Detail of Concrete
Buildings
Practical guidance for
sustainable construction
14:00 14-10
Introduction
14:10 -14:45
14:45 15:15
15:15 15:30:
Refreshment Break
15:30 17:00
17:00 17:30
17:30 18:40
18:40 18:50
Principles of
construction for heavy
weight buildings
Performance issues
Construction methodology
Types of construction
How do we categorize
building methodologies-:
Light weight ?
Medium weight ?
or
Ideas Store, Hackney,
Adjaye Associates / Mott Macdonald
Composite floors
Contoured/coffered floors
Cast insitu
Ribbed floors
Sprayed concrete
Tunnel form
Tilt up construction
Twin wall
Fabric formwork
Construction techniques
Insitu construction ?
Or
Offsite construction ?
Or
Hybrid?
Construction techniques
Cast Insitu reinforced
concrete (frames, floors)
Tunnel form
Sprayed concrete
Steel permanent formwork
Concrete blocks
Beam + block floors
Pre-cast elements
Stairs
external walls
columns
floor slabs
cladding panels
Hybrid structures
Twin wall
Composite floors
Combination of precast
and cast insitu elements
Insitu or precast
columns
Construction techniques
The Homes+Communities
Agency used to require such
approaches for affordable
homes funding
Twin wall
Pre tensioned beams/slabs
Insulated concrete
formwork
Tilt up construction
Cross wall
Tunnel form
Sprayed concrete
Darwin centre
C.F Moeller/
Ground floors
Ground floor:
Insitu ground bearing
slab
Suspended slab
Screed
In-situ
reinforced
100mm
EPS
dpm
concrete
slab (150mm
Trench fill
Blinded fill
Long spans
Potential for an extra storey in
a ten-storey building.
Trough slab
Hybrid Construciton
Precast concrete as permanent
formwork to insitu topping
Eg: Twin wall; lattice girder
floors; omnia deck
Composite floors using lattice
girder normally consists of a
temporarily propped pre-cast
plank which is not pre-stressed.
Pre-cast Plate
Construction
Panel weight
determined by
dimensions and number
of door/window openings
Twin wall
At corners the outside skin
of the double wall panels
project beyond the inside to
provide a fully shuttered
junction
All vertical joints are sealed
with foam filler or wood
Construction
Steel projecting from the
wall acts as a starter bar for
the next wall lift
Construction
Walls
Masonry (blockwork)
Traditional construction
External walls
cavity construction
partial/full fill
Internal partitions
Basement walls
Separating walls
No pointing necessary
Independent of brickwork
provides programming
benefits
Quickbuild
Walls: Precast
Structural or as cladding
Rainscreen or
waterproofing finish
Insulated sandwich panel
options
Range of finishes possible
Athletes Village
Crosswall construction
Pre cast cellular building
system
Comprises factory
engineered concrete
components including:
Loadbearing walls
Floors & Ceilings
Lift Shafts and stair
Elevation panels
Crosswall Construction
External walls
with window
openings
Internal
dividing walls
Ties in
every unit
Prestressed flat
slabs spanning from
cross wall to cross
wall
Floor slabs are
stitched together
and act as a
diaghram providing
lateral stability
Walls are stitched
together to form
load bearing joints
Buildability
Construction and Design benefits:
Less infill wall panels
High quality finishes minimises
follow-on trades
Flush walls and ceilings no
downstands or columns
Tight tolerances
Construction
Precast concrete panels are
delivered directly to site in
line with the construction
programme
Units are lifted directly from
the delivery vehicles into
place
Fixing Detail
Transportation limits
Constructed in 33 weeks
www.concretecentre.com/publications
Flexibility/Design changes
Time available to fix brief
and design prior to start on
site
Future adaptability: on
site and post occupancy
Cost
Materials
Labour
Transport
Programme
Arup
Davis langdon
Costain
6 structural
options considered
Published 2008
Procurement
Design responsibility and
quality control
Specialist items
Specialism of different
contractors
Site Conditions
Location
Quality
Design brief
Buildability
Appropriate designs
Sequence of works
Skills/labour to match
requirements
Sustainability issues
Use of thermal mass
Waste
Use of recycled material
in specification
Use of local and
responsibly sourced
materials
Design for future re-use or
recycling
Long term performance