Table 3.8.

2: - Effect of construction speed on the


cost of flat.
(Courtesy: Jogeswari Vikhroli link road, NNP
Nivara Parishad,MMRDA)

Descriptio
n

Construction Speed
A
B
C
D
Constructi 3 flats/day 4 flats/day 5 flats/day 6 flats/day
on speed
14.2 months
Period of 23 months 18.7
16.2
const.
months
months
Forming
741.9
989.2
1236.5
1483.8
area
Misc
55.5
55.5
55.5
55.5
formwork
Total
formwork
to be
ordered

797.4

1044.7

1292

1539

Cost of
formwork

14353200

18804600

23256000

27707400

Two third
of the
loaded cost

9568800

12536400

1550400

18471600

Profit &
Overhead
15%

1435320

1880460

2325600

2770740

Total Rs.
Cost per
flat, Rs

11004120
9825

14416860
12872

17829600
15919

21242340
18966

Note:
Construction period is calculated as follows:
Average 22 pouring of concrete are considered per
month.
About 3 months are required for mobilization and
getting plinths ready.
About 3 months are required for finishing.
Cost of formwork = $ 360; dollar Exchange Rate =
Rs50; No of flats = 1120
(Weight of aluminium formwork = 24 kg/m).

High quality Formwork panels ensure consistency of dimensions. On the removal of the formwork mould a high quality concret

The Advantages of this system are...


The MIVAN formwork is specifically designed to allow rapid construction of all types of architectural layouts.
1)

Total system forms the complete concrete structure.

2)

Custom designed to suit project requirements.

3)

Unsurpassed construction speed.

4)

High quality finish.

5)

Cost effective.

6)

Panels can be reused up to 250 times.

7)

Erected using unskilled labor.

Quality and speed must be given due consideration along with economy. Good quality construction will never deter to p

Even though there are so many advantages of MIVAN formwork the limitations cannot be ignored. However the limitations do n

1)

Because of small sizes finishing lines are seen on the concrete surfaces.

2)

Concealed services become difficult due to small thickness of components.

3)

It requires uniform planning as well as uniform elevations to be cost effective.

4)

Modifications are not possible as all members are caste in RCC.

5)

Large volume of work is necessary to be cost effective i.e. at least 200 repetitions of the forms should be possible at wor

6)

The formwork requires number of spacer, wall ties etc. which are placed @ 2 feet c/c; these create problems such as see

7)

Due to box-type construction shrinkage cracks are likely to appear.

8)

Heat of Hydration is high due to shear walls.

Remedial Measures

In external walls, ties used in shutter connection create holes in wall after deshuttering. These may become a source of leakag

The City and Industrial Development Corporation and Organization (CIDCO) of Maharashtra are responsible for the developm

completed Project with mivan FORMWORK

SPAGHETTI at KHARGHAR

Location:

Navi Mumbai.

Country:

India.

Client:

CIDCO and L&T ECC

Scope:

4 No. Blocks on each floor of 4, 5, 6, and 7 Storey Apts.

Design:

Load Bearing wall & slab.

Cycle:

4 days per floor.

System formwork:

6000 sq.mt.

Contract Start Date:

November 2003.

Project Type (s):

High rise, residential building having 16 buildings in all.

Architect:

Hafeez Contractor

The building in plan made an angle of 1720, 168 and 1610 with each other. The quality of construction is maintained at the sit

MIVAN formwork played a vital role in the construction of the project. The project was completed not only on stipulated

The task of housing due to the rising population of the country is becoming increasingly monumental. In terms of technical cap

Civil engineers not only build but also enhance the quality of life. Their creativity and technical skill help to plan, design

Traditionally, construction firms all over the world have been slow to adopt the innovation and changes. Contractors are

We have tried to cover each and every aspect related to aluminium (MIVAN) form construction. We thus infer that MIVA

Thus it can be concluded that quality and speed must be given due consideration with regards to economy. Good quali

Work cycle

MIVAN is a system for scheduling & controlling the work of other connected construction trades such as steel reinforce

The deshuttered panels are lifted & fixed on the floor .The activity requires 7-10 hours. Kicker & External shutters are fi

This is a well synchronized work cycle for a period of 7 days. A period of 10-12 hrs is left after concreting for the concre

The formwork assembling at the site is a quick & easy process. On leaving the MIVAN factory all panels are clearly lab
The system usually follows a four day cycle: -

Day 1: -The first activity consists of erection of vertical reinforcement bars and one side of the vertical formwork for the entire f

Day 2: -The second activity involves erection of the second side of the vertical formwork and formwork for the floor

Day 3: - Fixing reinforcement bars for floor slabs and casting of walls and slabs.

Day 4: -Removal of vertical form work panels after 24hours, leaving the props in place for 7 days and floor slab formwork in pla

work mould a high quality concrete finish is produced to accurate tolerances and verticality. The high tolerance of the finish means that no fu

ctural layouts.

construction will never deter to projects speed nor should it be uneconomical. In fact, time consuming repairs and modifications due to poo

ored. However the limitations do not pose any serious problems. They are as follows: -

forms should be possible at work.

hese create problems such as seepage, leakages during monsoon.

e may become a source of leakage if care is not taken to grout the holes. Due to box-type construction shrinkage cracks are likely to appear

are responsible for the development of Navi Mumbai. It has undertaken massive projects to achieve this goal and has encouraged use of

nstruction is maintained at the site with the use of RMC. The RMC plant has a capacity of producing 90 cubic meter of concrete of concrete

completed not only on stipulated period of time but also paid off with its attributes. Speedy & quality dwelling units were provided to the peo

umental. In terms of technical capabilities to face this challenge, the potential is enormous; it only needs to be judiciously exploited.

echnical skill help to plan, design, construct and operate the facilities essential to life. It is important for civil engineers to gain and harness t

ion and changes. Contractors are a conservative lot. It is the need of time to analyze the depth of the problem and find effective solutions. M

struction. We thus infer that MIVAN form construction is able to provide high quality construction at unbelievable speed and at reasonable c

regards to economy. Good quality construction will never deter to projects speed nor will it be uneconomical. In fact time consuming repair

on trades such as steel reinforcement, concrete placements & electrical inserts. The work at site hence follows a particular sequence. The w

. Kicker & External shutters are fixed in 7 hrs. The wall shutters are erected in 6-8 hrs One of the major activity reinforcement requires 10-12

eft after concreting for the concrete to gain strength before the beginning of the next cycle. This work schedule has been planned for 1010-1

factory all panels are clearly labeled to ensure that they are easily identifiable on site and can be smoothly fitted together using formwork m

vertical formwork for the entire floor or a part of one floor.

ormwork for the floor

ays and floor slab formwork in place for 2.5 days.

he finish means that no further plastering is required. Typically a 3mm to 4mm skin coat is applied internally prior to finishing and a 6mm bu

d modifications due to poor quality work generally delay the job and cause additional financial impact on the project. Some experts feel that

cracks are likely to appear around door and window openings in the walls. It is possible to minimize these cracks by providing control strips i

d has encouraged use of latest technologies to complete these projects. In recent years it has undertaken large scale constructions of ho

er of concrete of concrete per hour. The concrete used was of 25 grades. The construction from foundation up to stilt is done with conventio

were provided to the people of low income groups at very reasonable costs. MIVAN is a definitely future of this ever growing construction in

ciously exploited.

ers to gain and harness the potent and versatile construction tools.

find effective solutions. MIVAN serves as a cost effective and efficient tool to solve the problems of the mega housing project all over the w

peed and at reasonable cost. This technology has great potential for application in India to provide affordable housing to its rising populatio

act time consuming repairs and modification due to poor quality work generally delay the job and cause additional financial impact on the pro

particular sequence. The work cycle begins with the deshuttering of the panels. It takes about 12-15hrs.

It is followed by positioning o

nforcement requires 10-12 hrs. The fixing of the electrical conduits takes about 10 hrs and finally pouring of concrete takes place in these.

s been planned for 1010-1080 sq m of formwork with 72-25cu m of concreting & approximate reinforcement.

ogether using formwork modulation drawings. All formwork begins from corners and proceeds from there.

o finishing and a 6mm build up coat prior to laying tiles. Care must be taken so that the concert and in particular the enforcement does not b

t. Some experts feel that housing alternatives with low maintenance requirements may be preferred even if the initial cost is high.

y providing control strips in the structure which could be concreted after a delay of about 3 to 7 days after major concreting. The problem of

scale constructions of houses in Navi Mumbai.

stilt is done with conventional practice while the upper floors are constructed using MIVAN technology. The construction company has impo

er growing construction industry with lots of project still awaiting its touch of excellence.

sing project all over the world. MIVAN aims to maximize the use of modern construction techniques and equipments on its entire project.

sing to its rising population.

inancial impact on the project. Some experts feel that housing alternatives with low maintenance requirements may be preferred even if at

followed by positioning of the brackets & platforms on the level. It takes about 10-15hrs simultaneously.

ete takes place in these.

he enforcement does not become contaminated due to excessive or negligent application of the releasing agent.

ial cost is high.

oncreting. The problem of cracking can be avoided by minimizing the heat of hydration by using flyash.

uction company has imported three sets of aluminium forms. The cost is about Rs.500/- sq.ft as against Rs.650/- sq.ft using conventional m

nts on its entire project.

ay be preferred even if at the slightly may preferred even if at the higher initial cost.

sq.ft using conventional methods. Thus it can be said that even though the cost of construction is little bit high it has an unmatched quality c

as an unmatched quality compared to the conventional method.

In Construction, the formwork has to bear, besides its own weight, the weight of wet concret
For the design of planks and joists in bending & shear, a live load including the impact may b
In the design of formwork for columns or walls, the hydrostatic pressure of the concrete sho
The hydrostatic pressure of the concrete increases with the following cases: Increase in quantity of water in the mix.
The smaller size of the aggregate.
The lower temperature.
The higher rate of pouring concrete.
If the concrete is poured in layers at an interval such that concrete has time to set, there wil

Aluminium as usual is not a very strong material. So the basic elements of the formwork sys

eight of wet concrete, the live load due to labor, and the impact due to pouring concrete and workmen
g the impact may be taken as 370kg/m. It is however, usual to work with a small factor of safety in t
of the concrete should be taken into account. This pressure depends upon the quantity of water in the

me to set, there will be very little chance of bulging.

f the formwork system are the panel which is a framework of extruded aluminium sections welded to

rete and workmen on it. The vibration caused due to vibrators used to compact the concrete should a
factor of safety in the design of formwork. The surfaces of formwork should be dressed in such a mann
tity of water in the concrete, rate of pouring and the temperature.

sections welded to an aluminium sheet. It consists of high strength special aluminium components. Th

concrete should also be taken care off. Thus, the design of the formwork is an essential part during th
sed in such a manner that after deflection due to weight of concrete and reinforcement, the surface re

m components. This produces a light weight panel with an excellent stiffness-to-weight ratio, yielding

ential part during the construction of the building.


ment, the surface remains horizontal, or as desired by the designer. The sheathing with full live load of

eight ratio, yielding minimal deflections when subjected to the load of weight concrete. The panels are

with full live load of 370 kg/m should not deflect more than 0.25 cm and the joists with 200kg/m of l

te. The panels are manufactured in standard sizes with non-standard elements produced to the requir

with 200kg/m of live load should not deflect more than 0.25cm.

duced to the required size and size to suit the project requirements

The basic element of the formwork is the panel, which is an extruded aluminium rail section, welded to an aluminium sheet. Th
The panels are made from high strength aluminium alloy with a 4 mm thick skin plate and 6mm thick ribbing behind to

All the formwork components are received at the site whining three months after they are ordered. Following are the co

1) Beam Side Panel: - It forms the side of the beams. It is a rectangular


structure and is cut according to the size of the beam

FIG 3.5: BEAM SIDE PANEL

2) Prop Head for Soffit Beam: - It forms the soffit beam. It is a V-shaped
head for easy dislodging of the formwork.

FIG 3.6: PROP HEAD FOR SOFFIT BEAM.

3) Beam Soffit Panel: - It supports the soffit beam. It is a plain rectangular


structure of aluminium.

FIG 3.7: BEAM SOFFIT-PANEL

4) Beam Soffit Bulkhead: - It is the bulkhead for beam. It carries most of the
bulk load.

FIG 3.8: - BEAM SOFFIT BULKHEAD


1) Deck Panel: - It forms the horizontal surface for casting of slabs. It is built
for proper safety of workers.

FIG 3.9: - DECK PANEL

2) Deck Prop: - It forms a V-shaped prop head. It supports the deck and bears
the load coming on the deck panel.

FIG 3.10: -DECK PROP

3) Prop Length: - It is the length of the prop. It depends upon the length of the
slab.

FIG 3.11: - DECK PROP LENGTH

4) Deck Mid Beam: - It supports the middle portion of the beam. It holds
the concrete.

FIG 3.12: - DECK MID-BEAM

5) Soffit Length: - It provides support to the edge of the deck panels at their
perimeter of the room.

FIG 3.13: - SOFFIT LENGTH


6) Deck Beam Bar: - It is the deck for the beam. This component supports the
deck and beam.

FIG 3.14: -DECK BEAM BAR


1) Internal Soffit Corner: - It forms the vertical internal corner between the
walls and the beams, slabs, and the horizontal internal cornice between the walls
and the beam slabs and the beam soffit.

FIG 3.15: -INTERNAL SOFFIT CORNER


2) External Soffit Corner: - It forms the external corner between the
components

FIG 3.16: -EXTERNAL SOFFIT CORNER

3) External Corner: - It forms the external corner of the formwork system.

FIG 3.17: - EXTENAL CORNER


4) Internal Corner: - It connects two pieces of vertical formwork pieces at
their exterior intersections. Fig 3.18

FIG 3.18: - INTERNAL CORNERS

1) Wall Panel: - It forms the face of the wall. It is an Aluminium sheet properly
cut to fit the exact size of the wall

WALL PANEL

2) Rocker: - It is a supporting component of wall. It is L-shaped panel having


allotment holes for stub pin.

ROCKER

3) Kicker: - It forms the wall face at the top of the panels and acts as a ledge
to support

KICKER

4) Stub Pin: - It helps in joining two wall panels. It helps in joining two joints

STUB PIN

The panels of aluminium formwork are made from high strength aluminium alloy, with the fa
Since the equipment is made of aluminium, it has sections that are large enough to be effec
Trial erection of the formwork is carried out in factory conditions which ensure that all compo

MERITS OF ALUMINIUM FORMWORK

i. In contrast to most of the modern construction systems, which are machine and eq
ii. Fast construction is assured and is particularly suitable for large magnitude constru
iii. Construction carried out by this system has exceptionally good quality with accurat
iv. System components are durable and can be used several times without sacrificing
v. Monolithic construction of load bearing walls and slabs in concrete produces structu
vi. In view of the four day cycle of casting the floor together with all slabs as agains
vii. As all the walls are cast monolithic and simultaneously with floor slabs requiring n
viii. As fully completed structural frame is made available in one stretch for subsequen
ix. As the system establishes a kind of Assembly line production phase wise comp

Advantages of aluminium formwork over conventiona


construction

1. More seismic resistance: - The box type construction provides more seismic resistance t
the structure.
2. Increased durability: - The durability of a complete concrete structure is more than
conventional brick bat masonry.
3. Lesser number of joints thereby reducing the leakages and enhancing the durability.
4. Higher carpet area- Due to shear walls the walls are thin thus increasing area.
5. Integral and smooth finishing of wall and slab- Smooth finish of aluminium can be seen
vividly on walls.
6. Uniform quality of construction Uniform grade of concrete is used.
7. Negligible maintenance Strong built up of concrete needs no maintenance.
8. Faster completion Unsurpassed construction speed can be achieved due to light
of forms
9. Lesser manual labour- Less labour is required for carrying formworks.
10. Simplified foundation design due to consistent load distribution.
11. The natural density of concrete wall result in better sound transmission coefficient.
Table 2.1
RELATIVE COMPARISON OF IN SITU ALUMINIUM FORM SYSTEM WITH
CONVENTIONAL CONSTRUCTION
Sr. No

FACTOR

CONVEN
TIONAL

weig

Quality

Normal

The pace
of
constructio
n is slow
due to step
by step
completion
of different
stages of
activity the
masonry is
required to
be
laid
brick
by
brick.
Erection of
formwork,
concreting
and
deshutterin
g forms is
a two
week
cycle. The
plastering
and other
finishing
activities
can
Speed of commence
constructio only
n.
thereafter.

In the case
of
RCC
structural
framework
of column
and beams
with
partition
brick walls
is used for
constructio
n,
the
columns
and beams
show
unsightly
projections
in
room
Aesthetics. interiors.
Cement
plastered
brickwork,
painted
with
cement
based
paint.
Finishing
needs
painting
every
in
three years.

External
finishes.

Useful
Efficiency
carpet area around
as % of
83.5%
plinth area.

5
Consumpti
on of basic
raw
materials

Cement.
Normal

Reinforcin
g Steel

Reinforcin
g
steel
required is
less
as
compared
to the in
situ
constructio
n as RCC
framework
uses brick
wall
as
alternative

6
Maintenan In
maintenanc
ce
e cost, the
major
expenditur
e
is
involved
due to :
Repairs
and
maintenanc
e of plaster
of walls /
ceiling etc.

Painting
of
outer
and inner
walls.

Leakages
due
to
plumbing
and
sanitation
installation
.

The system of aluminum forms (MIVAN) has been used widely in the construction of residen

Background

Mivan is basically an aluminium formwork system developed by one of the construction com
The technology has been used extensively in other countries such as Europe, Gulf Countries,
In this system of formwork construction, cast in situ concrete wall and floor slabs cast m
The frames for windows and door as well as ducts for services are placed in the form before
The method of construction adopted is no difference except for that the sub structure is co

MIVAN aims in using modern construction techniques and equipment in all its projects. On le

Wall Assembly Details

SIMPLICITY PIN AND WEDGE SYSTEM

The panels are held in position by a simple pin and wedge system that passes through ho

EFFICIENT QUICK STRIP PROP HEAD:


One of the principal technical features which enables this aped to be attained using a single
The deck panels can therefore be resumed immediately.

A) PRE CONCRETE ACTIVITIES


a) Receipt of Equipment on Site The equipments is received in the site as ordered.
b) Level Surveys Level checking are made to maintain horizontal level check.
c) Setting Out The setting out of the formwork is done.
d) Control / Correction of Deviation Deviation or any correction are carried out.
e) Erect Formwork The formwork is erected on site.
f) Erect Deck Formwork Deck is erected for labours to work.
g) Setting Kickers kickers are provided over the beam.
Aftertheaboveactivitieshavebeencompleteditisnecessarytocheckthefollo
1.
2.
3.
4.
5.
6.
7.
8.

All formwork should be cleaned and coated with approved realize agent.
Ensure wall formwork is erected to the setting out lines.
Check all openings are of correct dimensions, not twist.
Check all horizontal formwork (deck soffit, and beam soffit etc.) in level.
Ensure deck and beam props are vertical and there is vertical movement in the prop le
Check wall ties, pins and wedges are all in position and secure.
Any surplus material or items to be cleared from the area to be cast.
Ensure working platform brackets are securely fastened to the concrete.

B) ON CONCRETE ACTIVITIES
At least two operatives should be on stand by during concreting for checking pins, wedges a
Things to look for during concreting:

i.

Dislodging of pins / wedges due to vibration.

ii.
iii.
iv.

Beam / deck props adjacent to drop areas slipping due to vibration.


Ensure all bracing at special areas slipping due to vibration.
Overspill of concrete at window opening etc.

POST CONCRETE ACTIVITIES


i) Strike Wall Form- It is required to strike down the wall form.
ii) Strike Deck Form- The deck form is then removed.
iii) Clean, Transport and stack formwork
iv) Strike Kicker Formwork The kicker are removed.
v) Strike wall Mounted on a Working Platform the wall are fitted on next floor.
vi) Erect Wall Mount Working Platform and the wall is erected.
Normally all formwork can be struck after 12 hours.

The post-concreting activities includes:

CLEANING
All components should be cleaned with scrapers and wire brushes as soon as they are str
The longer cleaning is delayed, the more difficult the task will be. It is usually best to clea

Transporting
There are basic three methods recommended when transporting to the next floor:
i.
The heaviest and the longest, which is a full height of wall panel, can b
ii.
Passes through void areas.
iii.
Rose through slots specially formed in the floor slab for this purpose.

Striking
Once cleaned and transported to the next point of erection, panels should be stacked at r

The formwork is designed using the most economical assortment of panel sizes with the help

Erection of Platform

Striking of formwork

Positioning of Platform

Removal of Kicker

The traditional mode of construction for individual houses comprising load bearing walls with
For undertaking mass housing works, it is necessary to have innovative technologies which
Several systems are adopted at different places in the world; eventually the systems which a

Cast-in-Situ Construction

Pre-cast and cast-in-situ are techniques that are used for quick construction. Pre-cast includ
Certain patented systems based on imported technologies such as Mascon System (Canad
The entire operation essentially comprises fitting and erecting the portion of shuttering as al

3-S SYSTEM OF PRECAST CONSTRUCTION

An engineered system of building construction, namely 3-S system was developed by B.G.

I. Cast in-situ sub-structure including foundations, stem columns, plinth beams, p


II. Erection of partial pre-cast components, jointing of these components using cas
III. Lying of reinforced cast in-situ screed over slab panels, construction of panels,

Achieving the 3-S system in the MIVAN formwork is quite easy. MIVAN formwork has got t

Present Technologies Available in INDIA

Some of the advanced technologies of formwork catering to the speed of construction are gi
To name a few:1) ThePrefabricationTechnology
The Pre-cast concrete elements in roofs, floors and in walls have become more comm

Prefabricated Technology (Raymond, 2001)

2)TunnelFormworkTechnology
It is a technologyconstructing large no of housing within short time using steel forms

Tunnel formwork (Raymond, 2001)

3)OutinardTechnology
Outinards superior engineering, the use of high quality steel and High Performance qu

Outinard Technology (Raymond, 2001)

4) MasconTechnology
The Mascon Construction System is a system for forming the cast in-place concrete structure

Mascon Technology. (Raymond, 2001)

d to an aluminium sheet. This produces a lightweight panel with an excellent stiffness to weight ratio, yielding minimal deflection under conc

mm thick ribbing behind to stiffen the panels. The panels are manufactured in MIVANS dedicated factories in Europe and South East Asia.

rdered. Following are the components that are regularly used in the construction.

um alloy, with the face or contact surface of the panel, made up of 4mm thick plate, which is welded
e enough to be effective, yet light enough in the weight to be handled by a single worker. Individual w
ensure that all components are correctly manufactured and no components are missed out. Also, they

are machine and equipment oriented, the formwork does not depend upon heavy lifting equipment an
e magnitude construction of respective nature at one project site.
d quality with accurate dimensions for all openings to receive windows and doors, right angles at meet
s without sacrificing the quality or correctness of dimensions and surface.
ete produces structurally superior quality with very few constructions joined compared to the conventi
th all slabs as against 14 to 20 day cycle in the conventional method, completed RCC structure is av
oor slabs requiring no further plasters finish. Therefore the time required in the conventional method f
stretch for subsequent finishing items, uninterrupted progress can be planned ensuring, continuity in
phase wise completion in desired groups of buildings can be planned to achieve early utilization of

conventional

seismic resistance to

re is more than

ng the durability.

asing area.

minium can be seen

tenance.

ed due to light

weight

ks.

ssion coefficient.

IN SITU REMARK
ALUMINI
S
UM
FORM
SYSTEM

Superior.

Superior
In quality in

Situ System
casting of housing
whole
structure
and
transverse
walls done
in
a
continuous
operation,
using
controlled
concrete
mixers
obtained
from
central
batching,
mixing
plants and
mechanical
ly placed
through
concrete
buckets
using crane
and
compacted
in
leak
proof
moulds
using high
frequency
vibrators

In
this System
system, the constructio
walls and n
floors are
cast
together in
one
continuous
operation
in matter
of
few
hours and
in
built
accelerated
curing
overnight
enable
removal
and re-use
of forms
on
daily
cycle basis.

is
much
faster.

The Room

Sized
wall panels
and
the
ceiling
elements
cast against
steel plates
have
smooth
finishing
and
the
interiors
have neat
and clean
lines
without
unsightly
projections
in various
corners.
The walls
and
ceilings
also have
smooth
even
surfaces,
which only
need
colour/whit
e wash

Textured /
pattern
coloured
concrete
facia can
be
provided.
This will
need
no
frequent
repainting.

Permanent
facia
finishes
feasible
with minor
extra initial
cost

Efficiency More
around
efficient
87.5%
utilization
of land for
useful
living
space.

Consumpti
on
somewhat
more than
that used in
convention
al
structures.

Although
greater
consumpti
on strength
and
durability
is
also
more

Steel
requiremen
t is more,
as it is
required
for
the
shear wall
constructio
n.
But
shear wall
constructio
n increases
safety
against
earthquake.

It
may,
however
will
be
slightly
more than
correspond
ing load
bearing
brick wall
constructio
n
for
which,
requiremen
ts of IS 456
have to be
followed
for system
housing.

The walls
and ceiling
being
smooth
and high
quality
concrete
repairs for
plastering
and
leakages
are not at
all required
frequently.

It can be
concluded
that
maintenanc
e cost is
negligible.

nstruction of residential units and mass housing projects. It is fast, simple, adaptable and cost effec

he construction company from Europe. In 1990, the Mivan Company Ltd from Malaysia started the ma
rope, Gulf Countries, Asia and all other parts of the world. MIVAN technology is suitable for constructin
nd floor slabs cast monolithic provides the structural system in one continuous pour. Large room sized
d in the form before concreting. Staircase flights, faade panels, chajjas and jails etc. and other pre-fa
sub structure is constructed using conventional techniques. The superstructure is constructed usin

all its projects. On leaving the MIVAN factory all panels are clearly labeled to ensure that they are eas

at passes through holes in the outside rib of each panel. The panels fit precisely, simply and securely a

ained using a single set of formwork panel is the unique V shaped a prop head which allows the quick

site as ordered.
vel check.
carried out.

ytocheckthefollowing.

vement in the prop lengths.

cking pins, wedges and wall ties as the pour is in progress. Pins, wedges or wall ties missing could lead

ue to vibration.

ed on next floor.

soon as they are struck. Wire brush is to be used on side rails only.
s usually best to clean panels in the area where they are struck.

next floor:
of wall panel, can be carried up the nearest stairway.

ab for this purpose. Once they have served their purpose they are closed by casting in concrete filter.

hould be stacked at right place and in right order. Proper stacking is a clean sign of a wall managed

el sizes with the help of the state-of-the art design software. The use of the software along with the e

ad bearing walls with an appropriate roof above or reinforced concrete (RC) framed structure construc
technologies which are capable of fast rate construction and are able to deliver good quality and dura
the systems which are reasonably economical and easy for operation with skilled labor are useful in I

ction. Pre-cast includes the wall-panel units and slab units directly added to building structure. The use
con System (Canada), Mivan System (Malaysia) have come on the Indian scene in recent years. In
n of shuttering as already determined (the optimization in use is determined by appropriate planning)

s developed by B.G.SHIRKE CONSTRUCTION TECH LTD., for achieving, speed, strength, safety and ec

mns, plinth beams, plinth masonry.


omponents using cast in-situ concrete with appropriate reinforcement.
struction of panels, construction of walling, flooring, plastering, water proofing etc.

formwork has got the unsurpassed speed of construction due to saving time for required time in mas

f construction are given below:

become more common as these eliminate shuttering; centering & plastering labor and saves material

me using steel forms to construct walls & slabs in one continuous pour.

High Performance quality control result in a vastly superior Wall Form system.

ce concrete structure of a building. It is also a system for scheduling and controlling the work of other

mal deflection under concrete loading. Panels are manufactured in the size and shape to suit the requirements of specific projects.

ope and South East Asia. Once they are assembled they are subjected to a trial erection in order to eliminate any dimensional or on site pro

e, which is welded to a formwork of specially designed extruded sections, to form a robust component
orker. Individual workers can handle all the elements necessary for forming the system with no requir
sed out. Also, they are numbered and packed in such a manner so as to enable easy site erection and

fting equipment and can be handled by unskilled labors.

ght angles at meeting points of wall to wall, wall to floor, wall to ceiling, etc, concrete surface finishes

red to the conventional column and beam slabs construction combined with filter brick work or block w
RCC structure is available for subsequent finish trades much faster, resulting in a saving of 10 to 15 da
ventional method for construction of walls and plastering is saved.
uring, continuity in each trade, thereby providing as cope for employing increased labor force on finish
early utilization of the buildings.

le and cost effective. It produces total quality work which requires minimum maintenance and when

ysia started the manufacturing of such formwork systems. Now a days more than 30,000 sq m of form
able for constructing large number of houses within short time using room size forms to construct wa
r. Large room sized forms for walls and floors slabs are erected at site. These forms are made strong a
tc. and other pre-fabricated items are also integrated into the structure. This proves to be a major adv
s constructed using MIVAN techniques. The integrated use the technology results in a durable structu

e that they are easily identifiable on site and can be smoothly fitted together using the formwork mod

mply and securely and require no bracing. Buildings can be constructed quickly and easily by unskilled

h allows the quick strip to take place whilst leaving the propping undisturbed.

missing could lead to a movement of the formwork and possibility of the formwork being damaged. T

g in concrete filter.

a wall managed operation greatly aids the next sequence of erection as well as prevents clutters and

re along with the experience and skill of the designers ensures an efficient construction process by inc

structure construction with infill masonry walls would be totally inadequate for mass housing construc
od quality and durable structure in cost effective manner...(Shrikande., et.al,2005)
abor are useful in India. Certain systems are in vogue and more and more contractors are trying to br

g structure. The use of aluminium also evolved as one of the technique for quick construction by use o
in recent years. In these systems traditional column and beam construction is eliminated and instead
propriate planning) and then carrying out concreting of the walls and slabs. Props are so designed tha

ngth, safety and economy in construction practices. The system involves structural elements such as p

quired time in masonry and plastering. The strength of raw aluminium is very less but when alloyed w

and saves material cost.

g the work of other construction trades such as; steel reinforcement, concrete placement, and mechan

specific projects.

dimensional or on site problems.

robust component. The panels are held in position by a simple pin and wedge arrangement system th
tem with no requirement for heavy lifting equipment or skilled labor. By ensuring repetition of work ta
y site erection and dismantling.

te surface finishes are good to receive painting directly without plaster.

rick work or block work subsequently covered by plaster.


ving of 10 to 15 days per floor in the overall completion period.

abor force on finishing item.

ntenance and when durability is the prime consideration. This system is most suitable for Indian condi

0,000 sq m of formwork used in the world are under their operation. In Mumbai, India there are numb
ms to construct walls and slabs in one continuous pour on concrete. Early removal of forms can be ach
are made strong and sturdy, fabricated with accuracy and easy to handle. They afford large number o
s to be a major advantage as compared to other modern construction techniques.
n a durable structure.

the formwork modulation drawings. All formwork begins at a corner and proceeds from there.

easily by unskilled labour with hammer being the only tool required. Once the panels have been numb

k being damaged. This effected area will then required remedial work after striking of the formwork.

revents clutters and impend other activities.

tion process by incorporating the optimum assembly procedures, economical panel selection and ultim

ss housing construction industry in view of the rapid rate of construction. Further, such constructions a

ors are trying to bring in new technologies. These are essentially based on the basis of mode of constr

nstruction by use of aluminium and steel (tunnel) formwork. As a matter of fact the cost of the formw
nated and instead walls and slabs are cast in one operation at site by use of specially designed, easy t
re so designed that they stay in position while de-shuttering of slabs and/or takes place. The dimensio

elements such as pre-cast hollow column shells pre-cast concrete beams, light weighed reinforced cel

but when alloyed with other materials prove to be strong enough to use as a formwork . To ensure saf

ement, and mechanical and electrical trades.

ngement system that passes through holes in the outside rib of each panel. The panel fits precisely, se
epetition of work tasks on daily basis it is possible for the system to bring assembly line techniques to

ble for Indian condition as a tailormade aluminum formwork for castinsitu fully concrete structure.

dia there are number of buildings constructed with the help of the above system which has been prov
of forms can be achieved by hot air curing / curing compounds. This facilitates fast construction, say tw
ord large number of repetitions (around 250). The concrete is produced in RMC batching plants under

rom there.

ls have been numbered, measuring is not necessary. As the erection process is manually, tower crane

g of the formwork.

selection and ultimately minimizing capital and operational costs.

uch constructions are prone to poor quality control even in case of contractors with substantial resourc

s of mode of construction, namely, pre-cast construction or in-situ construction.

e cost of the formwork may be up to 25% of cost of the structure in building work, and even higher in
lly designed, easy to handle (with minimum labor and without use of any equipment) light weight preplace. The dimensional accuracy of the formwork is of high order. Therefore any possibility of errors do

ghed reinforced cellular autoclaved concrete slabs for floor and roofs constituting the basic structural f

ork . To ensure safety in the site, an integrated safety/ working platform is developed which ensures l

nel fits precisely, securely and requires no bracing. The walls are held together with high strength wall
line techniques to construction site and to ensure quality work, by unskilled or semi-skilled workers.

oncrete structure.

hich has been proved to be very economical and satisfactory for Indian Construction Environment.
construction, say two flats per day. All the activities are planned in assembly line manner and hence re
ching plants under strict quality control and convey it to site with transit mixers.

nually, tower cranes are not required. The result is a typical 4 to 5 day cycle for floor to floor const

substantial resources and experience.

and even higher in bridges, it is thus essential that the forms are properly designed to effect economy
t) light weight pre-engineered aluminium forms. Rapid construction of multiple units of a repetitive ty
ssibility of errors does not rise.

e basic structural formwork. The 3-S system involves activities for construction of building such as:

ed which ensures labor safety during erection and striking of the formwork. Economy is also one of th

high strength wall ties, while the decks are supported by beams and props.
mi-skilled workers.

n Environment.
anner and hence result into more accurate, well controlled and high quality production at optimum c

or to floor construction.

to effect economy without sacrificing strength and efficiency.


s of a repetitive type can be achieved with a sort of assembly line production by deployment of a few

building such as:

my is also one of the main factors of any system. The MIVAN formwork proves to cost efficient as it can

uction at optimum cost and in shortest possible time.

ployment of a few semi-skilled labors.

st efficient as it can be used efficiently for 250 times.