Академический Документы
Профессиональный Документы
Культура Документы
OF
NUMBER
: QA/QC.
REVISION
:A
PAGE
Of
COVER SHEET
Document No.
MOS/H7008/TM Q01
Document Name
Client Name
PT. PERTAMINA
Project Name
PASAMAN
Project No.
MOS-H7008
MOS/PPC/QAQC
MOS/PPC/QAQC
Established By
Checked By
Date
Date
Classification Society
Owner
Reviewed By
Approved By
Date
Date
QUALITY DOCUMENT
OF
NUMBER
: QA/QC.
REVISION
:A
PAGE
Of
CONTENTS
Page
I.
GENERAL .
II.
REFERENCE ...
III.
RESPONSIBILITIES ..
IV.
V.
VI.
APPENDICES .
11
QUALITY DOCUMENT
OF
NUMBER
: QA/QC.
REVISION
:A
PAGE
Of
I.
GENERAL
Purpose
This procedure establishes the manner in which various inspections to be
coordinated, executed and documented. In addition, and in order to aid the
inspectors in the performance of their work PRODUCT OIL TANKER 17.500 LTDW
Project, the procedure provides inspection instruction to be performed during the
various phases of the work.
II.
REFERENCE
Meet the requirements of the NK classification Society Rules (Part D, Chapter 13,
Point 17)
Contract Specifications of PRODUCT OIL TANKER 17.500 LTDW PERTAMINA
(Chapter III, Section 9~10)
The international Convention for the prevention of pollution from ships the
requirements of API and ASME.B31.1
II.A. DEFINITION
a. Monitoring Point
An identified point in the fabrication during which an activity, work or
function is observed by inspector. Formal notice is not required to be
given.
b. Witness Point
An identified inspection point in the fabrication, which will be witnessed
or verified by Inspector. If inspector is not available fabrication process
can proceed. Records to be submitted to Client / Class (As Per ITP).
c. Spot Witness Point.
An identified inspection point in the fabrication, which will be spot
witnessed or verified by Inspector. If inspector is not available fabrication
process can proceed. Formal notice is not required to be given.
d. Hold Point.
An identified inspection point in the fabrication, beyond which shall not
proceed without the specified activity, work of function being witnessed
or verified by Inspector.
e. Review Point.
The quality record applicable to the specified inspection and test activity
shall be physically examined by Inspector.
f. Inspection and Test Plan
Schedule of all inspections and tests carried out during fabrication.
QUALITY DOCUMENT
OF
NUMBER
: QA/QC.
REVISION
:A
PAGE
Of
III.
RESPONSIBILITIES.
III.1.
III.2.
QA / QC Inspectors.
Is responsible for the followings tasks :
Scheduling daily work load and job assignment of Inspectors.
Monitoring the quality control activities and document inspection.
Preparation and Control Non Conformance Report (NCR)
Liaison with Company Engineer.
Monitoring production workmanship tasks.
Performing inspection and test.
Documentation of the inspection / monitoring results.
Liaison with Company Inspectors.
Verify correct drawing revision.
III.3.
Production Supervisors.
Performing Inspection for Self Active Control
Liaison with QA/QC Inspector.
Fit-up, Visual and pressure Inspection
QUALITY DOCUMENT
OF
NUMBER
: QA/QC.
REVISION
:A
PAGE
Of
SYSTEM DESCRIPTION
The Inspection activities throughout the project shall be carried out in an adequate
manner as part of the process. For this purpose, the inspection request to Company
for witness and Hold Points shall be submitted to company for its witness in
advance 24 hours before.
IV.1. Definition of Inspection Stages
The various inspections shall be carried out by QAQ/QC Inspector as
described in the following.
IV.1.1. In Process Inspection.
In Process Inspection is intended to ensure that all phases of
fabrication work are being conducted in accordance with the
requirements of other related approved procedures.
Basically, all inspection activities during in process shall be carried
out on going basis. One assigned sheet of spool drawing will travel
all stages of fabrication together its spool from marking to final just
like traveler cards. After inspection is finished at some stage, QA/QC
Inspectors shall sign his signature on inspection column of the spool
drawing. And then the spool may be released to subsequent stage.
If materials are cut into two or more pieces according to the cutting
plan which is prepared by the Design Engineering Dept., the original
marking including spool and piece no. shall be transferred to all
pieces prior to cutting. The transfer of the original marking shall be
inspected by the production Supervisor, QA/QC Inspector and
indicated on the spool drawing.
Spool visual / final inspection shall be carried out before the release
of the pipe spool from the piping shop to the Assembly areas.
Inspector shall inspect all quality factors at final inspections such as,
weld visual, surface condition and dimension.
IV.1.2. Monitoring Inspection.
Monitoring inspection items shall be carried out by all the inspection
parties and is to ensure that work in progress in being under taken in
a proper manner. In this respect the Inspector shall pay particular
attention to the following aspects.
Joint fit-up is properly prepared in accordance with approved
WPS.
All welders are certified for the type of work they do, and that they
are qualified with the welding procedure in question
QUALITY DOCUMENT
OF
NUMBER
: QA/QC.
REVISION
:A
PAGE
Of
Document.
All the document including spool inspection report shall be compiled by
QA/QC Dept. on an ongoing basis to maintain the traceability of spools and
hydro-test package.
QUALITY DOCUMENT
OF
: QA/QC.
REVISION
:A
PAGE
Of
Inspection Activity
to be Verified
Packing list
Verification
Checking heat
no, Tag No.
Type, size,
material grade,
thickness,
diameter &
length.
Transferring of
Original
marking.
5.1.
Material Inspection and pipe ID
V.
NUMBER
Instruction
Record to be
Prepared
- Spool
Drawing
- Mill
certificate
- Material
Piping
inspection
report
Insp. Involvement
PD QC NKK O/S
W/R
QUALITY DOCUMENT
OF
Kind of
Inspection Activity
Inspection
to be Verified
Cutting
Misalignment
Groove angle
5.2.
Fit-up Inspection Fitting ID
Root Face
Root Opening
Tapered Angle
Tack Weld
Joint No.
Fitting Ident.
Instruction
All fit-ups to be checked by QC
Inspector on negative report
bases.
Tolerances:
as per the
qualified WPS.
Tapered angle (t 1) : 10~1.
Girth
seams
minimum
distance : 1 nominal dia. or
150mm whichever is greater.
Misalignment (circumferential
welds) : 1.6mm
Linear tolerances : face to
face, face to end, end
measurements of pipe, center
to end or center to face of
nozzles, center to face of
bends : 3mm
NUMBER
: QA/QC.
REVISION
:A
PAGE
Record to be
Prepared
- Spool
drawing
Of
Insp. Involvement
PD QC NKK O/S
S/W
- Spool / Fitup
Inspection
report
Rotation of flange
~ Rotation : 1.5 mm
~ Flange center deviation:
max 3 mm
~ Out of misalignment of flange
(squareness) : 0.8mm Max.
Kind of
Inspection Activity
Inspection
to be Verified
Instruction
Record to be
Prepared
Insp. Involvement
PD QC NKK O/S
QUALITY DOCUMENT
OF
Arc strike
Spool No.
Joint No.
Spool
Dimension
WPS
Welding
consumable
Welder No. &
certificate
Inert gas
shielding
Kind of
Inspection
Inspection Activity
to be Verified
NUMBER
: QA/QC.
REVISION
:A
PAGE
- Spool
drawing
Of
S/W
- Visual
inspection
report
3.0
5.0
25.4 < TW
6.0
Any crack, lack of fusion and
surface
porosity
is
not
permitted.
Depth of undercut shall not be
greater than 0.5 mm
Splatter, overlapping at startstop to be grind smooth.
NDT if required
Instruction
Record to be
Prepared
Insp. Involvement
PD QC NKK O/S
QUALITY DOCUMENT
OF
Pressur
e test
5.5.
P & ID draw.
Line Size
Equip. Material
Branch
Reinforcing.
Valve
Installation
Gasket & Bolt /
Nut
Pipe Supports
Dimension
All Vents and
drains should
be checked for
hydro-test
Test Medium
Test
Temperature
Test Pressure
Location of
Blinds Spades
Limit of test
Calibration of
Pressure Gauge
and Records
NUMBER
: QA/QC.
REVISION
:A
PAGE
Of
- Installation
Inspection
Report
- Pressure
Test
Inspection
Report
Insp. Involvement
QUALITY DOCUMENT
OF
5.3.
Painting
Kind of
Inspection Activity
Inspection
to be Verified
Surface
Preparation
Dry film
thickness
Visual Surface.
NUMBER
: QA/QC.
REVISION
:A
PAGE
Record to be
Prepared
Painting
Inspection
shall
control / inspected according
to approved paint insp.
Procedure.
- Paint
Inspection
Report
Of
PD
QC
NKK O/S
M