Вы находитесь на странице: 1из 5

8/20/2012

Neven Krstulovic-Opara, PhD, FACI, is a Senior Structural Engineer at


ExxonMobil (EMDC). His work experience includes 11 years as an
university professor at University of Michigan, Ann Arbor, Northeastern
U. and North Carolina State University. For the last 10 years he has been
leading and/or supervising numerous forensic investigations and designs
of large offshore concrete structures and arctic platforms, LNG tanks and
natural gas plants while working for Exponent-Failure Analysis, Arup and
EMDC. Krstulovic is also the Chair of ACI 376, ACI 544-E, and the
Secretary of ACI 544. He received his MCE from the Univ. of Belgrade,
MSc from the Imperial College, London, and his PhD from Carnegie
Mellon Univ. His research interests include the behavior of concrete at
cryogenic temperatures, development of concrete tanks for storage of
cryogenic liquids, concrete offshore platforms for extreme environments,
smart materials and structures, high-performance fiber-reinforced
cement composites (HPFRCCs), use of HPFRCCS as seismic/blastresistant retrofit and new construction, and fracture mechanics of
cementitious materials and structures.

Design and Construction of


Concrete Tanks for Refrigerated
Liquefied Gas Containment, Part 2
ACI Spring 2012 Convention
March 18 21, Dallas, TX
ACI
WEB SESSIONS

ACI
WEB SESSIONS

Session on the Design & Construction of RLG Containment Part 2

ACI 376-10 Code & Commentary: Chapter VI

Minimum Performance
Requirements
Neven Krstulovic
ExxonMobil Development Company
Hyatt Regency Dallas, Dallas, TX
Reunion A
Tuesday, March 20, 2012
11:00 11:20 AM

ACI
WEB SESSIONS

Biography
NevenKrstulovicOpara,PhD,PE,FACI,isaSeniorStructuralEngineerforExxonMobil.
ChairofACI376(outgoing)&ACI544E
SecretaryofACI544.
MCE &MSc theU.ofBelgrade&theImperialColl.,London,respectively
PhD fromCarnegieMellonUniv.
Workexperienceincludes:

11years univ.professoratU.ofMichigan AnnArbor,Northeastern U.&NorthCarolinaStateU.


10years structuralleadonnumerousforensicinvestigations,designsoflargeoffshoreconcretestructures
&arcticplatforms,LNGtanksandplantswhileworkingforExponentFailureAnalysis,ArupandEM.

Researchinterestsinclude:

Cryogenicbehaviorofconcrete,&developmentofallconcreteLNGtanks,
smartmaterials&structures,
highperformanceFRCs,&theiruseinseismicresistantretrofit&newconstruction,
fracturemechanicsofcementitiousstructures.

ACI
WEB SESSIONS

Content

Overall Philosophy

1. Introduction

Inner Tank:

2. Performance Requirements
3. Construction (Material)Requirements
4. Other Requirements
ACI
WEB SESSIONS

maintainstructuralintegrity
maintainLIQUIDTIGHTNESS
Tank not to be emptied

Outer Tank:
maintainstructuralintegrity
containLNGafterSPILL
Tank to be emptied after a spill
ACI
WEB SESSIONS

8/20/2012

1.Introduction

1. Introduction: Requirements

Referencedocuments

Performance requirements:

1) ACI350 Code Requirements for Environmental Eng. Concrete


Structures & Commentary

2) ACI372R Design & Construction of Circular Wire- & Strand-Wrapped


PSC Structures

3) ACI373R Design & Construction of Circular PSC Structures with


Circumferential Tendons

ACI
WEB SESSIONS

Primaryconcrete tank
Secondarytank
Roof

Construction requirements Materials


Concrete&Shotcreteproperties
Coatings
Metalcomponents
ACI
WEB SESSIONS

2. Performance
Requirements

1. Introduction: Requirement Types


Strength requirements
Serviceability requirements

Cracking&spalling
Deformations
Deteriorationofreinforcementorconcrete
Vibrations
Leakage

ACI
WEB SESSIONS

Overall Philosophy
Inner Tank:
Liquid TIGHTNESS

Outer Tank:
LiquidCONATINMENT

ACI
WEB SESSIONS

2.1LiquidTightnessvs.Containment
2.2CrackLimits
2.3Sliding&Sloshing

ACI
WEB SESSIONS

2.1. Tightness vs. Containment


PRIMARY
(Inner)

Tank
CriteriaType

LoadStage

SectionResultant

LiquidTightness

Empty

>0

SECONDARY
(Outer)
Containment

Containment

Empty,
Operating,
OBE

SSE
SSEaft

Spill

twall /4
4in.

NeutralAxisDepth

twall /2
8in.

Aver.compressionzone

145psi

>0
twall /10
3.5in.
145psi

ACI
WEB SESSIONS

8/20/2012

2.1. Liquid Tightness: INNER Tank

2.2. Crack Limits: Outer Tank

ftensile=0 ..unlessjustified:

Normal designloading(no wind):


Slab,wall&roof:

DEMONSTRATE:sectionNOT previouslycracked
ConsiderALL loads,e.g.:
o Transient&steadystatethermalstresses
o Cooldown
o Hydrotest
o Creep&shrinkage
o OBE,etc.

calculated

Spill
ThermalCornerProtection(TCP)area:
calculated

ACI
WEB SESSIONS

wcr 0.012 in.

NOTE:heatlossthroughtheslab inducesadditionaltension

wcr 0.008in.

ACI
WEB SESSIONS

2.2. Crack Limits: TCP

2.3. Other: Sliding & Sloshing

EmbedmentZone 2twall aboveTCP

PrimaryTank

Considercompletetemperaturetimehistory
calculated

wcr 0.008 in.

SLIDING:usefrictionoranchorage
FREEBOARD:
SloshingOBE +1ft
SloshingSSE

ACI
WEB SESSIONS

3. Construction /
Material Requirements
3.1.General
3.2.ConcreteLimits
3.3.ShotcreteLimits
3.4.SteelReinforcementLimits
3.5.Liner
3.6.OtherMetalComponents
ACI
WEB SESSIONS

ACI
WEB SESSIONS

3.1. General
Useambient temperature propertiesfor
normalloadingconditions
StrengthIncreases
withIncreasing
Moisture
StrengthIncreases
withTemperature
Decrease

ACI
WEB SESSIONS

8/20/2012

3.1. General

3.2. Concrete

DIFFERENT Restraineddeformation

PSClimits:

UseCRYOGENIC coeff.ofthermalexp.,thermal
Confirmconcreteth. bytesting

ACI
WEB SESSIONS

serviceloads:c meetACI318
AtPStransfer:c 0.55fci ACI372 &373

ACI
WEB SESSIONS

3.2. Concrete

3.3. Shotcrete
Meetrequirementsof:
ACI506R Guide to Shotcrete

0.75

0.85fc

ACI506.2 Spec. for Materials, Proportioning, & Application of Shotcrete


ACI350,App.G Code for Enviro. Eng. Concrete Str. & Com.
ACI372R Design & Constr. of Circular Wire- & Strand-Wrapped PSC Str.
ACI373R Design & Constr. of Circular PSC Str. w. Circumferential Tendons

ACI
WEB SESSIONS

ACI
WEB SESSIONS

3.4. Steel Reinforcement

3.5. Liner

Cryogenic rebars

Preventsvapor&moisturetransmission
EXCLUDINGSPILL

Noncryogenic rebarsexposedto<0oF:
Usemorerestrictiveallow,st. Ch.IV:Materials
Lowerlimitsbasedonductility&toughnessrequirements

Prestressing steel

2typespermitted:
1) Metallic
2) Nonmetallic

UseACI350limits
ACI
WEB SESSIONS

ACI
WEB SESSIONS

8/20/2012

3.5. Liner
METALLIC Liner:meetAPI620 App.QorR
NONMetallic Liner(polymeric):
limits(BS EN 146203, Section 10.3)
ASTME96watervaporpermeability<0.00164 oz/ft2/24h
EscapeofLNGvapor<0.00033 oz/ft2/24h

retaincrackbridgingcapabilitybeyondanOBE

ACI
WEB SESSIONS

3.6. Other Metal Components


FollowAPI 620 requirementsfor:
Allowablestresses
Weldjointefficiency
Welding&weldtesting
Canusehigher stresses butmustassure
DUCTILEresponseunderthemostseverecase

ACI
WEB SESSIONS

4.1. Other Criteria

4. Other
Requirements

FATIGUE:ifOwnerspecified(see Appendix C)
outertank typicallynotaconcern

Risk/hazardassessment determineif
relevant:
1) Pressurewaveloading(e.g.,blast)
2) Impact
3) Fire

ACI
WEB SESSIONS

ACI
WEB SESSIONS

ACI37610Code&Commentary:ChapterVI

MinimumPerformanceRequirements

Thank You