Question No: 2
Selecting a correct procurement method is a main key requirement of a
project. As it will be directly affect to the time, cost and risk of the project.
There are seven successful steps identified by NEDO (1985) for building
procurements.
Completing the project that does not match with the functional
requirement of the building / project / client.
Project that delivered later than the initial programme
The project that cost more than the estimated cost in Pre-tender stage.
A good procurement method can be balance those risks against the project
objectives.
Mostly the following factors should be considered when evaluating the most
appropriate procurement method;
Page 1 of 7
B214MEC 002
2014/15
Cost issue if the design changes occurred the cost issue will
automatically raise and it will affect to the cash flow of the project.
Timing - adequate design time is allowing in the design stage. The
project duration will decide on that time and based on the project plan
and the cash flow will be decided. In any case if the timing got delay,
the cost and the risk will be rise accordingly. It will affect to the whole
project budget.
Lump sum contracts where the contract sum will determined before
the construction starts. The contractor somehow has to complete the
project within the budget. Contractor has no opportunity to claim
variations if occurred during the project stage. Lump sum fixed amount
Page 2 of 7
B214MEC 002
2014/15
Page 3 of 7
B214MEC 002
2014/15
Page 4 of 7
B214MEC 002
2014/15
Page 5 of 7
B214MEC 002
2014/15
In this method the contractor has direct contractual links with all the
works and the contractor is responsible for all construction works. In
this method the contractor paid an amount for professionally manage,
develop a programme and coordinate with the design and construction
team and activities to improve the project constructability. There are 3
types of Management procurement methods;
Construction Management The management contractor is selected
after careful selection based on their experiences and is paid a
management fee and this will gives the client a greater measure of
control.
Management Contracting The client will be appoint an independent
professional team in pre tender and also post tender stage to gives the
advice to the team and they will responsible in the execution stage. In
this type of contract there will be a possibility to make an early start on
site and achieve early completion. To get a good result on this there
must be trust and good team work on the part of the client.
Design and manage This method also similar to the management
contracting. The contractor is paid a fee and assumes responsibility,
not only for works contractors, but also for the design team.
Page 6 of 7
B214MEC 002
2014/15
Under a design and manage form, the contractor assumes risk and
responsibility for the integration of the design with construction.
Works packages can be let competitively at prices that are current
Improved constructability through constructor input in to the design
Roles, risks and responsibilities for all parties are clear
Flexibility for changes in design
Main Disadvantages are;
Price certainly is not achieved until the final works package has been
given
Informed and proactive client is required
Poor price certainty
Close time and information control required
Client must provide a good quality brief to the design team as the
design will not be complete until resources have been committed to
the project.
Client loses direct control of design quality which is influenced by the
constructors.
Bibliography:
Page 7 of 7
B214MEC 002
2014/15