/116

COM_QMCO_M_003
ed.03 del 03.04.07

Frame

CMO NI Site Engineering


Disable

Do not detect frame in the 2 Mbit/s external clock input.

(Default)

Enable

This setting does not care in the case that the 2 MHz external clock input is selected. The frame is always added to the 2 Mbit/s external clock output.

AIS
Enable

Detect AIS (Alarm Indication Signal) in the 2 Mbit/s received external


clock input. The AIS alarm will appear, if the frame can not be detected.

Disable

Do not detect AIS in the 2 Mbit/s received external clock input.

(Default)

Enable

This setting does not care in case that 2 MHz external clock input is
selected.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 53/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering


8.12.

Provisioning of the Order Wires, if requested

Set the parameters for OW (Orderwire) functions using E1 and E2 byte in the SOH (Section
Overhead) of STM-1.

Click the Provisioning Menu link in the Provisioning part of the menu frame, then the
Provisioning Menu main frame will appear.
Click the OW link, the OW subwindow will appear.

Orderwire Main Frame

First click the Edit OW1 button in the Order Wire main frame, then the Edit OW1
subwindow will appear (par.8.12.1)
Click the Edit OW2 button in the Order Wire main frame, then the Edit OW2 subwindow
will appear(par.8.12.2)
Click the Edit OW3 button in the Order Wire main frame, then the Edit OW3 subwindow
will appear(par.8.12.3).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 54/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

8.12.1.

Edit OW1 button (Setting OW)

Set the OW usage.

Edit OW1 Subwindow

OW Enable
Enable

Use OW function. Both Express and Omnibus OW are activated.

Disable

Do not use OW function, then the NE (Network Element) passes through


the E1 and E2 bytes.

(Default)

Disable

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 55/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.12.2.

Edit OW2 button (Setting OW Restorer)

Set the OW restorer function that protects the OW against the line failure in the ring network
configuration.

Edit OW2 Subwindow

OW Restorer
Enable

Activate OW restorer function..

Disable

Deactivate OW restorer function.

(Default)

Disable

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 56/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.12.3.

Edit OW3 button (Setting OW Function)

Set the OW functions.

Edit OW3 Subwindow

Use Ch
Click the radio button to select the E-byte you want to use.

(Line)/(Radio)
Click the pull-down menu button to select the number of work channel to transmit OW signal for Line or
Radio side.(In this application only GP1-W1 can be selected.)
Disable should be selected, if the OW signal is not transmitted to any channel.

Ext OW
Enable

Use 4-wire VF (Voice Frequency) OW extension to/from other equipment.

Disable

Do not use 4-wire VF OW extension to/from other equipment.

(Default)

Disable

No. (Telephone Number)


Click the pull-down menu button to set the telephone number of the NE (Network Element). Here, upper
two digits are Group Address and lower two digits are the Station Address.To call an individual station,
dial #1234. To call all stations in the group, dial #12** for example. There is no interconnection between
Express and Omnibus OW. Therefore, you can not call from Express to Omnibus, and vice versa.

Buzzer
:

Numero dOggetto/Document Number

909-041/12

Activate buzzer ringing on the SV (Supervisory) card (unit) when the NE is


called.

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 57/116

COM_QMCO_M_003
ed.03 del 03.04.07

Enable

CMO NI Site Engineering


Disable

Deactivate buzzer ringing on the SV card (unit) when the NE is called.

(Default)

Disable

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 58/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

8.13.

Provisioning of the Date & Time, if requested

Set the current time and date of the real time clock on the SV (Supervisory) card (unit).

Click the Set Date link in the Control part of the menu frame, the Set Date subwindow will
appear.

Set Date Subwindow

Set Date
Click the pull-down menu button to select the time and the date.
Year

Select year. (Range = 2002 to 2035)

Month

Select Month. (Range = 1 to 12)

Day

Select Day. (Range = 1 to 31)


Day 31 can not be set in Feb, Apr, Jun, Sep, and Nov. Day 30 can not be
set in Feb. Day 29 can not be set in Feb except a leap year.

Hour

Select Hour. (Range = 0 to 23)

Minute

Select Minute. (Range = 00 to 59)

Second

Select Second. (Range = 00 to 59)

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 59/116

COM_QMCO_M_003
ed.03 del 03.04.07

Once executed the selections, press the Operate push-button.


The confirmation window Configuration will be changed. OK? will open:
confirm

CMO NI Site Engineering

MW LINK ANTENNA ALIGNMENT

For a reliable microwave link between two terrestrial radio sites, a correct antennas alignment is
fundamental.
Parabolic microwave antennas can be aligned using either a customer supplied radio, independent path
alignment transceiver set or other properly tools and test instrument related to the equipment specifications.
Microwave antennas must be accurately positioned on true azimuth and be absolutely level before
beginning path alignment. Most alignment difficulties are the result of incorrect azimuth position or
inadequate leveling.
Target of antennas alignment is to adjust properly the direction of both antennas (site A and B), in order to
obtain the Calculate (Nominal) Power receive in both sites.
For more information and procedure for antenna adjustment, refer to the document 909-033/52.
In additional to the above mentioned procedure in order to start the alignment, it is important to set the
ATPC feature in manual mode, with the maximum Power transmission vale (High setting value).

Select Provisioning > RSPI & UC & RPS.


Click on the Edit RSPI button
Select the MSTU and select High in the TPC field.
Click on the Operate button to confirm to operation.

ATPC Setting Change

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 60/116

COM_QMCO_M_003
ed.03 del 03.04.07

Verify if the installed elements matches with the RF planning form, in particular regarding the antenna
diameter, frequency band, WG type / length and other additional element.
If some of the above mentioned elements are not included in the RF Planning form, it is necessary to review
the data for the Rx power level calculation.

CMO NI Site Engineering

9.1.

Antenna Alignment summarized steps

Align the antenna both in vertical and horizontal planes according to the site drawings. (Elevation
angle will have to be calculated from the height above sea level.) If site data is not available, adjust
the antenna for zero elevation.
Pan the antenna in the horizontal plane and have a second party check the RX or AGC voltage (or
using a spectrum analyzer/Power meter) for the distant sites signature. When the signature is detected, pan the antenna through the peak signal level and locate the first minimal to the left and right
of the peak.
Note the number of turns of the adjusting screw between the minimal, actual peak signal is
EXACTLY half way between the two minimal.
Pan the antenna in the vertical plane in the same steps as above, then lock the antenna panning
bars and secure.

9.2.

AGC Monitoring

It is suggested to connect and monitor the AGC Voltage on the Work 1 channel (W1 CH) Main/SD receiver
The AGC is monitored through the connector UIA block for antenna alignment and future troubleshooting.
For the connector position refer to the UMN manual.
CN34 of UIA of HK1 for N+1 Type
Or
CN39 of HK1 for 2x(N+1) Terminal Type

37

20

Pin No.

Pin Name

Function

SDA SG

Signal Ground for Monitor

SD AGC

SD AGC monitor (W1)

AGC SG

Signal Ground for Monitor

AGC MON

19

Front view
facing to
SCSU BWB

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

AGC monitor (W1)

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 61/116

COM_QMCO_M_003
ed.03 del 03.04.07

Connector

CMO NI Site Engineering


Note: In case of Double Terminal equipment, the AGC current monitoring function is in the connector of:

CNxxx => HK1 for System A


CNyyy. => HK1 for System B

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 62/116

COM_QMCO_M_003
ed.03 del 03.04.07

CN34 (or CN39) of UIA block accommodates housekeeping (external) supervisory/control terminals in
addition to AGC monitoring.

CMO NI Site Engineering

9.3.

Receive (Rx) Signal Level

At the end of the Alignment phase, verify that the Received signal complies with the Project specification.
This test is intended to confirm the result of the antenna alignment by measuring the RF receiving level at
the input of MSTU.

Required Test instruments:

WebLT
RF Power Meter with appropriate power sensor
Adaptors and RF cable

Typical Test Bench:

Test Procedure:

Check the ATPC (Automatic Transmitter Power Control) setting state of the TX side (ATPC = HIGH
is recommended).
Remove MN and SD RX IN connection between the branching network and RX.
Connect the Power meter to the RX branching network MN output.
Compare the result with the path calculations.
Repeat steps 3 thru 4 for SD.
Repeat for all the other channels (PROT, W1 etc.)

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 63/116

COM_QMCO_M_003
ed.03 del 03.04.07

Typical test bench for Prx measurement

CMO NI Site Engineering


Report the value on the field commissioning tests sheets
Warning
For the measurement check that all the losses present in the link are
considered, in particular Flex wave guide and all Branching filter loss.
Refer to the UMN manual for the more detailed value

Refer to the above picture as example of the Received Signal Level (RSL) Calculation Sheet.
The parameters are:
Ref.
1
2
3
4
5
6
7
8
9
10
11

Parameter
Transmitter Output Power
MSTU Adaptor Loss (Tx ADPT)
Branching Network Loss (TX + RX)
BPF + CIR + DUP on Both Side)
Flex. WG Loss (Tx)
Feeder Loss (Tx Side)
Antenna Gain (Tx Side)
Free Space Loss
Antenna Gain (Rx Side)
Feeder Loss (Rx Side)
Flex. WG Loss (Rx)
MSTU Adaptor Loss (Rx ADPT)

Value
+ dBm
- . dB

Type
Start value
Loss

- . dB

Loss

- . dB
- . dB
+ . dB
- . dB
+ . dB
- . dB
- . dB
- . dB

Loss
Loss
Gain
Loss
Gain
Loss
Loss
Loss

Result
Calculated Received Signal Level (Sum of all Loss and Gain)

- .. dBm

Antenna gain and feeder loss shall be calculated based on the technical data.
In the above example table the Prx signals are calculated at the MSTU Input

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 64/116

COM_QMCO_M_003
ed.03 del 03.04.07

Note that Item Ref. 2,3,11 are reported on the UMN manual with a cumulative value.

CMO NI Site Engineering

9.3.1.

Receive (Rx) Signal Level with WebLT Menu

It is also possible to check the Received power level on MSTU unit by using a WebLT monitoring command.
Select Performance > Analog Monitor
Select the unit.

Level menu Dialog Box

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 65/116

COM_QMCO_M_003
ed.03 del 03.04.07

Click on the Operate button. The following screen opens.

CMO NI Site Engineering

RL-M: Received power on Main Channels


RL-SD: Received power on diversity Channels
TL: Transmission Power level

Display level data


On the above example figure, the Prx level is 50 dBm. The Transmission power is +18 dBm.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 66/116

COM_QMCO_M_003
ed.03 del 03.04.07

Warning
The tolerance of the Prx is about 3-4 dB

CMO NI Site Engineering

9.4.

Cross Polar Decoupling

This check is fundamental in case of AP system with double polarization or CC system type.
This test is intended to confirm the proper XPIC optimization.
Note: if the test is performed only in the local station (Tx on V polar Rx on H polar and reverse) you test only
the local antenna decoupling, if the test is performed on the link, you test also, if there are some
misalignments between the feed of both antennas.

Required Test instruments:

WebLT
Spectrum Analyzer
Adaptors and RF cable

Typical Test Bench:

Typical test bench for Cross Polar (Link Overview)

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 67/116

COM_QMCO_M_003
ed.03 del 03.04.07

Typical test bench for Cross Polar (Local station Overview)

CMO NI Site Engineering

Test Procedure:

1. On the remote side activate only one MSTU on a reference polarization (e.g. Vertical)
2. Set the MSTU (on the remote side) to transmit only the CW signal.
3. On the local side, connect a spectrum analyzer to the horizontal waveguide, and measure the relevant Prx value; memorize the trace on the spectrum analyzer.
4. Disconnect the Spectrum Analyzer from the horizontal waveguide and connect the test instrument
on the vertical waveguide, and measure the relevant Prx value on the second trace.
5. Measure the difference between the signal on the same Polarization and the cross polarization.
6. The level difference should be at least about 30 dB below the received signal of the vertical polarization.
7. If the value is less than 27 dB, rotate the feed point on the antenna (at the local and remote sites) to
achieve maximum cross polar discrimination.
8. Note: the discrimination ratio depends on the antenna specifications (i.e. HPX10-44D is grater than
30 dB.).
9. Lock the feed mounting hub after achieving maximum cross polar discrimination.
10. Repeat the test for both polarizations for both stations.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Example of main signal (CW) detected from


Spectrum Analyzer

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 68/116

COM_QMCO_M_003
ed.03 del 03.04.07

Example of Cross Polar signal (CW) detected


from Spectrum Analyzer

CMO NI Site Engineering


Note: in order to transmit only the Carrier signal it is necessary to configure the remote MSTU unit in
maintenance mode.
1) On the Transmission Station, select Provisioning > Service State

Service State Main Frame


Press the Maintenance Facility button in the Maintenance State column.

Maintenance Facility Subwindow


Select the unit. In the RSPI field select IS-MT.
Confirm the changing maintenance state by pressing the Operate button.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 69/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 70/116

COM_QMCO_M_003
ed.03 del 03.04.07

Maintenance Facility Subwindow

CMO NI Site Engineering


2) Now the CW operation has to be activated.

Select Control > Operate RPI

Operate RPI Subwindow

Select the MSTU unit and in the command field enter CW.
Press the Operate button to activate the command.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 71/116

COM_QMCO_M_003
ed.03 del 03.04.07

At the end of test to disable the Carrier Wave ON signal select the Release command action.

CMO NI Site Engineering

10

LOCAL TESTS AND MEASURE

After the link alignment and the Prx and Cross Polarization decoupling (if required) go on with all the tests
required for line-up and commissioning.
In any case some of the controls given in the previous chapters are required during the commissioning
tests; in this case take a note and report the value on the commissioning tests sheets.

10.1.

MSTU Transmitting Power

This measurement verifies the proper RF Tx Power of the MSTU unit.

Required Test instruments:

WebLT
Power meter with the proper Sensor
Fix attenuator (minimum 20dB)
Adaptors and RF cable

Typical Test Bench:

()

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 72/116

COM_QMCO_M_003
ed.03 del 03.04.07

Typical test bench for Transmission Power measurement

CMO NI Site Engineering

Test Procedure:

1.
2.
3.
4.
5.

Remove the TX OUT cable (jumper cable between ADPT and Tx Branching filter).
Connect the Power sensor with in series a fix attenuator (min. 20 dB) into the TX OUT port of ADPT
Set the MSTU Power with a ATPC High value
Read the power meter indication.
Repeat the measurement with ATPC Low value.

Note: The TX output power specifications refer to the MSTU output port, but the measurement is performed
on the MSTU Adapter.
The values of Tx power on MSTU are:
Tx = Measured Value () + Adapter Loss + Fix Attenuator + RF Cable loss (if applicable).
Note: Fix attenuator and RF cable are connected to the power meter.
Refer to the specification document attached on the field commissioning test sheets for the proper value of
the Adapter Loss.
Note: the Transmission Power can be also evaluated with the WebLT.
Select Perfomance > Analog Monitor > Operate
If the measured power level does not meet the specification (supposing that the Tx Spectrum Mask meets
the specification) a small Power Tx adjustmen can be done.

10.1.1.

MSTU Transmitting Power Adjustment

To adjust the Tx power refer to the following steps.


1) Configure the remote MSTC unit in maintenance mode.

On the Transmission Station, select Provisioning > Service State

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 73/116

COM_QMCO_M_003
ed.03 del 03.04.07

Service State Main Frame

CMO NI Site Engineering

Press the Maintenance Facility button in the Maintenance State column.

Maintenance Facility Subwindow


Select the unit. In the RSPI field select IS-MT.

Confirm the changing maintenance state by pressing the Operate button.

2) Now the TX PWR command has to be activated.

Select Control > Operate RPI Adjust

Select the MSTU unit and in the command field choose TXPWR.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 74/116

COM_QMCO_M_003
ed.03 del 03.04.07

Operate RPI ADJ Equipment Subwindow

CMO NI Site Engineering

Select the mode and click on the Operate button.


Mode
20:
1:
-1:
-20:

Coarse
Fine
Fine
Coarse

Press the Operate button to activate the command.

At the end reconfigure the unit in In Service mode.


Note: it is suggested to adjust only with a fine mode in order to maintain the Tx linearity response (expect
the case of high value of Power mismatch value between specification and Measured value).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 75/116

COM_QMCO_M_003
ed.03 del 03.04.07

In any case refer the Transmission power level to the MSTU Output point.

CMO NI Site Engineering

10.2.

Transmitter spectrum Mask

This measurement verifies if the RF Tx spectrum complies with the specification (refer to the Transmitter
emitted mask given in the UMN manual.

Required Test instruments:

WebLT
Spectrum Analyzer
Fix attenuator (suggested 30dB)
Adaptors and RF cable

Typical Test Bench:

Typical test bench for Transmission output mask measurement

Test Procedure:

1.
2.
3.
4.
5.

Insert an STM-1 word on the BSW Unit related to the channel under test.
Switch off all the MSTU units and disconnect the waveguide from the TX/RX antenna circulator.
Connect an adapter at the TX/RX antenna circulator.
Connect the Spectrum Analyzer to the adapter (Main) and switch ON only the MSTU under test.
Search the Central frequency and set the Spectrum Analyzer, with the following suggested parameter:

Span: 200 MHz


RBW: 100 kHz
VBW: 300 Hz
Center frequency: MSTU Specification

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 76/116

COM_QMCO_M_003
ed.03 del 03.04.07

6. Check that the MSTU emitted spectrum meets the specification mask.
7. Refer to the specification document attached on the field commissioning test sheets or to the UMN
Manual.
8. Repeat the test for all the equipped MSTU (one by one).

CMO NI Site Engineering

10.3.

Tx Local Oscillator frequency.

This measurement verifies the correct CW frequency on the Tx local Oscillator on the MSTU Unit.

Required Test instruments:

WebLT
Frequency counter
Adaptors and RF cable

Typical Test Bench:

Typical test bench for Tx Local Oscillator frequency check

Test Procedure:

Connect the Frequency Meter to the Local Oscillator Monitory Point on the front panel of the MSTU units
and check that the measured value meets the limits (less than 10 ppm referred to the OL Frequency
nominal value).
Warning
The LO frequency is 844MHz from the RF nominal value.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 77/116

COM_QMCO_M_003
ed.03 del 03.04.07

Refer to the specification document attached on the field commissioning test sheets or to the UMN Manual.

CMO NI Site Engineering

10.4.

Optical Interface Output Level (on BSW Units).

This measurement verifies the proper output power emitted by BSW Unit.
This test is applicable only in case of Optical BSW Unit.
Note
Controls and alarms for BSW Optical are not managed by WebLT, but via
connection to SRT1F housekeeping facility. 4 DI plus 2 DO of housekeeping
facility are needed per each BSW Optical card.
Note
Through hardware switch setting on the BSW Optical card, it is possible to
choose maximum two type of control items.
The control items can be set per card individually.
Refer to the technical description in the UMN manual in order to manage properly the unit for testing and
operation.

Required Test instruments:

WebLT
Optical Power meter
Optical Adaptors and Fiber patch cord with LC connectors (side BSW)

Typical Test Bench:

Typical test bench for Optical Power measurement

Test Procedure:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 78/116

COM_QMCO_M_003
ed.03 del 03.04.07

1. Clean and inspect the optical connections.


2. By using the proper HW Switch selector on the Unit, set OFF (or disable) the Automatic Laser Shutdown function.
3. Connect the optical power meter to the optical signal output port of the OPT BSW unit through the
optical fiber cord with LC Duplex connectors.
4. Verify that the optical output power is within specifications.
5. Record the results.

CMO NI Site Engineering


6. Repeat for all the OPT BSW units.
7. At the end of the test set all the HW switches according to the project specification.
Note that to manage the Laser Shutdown (ALS) select the Switch number SW22.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 79/116

COM_QMCO_M_003
ed.03 del 03.04.07

ALS Mode Switch SW22

CMO NI Site Engineering

10.5.

Return Loss Feeder Check.

This measurement is one of the most important tests in order to evaluate, if the antenna and WG connection
are properly installed and connected.
Note that if the result of the test is lower than the minimal specification, it is possible to have an high value of
residual BER on the system with a worsening of the link quality.
In field this test is applied on the WG and antenna.
In order to understand the tests (and the relevant test instruments) it is important to define the difference
between the Return Loss Test (normally applied in field) and VSWR.
The reflection can be estimated by the reflection coefficient, which is the ratio of the reflected wave
voltage (current) to the incident wave voltage (current). The Reflection coefficient has a magnitude and
phase and can be represented by complex numbers.
Another parameter for reflection is the Voltage Standing Wave Ratio (VSWR). VSWR is defined from the
magnitude of reflection coefficient and, therefore, does not have a phase.
Return loss compares the power in the reflected wave with that in the forward wave. The unit for return loss
is decibel. Return loss can be calculated from VSWR and vice-versa.
Return Loss: This is the dB value of the absolute reflection coefficient.
It is a curious concept of the transmission engineering. This loss value becomes 0 for 100% reflection and
becomes infinite for an ideal connection (requested minimal value, higher than 23 dB for WG with antenna).
Voltage Standing Wave Ratio (VSWR): this is the ratio of maximum voltage to minimum voltage in
standing wave pattern.
It varies from +1 to infinite.
Both VSWR and Return Loss are a measurement of the divergence of a microwave device from a perfect
impedance match, for example, 50 ohm (RF impedance used in MW).
They are mathematically interchangeable and result from scalar measurements, which are required for a
number of reasons; the relations between the both values are defined by the following formula:

Return Loss and VSWR Formula conversion


Where: RL=Return Loss

= Reflection Coefficient

Note also that there are different test equipment (and related tests bench) applicable for this test, in this
procedure we provide the measurement with two typical test benches:
Using Site Master Test Equipment
Using Spectrum Analyzer / Coupler and RF Sweep Generator tests equipments

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 80/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

10.5.1.

Return Loss Feeder with Site Master.

Site Master is a useful test instrument for Return Loss, fault locator and VSWR measurement.
Note that to use this test instrument for Antenna and WG (normally for frequency higher than 3 GHz) it is
necessary a complete set of calibration Kit related to the Flange WG and frequency used in the device
under test.

Required Test instruments:

WebLT
Site Master
RF cable, Adaptors and Calibration Kit

Typical Test Bench:

Typical test bench for Return Loss measure with Site Master

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 81/116

COM_QMCO_M_003
ed.03 del 03.04.07

Adaptor and Calibration Kit for Site Master

CMO NI Site Engineering

Test Procedure:

The test port interface to the waveguide under test is a small coaxial-to-waveguide adapter rather than a
bulky precision coupler.
The calibration components include two offset shorts,1/8 and 3/8 wavelength, and a precision load. The two
offset shorts eliminate reference error suffered by scalar systems, when only a single waveguide short is
used to determine the 0.0 dB reflection reference level.
For calibration phase of the test instrument, connect before the related RF cable and Cable/WG adaptor,
then apply the internal calibration procedure require from test instrument.

Step 1. Select the appropriate frequency range


Step 2. Press the START CAL key to start the calibration.
Step 3. Select the Waveguide soft key. The Waveguide Flange Selection menu will appear, with the
Start Calibration function highlighted. Check if the correct DUT waveguide is selected from the list in
the menu. The selected waveguide flange type is marked by the symbol (*) and is also displayed at
the bottom of the screen.
Step 4. If the correct DUT waveguide is selected, proceed with the calibration (go to Step 5). To
choose a different waveguide, use the Up/Down arrow keys to highlight the desired waveguide.
Press the ENTER key to select the new waveguide flange and go to its configuration listing, which
lists the lengths of the calibration 1/8th and 3/8th Offset Shorts as well as the waveguide Cutoff Frequency.
To choose a different waveguide, go back to the previous menu (use the Up/Down arrow key to
highlight Waveguide Flange Selection and press the ENTER key). Otherwise, proceed with the
calibration.
Step 5. Press the ENTER key or the Start Cal soft key to start the calibration. The message Connect 1/8 OFFSET SHORT to RF Out Port will appear in a message box.
Step 6. Connect the required 1/8 offset short component and press the ENTER key. After several
seconds of measurements and calculations, the message Connect 3/8 OFFSET SHORT to RF Out
Port will appear.
Step 7. Remove the 1/8 offset short, connect the required 3/8 offset short component and press the
ENTER key. The message Connect LOAD to RF Out Port will appear.
Step 8. Remove the 3/8 offset short, connect the required calibrated Termination component and
press the ENTER key. An audible tone will sound when the calibration is complete.
Step 9. Verify that the calibration has been properly performed by checking that the Cal ON message is now displayed in the upper left corner of the display.
Step 10. Connect the device under test and measure the return loss.

Note that some calibration and measurement steps must be different related to the model of Site master,
refer in any case to the User Guide of test instrument for the proper Calibration and measurement
procedure.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 82/116

COM_QMCO_M_003
ed.03 del 03.04.07

Typical figure of Return loss with Site Master

CMO NI Site Engineering

10.5.2.

Return Loss Feeder with Spectrum analyzer

This test bench has a large use in field; note that with this test bench only the Return Loss can be tested.

Required Test instruments:

WebLT
RF Sweep generator
Spectrum Analyzer
Directional coupler
RF cable, Adaptors, Load and CC
Plotter or Printer (optional)

Typical Test Bench:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 83/116

COM_QMCO_M_003
ed.03 del 03.04.07

Typical test bench for Return Loss measure with Spectrum Analyzer and coupler

CMO NI Site Engineering

Test Procedure:
Phase 1: Test Bench Calibration and reference level.

Short Circuit calibration for Return Loss

Set a test bench as shown in the above figure (connect the RF generator to the directional coupler
input and the spectrum analyzer to the output).
Use the RF sweep generator to send a sweep signal in the working frequency bandwidth. Set the
RF generator with about 10 dBm Tx Power and sweep time at 0,01 s.
Set the spectrum analyzer as follows:
o
o
o

Residual Bandwidth Filter: 1 MHz


Video Bandwidth Filter: 100 kHz
Sweep Time: 15 s.

Connect the short circuit to the coupler terminal flange.


Memorize the received trace on the spectrum analyzer display.
Remove the short circuit from the coupler terminal flange and connect it to the wave guide under
test
Phase 2: Return Loss measure.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 84/116

COM_QMCO_M_003
ed.03 del 03.04.07

Return Loss Measure

CMO NI Site Engineering

Switch off all MSTU units and disconnect waveguide from the N3 rack.
Verify that no other radio systems are transmitting in the RF sweep band under test.
Connect the Waveguide to the Directional Coupler measurement ports.
Check the received trace on the spectrum analyzer display.
Check that the minimal amplitude difference between the actual and the previous memorized trace
is comply with the limit reported in the test sheets document.
If required plot/print the traces on the spectrum analyzer display.

Example of Spectrum analyzer screen for return loss test

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 85/116

COM_QMCO_M_003
ed.03 del 03.04.07

Note that if the value of the return loss is lower than the required specification, in most cases the cause is
due to one of the connectors.
Check then (if necessary reassembly the connector) and repeat the tests.

CMO NI Site Engineering

11

LINK TESTS AND MEASURE

11.1.

IF-IF Test Basics

All the IF-IF tests are intended to measure and adjust the IF-IF characteristics during the normal
propagation condition in order to detect any sort of flaws on the antenna and/or waveguide system and to
equalize a proper IF-IF response on the link.
Note that if the result of the test is lower than the minimal specification or if it is not applied, it is possible to
have an higher value of residual BER on the system with a worsening of the link quality.
It is possible to identify this type of adjustment in two basic modes:
a) IF Frequency Response and Group Delay for each single channel.
b) Space Diversity Equalization.
If the link is without space diversity, operate only the first one.
If the MW Link is with diversity, it is necessary to adjust the IF Frequency Response and Group Delay for
Main and Diversity receiver in single mode (Main with diversity disconnected and Diversity with main
disconnected), and then operate with Space diversity Delay and Amplitude equalization in order to optimize
the response between Main and diversity.
It is recommended to perform the following tests with a Prx value of about <-50dBm and with a
stable propagation condition without fading.
If the Rx power is higher than 50 dBm, set the Transmitter ATPC in Tx Low level.
In the following chapters we analyze each test in independently mode, but note that in particular for diversity
system all of them are correlated.

Required Test instruments:

WebLT
MW Link Analyzer (MLA)
Power meter
IF cable and coax

Note:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 86/116

COM_QMCO_M_003
ed.03 del 03.04.07

The following description is applied using the Link Analyzer test instrument.
In alternative it is possible to use a couple of spectrum analyzers (type Agilent model HP 8593-E),
equipped with an additional option (type HP 11770A Link Measurements Personality)

CMO NI Site Engineering

Typical Test Bench:

Typical test bench for IF-IF tests with Link Analyzer

SRT 1F Typical image and adjustment point:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 87/116

COM_QMCO_M_003
ed.03 del 03.04.07

Link Analyzer port connection on MSTU

CMO NI Site Engineering

Adjustment point on MSTU


Item No.

Item

Normal operation

DADE for XPIC

2
3
4
5
6

DELAY-H
DELAY-M
DELAY-L
ALC LVL
ALC GAIN

SD GAIN

SD SLOPE

RRF GAIN

RIF GAIN

R SLOPE

T SLOPE

Normal operation
The position for normal operation, in service state.
TX=D,MN=E ASCII
FAN replacement For FAN replacement, inhibit FAN alarm and switches TX
F
SD ASCII
output to LOW level.

Use the WebLT for setting.


Note

Do not attempt to re-adjust.


To memorize some the setting, select ITEM No. = 9, then press INCR/DECR switches together.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 88/116

COM_QMCO_M_003
ed.03 del 03.04.07

9
A
B
C
D
E

Function
The position for normal operation, in service state. INCR and
DECR push switches are invalid.
Compensates the delay time difference between the feeders
for Vertical and Horizontal polarization using DADE
(Differential Absolute Delay Equalizer) in the case of cochannel operation.
Adjusts IF-IF group delay, high frequency component.
Adjusts IF-IF group delay, medium frequency component
Adjusts IF-IF group delay, low frequency component
Sets TX output level at ALC AUTO (ON)
Sets TX output level at ALC MNL (OFF)
Adjusts XPIC OUT level to -10 dBm at AGC OFF to
compensate the loss of DADE line.
Adjusts XPIC OUT slope at AGC OFF to compensate the
slope of DADE line.
Adjusts MN/SD 70M OUT level to -10 dBm at AGC OFF
Adjusts XPIC OUT level to -10 dBm at AGC OFF
Compensates the slope of Main line.
Compensates the slope of TX.

CMO NI Site Engineering

SLD MRK: 14.00 MHz


IF:
10 dBm
FM:
250 kHz rms, BF: 250 kHz

Y1

Y2

Marker

Y1: IF AMPL: 0.5 dB/div

Marker

Y2: DELAY: 2 ns/div

Typical screen of Group delay and IF Amplitude


Warning
For 128 MLCM modulation system, an IF adaptive equalizer D-EQL is
used according to the BRU branching system.
Check that the proper D-EQL module is installed, (Part Number can be
different according to the type and release of the MSTU unit)

Position of D-EQL module on MSTU


Channel Arrangement
Interleaved
Co-Channel
Co-Channel
Co-Channel

Adjacent Channel Type


No adjacent Channels
Both Adjacent Channel
Adjacent Channel Upper
Adjacent Channel Lower

D-EQL Code
CA53140-0330
CA53140-0263
CA53140-0264
CA53140-0265

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 89/116

COM_QMCO_M_003
ed.03 del 03.04.07

For all the other system types, a sample IF cable is inserted on the slot of D-EQL module.

CMO NI Site Engineering

11.1.1.

IF Frequency Response and Group Delay in single mode.

This test measures the IF-IF characteristics during the normal propagation conditions in order to detect any
sort of flaws on antenna and/or waveguide system and to equalize a proper IF-IF response on the Link.
Note that if the result of the test is lower to the minimal specification or if it is not applied, it is possible to
have an higher value of the residual BER on the system with a worsening of the link quality.

Test Procedure:

Connect the Tx Link Analyzer to 70M IN of MSTU in the remote station and the Rx Link Analyzer to XPIC
OUT of MSTU in the local station as shown above. Set the test instruments as follow
Link Tx Settings
Baseband Frequency
250 500KHz
Deviation
250 500KHz
Sweep width
12.0 / 14.0 MHz
IF Frequency
70.00 MHz
IF Level
10.0 dBm
Change the status of the Rx equipment from In service to Maintenance by WebLT.

Select Provisioning > Service State

Service State Main Frame


Press the Maintenance Facility button in the Maintenance State column.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 90/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

Maintenance Facility Subwindow

Select the unit. In the RSPI field select IS-MT.

Confirm the change of the maintenance state by pressing the Operate button.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 91/116

COM_QMCO_M_003
ed.03 del 03.04.07

Note: if the Space Diversity system is applied, this test should be done independently for MAIN
receiver and SD receiver.

CMO NI Site Engineering

11.1.1.1.

Response on Main Rx Channel.

1. Remove the SD RX RF cable.


2. In the received side on the rotary switch ITEM No select B position.
3. Set the Frequency Measurement of Rx side by WebLT. Choose Control > Operate RPI. Select the
MSTU unit and the dialog box appears.

Operate RPI Subwindow


4. Select command FMSR and click on Operate button to activate the command.
FMSR: When FMSR is set on SRT1F WebLT, activation of AGC OFF and EPS OFF at near End
(Local) station and at once ALC OFF at Far End (Forced) station are automatically carried out.
5. The amplitude response and the group delay curve are displayed on RX link analyzer.
6. If the Link under test is without diversity, (with space diversity continue with next point) check that
the Power on MN 70M measurement point is within the limit (10dBm1dB). If the output level does
not comply the tolerance, adjust the level by WebLT command:

Choose Control > RPI adjust


On the Adjustment Item, six selections are available:
TXPWR: Select to transmitter output power level adjustment.
TXGAIN: Select to transmitter RF gain adjustment.
RXRFGAIN: Select to receiver RF gain adjustment.
RXIFGAIN: Select to receiver IF gain adjustment.
SDGAIN: Select to SD receiver IF gain adjustment.
SDSLOPE: Select to SD receiver IF group delay slope adjustment.
Select the Adjustment Item RXRFGAIN to modify the MN 70M output point.
Select the Mode (Coarse or Fine) as required and click OK.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 92/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

Repeat the step in order to obtain the properly IF output power level.

Operate RPI ADJ Equipment Subwindow


7. Connect the Link Analyzer on XPIC OUT measurement point.
8. If the RX link analyzer is not locked, check that the XPIC OUT level is within the limit 10dBm1dB. If
the output level is not complying with the tolerance adjust the level by WebLT command:

Choose Control > RPI adjust


On the Adjustment Item, six selections are available:
TXPWR: Select to transmitter output power level adjustment.
TXGAIN: Select to transmitter RF gain adjustment.
RXRFGAIN: Select to receiver RF gain adjustment.
RXIFGAIN: Select to receiver IF gain adjustment.
SDGAIN: Select to SD receiver IF gain adjustment.
SDSLOPE: Select to SD receiver IF group delay slope adjustment.
Select the Adjustment Item RXIFGAIN to modify the XPIC OUT output point.
Select the Mode (Coarse or Fine) as required and click OK.
Repeat the step in order to obtain the proper IF output power level.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 93/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

Operate RPI ADJ Equipment Subwindow


9. In absence of fading and reflections, check that the amplitude response and the group delay of the
main receiver are within the limits.
10. If the amplitude response does not comply the limits, use the INCR/DECR push- button on the front
panel of the MSTU until the amplitude is within the limits. Performed this operation with ITEM No.
rotary switch in the B position.
11. If the group delay response does not comply the limits, use the INC/DECR push- button on the front
panel of the MSTU until the amplitude is within the limits. Perform this operation with ITEM No. rotary switch in the following position:

ITEM No.2 : DELAY-HIGH (for adjustment of higher frequency)


ITEM No.3 : DELAY-MIDDLE (for adjustment of middle frequency)
ITEM No.4 : DELAY-LOW (for adjustment of low frequency)

12. To memorize the new value set the ITEM No. rotary switch in 9 position and push the
INCR/DECR buttons simultaneously. After that, reset the ITEM No. rotary switch to 0and then
return on B position.
13. Enter Control > Operate RPI and Release the Frequency Measurement.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 94/116

COM_QMCO_M_003
ed.03 del 03.04.07

If the diversity is not installed, change the status of Rx equipment from Maintenance to In service by
WebLT.

CMO NI Site Engineering

11.1.1.2.
1.
2.
3.
4.

Response on Diversity Rx Channel.

Remove the Main RX RF cable.


Connect the Diversity Receiver RX RF cable.
In the received side set the ITEM No. rotary switch to B position.
Set the Frequency Measurement of Rx side by WebLT. Choose Control > Operate RPI. Select the
MSTU unit and the dialog box appears.

Operate RPI Subwindow


5. Select command FMSR and click on Operate button to activate the command.
FMSR: When FMSR is set on SRT1F WebLT, activation of AGC OFF and EPS OFF at near End
(Local) station and at once ALC OFF at Far End (Forced) station are automatically carried out.
6. The amplitude response and the group delay curve are displayed on RX link analyzer.
7. In absence of fading and reflections, check that the amplitude response and the group delay of the
diversity receiver are within the limits.
8. If the amplitude response does not comply with the limits, adjust it by WebLT.

Choose Control RPI adjust.


Click a selectable unit, and then click anywhere else on the shelf. The RPI Adjust dialog box
appears
On the Adjustment Item, six selections are available:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 95/116

COM_QMCO_M_003
ed.03 del 03.04.07

TXPWR: Select to transmitter output power level adjustment.


TXGAIN: Select to transmitter RF gain adjustment.
RXRFGAIN: Select to receiver RF gain adjustment.
RXIFGAIN: Select to receiver IF gain adjustment.
SDGAIN: Select to SD receiver IF gain adjustment.
SDSLOPE: Select to SD receiver IF group delay slope adjustment.

CMO NI Site Engineering

Select the Adjustment Item SDSLOPE to modify the IF Response


Select the Mode (Coarse or Fine) as required and click OK.
Repeat the step in order to obtain the proper IF response.

Set RPI adjustment dialog box


9. If the group delay response does not comply the limits, use the INC/DECR push- button on the front
panel of the MSTU until the amplitude is within the limits. Perform this operation with ITEM No. rotary switch in the following position:

ITEM No.2 : DELAY-HIGH (for adjustment of higher frequency)


ITEM No.3 : DELAY-MIDDLE (for adjustment of middle frequency)
ITEM No.4 : DELAY-LOW (for adjustment of low frequency)

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 96/116

COM_QMCO_M_003
ed.03 del 03.04.07

10. To memorize the new value set the ITEM No. rotary switch in 9 position and push the
INCR/DECR buttons simultaneously. After that, resets the ITEM No. rotary switch to 0 and return in position B.
11. Note that sometime in case of high adjustment of group delay curve, it is necessary research a
compromise curve adjustment between Main and diversity system (common setting and adjustment).
12. At the end connect the MN RX RF cable.
13. Enter Control > Operate RPI and Release the Frequency Measurement.
14. Change the status of Rx equipment from Maintenance to In service by WebLT.

CMO NI Site Engineering

11.1.2.

Space Diversity Equalization.

This step is fundamental in case of system with Space diversity, in order to equalize the amplitude of
different path introduced by the diversity.
The test bench used for this measurement is the same bench used for IF-IF response tests (Group Delay
and IF amplitude), but it is necessary to introduce in the system (via sw and front panel setting on the MSTU
unit) a particular application called DADE (Differential Absolute Delay Equalizer) to activate an internal
oscillation from Main and Diversity Channel.
The adjustment of the absolute delay is performed by using a front panel (MSTU) jumper and the amplitude
equalization is performed by using the WebLT.

Required Test instruments:

WebLT
MW Link Analyzer (MLA)
Power meter
IF cable and coax

Typical Test Bench:

Typical test bench for IF-IF tests with Link Analyzer


Use the same test bench used for Group delay and IF amplitude measurement.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 97/116

COM_QMCO_M_003
ed.03 del 03.04.07

The following description is applied by using the Link Analyzer test instrument.
In alternative it is possible to use a couple of spectrum analyzers (type Agilent model HP 8593-E),
equipped with an additional option (type HP 11770A Link Measurements Personality)

CMO NI Site Engineering

DADE Jumper on MSTU Unit

11.1.2.1.

Static Delay Equalization between Main and Diversity

1. In the remote station, connect the Tx Link Analyzer to 70M IN of MSTU


2. In the local station, connect the Rx Link Analyzer to XPIC OUT of MSTU.
3. Set the test instruments as follow
Link TX Settings
Baseband Frequency
250 500KHz
Deviation
250 500KHz
Sweep width
2.0 MHz
IF Frequency
70.00 MHz
IF Level
10.0 dBm

4. Control on the remote station that the ATPC function is in OFF with the ATPC in High or Low
value.
5. Change the status of the Rx equipment from In service to Maintenance by WebLT.
Select Provisioning > Service State

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 98/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

Service State Main Frame

Press the Maintenance Facility button in the Maintenance State column.

Maintenance Facility Subwindow

Select the unit. In the RSPI field select IS-MT.

Confirm the change of the maintenance state by pressing the Operate button.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 99/116

COM_QMCO_M_003
ed.03 del 03.04.07

6. Set the Frequency Measurement of Rx side by WebLT. Choose Control > Operate RPI. Select the
MSTU unit and the dialog box appears

CMO NI Site Engineering

Operate RPI Subwindow


7. Select command FMSR and click on Operate button to activate the command. FMSR: When FMSR
is set on SRT1F WebLT, activation of AGC OFF and EPS OFF at near End (Local) station and at
once ALC OFF at Far End (Forced) station are automatically carried out.
8. In the received side set the ITEM No. rotary switch to B position.
9. Check the level of IF Output on XPIC Out Port (10.0 dBm 1 dB).
10. If the amplitude response does not comply the limits, adjust it by WebLT.
Choose Control > RPI adjust.
Click a selectable unit, and then click anywhere else on the shelf. The Operate RPI Adjustment
dialog box appears.
On the Adjustment Item, six selections are available:
TXPWR: Select to transmitter output power level adjustment.
TXGAIN: Select to transmitter RF gain adjustment.
RXRFGAIN: Select to receiver RF gain adjustment.
RXIFGAIN: Select to receiver IF gain adjustment.
SDGAIN: Select to SD receiver IF gain adjustment.
SDSLOPE: Select to SD receiver IF group delay slope adjustment.
Select the Adjustment Item RXIFGAIN to modify the IF Level
Select the Mode (Coarse or Fine) as required and click OK.
Repeat the step in order to obtain the proper IF response.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 100/116

COM_QMCO_M_003
ed.03 del 03.04.07

CMO NI Site Engineering

Set RPI adjustment dialog box


11. After the Level adjustment, set the Activation of SD DADE facility.
12. Set the SD DADE ON (to active the internal oscillation) by WebLT in the Rx station.

Choose Control >Operate RPI, select the MSTU unit and the Maintenance dialog box appears.
Select the Action Operate and the command SD DADE and click on Operate button.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 101/116

COM_QMCO_M_003
ed.03 del 03.04.07

SD DADE activation on Maintenance for SD dialog box

CMO NI Site Engineering


13. To display the two tracks on the Rx link analyzer turn the ITEM No. rotary switch in position 0
and after than in position B again. The difference between the 2 tracks displayed represents
the delay between the Main and Diversity received signals (due to the waveguide path difference).
Verify that the delay difference displayed on the Microwave Link Analyzer is less than 2 ns.
(see next figure for a example).
14. If the delay difference is not less than 2 ns, change the delay line with SD DADE jumpers so as to
achieve the difference of 2 ns. The green jumpers are used to introduce the delay on the Diversity
path.
The green jumper in default position (vertical) does not introduce delay; put it in the horizontal
position to introduce the delay. Please refer to the above reference picture or to the UMN manual for
more detailed information.
15. At the end, enter Control > Operate RPI and select the Action Release for the command SD DADE
and click the Operate button

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 102/116

COM_QMCO_M_003
ed.03 del 03.04.07

Warning
In the SRT1F equipment it is possible to compensate a static delay
between Main and Diversity antenna only by inserting a delay on the
diversity path. The max compensable delay is 120nsec.

CMO NI Site Engineering

Example of Static delay curve before equalization

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 103/116

COM_QMCO_M_003
ed.03 del 03.04.07

Example of Static delay curve after equalization

CMO NI Site Engineering

11.1.2.2.

Main and Diversity Amplitude Response check

This chapter describes how to check and equalize the amplitude of the two received paths.
They must be executed on the Main path, when the Diversity receives a negligible power and vice-versa.
It is suggested to perform this test with a Prx value of about <-50dBm
1. Remove the SD RX RF input cable.
2. Check the IF level value for Main Channel, verify that the following output levels are within the limits:

MN 70M OUT
XPIC OUT

10dBm1db
10dBm1dB

3. If the output levels do not comply the tolerances, adjust the levels by WebLT

Choose Control > RPI adjust.


Select the unit.
On the Adjustment Item, six selections are available:
TXPWR: Select to transmitter output power level adjustment.
TXGAIN: Select to transmitter RF gain adjustment.
RXRFGAIN: Select to receiver RF gain adjustment.
RXIFGAIN: Select to receiver IF gain adjustment.
SDGAIN: Select to SD receiver IF gain adjustment.
SDSLOPE: Select to SD receiver IF group delay slope adjustment.

Select the Adjustment Item RXRFGAIN to modify the MN 70 MOUT level.


Select the UP/DOWN and the Mode as required and click on the Operate button.
Select the Adjustment Item RXIFGAIN to modify the XPIC OUT level.
Select the Mode as required and click on the Operate button.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 104/116

COM_QMCO_M_003
ed.03 del 03.04.07

Set RPI adjustment dialog box

CMO NI Site Engineering


4. After the check on the main channel, replace the SD Rx RF input cable and remove the Main Rx RF
input cable.
5. Check that the relevant output power on XPIC OUT port is 10dBm1dB
6. If the output levels do not comply the tolerances, adjust the levels by WebLT

Choose Control > RPI adjust.


Select the unit.
On the Adjustment Item, six selections are available:
TXPWR: Select to transmitter output power level adjustment.
TXGAIN: Select to transmitter RF gain adjustment.
RXRFGAIN: Select to receiver RF gain adjustment.
RXIFGAIN: Select to receiver IF gain adjustment.
SDGAIN: Select to SD receiver IF gain adjustment.
SDSLOPE: Select to SD receiver IF group delay slope adjustment.

7.
8.
9.
10.

Select the Adjustment Item SDGAIN to modify the XPIC OUT level.
Select the Mode and click on the Operate button.

Set the ITEM No. rotary switch in position 0in the Rx station.
Enter Control > Operate RPI and Release the Frequency Measurement.
Change the status of the Rx equipment from Maintenance to In service by WebLT.
Replace the MAIN RX RF input cable.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 105/116

COM_QMCO_M_003
ed.03 del 03.04.07

Repeat the same control for all MSTU units equipped.

CMO NI Site Engineering

11.1.3.

IF-IF testing by using Spectrum analyzer with MLA option.

In alternative to the MLA (Microwave Link Analyzer) Test instrument, it is possible to use also a particular
model of Agilent spectrum analyzer, equipped with a Link Measurements Personality Measurement
option for group delay.
The applicable Spectrum analyzer is Agilent model HP 8593-E equipped with an optional card and a
configuration type HP 11770A Link Measurements Personality.
Warning
If for IF-IF measurement the spectrum analyzer test instrument is used, 2
test instruments must be used (one on both ends).

Typical test bench for IF-IF tests with Spectrum Analyzer with option 111
Refer to the User manual supplied with the test instrument in order to properly configure the Spectrum
Analyzer.
Link Measurement Personality
For use with the HP 85933, HP 8594E, HP 85953, and HP 8596E only. The spectrum analyzer must be
configured with options 010 and 111. The HP 11770A Link Measurement Personality is a downloadable
program on a memory card. It provides a way to adapt your spectrum analyzer for making end-to-end and
loop back measurements of group delay and amplitude flatness.
These are important test requirements for digital microwave radios.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 106/116

COM_QMCO_M_003
ed.03 del 03.04.07

Group Delay and Amplitude Flatness (Option 111)


For HP 85933, HP 8594E, HP 8595E, and HP 8596E only. Option 111 allows to make end-to-end and loop
back measurements of group delay and amplitude flatness. It must be used with HP 11770A Link
Measurement Personality and the Option 010, Tracking Generator.
HP 11768A Group Delay and Amplitude Flatness Retrofit Kit contains both the Option 111 and the HP
11770A Link Measurement Personality. This kit is factory retrofittable only.

CMO NI Site Engineering

11.2.

BER vs Receiver.

Purpose of this test is to verify the proper BER threshold of Receiver equipment.
Note that in order to apply this test is required a link with a stable propagation condition without any type of
interference (external signal, reflection etc).
Basically the test is performed with a variable attenuator on Rx side only, but in case of SD system, in order
to verify the diversity improvement, the variable attenuator could be inserted in Tx side.
Note that in particular in this condition some effects of the external interferences are detected and the test
result could be not compliant (cause external interference and not the equipment specification).

Required Test instruments:

WebLT
Rotary variable attenuator
RF Cable
Fix attenuator (if necessary)
SDH BER test analyzer
Power meter with Related Sensor for Low RF power measure

Typical Test Bench:

Typical test bench for BER vs Receiver test

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 107/116

COM_QMCO_M_003
ed.03 del 03.04.07

Note that it is suggested to use 2 SDH BER tests, because if the measure is applied with a remote STM 1
loop, in case of High BER detected on the remote side, these errors increase the BER result on the local
side.

CMO NI Site Engineering

Test Procedure:

To perform this test the variable attenuator could be inserted in TX side or RX side.
Note that by attenuating on Rx side only the MSTU unit is tested; instead by attenuating on Tx side also the
presence of RF interferences is considered in the measurement.
In presence of interfering system verify that the measured value complies with the expected one.
Note that the test result curves are inserted in the UMN manual or in a document enclosed in the Field
commissioning test sheet collection.
The Rx values are referred to two the points, called A and B;

Point A refers to the input of MSTU unit.


Point B refers to the input of Branching filter.

See a BER Threshold curve for an example:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 108/116

COM_QMCO_M_003
ed.03 del 03.04.07

Example of BER threshold characteristic

CMO NI Site Engineering

11.2.1.

Test on Single Rx Main Channel (Attenuator on Rx Side).

1. With the WebLT force and lock the traffic on the MSTU/Channel under test.
2. For Space diversity system, disconnect the RF cable from Branching unit (Div.) and MSTU. Open
also some DADE jumpers in order to isolate completely the Main channel from Diversity channel.
3. Connect the RF Test bench (RF Cable, variable attenuators) on the Main RF output filter.
4. Measure the Prx value on the end point of the test bench. Take a note of the value.
5. Connect the end point of the test bench to the input (Rx) of MSTU.
6. On the Prx value measured consider the Branching / Adaptor loss referred to point A or B considered for the measurement.
7. On both sides, connect the SDH BER Analyzer on the relevant Input/output STM1 port on BSW unit.
8. Activate repetitive measurements with a small gate counter (about 1 second, in repetitive mode);
verify that in this condition no errors are detected.
-6
-3
9. Increase the attenuation (with the rotary variable attenuator) and check that BER 10 and BER 10
points respect the limits. Note that it is possible to read the Prx value also with WebLT (on MSTU
input point)

11.2.2.

Test on Single Rx Diversity Channel (Attenuator on Rx Side).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 109/116

COM_QMCO_M_003
ed.03 del 03.04.07

1. With WebLT force the traffic on the MSTU/Channel under test.


2. Disconnect the RF cable from Branching unit (Main.) and MSTU, in order to isolate completely the
Main channel from Diversity channel.
3. Connect the RF Test bench (RF Cable, variable attenuators) on the Diversity RF output filter.
4. Measure the Prx value on the end point of the test bench. Take a note of the value.
5. Connect the end point of the test bench to the input (Div. Rx) of MSTU.
6. On the Prx value measured consider the Branching / Adaptor loss referred to point A or B considered for the measure.
7. On both sides, connect the SDH BER Analyzer on the relevant Input/output STM1 port on BSW unit.
8. Activate repetitive measurements with a small gate counter (about 1 second, in repetitive mode),
verify that in this condition no errors are detected.
-6
-3
9. Increase the attenuation (with the rotary variable attenuator) and check that BER 10 and BER 10
points respect the limits. Note that it is possible to read the Prx value also with WebLT (on MSTU
input point)

CMO NI Site Engineering

11.2.3.

Test in Combined mode (Main and Diversity) (Attenuator on Tx Side).

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 110/116

COM_QMCO_M_003
ed.03 del 03.04.07

1. With WebLT force the traffic on the MSTU/Channel under test.


2. On the transmission side, connect the RF Test bench (RF Cable, variable attenuators) between the
RF output (MSTU) and Transmission Filter.
3. On the received side, measure the Prx value. Take a note of the value.
4. On the Prx value measured consider the Branching / Adaptor loss referred to point A or B considered for the measure.
5. On both sides, connect the SDH BER Analyzer on the relevant Input/output STM1 port on BSW unit.
6. Activate repetitive measurements with a small gate counter (about 1 second, in repetitive mode),
verify that in this condition no errors are detected.
-6
-3
7. Increase the attenuation (with the rotary variable attenuator) and check that BER 10 and BER 10
points respect the limits.
8. Compare the result value with the same tests in single mode (Main Channel) and check that the
threshold limit improves the BER limit of about 2 dB.

CMO NI Site Engineering

11.3.

STM 1 Radio Protection Switching.

Purpose of this test is to verify the proper switching with a simulation of the switching criteria alarms defined
in the field commissioning tests sheet.
Tests to be performed in all the protected configurations.
Apply the test for all the protect channel.
The three switch criteria are:

B-SW (bipolar switch)


U-SW (unipolar switch)
SW switch

Required Test instruments:

WebLT
SDH BER test analyzer

Typical Test Bench:

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 111/116

COM_QMCO_M_003
ed.03 del 03.04.07

Typical test bench for Radio Protection switch tests

CMO NI Site Engineering

Test Procedure:

Connect the SDH BER analyzer to the SRT-1F radio equipment in the local station and set a base band
loop in the remote station.
Configure the STM1 payload with the following settings:
STM-1 signal - VC4 unframed - 140 M/s payload
Before to perform this test, check that the configuration of SW INITIATOR status (The proper setting must
be configured during the first configuration of system).
In any case to check them, select the Provisioning > RSPI & UC & RPS.

RSPI & UC & RPS Main Frame


Select Enable for all the channels configured in the system.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 112/116

COM_QMCO_M_003
ed.03 del 03.04.07

Edit RPS(Line) Subwindow

CMO NI Site Engineering


1. To simulate the B-SW (bipolar switch) turn OFF the MSTU under test. Verify that the B-SW has
occurred by DTA instrument and by WebLT (Choose ControlRPS & Loopback and the dialog box
in the next figure appears). This test is not errors free.

Control -> RPS & loopback (BSW)


2. To simulate the U-SW (unipolar switch) insert a variable attenuator in Tx or Rx side on the Working channel under test (to simulate a fading variability) and increase the attenuation. Verify that the
U-SW has occurred by DTA instrument and by WebLT. This test is not errors free.
Warning
Remember that the B-SW is not hitless because occurs for HW faults.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 113/116

COM_QMCO_M_003
ed.03 del 03.04.07

Control -> RPS & loopback (USW)

CMO NI Site Engineering


3. To simulate the SW switch enter Control RPS & loopback menu and select the MSTU under test.
To switch the MSTU under test on the Protection channel select action Operate Manual or Operate
Forced. Verify that the U-SW/B-SW has occurred by DTA and by WebLT. Remember that only the
U-SW is errors free.

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 114/116

COM_QMCO_M_003
ed.03 del 03.04.07

Operate RPS

CMO NI Site Engineering

11.4.

Link quality evaluation

Purpose of this test is to verify that the quality improvement of the MW link meets the Quality (G.826)
parameter defined by the MW Planning.
Two types of tests are requested:

Short Term, to check only the BER functionality of each channel/MSTU present in the system
Long Term, to check the G.826 Quality improvement on one channel selected by the customer.

Note that the proper G.826 Quality tests need an SDH BER Test Instrument in both end terminals, but if the
Short term performance dont detect any particular problem, it is possible to apply the test with a remote
loop. In case of problems it is mandatory a single channel analysis with two test instruments.
The measurement time should be in accordance with the customer requirements (normally 12h).
If the measurement is not OK, remove the base band loop and connect to the radio equipment another SDH
BER Analyzer. This operation is helpful to locate the critical direction.
Caution
If there is any particular sync. configuration between MW equipment and
test instrument, it is possible to detect some Pointer Adjustments by the
test instrument.
This type of detection is normal, because the equipment is with MST.
In some particular cases it is suggested to synchronize the radio
equipment with the STM1 signal generated in the SDH test instrument
(for this application is requested a test instrument with S1 capabilty)
It is also suggested to perform the test at the DDF (Digital distribution Frame), in order to verify also the
STM1 cabling between the equipment and the DDF.
For the test configure the basic parameters of the test instrument with the following data:
STM-1 signal - VC4 unframed - 140 M/s payload

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 115/116

COM_QMCO_M_003
ed.03 del 03.04.07

Note
If the radio Link is connected to a Nokia Siemens Networks management
supervision system (e.g. Netviewer) it is also possible to activate the
Performance Monitoring feature, in order to perform the Long Term
Quality test with the management system.

CMO NI Site Engineering

Required Test instruments:

WebLT
SDH BER test analyzer

Typical Test Bench:

Typical test bench for short term G.826 quality evaluation

Numero dOggetto/Document Number

909-041/12

Edizione/Issue

Data/Date

03

03/2008

Nokia Siemens Networks S.p.A.


Copyright Tutti i diritti riservati - All rights reserved 2008

Tests Procedure for SRT 1F K Shelf


System
Field Tests Procedure
Foglio/Sheet 116/116

COM_QMCO_M_003
ed.03 del 03.04.07

Typical test bench for long term G.826 quality evaluation