TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME

PHASEII[TEQIPII]

PROJECTIMPLEMENTATIONPLAN
December 2009 (updated June 2015)

GOVERNMENTOFINDIA
DEPARTMENTOFHIGHEREDUCATION
MINISTRYOFHUMANRESOURCEDEVELOPMENT
NEWDELHI

ABBREVIATIONSANDACRONYMS

AICTE
BoG
CAAA
CABE
CAGR
CD
CDC
CE
CFI
CII
CoE
CPA
CSS
DEA
DMF
DTE
eFMR
EAP
EMF
FICCI
FMM
FMR
GATE
GoI
HoD
IBRD
ICB
ICT
IDA
IDP
III
IIIC
IIT
INDEST
IRG
IT
KPI
LCD
LRs
MHRD
MIS
MoA
MoU
NAAC
NASSCOM

AllIndiaCouncilforTechnicalEducation
BoardofGovernors
ControllerofAid,Accounts&Audit
CentralAdvisoryBoardofEducation
CompoundAnnualGrowthRate
CompactDisk
CurriculumDevelopmentCell
ContinuingEducation
CentrallyFundedInstitution
ConfederationofIndianIndustry
CentreofExcellence
CentralProjectAdvisor
CentrallySponsoredScheme
DepartmentofEconomicAffairsofGoI
DisclosureManagementFramework
DirectorofTechnicalEducation/DirectorateofTechnicalEducation
ElectronicFinancialMonitoringReport
EquityActionPlan
EnvironmentManagementFramework
FederationofIndianChambersofCommerceandIndustry
FinancialManagementManual
FinancialMonitoringReport
GraduateAptitudeTestinEngineering
GovernmentofIndia
HeadoftheDepartment
InternationalBankforReconstructionandDevelopment
InternationalCompetitiveBidding
InformationandCommunicationTechnology
InternationalDevelopmentAssociation
InstitutionalDevelopmentProposal
IndustryInstituteInteraction
Industry InstituteInteractionCell
IndianInstituteofTechnology
IndianNationalDigitalLibraryinEngineeringSciences&Technology
InternalRevenueGeneration
InformationTechnology
KeyPerformanceIndicator
LiquidCrystalDisplay
LearningResources
MinistryofHumanResourceDevelopment
ManagementInformationSystem
MemorandumofAssociation
MemorandumofUnderstanding
NationalAssessmentandAccreditationCounciloftheUGC
NationalAssociationofSoftware&ServiceCompanies

NBA
NCB
NDMA
NEC
NIT
NPD
NPE
NPIU
NPSAG
NSC
OBC
PIP
PMSS
QA
QCBS
R&D
R&D&I
RFP
SC
ST
SPA
SPFU
SPSAG
SSC
SWOT
TEQIP
TEQIPI
TEQIPII
ToR
TNA
UG
UGC
UT

NationalBoardforAccreditationoftheAICTE
NationalCompetitiveBidding
NationalDisasterManagementAuthority
NationalEvaluationCommittee
NationalInstituteofTechnology
NationalProjectDirector/NationalProjectDirectorateinDHEofMHRD
NationalPolicyonEducationofGoI
NationalProjectImplementationUnit
NationalPrivateSectorAdvisoryGroup
NationalSteeringCommittee
OtherBackwardClass
ProjectImplementationPlan
ProcurementManagementSupportSystem
QualityAssurance
Quality&CostBasedSelection
ResearchandDevelopment
Research&DevelopmentandInnovation
RequestforProposal
ScheduledCastes
ScheduledTribes
StateProjectAdvisorintheSPFU
StateProjectFacilitationUnit
StatePrivateSectorAdvisoryGroup
StateSteeringCommittee
Strengths,Weaknesses,OpportunitiesandThreats
TechnicalEducationQualityImprovementProgramme
TechnicalEducationQualityImprovementProgramme,PhaseI(20032009)
TechnicalEducationQualityImprovementProgramme,PhaseII(20102014)
TermsofReference
TrainingNeedsAnalysis
Undergraduate
UniversityGrantsCommission
UnionTerritory

CONTENTS

Section1:

BACKGROUND___________________________________________________________________ 12
1.1 PresentSystemofEngineeringEducationinIndia............................................................................................1
1.2 GovernmentofIndiaInitiatives.........................................................................................................................2

Section2:

THEPROJECT ___________________________________________________________________ 311


2.1 Introduction......................................................................................................................................................3

2.2 ProjectObjectives.............................................................................................................................................3
2.3 ProjectScope....................................................................................................................................................3
2.4 ProjectStrategy.................................................................................................................................................3
2.5ProjectDesign...................................................................................................................................................4
2.6 RiskAnalysisandMitigationMeasures...........................................................................................................10

Section3:

PROJECTDESCRIPTION__________________________________________________________ 1348

3.1 Component1:ImprovingQualityofEducationinSelectedInstitutions..................................................13
3.1.1 Subcomponent1.1
: StrengtheningInstitutionstoImproveLearningOutcomes

andEmployabilityofGraduates.....................................................14
3.1.2 Subcomponent1.2
: ScalingupPostgraduateEducationandDemandDriven

Research&DevelopmentandInnovation.....................................26
3.1.3
Subcomponent1.2.1
: EstablishingCentresofExcellence.................................................33
3.1.4
Subcomponent1.3
: FacultyDevelopmentforEffectiveTeaching

(PedagogicalTraining)....................................................................38

3.2 Component2:ImprovingSystemManagement......................................................................................39

3.2.1
Subcomponent2.1
3.2.2 Subcomponent2.2

:
:

CapacityBuildingtoStrengthenManagement..............................41
ProjectManagement,MonitoringandEvaluation.........................43

Section4:

SELECTIONPROCESS____________________________________________________________ 4958

4.1 Introduction.....................................................................................................................................................49
4.2 SelectionofStates...........................................................................................................................................49
4.2.1
EligibilityCriteriaforSelectionofStatesandUnionTerritories......................................................49
4.2.2
StateSelectionProcess....................................................................................................................50

4.3 SelectionofInstitutionsunderSubcomponent1.1........................................................................................51
4.3.1
EligibilityCriteriaforSubcomponent1.1........................................................................................52
4.3.2
ScrutinyofInstitutionalEligibilityProposals...................................................................................52
4.3.3
EvaluationofInstitutionalDevelopmentProposalsunderSubcomponent1.1.............................53
4.4 SelectionofInstitutionsunderSubcomponent1.2........................................................................................54
4.4.1
EligibilityCriteriaforSubcomponent1.2.......................................................................................54
4.4.2
EvaluationofInstitutionalDevelopmentProposalsunderSubcomponent1.2.............................55

4.5 SelectionofInstitutionsunderSubcomponent1.2.1.....................................................................................55

4.5.1
4.5.2
4.5.3

PrescreeningofInstitutions...........................................................................................................55
EligibilitycriteriaforSubcomponent1.2.1....................................................................................56
EvaluationofInstitutionalDevelopmentProposalsunderSubcomponent1.2.1..........................56

Section5:

PROJECTIMPLEMENTATION______________________________________________________ 5972

5.1 ImplementationArrangementattheNational,StateandInstitutionalLevels...............................................59
5.1.1 NationalLevelImplementationArrangements.............................................................................59
5.1.1.1 NationalSteeringCommittee(NSC)................................................................................................59
5.1.1.2 NationalEvaluationCommittees(NECs).........................................................................................60
5.1.1.3 NationalProjectDirectorate...........................................................................................................60
5.1.1.4 NationalProjectImplementationUnit(NPIU).................................................................................61
5.1.2
StateLevelProjectImplementationArrangements........................................................................65
5.1.2.1 StateSteeringCommittee(SSC)......................................................................................................65
5.1.2.2 StateProjectFacilitationUnit..........................................................................................................66
5.1.3
InstitutionalLevelImplementationArrangements.........................................................................69
5.1.3.1 BoardofGovernors(BoG)...............................................................................................................69
5.1.3.2 InstitutionalTEQIPUnit..................................................................................................................69

(i)

5.2 RoleofPrivateSector................................................................................................................................70

5.2.1 CouncilofIndustryHigherEducationCollaboration(CIHEC)....................................................70
5.2.2 StatePrivateSectorAdvisoryGroup(SPSAG)............................................................................70
5.2.3 FundingfortheAdvisoryGroups.................................................................................................71
RoleoftheWorldBankduringProjectimplementation...........................................................................71

5.3

ChartI:

ImplementationarrangementsatNational,StateandInstitutionalLevels..........................................................72

Section6:

FINANCIALMANAGEMENT__________________________________________________________ 7385

6.1
6.2
6.3
6.4
6.5
6.6
6.7

FinancialPlan............................................................................................................................................73
FundAllocation........................................................................................................................................73
Strategy ..................................................................................................................................................83
FundFlow..................................................................................................................................................83
ElectronicFinancialMonitoringReport(eFMR).......................................................................................84
Auditing ..................................................................................................................................................84
FinancialManagementManual.................................................................................................................85

Section7:
PERMISSIBLEANDNONPERMISSIBLEEXPENDITURES___________________________________ 87120

Section8:

PROCUREMENTMANAGEMENT___________________________________________________ 121124

8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9

ProcurementGuidelines..........................................................................................................................121
ProcurementArrangements...................................................................................................................121
ProcurementManagementSupportSystem(PMSS)..............................................................................121
ProcurementManual..............................................................................................................................121
InstitutionalProcurementPlan..............................................................................................................121
ProcurementofGoods............................................................................................................................122
ProcurementofWorks...........................................................................................................................122
SelectionandEmploymentofConsultants/Services.............................................................................122
ProcurementAudits................................................................................................................................122

Section9:

EQUITYACTIONPLAN ___________________________________________________________ 125127

9.1
9.2
9.3
9.4

Objective.................................................................................................................................................125
Scope.......................................................................................................................................................125
Strategy...................................................................................................................................................125
ActivitiesofEquityActionPlanforimprovingAcademicPerformanceofweakstudentsthrough
Innovativemethods................................................................................................................................125

Section10:

ENVIRONMENTMANAGEMENTFRAMEWORK ___________________________________________129

10.1
10.2
10.3
10.4

Objective.................................................................................................................................................129
Scope.......................................................................................................................................................129
Strategy...................................................................................................................................................129
EnvironmentManagementFramework..................................................................................................129

Section11:

DISCLOSUREMANAGEMENTFRAMEWORK___________________________________________131134

11.1 Objective.................................................................................................................................................131
11.2 Scope.......................................................................................................................................................131
11.3Strategy...................................................................................................................................................131
11.4 ActivitiesofDisclosureManagementFramework...................................................................................131

(ii)

ANNEXES:___________________________________________________________________________135240

AnnexI

: GuidelinesonImplementationofReforms....................................................................135

AnnexII

: UGCGuidelinesforSchemeofAutonomousInstitutions..............................................145

AnnexIII

: MemorandumofUnderstandingbetween:

(a) MHRDandStates...................................................................................................149
(b) MHRDandCFIs......................................................................................................153
(c)StateGovernmentandGovernmentFunded/GovernmentAided
InstitutionunderSubcomponent1.1&1.2andPrivateunaided
InstitutionunderSubcomponent1.2...................................................................156
(d) StateGovernmentandPrivateunaidedInstitutionunderSubcomponent1.1....159

AnnexIV(A)

: ProposalFormatforSelectionofStatesandUTs.........................................................163

AnnexIV(B).a(i)

FormatforInstitutionalEligibilityProposalforSubcomponent1.1............................169
(1stCycleofselection)

(1stCycleofselection)

FormatforInstitutionalDevelopmentProposalforSubcomponent1.1.....................185
(2ndCycleofselection)

FormatforInstitutionalDevelopmentProposalforSubcomponent1.2.....................197

FormatforDevelopmentProposalforSubcomponent1.2.1......................................207

AnnexIV(B).a(ii)

FormatforInstitutionalDevelopmentProposalforSubcomponent1.1.....................175

AnnexIV(B).a

AnnexIV(B).b

AnnexIV(B).c

AnnexV

: GuidelinesonStrengths,Weaknesses,OpportunitiesandThreats(SWOT)Analysis...215

AnnexVI

: GuidelinesonTrainingNeedsAnalysis(TNA)................................................................219

AnnexVII

: GuidelinesforInternationalTravel................................................................................221

AnnexVIII

AnnexIX

ListofCentrallyFundedInstitutionsandStatesInstitutionsthatparticipated
inTEQIPPhaseI..........................................................................................................231
GuidelinesonIndustryInstitutionInteractionCell(IIIC)...........................................235

SchemesforProposalEvaluation:

AnnexX

(A) SchemeforEvaluationofStateProposals.......................................................237
(B) SchemeforEvaluationofInstitutionalEligibilityProposal

underSubcomponent1.1...............................................................................237
(C) SchemeforEvaluationofInstitutionalDevelopmentProposal(IDP)
underSubcomponent1.1...............................................................................238
(D) SchemeforEvaluationofInstitutionalDevelopmentProposal(IDP)
underSubcomponent1.2...............................................................................239
(E) SchemeforEvaluationofInstitutionalDevelopmentProposal(IDP)
underSubcomponent1.2.1............................................................................240

APPENDICES:
AppendixI

: FinancialManagementManual

AppendixII

: ProcurementManual

AppendixIII

: CivilWorksManual(inclusiveofEnvironmentManagementFramework)

(iii)

LISTOFTABLES

S.
No.
1

TableNo.
Table1

Contents
ProjectComponentsandSubcomponents

Section/
Annex
Section2

Page
No.
6

Table2

RisksandMitigationMeasures

Section2

10

3
4

Table3
Table4

PerformanceIndicators
KeyPerformanceIndicatorswithTargetValues

Section3
Section3

45
46

5
6
7

Table5
Table6
Table7

Section4
Section4
Section4

51
52
53

Table8

ParametersforEvaluationofStateProposals
EligibilityCriteriaforSubcomponent1.1
EvaluationSchemeforInstitutionalDevelopmentProposalunder
Subcomponent1.1
EligibilityCriteriaforSubcomponent1.2

Section4

54

Table9

Section4

55

10

Table10

EvaluationSchemeforInstitutionalDevelopmentProposalunder
Subcomponent1.2
EligibilityCriteriaforSubcomponent1.2.1

Section4

56

11

Table11

Section4

57

12

Table12

Section6

74

13

Table13

Section6

75

14

Table14

Section6

76

15

Table15

Section6

77

16

Table15(a)

Section6

78

17

Table16

Section6

79

18

Table16(a)

Section6

80

19

Table17

Section6

81

20

Table17(a)

Section6

82

21

Table18

Section7

88

22

Table18(a)

Section7

93

23

Table19

Section7

98

24

Table19(a)

Section7

104

25

Table19(b)

Section7

109

EvaluationSchemeforInstitutionalDevelopmentProposalunder
Subcomponent1.2.1
IndicativefundingbyComponents
FundingpatternandcostsharingdetailswithrespecttoCentral,
StateandPrivateunaidedInstitutions
Approximatecomponentwisedistributionofcostwithrespectto
Central and State Project Management entities and Private
unaidedInstitutions
Indicative categorywise funding for Suggested Activities per
Project Institution (Centrally Funded, Government Funded and
Government Aided Institution) selected under Subcomponent
1.1
Indicative categorywise funding for Suggested Activities per
Project Institution (Private unaided Institution) selected under
Subcomponent1.1
Indicative categorywise funding for Suggested Activities per
Project Institution (Centrally Funded, Govt. Funded and Govt.
AidedInstitution)selectedunderSubcomponent1.2
Indicative categorywise funding for Suggested Activities per
Project Institution (Private unaided Institution) selected under
Subcomponent1.2
Indicative categorywise funding for Suggested Activities per
Centre of Excellence from Centrally Funded, Govt. Funded and
Govt.AidedInstitutionselectedunderSubcomponent1.2.1
Indicative categorywise funding for Suggested Activities per
Centre of Excellence from Private unaided Institution selected
underSubcomponent1.2.1
PermissibleandNonpermissibleExpendituresfor
Centrally Funded, Government Funded and Government Aided
InstitutionparticipatinginSubcomponent1.1
Permissible and Nonpermissible Expenditures for Private
unaidedInstitutionparticipatinginSubcomponent1.1
PermissibleandNonpermissibleExpendituresfor
Centrally Funded, Government Funded and Government Aided
InstitutionparticipatinginSubcomponent1.2
PermissibleandNonpermissibleExpendituresfor
PrivateunaidedInstitutionparticipatinginSubcomponent1.2
PermissibleandNonpermissibleExpenditures
for Centre of Excellence from Centrally Funded, Government
Funded and Government Aided Institution participating in Sub
component1.2.1

(iv)

26

Table19(c)

27

Table20

28

Table21

29

PermissibleandNonpermissibleExpenditures
for Centre of Excellence from Private unaided Institution
participatinginSubcomponent1.2.1

Section7

112

Section7

115

Section7

118

Table22

PermissibleandNonpermissibleExpenditures
fortheStateProjectFacilitationUnits(SPFUs)
ProcurementPlanforWorksandGoods

Section8

123

30

Table23

ProcurementPlanforConsultantServices

Section8

124

31

Table24

DetailsofEquityActionPlan

Section9

126

32

Table25(a)

Section11

132

33

Table25(b)

DisclosureManagementbytheNationalProjectImplementation
Unit
DisclosureManagementbytheStateProjectFacilitationUnits

Section11

133

34
35

Table25(c)
Table26

Section11
AnnexI

134
136

36

Table27

DisclosureManagementbytheProjectInstitutions
Academic Functions to be carried out as an Autonomous
Institution
State/UTLevelAcademicDataforAcademicYear20092010

AnnexIV(A)

167

37

Table28

BenchmarksforInstitutionstoQualifyforSubcomponent1.1

AnnexIV(B).a

188

38

Table29

InstitutionalProjectBudgetforSubcomponent1.1

AnnexIV(B).a

191

39

Table30

ProjectTargetsforInstitutionsunderSubcomponent1.1

AnnexIV(B).a

192

40

Table31

ProcurementPlanforWorksandGoodsforSubcomponent1.1

AnnexIV(B).a

195

41

Table32

ProcurementPlanforConsultantServicesforSubcomponent1.1

AnnexIV(B).a

196

42

Table33

BenchmarksforInstitutionstoQualifyforSubcomponent1.2

AnnexIV(B).b

201

43

Table34

InstitutionalProjectBudgetforSubcomponent1.2

AnnexIV(B).b

203

44

Table35

ProjectTargetsforInstitutionsunderSubcomponent1.2

AnnexIV(B).b

204

45

Table36

ProcurementPlanforWorksandGoodsforSubcomponent1.2

AnnexIV(B).b

205

46

Table37

ProcurementPlanforConsultantServicesforSubcomponent1.2

AnnexIV(B).b

206

47

Table38

BenchmarksforInstitutionstoQualifyforSubcomponent1.2.1

AnnexIV(B).c

209

48

Table39

ProjectBudgetforSubcomponent1.2.1

AnnexIV(B).c

211

49

Table40

IncrementalProjectTargetsforCentreOfExcellence

AnnexIV(B).c

212

50

Table41

ProcurementPlanforWorksandGoodsforSubcomponent1.2.1 AnnexIV(B).c

213

51

Table42

ProcurementforConsultantServicesforSubcomponent1.2.1

AnnexIV(B).c

214

52

Table43

AnnexVI

219

53

Table44

SuggestedTrainingDomainsforFacultyandVariousCategoriesof
Staff
ListofTNAProformaforFacultyandVariousCategoriesofStaff

AnnexVI

220

54

Table45

SchemeforEvaluationofStateProposal

AnnexX

237

55

Table46

AnnexX

237

56

Table47

AnnexX

238

57

Table48

AnnexX

239

58

Table49

Scheme for Evaluation of Institutional Eligibility Proposal (IEP)


underSubcomponent1.1
Scheme for Evaluation of Institutional Development Proposal
(IDP)underSubcomponent1.1
Scheme for Evaluation of Institutional Development Proposal
(IDP)underSubcomponent1.2
Scheme for Evaluation of Institutional Development Proposal
(IDP)underSubcomponent1.2.1

AnnexX

240

PermissibleandNonpermissibleExpenditures
fortheNationalProjectImplementationUnit(NPIU)

(v)

AmendedTables
S.
No

TableNo.

Contents

Section/
Annex

Page
No.

Section2

Section2

10

Section/Annex
/TableNo./Page
No.(asonOct/Dec
2009)
SectionII/Table1/
PageNo.8
SectionII//
PageNo.1415

Remarks

Table1

Table2

Project Components and Sub


components
RisksandMitigationMeasures

Table3

PerformanceIndicators

Section3

45

SectionIII/
/PageNo.5051

Table4

Section3

46

Table5

Section4

51

Table6

Section4

52

Table7

Section4

53

SectionIV/Table1/
PageNo.57
SectionIV/Table2/
PageNo.58
SectionIV/Table3&
4/PageNo.5960

Table8

Section4

54

Table9

Section4

55

SectionIV/Table5/
PageNo.61
SectionIV/Table6/
PageNo.62

10

Table10

Section4

56

Table11

Section4

57

SectionIV/Table7/
PageNo.63
SectionIV/Table8/
PageNo.64

11

12

Table12

Key Performance Indicators with


TargetValues

Parameters for Evaluation of State


Proposals
EligibilityCriteriaforSubcomponent
1.1
Evaluation Scheme for Institutional
Development Proposal under Sub
component1.1
EligibilityCriteriaforSubcomponent
1.2
Evaluation Scheme for Institutional
Development Proposal under Sub
component1.2
EligibilityCriteriaforSubcomponent
1.2.1
Evaluation Scheme for Institutional
Development Proposal under Sub
component1.2.1
IndicativefundingbyComponents

Section6

74

13

Table13

Section6

75

14

Table14

Section6

15

Table15

16

Table15(a)

17

Table16

Funding pattern and cost sharing


details with respect to Central, State
andPrivateunaidedInstitutions
Approximate
componentwise
distribution of cost with respect to
Central
and
State
Project
Management entities and Private
unaidedInstitutions
Indicative categorywise funding for
Suggested Activities per Project
Institution
(Centrally
Funded,
Government
Funded
and
Government Aided Institution)
selectedunderSubcomponent1.1

TableNo.notgiven
underheadingRisk
Analysis
TableNo.notgiven
underheading
Monitoringthrough
KeyPerformance
Indicators
NewlyAdded

SectionVI/Table3/
PageNo.86
SectionVI/Table1/
PageNo.84

76

SectionVI/Table2/
PageNo.85

Section6

77

SectionVI/Table4/
PageNo.86

Section6

78

Newlyadded

Section6

79

SectionVI/Table5/
PageNo.87

Indicative categorywise funding for


Suggested Activities per Project
Institution
(Private
unaided
Institution) selected under Sub
component1.1

Indicative categorywise funding for


Suggested Activities per Project
Institution (Centrally Funded, Govt.
Funded, Govt. Aided Institution)
selectedunderSubcomponent1.2

(vi)

18

Table16(a)

19

Table17

20

Table17(a)

21

Table18

22

Table18(a)

23

Table19

24

Table19(a)

25

Table19(b)

26

Table19(c)

27

Table20

28

Table21

29

Table22

30

Table23

31

Table24

Indicative categorywise funding for


Suggested Activities per Project
Institution
(Private
unaided
Institution) selected under Sub
component1.2
Indicative categorywise funding for
Suggested Activities per Centre of
Excellence from Centrally Funded,
Government
Funded
and
Government
Aided
Institution
selectedunderSubcomponent1.2.1
Indicative categorywise funding for
Suggested Activities per Centre of
Excellence from Private unaided
Institution selected under Sub
component1.2.1
Permissible and Nonpermissible
Expendituresfor
Centrally Funded, Government
Funded and Government Aided
Institution participating in Sub
component1.1
Permissible and Nonpermissible
Expenditures for Private unaided
Institution participating in Sub
component1.1
Permissible and Nonpermissible
Expendituresfor
Centrally Funded, Government
Funded and Government Aided
Institution participating in Sub
component1.2
Permissible and Nonpermissible
Expendituresfor
Private
unaided
Institution
participatinginSubcomponent1.2
Permissible and Nonpermissible
Expenditures
for Centre of Excellence from
Centrally Funded, Government
Funded and Government Aided
Institution participating in Sub
component1.2.1
Permissible and Nonpermissible
ExpendituresforCentreofExcellence
from Private unaided Institution
participatinginSubcomponent1.2.1
Permissible and Nonpermissible
Expenditures
for
the
National
Project
ImplementationUnit(NPIU)
Permissible and Nonpermissible
Expenditures for the State Project
FacilitationUnits(SPFUs)
Procurement Plan for Works and
Goods
Procurement Plan for Consultant
Services
DetailsofEquityActionPlan

Section6

80

Newlyadded

Section6

81

Newlyadded

Section6

82

Newlyadded

Section7

88

SectionVII/Table1/
PageNo.9297

Section7

93

SectionVII/Table2/
PageNo.98102

Section7

98

SectionVII/Table3/
PageNo.103108

Section7

104

Newlyadded

Section7

109

SectionVII/Table4/
PageNo.109114

Section7

112

Newlyadded

Section7

115

SectionVII/Table5/
PageNo.115117

Section7

118

SectionVII/Table6/
PageNo.118122

Section8

123

Section8

124

Section9

126

SectionVIII/Table1/
PageNo.125
SectionVIII/Table2/
PageNo.126
SectionIX//
PageNo.128130

(vii)

TableNo.&titlenot
givenunder
headingActivities
onEquityAction
Plan.

32

Table25(a)

33

Table25(b)

34

Table25(c)

35

Table26

36

Table27

37

Table28

38

Disclosure Management by the


National Project Implementation
Unit
DisclosureManagementbytheState
ProjectFacilitationUnits
Disclosure Management by the
ProjectInstitutions
AcademicFunctionstobecarriedout
asanAutonomousInstitution

Section11

132

SectionXI//Page
No.134136

TableNo.&titlenot
givenunder
headingDisclosure
Management
Framework.

Section11

133

Section11

134

AnnexI

136

AnnexI//Page
No.138

AnnexIV(A)

167

AnnexIV
(B).A

188

Institutional Project Budget for Sub


component1.1

AnnexIV
(B).A

191

Table30

ProjectTargetsforInstitutionsunder
Subcomponent1.1

AnnexIV
(B).A

192

40

Table31

Procurement Plan for Works and


GoodsforSubcomponent1.1

AnnexIV
(B).A

195

41

Table32

Procurement Plan for Consultant


ServicesforSubcomponent1.1

AnnexIV
(B).A

196

42

Table33

Benchmarks for Institutions to


QualifyforSubcomponent1.2

AnnexIV
(B).b

201

AnnexIV(A)/Table
no.1/PageNo.179
Annex
IV(B).a(i)/Table
1/PageNo.184
AnnexIV(B).a
(ii)/Table1&2/Page
No.192
AnnexIV(B).a
(ii)/Table3/Page
No.193
AnnexIV(B).a
(ii)/Table4/Page
No.194
AnnexIV(B).a
(ii)/Table5/Page
No.195
AnnexIV(B).b/
/PageNo.201

TableNo.&titlenot
givenunder
headingAcademic
Autonomy

State/UT Level Academic Data for


AcademicYear20092010
Benchmarks for Institutions to
QualifyforSubcomponent1.1

Table29

39

43

Table34

Institutional Project Budget for Sub


component1.2

AnnexIV
(B).b

203

44

Table35

ProjectTargetsforInstitutionsunder
Subcomponent1.2

AnnexIV
(B).b

204

45

Table36

Procurement Plan for Works and


GoodsforSubcomponent1.2

AnnexIV
(B).b

205

46

Table37

Procurement Plan for Consultant


ServicesforSubcomponent1.2

AnnexIV
(B).b

206

47

Table38

Benchmarks for Institutions to


QualifyforSubcomponent1.2.1

AnnexIV
(B).c

209

48

Table39

Project Budget for Subcomponent


1.2.1

AnnexIV
(B).c

211

49

Table40

Incremental Project Targets for


CentreOfExcellence

AnnexIV
(B).c

212

50

Table41
Table42

AnnexIV
(B).c
AnnexIV
(B).c

213

51

Procurement Plan for Works and


GoodsforSubcomponent1.2.1
Procurement
for
Consultant
ServicesforSubcomponent1.2.1

AnnexIV
(B).c/Table
1&2/PageNo.212,
213
AnnexIV
(B).c/Table3/Page
No.213

214

Newlyadded

52

Table43

Suggested Training Domains for


Faculty and various categories of
Staff

AnnexVI

219

AnnexVI//Page
No.219

TableNo.&titlenot
givenunder
headingSuggested
TrainingDomains

(viii)

AnnexIV(B).b
/Table1&2/Page
No.203
AnnexIV
(B).b/Table3/Page
No.204
AnnexIV
(B).b/Table4/Page
No.205
AnnexIV
(B).b/Table5/Page
No.206
AnnexIV(B).c/
/PageNo.211

Tableno.&titlenot
givenunder
headingEligibility
forparticipation.

TableNo.&titlenot
givenunder
headingEligibility
Criteria

Newlyadded

53

Table44

ListofTNAProformaforFacultyand
VariousCategoriesofStaff

AnnexVI

220

AnnexVI//Page
No.220

TableNo.&titlenot
givenunder
headingProcedure

54

Table45

AnnexX

237

55

Table46

AnnexX

237

AnnexXI/Table
A/PageNo.251
AnnexXI/Table
B/PageNo.252

56

Table47

AnnexX

238

AnnexXI/Table
C/PageNo.253

57

Table48

AnnexX

239

AnnexXI/Table
D/PageNo.254

58

Table49

Scheme for Evaluation of State


Proposal
Scheme
for
Evaluation
of
Institutional Eligibility Proposal (IEP)
underSubcomponent1.1
Scheme
for
Evaluation
of
Institutional Development Proposal
(IDP)underSubcomponent1.1
Scheme
for
Evaluation
of
Institutional Development Proposal
(IDP)underSubcomponent1.2
Scheme
for
Evaluation
of
Institutional Development Proposal
(IDP)underSubcomponent1.2.1

AnnexX

240

Newlyadded

(ix)

Section1
BACKGROUND

1.1

PresentSystemofEngineeringEducationinIndia:
Engineeringeducationbecameamainattractionafter1990whenIndiabecameamajorcontributorto
the global IT industry revolution. In the last two decades, many State Governments have encouraged
establishment of selffinanced Engineering Institutions where State Government does not provide
financialsupport.Asaresult,theIndiansystemofEngineeringEducationhasbecomevastandsofara
totalnumberof3495EngineeringDegreeinstitutions1havebeenestablishedwithenrolmentcapacity
of17,61,976asin201213.
TheexponentialgrowthinEngineeringEducationseemstohavenotresultedinanysignificantgrowth
in the number of quality Graduates due to restricted availability of qualified and meritorious faculty.
There is currently a wide gap between qualities of Engineering Education as imparted in various
institutions. The quality of education and training being imparted in the Engineering Education
institutionsvariesfromexcellenttopoor,withsomeinstitutionscomparingfavourablywiththebestin
the world and others suffering from different degrees of handicaps. There is a gap between the
educational standards of the Indian Institutes of Technology (IITs) and other Engineering institutions.
The few IITs can neither change the fate of the whole country nor improve the entire Engineering
EducationSystem.
Concerted efforts are required to bridge the gap in the quality of education between IITs and other
institutions.TheIITscanactasacatalystinthegrowthofqualityEngineeringEducationinthecountry,
and play a major role in training faculty from other institutions of the country in both teaching and
research.
SomeoftheconcernsinEngineeringEducationSystemare:

a)

Facultyshortage:Themassiveexpansionofinstitutionshasresultedinanacutefacultyshortagein
theinstitutions.InsomeoftheimportantdisciplinessuchasInformationTechnologyandrelated
areas, availability of faculty is dismal as the institutions are not able to attract and retain good
quality faculty due to archaic recruitment and promotion procedures, absence of incentives for
quality performance, and nonexistent faculty development policies in most institutions. Also,
shortageoftrainingopportunitiesandattentiontooverallgrowthoffacultyisadverselyaffecting
impartationofqualityknowledgeandskillstostudents.Thefacultyalsolackcommunicationskills
andpedagogicalskills.

b)

IndustryAcademia collaboration: At present, this collaboration is at a nascent stage. Industry


Academia collaboration involves two key aspectsinputs to curriculum development and
internships for students. Increasing IndustryAcademia collaboration requires: (i) overcoming the
distrust between the two partners; (ii) identification of winwin partnerships in terms of sharing
technicalknowledge;and(iii)provisionofincentivestoinstitutionsandfacultyforcollaboration.

c)

Obsolete learning infrastructure: This prevents the development of handson skills in Industry
relevant technologies. Many institutions have not upgraded their equipment, laboratories, and
learning resources for even more than a decade. There is also absence of timely curriculum
revisions for increasing focus on practical training and quality instructions, research and
development.

d)

Stagnatingresearch:IncreasingresearchthatcaterstotheemergingIndustryandsocietaldemands
for technological solutions results in directly and indirectly improving knowledge and quality of
faculty, which in turn would benefit students. A growing number of Indian firms are keen to
collaborate with academia to enhance their competitiveness in teaching and research. Active
research programmes in Engineering Education institutions would also make meaningful
contributionforsustainabletechnologicaldevelopmentinIndia.

e)

Attracting students to become faculty: The attraction of students to a teaching career depends
upon salary package, perks/facilities and professional career development opportunities.
Industrialsectorsalarieshaveincreasedsignificantlyinthelastfewyearsbuttheincreaseinfaculty
salary with comparable experience is marginal. Furthermore, in many institutions, there is a
probleminprovisionandmaintenanceofstandardamenitiesofhousingaccommodation,medical
attention, good quality schooling for wards on residential campus, etc. The nonavailability of
adequate research funds and quality research students is also a cause of concern in the
professionalgrowthofafaculty.

Source:AICTENo.ofEngineeringCollegesin20122013.

TEQIPII

f)

Imbalance in outputs at Bachelors, Masters and Doctoral levels in engineering disciplines: The
number of Bachelors degree graduates in engineering (BE/BTech) every year has increased
exponentiallyfromabout270in1947to2,37,000in2006whichis12%aspercompoundannual
growthrate(CAGR)asstatedinstudyreportsubmittedbyEnergySystemsEngineering,IITBombay
in the year 2007. However, as compared to Bachelors degree, the Masters output has only
increasedfromabout14,000in2001to20,000in2006,whichis7.5%,andtheDoctoraloutputhas
increasedbyamere2.9%from1985to2005.Thedatapresentedclearlyreflectsthattheoutput
of Engineering Graduates at Bachelor level is disproportionately high in comparison to Masters
level and further higher at the Doctoral level. The under production of Masters and Doctoral
degree holders is now seen to be seriously undermining quality of education (due to high
proportionofunderqualifiedfaculty).

1.2

GovernmentofIndiaInitiatives:
GovernmentofIndiahasadoptedtheNationalPolicyonEducation(NPE1986asrevisedin1992).The
NPEhassuggestedsomemajorstepstopromoteefficiencyandeffectivenessofEngineeringEducation
asquotedbelow:

(i)
(ii)
(iii)

(iv)

(v)
(vi)

Highprioritywillbegiventomodernizationandremovalofobsolescence.Themodernizationwillbe
undertakentoenhancefunctionalefficiency.
More effective procedures will be adopted in the recruitment of staff. Career opportunities, service
conditions,consultancynormsandotherperquisiteswillbeimproved.
Teachers will have multiple roles to perform such as teaching, research, development of learning
resourcematerial,extensionandmanagingtheinstitution.Initialandinservicetrainingwillbemade
mandatoryforfacultyandadequatetrainingreserveswillbeprovided.StaffDevelopmentProgramme
willbeintegratedattheState,andcoordinatedatregionalandNationallevels.
Institutionswillbeencouragedtogenerateresourcesusingtheircapacitiestoprovideservicestothe
Community and Industry. They will be equipped with uptodate learning resources, library and
computerfacilities.
Facilitiesforsports,creativeworkandculturalactivitieswillbeexpanded.
TheGovernmentofIndiashallassisttheStateGovernmentsforthedevelopmentofprogrammesof
Nationalimportance.

During 1980s, the Government of India (GoI) and the State Governments had felt the need for
revamping the Technician Education System in the country to make it demanddriven with relevant
coursesinnewandemergingtechnologies,withadequateinfrastructureresources,competentfaculty
and effective teachinglearning processes. The Government of India supported 25 State Governments
and Union Territories of Andaman & Nicobar Islands and Puducherry through three Technician
Education Projects during 19912007, financed by the World Bank, which helped to strengthen and
upgradethesystemandbenefited552polytechnics.
ThesuccessoftheseprojectsencouragedtheGovernmentofIndiaandtheStateGovernmentstoseek
morefundingfromtheWorldBankforsystemictransformationoftheTechnicalEducationSystemwith
focus on Degree level Engineering Education. In 200203, the Government of India with financial
assistance from the World Bank launched a Technical Education Quality Improvement Programme
(TEQIP)asalongtermProgramme,tobeimplementedinthreephasesforsystemictransformationof
the Technical Education System. The first phase of TEQIP commenced in March 2003 and ended in
March2009,covering127institutionsin13States.Thisprojectcoveredlessthan10%oftheinstitutions
thatexistedthen.Itwasabeginning.Thechallengeforsystemictransformationremainsbig.Tomeet
thechallengeserious,organizedandconvergingeffortsareneeded.
RealizingthepotentialofsociopoliticalandeconomicbenefitsfromHigherEducationintransforming
India into a knowledge society, the Government ofIndia has placed a much higher priority on Higher
EducationintheEleventhandTwelfthFiveYearPlan(2012to2017).ThemaintargetfortheTwelfth
Fiveyear Plan for Higher Education (Technical and General) is to increase gross enrolment ratio in
HigherEducationfrom17.9%to25.2%.
The Project, second phase of Technical Education Quality Improvement Programme (referred to as
TEQIPII)isfullyintegratedwiththeTwelfthFiveyearPlanobjectivesforTechnicalEducationasakey
componentforimprovingthequalityofEngineeringEducationinexistinginstitutions.

Section2
THEPROJECT
2.1 Introduction:

Technical Education Quality Improvement Programme (TEQIP) was envisaged in 2003 as a longterm
Programmeofabout1012yearsdurationtobeimplementedin3phasesforsystemictransformation
oftheTechnicalEducationSystem.

The goal of the Programme is to scaleup and support ongoing efforts of the Government of India to
improve quality of Technical Education and enhance existing capacities of the institutions to become
dynamic,demanddriven,qualityconscious,efficientandforwardlooking,responsivetorapideconomic
andtechnologicaldevelopmentsoccurringattheNationalandInternationallevels.

IthasaclearfocusontheobjectiveofimprovingtheoverallqualityofEngineeringEducation.

AsperTEQIPconceptanddesign,eachphaseisrequiredtobedesignedonthebasisoflessonslearnt
from implementation of an earlier phase. TEQIPI2 started a reform process in 127 institutions. The
reformprocessneedstobesustainedandscaledupforembeddinggainsinthesystemandtakingthe
transformation to a higher level. To continue the development activities initiated through TEQIPI, a
sequelprojectisplannedasTEQIPII3.

2.2

ProjectObjectives:

TheProjectwillfocusonthefollowingobjectives:
Strengtheninginstitutionstoimprovelearningoutcomesandemployabilityofgraduates
ScalingupPostgraduateEducationanddemanddrivenResearch&DevelopmentandInnovation,
EstablishingCentresofExcellenceforfocusedapplicableresearch,
Trainingoffacultyforeffectiveteaching,and
EnhancingInstitutionalandSystemManagementeffectiveness.

2.3

ProjectScope:

Project will be open for competition and participation by: (a) the All India Council for Technical
Education (AICTE) approved Engineering institutions from all States and Union Territories across the
country and (b) Engineering faculty, Engineering Teaching Department, Constituent Institutions of
Universities and Deemed to be Universities (c) Centrally Funded Institutions (CFIs). An around 200
Engineering institutions will be competitively selected in one or two cycles. Eligible private unaided
institutions willing to contribute to the vision of India to produce high quality technical manpower
would also be selected in the Project. However, total number of private unaided institutions to be
selectedforparticipationintheProjectwillbelimitedtoabout20%oftotalprojectinstitutions.

2.4

ProjectStrategy:

TheProjectwillbeimplementedinpursuanceoftheNationalPolicyonEducation(NPE1986revisedin
1992)throughtheMinistryofHumanResourceDevelopment(MHRD)oftheGovernmentofIndia.The
Projectwillbeimplemented asaCentrallySponsoredScheme(CSS)withmatchingcontributionfrom
StateGovernmentsandUnionTerritories.

Indiacomprisesapartfrom07UnionTerritories,18Statesinthegeneraland11StatesintheSpecial
category4. The Special category states are Arunachal Pradesh, Assam, Himachal Pradesh, Jammu &
Kashmir,Manipur,Meghalaya,Mizoram,Nagaland,Sikkim,TripuraandUttarakhand.Thesestateshave
some distinct characteristics like international boundaries, hilly terrains and have distinctly different
socioeconomic development parameters. These States also have geographical disadvantages in their
effortforinfrastructuraldevelopmentandhencetheseStatesdeservespecialassistance.

ProjectcostintheGovernmentfundedandGovernmentaidedinstitutionsforallsubcomponentswill
besharedbetweentheMHRDandStateandUTGovernmentsintheratioof75:25inallStatesexcept
theSpecialCategoryStateswhereintheratiowillbe90:10.ForCentrallyFundedInstitutions,100%of
institutionalprojectcostswillbebornebytheMHRD.

First Phase of the Technical Education Quality Improvement Programme that closed on March 31, 2009 is referred to as TEQIPI
throughout this Project Implementation Plan (PIP) document. The list of 127 institutions that participated in TEQIPI is given at
AnnexVIII(P.No.229).
3
SecondPhaseoftheTechnicalEducationQualityImprovementProgrammeisreferredtoastheProjectorTEQIPIIthroughoutthePIP.
4
th
th
Source:12 &13 FinanceCommissionReport.

TEQIPII

Fundingforprivateunaided institutions in allStatesand UTswillbeintheratioof60:20:20i.e.60%


fundingasGrantfromMHRD,20%fundingasGrantfromtheStateand20%fundingfrominstitutions.

The funding pattern and costsharing details with respect to Centre, State and Private unaided
institutionsaregiveninTable13.

AsetofEligibilityCriteriaforStatesandUTsisenforcedtoachieveahighandsustainedimpactofthe
Project. The criteria seek to give the project institutions adequate decision making powers that will
enableandencouragethemtodeliverqualityeducationandundertakeresearchinanefficientmanner.
A primary focus is to increase empowerment of institutions for selfgovernance and incentivizing
improvementsinEngineeringEducation.

Theprojectinstitutionswillberequiredtoimplementacademicandnonacademicreformswithintheir
selfconceived development programmes that focus on quality and relevance, excellence, resource
mobilization,greaterinstitutionalautonomywithaccountability,researchandequity.

Professional development programmes for engineeringeducation policy planners, administrators and


implementers at the Central, State and Institutional levels will be organized. The Project will also
supportdevelopmentofaneffectivegovernancemodel.

The Project will lay major emphasis on monitoring and evaluation. The prime responsibility of
monitoringwillliewiththeinstitutionsthemselves.ThemanagementstructureattheInstitutionallevel
i.e.theBoardofGovernors(BoG)willmonitortheprogressofInstitutionalprojectsonaregularbasis
and provide guidance for improving the performance of institutions in project implementation. The
information from project institutions will be collected through a scalable webbased Management
InformationSystem(MIS).StateGovernmentswillalsoregularlymonitorandevaluatetheprogressof
institutions.TheGovernmentofIndiaandtheWorldBankwillconductbiannualJointReviewsofthe
Projectwithassistancefromthe National ProjectImplementationUnit(NPIU).Themonitoringwillbe
based on action plans prepared by each project institution and achievements made on a set of Key
PerformanceIndicators(KPIs).Themonitoringwillfocusonimplementationofreformsbyinstitutions,
achievements in project activities under different Subcomponents, procurement of resources and
services, utilization of financial allocations and achievements in faculty and staff development and
managementdevelopmentactivities.

EstablishingCentresofExcellencewithpotentialforworldclassresearchinemergingareasisoneofthe
importantaspectsoftheProject.

2.5

ProjectDesign:

TheProjectsecondphaseoftheTechnicalEducationQualityImprovementProgramme(TEQIP)seeks
to strengthen selected institutions to produce more employable and higher quality engineers and
preparemorepostgraduatestudentstoreducefacultyshortage.

StrengtheningofInstitutionsisthelongtermobjectiveoftheProjectemphasizingonproductionof
more employable and higher quality graduate engineers. Improving quality of education (learning
outcomes)andemployabilityofgraduatesaremediumtermoutcomes.

TheProjectiscomposedofthefollowingComponentsandSubcomponents:

Component1:ImprovingQualityofEducationinSelectedInstitutions

This Component aims to strengthen around 200 competitively selected Engineering Education
Institutions to improve learning outcomes and employability of graduates and scaleup Postgraduate
education,research&developmentandinnovationandestablishingcentresofexcellence.Thefaculty
oftheseinstitutionswillalsobeofferedpedagogicaltrainingforeffectiveteaching.

TheobjectivesofthisComponentwillbeachievedthroughthefollowingSubcomponents:

Subcomponent1.1

Subcomponent1.2

Scalingup Postgraduate Education and Demand


DrivenResearch&DevelopmentandInnovation

Subcomponent1.2.1

EstablishingCentresofExcellence

Subcomponent1.3

FacultyDevelopmentforEffectiveTeaching
(PedagogicalTraining)

: Strengthening institutions to improve learning


outcomesandemployabilityofgraduates

Section2TheProject

Component2:ImprovingSystemManagement

This Component aims to build capacity of Technical Education policy planners, administrators and
implementers at the Central, State, and Institutional levels to effectively implement the institutional
reformsandtointroduceandsustaininnovativesystemicqualityimprovementpractices.

It also aims to provide timely, sufficient, precise, and reliable information to improve and assess the
performanceoftheselectedinstitutionsforeffectiveProjectManagementthroughthefollowingsub
components:

Subcomponent2.1

CapacityBuildingtoStrengthenManagement

Subcomponent2.2

ProjectManagement,MonitoringandEvaluation

The key features of the Project are presented in Table1 and the detailed descriptions are given in
Section3.

TEQIPII

Table1
ProjectComponentsandSubcomponents

1.1

Component1:ImprovingQualityofEducationinSelectedInstitutions
StrengtheningInstitutionstoImproveLearningOutcomesandEmployabilityofGraduates
Objectives
Suggestedactivities

To strengthen selected engineering


institutionstoimprovelearningoutcomes
andemployabilityofgraduates.
#

(An estimated 125 new* Engineering


Education institutions meeting the
Eligibility Criteria will be competitively
selectedunderthisSubcomponent.)
#

Private unaided institutions (around 25 )


could also be part of this Subcomponent
butwillbefundedoncostsharingbasis.

Improvementinteaching,trainingandlearningfacilitiesfor
GovernmentfundedandGovernmentaidedinstitutions:
o StartingnewPGprogrammesinEngineeringdiscipline
o Modernization and strengthening of laboratories and
establishment of new laboratories for existing UG and
PG5programmesandfornewPGprogrammes
o Modernizationofclassrooms
o Updationoflearningresources
o Procurementoffurniture
o Establishment/upgradation of Central and Departmental
ComputerCentres
o Modernization/improvements
of
supporting
departments
o Modernization and strengthening of libraries and
increasingaccesstoknowledgeresources
o Minorcivilworks

Improvementinteaching,trainingandlearningfacilitiesfor
PrivateunaidedInstitutions:
o Acquiringtextbooks,ejournalsandsoftware6

ProvidingTeachingandResearchAssistantships7toincrease
enrolment in existing and new PG programmes in
engineering&appliedsciencesdisciplines

EnhancementofR&Dandinstitutionalconsultancyactivities
Faculty and Staff development for improved competence
basedonTrainingNeedsAnalysis(TNA)

EnhancedinteractionwithIndustry
Institutionalmanagementcapacityenhancement
Implementationofinstitutionalreforms
Supporttostudentneeds8

ThetermPGcoversbothMastersandDoctoralprogrammes.
th
UpdatedasperMinutesofReviewMeetingheldon19 June2013.
7
TeachingAssistantshipsaretobeawardedtofulltimeMastersdegreestudentsandResearchAssistantshipsaretobeawardedtofull
timeDoctoralstudentswhoarenotabletosecureAICTE/UGCsponsorshiporanyotherscholarshiporfellowship.
th
# Updatedasper5 NSCMeetingdecision.
*New:FirsttimeentrytotheTEQIP.
8
nd
Updatedasper2 JRMAideMemorie.
6

Section2TheProject
1.2ScalingupPostgraduateEducationandDemandDrivenResearch&DevelopmentandInnovation
Objectives

Suggestedactivities

To significantly increase enrolment in


Postgraduateeducationandenhanceengineering
researchanddevelopmentandinnovation.
#

(An estimated 75 institutions will be selected


under this Subcomponent. Private unaided
institutions(around15)couldalsobepartofthis
Subcomponent) but will be funded on cost
sharingbasis.

o Starting new PG programmes in emerging


engineeringdisciplines
o Establishment of new laboratories for new and
existing PG programmes in engineering
disciplines
o Updationoflearningresources
o Procurementoffurniture
o Modernization and strengthening of libraries
andincreasingaccesstoknowledgeresources
o Minorcivilworks

Majorfocuswillbeonthefollowing:

Improving quality and relevance of PG


programmes

Attracting more and better qualified


studentsforPGprogrammes

Improvingfacultyqualifications

Improvement in teaching, training and learning


facilities for Government funded and Government
aidedinstitutions:

Improving management of the institutions


througheffectivegovernance

Improvement in teaching, training and learning


facilitiesforPrivateunaidedinstitutions:
o Acquiringtextbooks,ejournalsandsoftware9

Providing Teaching and Research Assistantships for


significantly increasing enrolment in existing and new
Masters and Doctoral programmes in engineering &
appliedsciencesdisciplines

Enhancement of R&D and Institutional consultancy


activities
o Developmentofresearchinterestamongunder
graduateandMastersstudents
o Resource sharing with Industry through
collaborativearrangements

Faculty and Staff development for improved


competencebasedonTrainingNeedsAnalysis(TNA)

EnhancedinteractionwithIndustry
InstitutionalManagementCapacityenhancement
Implementationofinstitutionalreforms
Supporttostudentneeds10

th

Updatedasper5 NSCMeetingdecision.
th
UpdatedasperMinutesofReviewMeetingheldon19 June2013.
10
Updatedasper2ndJRMAideMemorie.
9

TEQIPII

Objectives

1.2.1EstablishingCentresofExcellence
Suggestedactivities

To support establishment of Centres


of Excellence for collaborative and
multidisciplinary research within
specificthematicareasofregionalor
nationalimportance.
The institutions having potential for
carrying out applicable research will
be eligible for setting up Centres of
Excellence. About 30 Centres of
Excellencewillbeestablished.
Majorfocuswillbeonthefollowing:

Improvement in Research and Development facilities for


GovernmentfundedandGovernmentaidedinstitutions:
o Establishmentofnewlaboratoriesforapplicablethematic
research
o

Establishmentofaknowledgeresourcecentre(library)in
thethematicarea

Procurementoffurniture

Minorcivilworks

ImprovementinResearchandDevelopmentfacilitiesforPrivate

Create knowledge in thematic,


multidisciplinary areas in
collaboration with industry and
otherknowledgeusers
Produce advanced human
capital (MTechs and PhDs) in

thematic areas in collaboration


with Industry and other

knowledgeusers

Increase societal use of


engineering
R&D
through
technology
transfer
and
commercialization

Increaseresearchoutput

unaidedInstitutions:
o Acquiringtextbooks,ejournalsandsoftware11

Providing Teaching and Research Assistantships for enrolment in


MastersandDoctoralprogrammesintopicslinkedtoeconomicor
societalneedsinthethematicareas
Collaboration with Industry for applicable research and product
development
Collaborationwithindustryineducationandresearch
National/International collaboration for Research and
Development activities with academic institutions and R&D
organizations.
Enhancingresearchcompetenceoffacultyandknowledgesharing
inthematicareas,bothwithinIndiaandabroad
(Note:IndustrycollaborationthroughanMoUisanecessarypre
conditionforawardofCoEtoaninstitution)

1.3FacultyDevelopmentforEffectiveTeaching(PedagogicalTraining)
Objective
Suggestedactivities
To improve competence of faculty
from project institutions through ToprovidePedagogicalTrainingtofacultyfromprojectinstitutions.
Pedagogical Training for effective
teaching to improve the learning
outcomesofEngineeringstudents.

11

th

UpdatedasperMinutesofReviewMeetingheldon19 June2013.

Section2TheProject
Component2:ImprovingSystemManagement
2.1CapacityBuildingtoStrengthenManagement
Objectives
Suggestedactivities
To build capacity of Technical Conducting Professional Development Programme for
Technical Education Policy Planners, Administrators and
Education
Policy
Planners,
Implementers at the Central, State level and Institutional
Administrators and Implementers
levels
at Central, State level and
Institutional
for
effective EstablishmentofanExpertAdvisorGroup(EAG)foreffective
implementation of academic and
systemgovernancebytheMHRD
nonacademicreforms
Establishing Management Capacity Development Centres at
IIMsfortrainingofTEQIPinstitutions
To introduce and sustain
innovative
systemic
quality
improvementpractices

Objectives

2.2ProjectManagement,MonitoringandEvaluation
Suggestedactivities

To plan, organize and manage


resources to bring about
successful achievement of Project
objectives

To support innovations for

improving State and Institutional


level management and education
practices

To monitor and evaluate the


performance
of
project
institutions and to identify
variance, if any, from the
Institutional
Development
Proposal (IDP) and suggest
remedialmeasures,asrequired

To mentor the project institutions

EnsuringsuccessfulandtimelyimplementationoftheProject
at the Central, State and Institutional levels through
coordination of resources and integration of activities of the
Project in accordance with the Project Implementation Plan
(PIP)
EnsuringdeliverablesasoutputsfromtheProject,asplanned
Monitoringandevaluationofperformancethrough:
KeyPerformanceIndicators(KPIs)
ManagementInformationSystem(MIS)
FinancialMonitoringReport(eFMR)
ProcurementManagementSupportSystem(PMSS).
ConductofAssessmentSurveys:
o StudentSatisfactionSurveys
o FacultySatisfactionSurveys
o ImplementationSurveys

towards quality improvement and


to audit the Institutional
performance in achieving their
respectivetargets

ConductofInstitutionalAudits:
o PerformanceandDataAudits
o FiduciaryReviews
ConductofResourceUtilizationStudy
ConductofBibliometricStudy
ConductofImpactAssessmentStudy
Reviews:
o MidtermReviewMission
o BiannualJointReviewMissions

Mentoring

TEQIPII

2.6 RiskAnalysisandMitigationMeasures:

TheProjectisdesignedwithanobjectivetoimprovequalityofTechnicalEducationandenhancement
ofexistingcapabilitiesoftheinstitutionstobecomeresponsivetorapideconomicandtechnological
developmentsoccurringbothattheNationalandInternationallevels.TheProjectDesignhasbeen
deliberated adequately by all stakeholders (State and Central governments, experts, private sector,
etc.)withanaimtominimizetherisksassociatedwiththeProject.
Following are the risks perceived and the ways to mitigate these risks to ensure successful
implementationoftheProject:
Table2
RisksandMitigationMeasures

TechnicalDesign

GovernanceandPolicies

Risk
Factor

DescriptionofRisk

Ratingof
Risk

Due to the selectivity in Eligibility


Criteria to achieve the project
objectives, the institutions from
the States lagging in Technical Moderate
Education, may not be able to
participate in the Project causing
regionalimbalance.
There may be possible resistance
to reforms envisioned for the
Project by participating States/
institutions.
Low

Thepossibilityoffailingtoadhere
to Project targets and time limits
by the participating States/
institutions due to changes in
leadership at State / Institutional
levels.
Inadequacy in Financial and
Administrative Autonomy to
BoardsofGovernors/Institutional
leaders.
Lessincentivetoprivatesectorto
collaborate with institutions and
promote R&D activities, and also
less incentive to institutions to
engagewithIndustries.
Less effectiveness of the
implementation plan for Faculty
DevelopmentProgrammes.

Low

Low

Moderate

Implementation
Capacityand
Sustainability

Low

10

Lack of ownership at State level


causing delay in implementation
of all the agreed reforms and in
compliance with all the fiduciary
requirementsoftheProject.
Lack of ownership at Institutional
level
causing
delay
in
implementation of all the agreed
reforms.

Low

Moderate

MitigationMeasures
TheProjecthasbeendesignedtoprovide
relaxation in Eligibility Criteria for the
States lagging in Technical Education and
give fair representation to such States to
minimizetheimbalance.

The willingness to implement academic


and nonacademic reforms is an essential
precondition for participation in the
Project to be fulfilled by the Institutions
and the States. Only those institutions
thatarewillingtoreformwillbeselected
undertheProject.
The Project has been designed as a
bottom up approach. Project planning by
the institutions and States have been
encouragedtoensureprojectownership.

The minimum desirable autonomy has


beenagreedandincludedintheEligibility
CriteriaforStatesandInstitutions.
The Project will help the institutions, the
private sector, and business oriented
institutions to create a platform where
they can discuss on mutual benefits for
collaboration.
The Institutional Development Proposals
(IDPs) are required to provide details of
Training Needs Analysis carried out and a
FacultyDevelopmentPlanforthefirst18
months of the Project. The funding to
nonperforminginstitutionsmayeitherbe
stopped or curtailed. Also, selected
institutions will be funded for training of
faculty in modern pedagogy and for
updatingsubjectknowledge.
TheStatesthatagreetoimplementallthe
reforms and to comply with all the
fiduciary requirements will only be
selectedundertheProject.
The project institutions will be reviewed
and mentored on regular basis to help
them meet the requirements of the
Project.

Section2TheProject
Risk
Factor

DescriptionofRisk

Ratingof
Risk

MitigationMeasures

SocialandEnvironmental
Safeguards

Procurement

FinancialManagement

Variationinstaffcapacities.

The Project has allocated budget for


regularandongoingtrainingforstaffatall
Substantial levels.TheFinancialManagementTraining
will be provided to staff to improve their
capacitytohandlevariousfinancialissues.
The States will make 100% budget
Delay in fund distribution and
provisions for the institutional projects. A
inadequate amount of funds to
common MoU between State and
institutions, especially to the
privateunaidedinstitutions.
Substantial institutionsforfundingprivateinstitutions
hasbeenagreedtoensurefundingtothe
private unaided institutions [AnnexIII (c)
and(d)].
The Central and State governments have
Potential delays in fund release
made adequate provisions in their
due to Centrally Sponsored
budgets. The SPFUs with adequate staff
Scheme
(CSS)
with
willbeinplacebycommencementofthe
implementation
responsibility
Substantial
Project.TheNPIUwillproactivelyfollow
vested in participating States,
upwiththeStatestoexpediteaudits.
partlyduetolackofdelegationof
power, slow recruitment of staff,
andslowaudits.
The Project has been designed to build
Fiduciary risks of economy,
the capacity of each institution by
efficiency, transparency and
fairnessinprocurementofGoods,
identifying a Coordinator to coordinate
Works and Consultant Services at
and manage the procurement processes.
Institutionlevelinalargenumber
The Coordinator will be trained on the
of institutions of the country.
agreed
procurement
procedures.
Moreover, potential procurement
ProcurementManualhasbeendeveloped
risks
involved
with
new Substantial for the Project as per the World Bank
institutions and States in the
Guidelines on Procurement to streamline
proposedProject.
the Procurement activities of all project
institutions. An appropriate Internal
Quality Assurance Mechanism will be
established to carry out prior review and
post review of procurement undertaken
byparticipatinginstitutions.
A web based Procurement Management
Too many entities handling
Support System is being developed for
procurement which could lead to
monitoring the entire procurement
issues of consistency and
processes of all procurement activities
standards and lead to fiduciary
undertaken in the Project to ensure
risks.
smooth flow of information/data which
Substantial couldassistandidentifypriorityareasfor
effective supervision. The system will
identify commonly procured items and
develop data bank including standard
specifications, along with addresses of
originalmanufacturersinthecountrywith
anticipatedpriceranges.
TheProjecthasbeendesignedtodevelop
Inadequate attention, at both
and oversee implementation of a set of
State and Institutional levels, to
actions to overcome such disadvantages
address the disadvantages faced
Low
andimproveequityineducation.
by SC/ST/OBC students, resulting
in reduced internal and external
efficiencies.
Possible agitation by local people
The Project agrees that no construction
duetoconstructionintheProject.
will be allowed on such sites/ or that
Low
appropriateproceduresarefullyfollowed
toaddressthesituationsencountered.

11

Section3
PROJECTDESCRIPTION

3.1

COMPONENT1: IMPROVING QUALITY OF EDUCATION IN SELECTED


INSTITUTIONS
This Component aims to strengthen around 200 competitively selected
Engineering Education Institutions to (i) improve learning outcomes and
employability(ii)scaleuppostgraduateeducation,research&developmentand
innovation (iii) establish Centres of Excellence and (iv) organise faculty
developmentforeffectiveteachingbyofferingPedagogicalTraining.
TherearefourSubcomponentsunderthisComponent.

13

TEQIPII

3.1.1Subcomponent1.1: StrengtheningInstitutionstoImproveLearningOutcomesandEmployabilityof
Graduates
1.

Objective:

To strengthen selected engineering institutions to improve learning outcomes and employability of


graduates.

2. Scope:

ThepotentialinstitutionsthatpreparebestInstitutionalDevelopmentProposals(IDPs)formeetingthe
above objective could be part of this Subcomponent. Around 125 new Engineering education
institutions (out of which 25 institutions can be private unaided), meeting the Eligibility Criteria as
describedinSection4(4.3.1)willbecompetitivelyselectedinoneortwocyclesfrombothnew12and
old13eligibleStatestoparticipateinthisSubcomponent.
Following types of educational institutions will be eligible for submission of IDPs and if selected, for
fundingunderthisSubcomponent:

New14institutionsfromtheoldStates

NewCentrallyFundedInstitutions

InstitutionsfromnewStates

EngineeringFaculty/EngineeringTeachingDepartments/ConstituentInstitutionsofUniversities

EngineeringFaculty/EngineeringTeachingDepartments/ConstituentInstitutionsofDeemedto
beUniversities,and

Privateunaidedinstitutionsoncostsharingbasis15

FollowingtypesofeducationalinstitutionswillnotbeeligibleforfundingunderthisSubcomponent:

StateinstitutionsandCFIs,whichhaveparticipatedinTEQIPI,

Polytechnicinstitutions,

Architecture,ManagementandPharmacyinstitutionsordepartments,and

MasterofComputerApplicationDepartments/institutions.

3.

Strategy:

The objective of this Subcomponent will be achieved through implementation of comprehensive and
coherent Institutional Development Proposals (IDPs) containing a set of reforms, improvements in
faculty competence and quality of teaching, research and consultancy, and improvement in the
associatedinfrastructure.

InstitutionsparticipatinginthisSubcomponentcannotapplyforSubcomponent1.2.

4.

Deliverables:

a) TheinstitutionsunderthisSubcomponentwillberesponsibleforthefollowingdeliverables:

Astrengthenedinstitutionintermsofacademicandmanagementcapacitiesasevidencedby
:

ObtainingAutonomousInstitutionStatuswithin2yearsofjoiningtheproject.

Atleast55%ofitseligibleUGandPGprogrammes#accreditedplusappliedfor.

HavingatleastfourBoardofGovernors(BoG)16meetingsperyearasdocumented
by publication of the proceedings of the BoG meetings on the institutions
website.

Completionofperformanceanddataaudit.

CompletionofdatainputsintheMIS.

12

New:FirsttimeentrytotheTEQIP
Old:States/InstitutionsthathadparticipatedinTEQIPPhaseI(ReferAnnexVIII)
14
Institutions:Governmentfunded,Governmentaided,Privateunaided
15
FundingforprivateunaidedinstitutionsunderthisSubcomponentwillbeintheratioof60:20:20forpermissibleactivitiesi.e.60%by
theMHRDasgrant,20%byStateasgrantand20%byinstitutionsforselectactivities(seeTable13&18A).
13

nd

Updatedasper2 JRMheldinDecember2013.
The term Board of Governors is synonymous with such term as Board of Management or Managing Committee of Faculty /
Departments/constituentinstitutions/collegesofUniversitiesandDeemedtobeUniversities.

16

14

Section3ProjectDescription

b) In addition, the project institutions are expected to improve performance with respect to
baselineonthefollowingaspects:

Increasedemployabilityofstudentsasmeasuredby:

Improvements in the placement rate and the average salary of placement


package
Improvedlearningamongstudentsasindicatedby:

The share of the first year students that complete the full first year and transit
successfullytosecondyear
OverallInstitutionalprogressasmeasuredthrough:

Increaseintheoverallstudentandfacultysatisfaction,
NumberofregistrantsforMastersandDoctoraldegrees(andnumberofMasters
andDoctoralgraduates),
PercentageofexternalrevenuefromR&Dprojectsandconsultanciesinthetotal
revenueoftheinstitution,
Increaseinthenumberofpublicationsinrefereedjournals,and
NumberofMoUssignedwithIndustry

5.

EvaluationandSelection:

Selection will be based on evaluation of Eligibility and Institutional Development Proposals (IDPs)
preparedusingtheprescribedformats.TheselectionprocessisdetailedinSection4.Informationgiven
intheformatsshouldbeverifiable,betothepointandbesupportedbydocuments.

6.

Fundingpattern:
The financial allocation to each Centrally Funded, Government funded and Government aided
institutionisexpectedtobeintherangeofRs.10.00croreandRs.4.00forprivateunaidedinstitutions
oncostsharingbasisforselectactivities(seeTable1).Forplanningoffundrequirementsundervarious
groupsofactivities,referSection6[Table15andTable15(a)].Furtherallocationsmaybemadebased
oninstitutionalperformanceagainstcertainbenchmarks,onabasistobedeterminedbyMHRDfrom
timetotime17.Allocationmayalsobereducedfornonfulfilmentofbenchmarks.

7.

ThefollowingactivitiesaresuggestedunderthisSubcomponent:
(A)Preselection:

The institutions desirous to participate in this Subcomponent may undertake the activities as
suggestedbelow:
(i) SWOTAnalysis:

The States/Union Territories are required to carry out analysis using SWOT framework in
applicantinstitutionstoidentifyStrengths,WeaknessesandtoexaminetheOpportunitiesand
Threatsfaced,therebyfocusingprojectactivitiesintoareaswheretheyarestrong,andwhere
thegreatestopportunitieslie(forGuidelinespleasereferAnnexV).
(ii) Preparednessforparticipation:
TheselectionofinstitutionsinthisSubcomponentwillbebasedon:
1. Fulfilmentofminimumeligibilitybenchmarks
2. QualityofInstitutionalDevelopmentProposal(IDP)
Institutionsshouldensurethemselvesthattheyfulfiltheminimumeligibilitybenchmarksbefore
applyingasdescribedinSection4(4.3.1).
EligibleinstitutionsarerequiredtoprepareanInstitutionalDevelopmentProposal(IDP)inthe
prescribedformatforstrengtheningtheinstitutionandincreaseemployabilityofgraduates.The
SWOT analysis would help institutions in designing their project proposal.The institutions can
proposeacombinationofthefollowingactivitiesintheirproposal:

17

Improvementinteaching,trainingandlearningfacilities,

Updatedasper9thNSCmeetingdecision.
15

TEQIPII

ProvidingTeachingandResearchAssistantshipstoincreaseenrolmentinexistingand
newPGprogrammesinEngineering&appliedsciencesdisciplines,
EnhancementofResearch&Developmentandinstitutionalconsultancyactivities,
Faculty and Staff Development for improved competence based on Training Needs
Analysis(TNA),
EnhancedinteractionwithIndustry,
Institutionalmanagementcapacityenhancement,
Implementationofinstitutionalreforms,and
Providingacademicsupportforweakstudents.

(B)Postselection:

The institutions selected in this Subcomponent should determine which activities they need to
undertakeinordertomeettheobjectivesofthisSubcomponent;suchactivitiesshouldbesetoutin
theInstitutionalDevelopmentProposal,asamendedfromtimetotimebytheinstitutionsBoardof
Governors.Examplesofactivitiesinstitutionsmaywishtoconsiderinclude:

(i) (a) Improvement in Teaching, Training and Learning facilities for Government funded and
Governmentaidedinstitutions:
Procurement of Goods [equipment; furniture; books & LRs, softwares; and minor items] and
minorcivilworksthatmayberequiredundertheProjectforimprovementinteaching,training
andlearningfacilities.Amaximumof55%oftotalprojectallocation(estimatedRs.5.5crore)can
be made for procurement by each Government funded and Government aided institution for
thisactivity.[ReferTable15S.No.(1)].

Thevarioussubactivitiesareasfollows:
(a) StartingnewPGprogrammesinEngineeringdiscipline:StartingofnewPGprogrammes
(Masters/Doctoral)canbeproposedintheIDP.TheProjectwillsupportonlythosenew
PGprogrammesthatareAICTEapprovedandforwhichtheavailabilityofrequiredfaculty
isassured.
(b) Modernization and strengthening of laboratories and establishment of new laboratories
for existing UG and PG programmes and for new PG programmes: For meeting
additional/newrequirementsfromUGandPGcurricula,startingofnewPGprogrammes,
removalofobsolescenceandpromotionofresearchactivitiesforstudentsandfacultyare
envisagedintheprojectthrough:

(i) modernization and strengthening of laboratories for existing UG and PG


programmes
(ii) establishmentofnewlaboratoriesforexistingUGandPGprogrammes
(iii) establishmentofnewlaboratoriesfornewPGprogrammes

(c) ModernizationofClassrooms:ClassroomscouldbemodernizedtohaveSmartBoardsand
Computers linked to LCD Projectors with screen, which would hold greater attention of
the students than mere lecturing. Guest lectures or class lectures organized through V
SAT,VideoConferencingandAudioConferencingcanalsobeconsidereddependingupon
needandfeasibility.Theclassroomsneedtobeequippedaccordingly.
(d)UpdationofLearningResources:ContinuousupdatingofLearningResources(books,ebooks,e
journals,CDsandprofessionalsoftware)andprocuringthesameispartoftheimprovementto
bebroughtaboutintheteachinglearningprocess.Coursespecificsoftwaretoimproveteaching
learningprocessmaybeprocured,asrequired.Thefacultyneedstobeencouragedandtrained
tousemodernequipmentandcoursespecificsoftware.
(e) ProcurementofFurniture:Furnituremayberequiredformodernizationofexistinglaboratories,
establishmentofnewlaboratories,libraries,ComputerCentresandclassrooms.Provisionwould
needtobemadeforsuchprocurementintheInstitutionalDevelopmentProposal.
(f) Establishment/Upgradation of Central and Departmental Computer Centres: Institutions may
need to focus on modernize/upgrade Computer Centres to meet curricular and research
requirements.ItisdesirablethatComputerCentresbekeptopenforextendedperiodsbeyond
working hours and on nonworking days. Proper connectivity with Campuswide Networking is
mostdesirable.PurchaseoftherequiredComputersatonegomaybeavoided;itmaybephased
toensurethatthelatestsystemsareprocured.TheIDPshouldincludethenumberofcomputer
systemsrequiredwithpurpose,costestimatesandtimeframe.

16

Section3ProjectDescription

InstitutionswouldneedtoenterintoAnnualMaintenanceContractsaftertheexpiryofwarranty
period for the computers and associated hardware procured under the Project. Wherever
possible, replacement of computers/components by the suppliers/manufacturers to ensure
upgradationofthecomputersprocuredmaybeconsidered.

(g) Modernization/Improvements of Supporting Departments: Upgradation of teaching and training


facilitiesinthesupportingDepartmentsmaybeconsideredandincludedintheIDPsothattheir
contribution is enhanced. The faculty belonging to these supporting Departments may also be
extendedbenefitsunderFacultyDevelopment.

InPhysicalEducation,fundingwillbeforsupportingthetrainingoftrainersforenhancingtheir
proficiencyandknowledgeandalsoforthetrainingofstudentsparticipatingingamesandsports
attheUniversityandabovelevels.

(h) Modernization and strengthening of libraries and increasing access to knowledge resources:
Libraries,whicharepartofeveryinstitution,promoteselflearningandalsosupporttheteaching
learning processes. There is a widespread need to keep the libraries open to the maximum
extent.Thereareinstitutionswherelibrariesarekeptopenfor24hoursadaythroughoutthe
week.

Modernization of libraries could include conversion to Digital Libraries, which would occupy
lesser space and make space available for other activities. The institutions can also become
member of Indian National Digital Library in Engineering Sciences and Technology Consortium
(INDESTAICTE Consortium). Purchase of books should be through CDs to the extent possible.
Evenoldbooks,whichareavailableonCDs,shouldbelocatedandpurchased.Thereneedstobe
a CD Bank with proper identification and accessibility. The library could be reorganized with
adequate computers and connectivity to hostels and Departments through Campuswide
Networking.SubscriptiontothelatesteJournalscouldbemade.TheIDPshouldclearlyindicate
the actions that are proposed to be taken for Modernization of Libraries including the cost
involved. The project institutions are required to avail essentially the benefit of the existing
InformationandCommunicationTechnology(ICT)schemeofMHRDundertheNationalMission
onEducation.
(i) MinorCivilWorks:Theminorcivilworkstobeundertakenbytheinstitutionsaretobeprioritized
assuggestedbelow:(However,civilworksarenotpermittedinprivateunaidedinstitutions)

Repairworks:Theworksunderthiscategorycouldberepairofoldstructuresand/ornon
functionalcomponentsoftheexistingbuilding.
Refurbishment works: The works under this category could be related to changing the
existing functions of a room to a new proposed function. For example: provision of
electrical,watersupplyand/orwastedisposalarrangementsinanexistingroomwhichis
proposedtobeusedasalaboratory.
Extension to Existing Buildings: Institutions can construct an additional area in
continuationtoanexistingbuildingwithinthecampus.However,institutionswillneedto
providejustificationontheextensionworksproposed.

Theexpenditureonminorcivilworksshouldnotexceed5%oftheInstitutionalprojectallocation.
Note:Govt.fundedandGovt.aidedInstitutionsshouldfollowscrupulouslytheagreedrulesand
proceduresassetoutintheFinancialManagementandProcurementManual.

(i)(b)ImprovementinTeaching,TrainingandLearningFacilitiesforPrivateunaidedInstitutions:

Acquiring text books, ejournals and software18: These institutions may acquire the text books,
ejournals and software with the approval of Institutions BoG and under information to the
respectiveSPFU.

For participation in Quality Enhancement in Engineering Education (QEEE) programme, the


institution may purchase following hardware components from the project fund (not exceeding
Rs.78Lakhs)byfollowingtheWorldBanknorms.

(i)
(ii)
(iii)
(iv)
(v)
18

MirrorServer
DTHreceiverthroughtheSetTopBox
Classroomwithprojector,speaker,laptopandotherfacilities
Wifiaccesstostudents
Accessbystudentsonsometablets/laptops.
th

UpdatedasperMinutesofReviewMeetingheldon19 June2013.

17

TEQIPII

Further,theseinstitutionsshouldensurethattheallocatedfundsbespentjudiciouslycoveringall
the envisaged activities under the project for the private unaided institutions, so that the
objectives of the project are achieved. Moreover, it should be ensured that these institutions
should follow scrupulously the agreed rules and procedures as set out in the Financial
ManagementandProcurementManual.

(ii)

ProvidingTeachingandResearchAssistantshipstoincreaseenrolmentinexistingandnewPG
programmesinEngineering&appliedsciencesdisciplines:

IncreasedoutputofPostgraduatesandDoctoratesisofcrucialimportanceformeetingthelarge
requirements of faculty and for meeting the needs of the Industry. It is also essential to
encourage Graduates to join Masters programmes and also pursue Research programmes for
beingemployedasfaculty.InstitutionsreceivingfundsundertheProjectareencouragedtoseek
enhancement of Masters degree seats from AICTE so as to increase the enrolment in Masters
programmes. Employees sponsored from Industry will be allowed to be enrolled in all Masters
and Doctoral programmes. Institutions may also seek permission to convert the unfilled GATE
andIndustrysponsoredseatstononGATEandnonIndustrysponsoredseatsrespectivelysothat
seatsdonotremainvacant.

GATEqualifiedstudentsenrolledinMasterscourseswillreceivescholarshipsasperAICTEnorms
fromtheGovernmentsources.ThemeritoriousstudentsadmittedbytheinstitutionsforMasters
CoursesthatdonotreceiveGATE/otherscholarships,mayreceiveTeachingAssistantshipsfrom
TEQIPfunds.

TheinstitutionscouldalsoprovideResearchAssistantshipsthroughTEQIPfundstotheenrolled
DoctoralstudentsthatdonotgetanyscholarshipsthroughNDF/otherschemes.

TheTeachingandResearchAssistantshipsaretobeprovidedbyinstitutionsaspertheprevalent
UGC/AICTEnorms.ThestudentsreceivingTeachingorResearchAssistantshipswillberequiredto
devote810hoursperweekforteachingorresearch,asthecasemaybe.

(iii) EnhancementofResearch&DevelopmentandInstitutionalConsultancyActivities:
The selected institutions are to promote increased participation of faculty in research, R&D
projectsandconsultancy,forexamplethroughmeritrecognitionandfiscalandcareerincentives.
InstitutionsthatalreadyhaveDoctoralprogrammesshouldencourageMastersStudentstojoin
Doctoralprogrammes,asexplainedinparagraphabove.
InstitutionsneedtomarkettheirservicestotheIndustry.TheIndustryshouldbeencouragedto
give live problems to the institution for solutions. The faculty who have expertise should be
encouragedtotakeupconsultancyassignments,whichwoulddirectlyandindirectlybenefitthe
institution,facultyandstudents.InternalRevenueGeneration(IRG)shouldreceiveaboost,and
someoftheincomeshouldbesharedwithfaculty,staffandstudentsasperthenormsapproved
bytheInstitutesBoardofGovernors(BoG).Regularinteractionsthroughconsultancyarelikelyto
promote a healthy and useful relationship between Industries and institutions. Care should be
taken that consultancy services offered to Industry do not affect the teaching schedules and
processes. Institutions need to develop a strategy for enabling faculty to secure consultancy
assignments and to complete them timely and successfully. The strategy in this regard is to be
detailedintheIDP.
InstitutionisalsoexpectedtoencourageUGandMastersstudentstogetassociatedwithIndustry
oriented/sponsoredresearchprogrammesundertheguidanceofseniorfaculty.Thisisexpected
toincreasetheirinterestinhighereducationandresearch.
Institutions are also expected to offer Seed grant19 for research to faculty members and / or
studentstoventureintoinnovativeresearchandtostrengthenresearchcultureininstitutions.
(iv)

Faculty and Staff Development for Improved Competence based on Training Needs Analysis
(TNA):
Enhancing faculty and staff competence would receive focused attention under the Project.
Facultydevelopmentshouldbecloselylinkedtotheoverallgoalsoftheinstitutionasalsotofulfil
individuals justifiable professional aspirations. Institutions should plan to spend at least 10%
institutionalprojectoutlayonfacultyandstaffdevelopment.[ReferAnnexVI].

19

UpdatedasperMinutesofReviewMeetingheldon19June2013.

18

Section3ProjectDescription

(a) FacultyDevelopmentforimprovedcompetence:
(Applicableforfacultyofengineeringdisciplineandsupportingdepartments)
FacultyDevelopmentneedstobecarriedoutthroughthefollowingmainactivities.

Thefollowingareasmaybegivenimportancewhileformulatinganactionplaninthisregard:
Upgradationofqualifications
Improvingcompetenceinteachingtraining
Developmentofmodernlearningresourcesandteachingaids
Newtechniquesinresearch
Improvingcompetenceinresearchandconsultancy
Deputationtoseminars,conferencesandpresentationofresearchpapers
InteractionwithpeergroupswithinIndiaandabroad
EstablishinglinkageswithacademicandresearchinstitutionsandIndustry.
ManagementofIndustryinteractions
Studentcounselling
Studentperformanceevaluation
ContinuingEducationProgramme
InstitutionsshouldsubmitadetailedactionplanonFacultyDevelopmentintheirrespective
InstitutionalDevelopmentProposals.
Thesuggestedactivitiestobeconductedare:
(i) QualificationUpgradation:
Institutions are expected to encourage faculty to upgrade their qualification from
BachelorstoMastersandfromMasterstoDoctoraldegree.Ifthefacilitiesareavailable
withintheinstitution,thesameneedtobemaximallyutilized.Alternatively,thefaculty
could be deputed to other institutions (within India) for enhancement of qualification.
Parttime or sandwich programmes may also be made use of where feasible and
necessary.
(ii) Enhancingknowledgeandresearchcompetence:

Subject upgradation and research competence : Subject knowledge upgradation is


tomakethefacultyawareoftheadvancesinknowledge,technologiesandresearch
methodologies for improving his/her own performance and for the benefit of
students. Shortterm and longterm courses are available within India including
Summer Schools arranged by Government organizations, institutions and
professional Societies. Faculty should be on the lookout for appropriate
opportunities.

ContinuingEducationProgrammes(CEPs): The CEPs at project institutions are to


betargetedattheworkingprofessionals.Thedurationoftheprogrammesmustbe
atleast one week (5 working days). The participants should preferably have
representations from industries, faculty from other AICTE recognized Engineering
institutions and few faculty of the host institution. The Continuing Education
Programmesshouldbeconductedpreferablyincuttingedgetechnologies.

ParticipationinSeminars,Conferences,Workshops,etc.:Facultyistobeencouraged
to participate in seminars, conferences and workshops, both National and
International. Participation in these would give a good exposure on the
developments taking place in different areas. The faculty participating in these
should be encouraged to visit closeby institutions and laboratories of his/her
interest.Besides,accrualofbenefitstostudentsandintheirownresearches,such
participation is expected to bring about collaborations with academic institutions
andR&Dorganizationswithinandoutsidethecountry.Theinstitutionsarerequired
toestablishsuchcollaborationsthroughMoUs.

19

TEQIPII

(iii)

Pedagogical Training : The need for Pedagogical Training at institution using the
latest teaching methodologies is strongly felt for improving the teaching and
trainingcompetenceoffaculty.Thetargetistocoverthemaximumfacultyfromthe
projectinstitutions.

(b) StaffDevelopmentforimprovedcompetence:
ThestaffinanEngineeringEducationinstitutionfallundertwocategories:
TechnicalStaff:TheTechnicalStaffinlaboratoriesandworkshopsneedstobetrainedintheir
functionalareasincludingoperationandroutinemaintenanceofboththeexistingandnew
equipment.Theyalsoneedtrainingonworkshopinstructions,upkeepofinstitutionalservice
facilities, etc. The training can be organized within the institution or at the
supplier/manufacturer premises or at reputed technical training institutions. The technical
staff also needs to be motivated and encouraged to participate in training and to use the
newlyacquiredexpertiseforthebenefitofstudentsandtheinstitution.
Administrative Staff: The Administrative Staff also needs training in respective functional
areas, particularly in the use of modern office equipment, software, office automation,
maintenanceofrecords,procedures,etc.Thetrainingshouldalsocovermotivationfortime
and material efficiency, and friendliness towards faculty and students. The training may
preferablybeorganizedwithintheinstitutionwiththehelpofsuitableorganizations.
(c) Proceduretobefollowed:
Based on the Training Needs Analysis, Faculty Development and Staff Development plans
need to be developed for each faculty and staff linking to the institutions objective and
requirements.Thisshouldalsocovercareerprogressionofthefacultyandstaff.
Basedontheabove,comprehensiveFacultyandStaffDevelopmentPlans(separateforeach
group) need to be made on an yearly basis with the approval of the BoG. The Faculty and
Staff Development plans should contain details of the venue, dates, duration and
organization where the training will be conducted. Once the plans are approved by BoG,
deputationoffacultyandstaffshouldbedoneonaregularbasis.
AnychangesinanyFacultyDevelopmentPlanduetochangesineitherinstitutionalpriorities
orchangesindates/venue,etc.maybemadewiththeapprovaloftheBoG.
(d) Accountability:
Thefacultyandstaffafterundergoingtrainingarerequiredto:

Prepareareportonthetrainingundertakenandtheexperiencegained.Thereport
should also include the aspects that can be used to improve the teachinglearning
process, enhance / improve research, improve equipment utilization and, make
administrativeandfinancialfunctionsmoreefficient.

Share their experience with students and other faculty/staff of the institution
throughseminars.

Thereportfromthefacultyandstaffshouldbehostedontheinstitutionswebsite.

(v)

EnhancedInteractionwithIndustry:

The Central Advisory Board of Education (CABE) has suggested a strong need for developing
effectivesynergiesbetweenresearchintheUniversitiesandtheirapplicationinandutilizationby
the Industry to the mutual advantage of both the systems. Likewise, Industry should be
persuadedtoestablishlinkageswiththeUniversitiestoseeksolutionsofproblemsfacedbythe
Industry.

IndustryInstituteInteraction Cell (IIIC) is to be formed in each institution to promote links to


benefitstudentsandfaculty,andtopromotecollaborativeinterdisciplinaryresearchforoffering
real life solutions. Specific steps proposed should be part of the IDP as an action plan (for
GuidanceonIIIC,referAnnexIX).

20

Section3ProjectDescription

(a) ThekeyactivityareasinwhichIndustrycanparticipateforthebenefitoftheinstitutionsare:

Participating in curriculum design, curriculum implementation, student assessment,


trainingofstudents,exposingstudentstonewtechnologies,andprovidingexpertsfor
certaininstructionalsessions;
Providingopportunitiesforstudentgroupstoundertakeproblemsolvingprojects;
Providingexposuretofacultyonindustrialpracticesandlatesttechnologies;
Participating in such bodies as the Board of Governors, Academic Council, Boards of
Studies,facultyrecruitment,etc;
Assisting institutions in establishing new laboratories, providing literature on new
technologies,andofferingtheirshopfloorsassubstitutesforlaboratories;
Trainingstudents,facultyandtechnicalstaffinnewtechnologiesandprocesses;
Collaboratinginsandwichprogrammeofferings;
ParticipatinginjointR&Dactivities;
Deliveringexpertlectures;
Industryseniorpersonnelservingasadjunctfaculty;
Utilizing institutional resources (manpower and physical) for industrial manpower
training;
Developing Postgraduate Education in areas of current and potential high demand;
and
Providing assistance for improving employability including entrepreneurial training,
specializedskilltraining,andtraininginsofterskillsrequiredbyIndustry.
Conductingshorttermtrainingprogrammesincollaborationwithinstitutions.
StudentsinternshiptoIndustry.

(b) ThekeyareasinwhichacademicinstitutionscanbenefitIndustries:

The existing expertise available with project institutions can be utilized by the
Industriesfortechnologyassessment,upgradationandabsorption.
Laboratoriesintheinstitutions,especiallyinselectareasofexcellence,canbeshared
withindustriesonagreedterms.
Developinnovations,productsandtechnologieswhichcanbeadoptedbyIndustries.
FacultycanbedeputedtoIndustryforproblemsolvingandforjointprojects.

(vi)

InstitutionalManagementCapacityEnhancement:
(a) ImprovingManagerialandAdministrativeabilitiesofHeadsofInstitutions,Deans,Headsof
Departments,seniorfacultyandofficialsthroughspecificallydesignedtrainingprogrammes
isanimportantProjectactivitytosupporteffectiveimplementationofreforms,toimprove
development, planning and implementation, and monitoring. The expected outcomes are
enhanced management capacity, helping the institution to gain improved internal and
externalefficiencies.
(b) All the SPFUs, in conjunction with the institutions, are advised to conduct Orientation
Programmes for BoG Members to keep them well informed of the Project design and
implementationrequirements,andtheirroleinrespectofbothprojectimplementationand
overallinstitutionaldevelopment.
(c) Accountability:
Allofficialsandfacultywhohaveundergonethistrainingarerequiredto:
Prepare a report on the training undertaken and the experience gained. The report
should also include the aspects that can be used for efficiency improvement in
ManagerialandAdministrativefunctions.
Share their experience with other faculty and staff within the institution through
seminars.
Thereportsfromallbeneficiariesshouldbehostedontheinstitutionswebsitewhich
shouldbelinkedtotheNPIUswebsite.

21

TEQIPII

(vii)
ImplementationofInstitutionalReforms:

TheeligibilitycriteriaforselectionofinstitutionsunderthisSubcomponentenvisagewillingnessfor
implementationofacademicandnonacademicreforms.Fornonacademicreforms,institutionsare
expectedtoutilizetheirownfunds.

(a) AcademicReforms:

(i)

Curricular Reforms: The Central Advisory Board of Education (CABE) has suggested that each
institution should exercise innovative approaches in undertaking periodic revision of
curriculum every two to three years and an intensive revision every four to five years
dependingonthedevelopmentsinthesubjectarea.Themainpurposeofrevisionofcurricula
andsyllabiforEngineeringEducationdisciplinesatUGandPGlevelsistoeffectivelyprepare
students to meet the labour market requirements. Involvement of employers including core
Industryincurricularreformsisanessentialrequirement.

The Yash Pal Committee Report (2009) on Renovation and Rejuvenation of Higher Education
has also stressed that all syllabi should require the faculty and students to apply what they
have learnt in their course on a local situation, issue or problem. There should be sufficient
roomfortheuseoflocaldataandresourcestomaketheknowledgecoveredinthesyllabus
comealiveasexperience.

Project institutions, which are affiliated to Universities, will need to get the revisions in the
curriculaapprovedbytheCompetentAuthoritiestilltheyattainAutonomousInstitutionstatus.
Institutions, which are autonomous, can carry out the curricula development and revision
themselves by establishing mechanism that would ensure that the curricula meet labour
marketrequirements.
Allnewandrevisedcurricula,amongothers,needtoimbibethefollowing:

Innovationsinteachingandstudentevaluationmethodologies;
Design skills, communication skills, entrepreneurial skills, information processing,
creativeandinnovativethinking,leadershipskills;
ProblemsolvingprojectsfromIndustry;
Electivecourses;
Extensiveuseofmedia;
InvitedexpertlecturesfromIndustryandfield;
VisitstoandtraininginIndustry;and
Multilevelandmultibackgroundentrycreditexemptions.

(ii) Improved Student Performance Evaluation: Evaluation of students has to be done on a


continuousbasis,inordertoprovideopportunitiesforimprovement.Publicationofresultsin
the shortest period and allowing the students to see the evaluated papers are some of the
innovative measures that can be adopted. Students and faculty will benefit largely from this
reformationofstudentevaluationprocess.Thefacultymayidentifytheacademicweaknesses
andthencounselthestudentsastohowtheymayimprovetheirperformance.Abrainstorming
by faculty with students can help to identify various options for performance improvement.
Transparency, fairness, consistency and accountability in grading must be ensured. The
aggrievedstudentmaybeallowedtoseetheevaluation.Weakstudentsshouldbegivenevery
opportunitytoimprove.Thiswilldevelopagreaterrespectfortheinstitutionbythestudents.
ThedetailsaregiveninAnnexI.
(iv) Performanceappraisaloffacultybystudents:Evaluationoffacultyperformanceonaperiodic
basisshouldbeimplemented.Theresultsofthisshouldbeusedfortakingremedialactionsfor
improvement of teaching learning process.The main purpose is to help a faculty to improve
his/her teaching/training skills. The assessment by students and the counselling which may
follow such assessment needs to be aimed at helping faculty recognize weaknesses and
remedythemtoimprovestudentlearning.Anexitassessmenttakenattheendofthecourse
gives an insight into the total effectiveness of the course, learning achievements and
shortcomingsandmaybeusefulforfuturedeliveryofthecoursebythefaculty.Facultymust
betakenintoconfidenceduringeachassessmentandthebenefitstothefaculty/studentand
the improvement in quality of education should be well explained. Faculty should be
continuouslymotivatedtoimproveperformance.Thiswillensureapropermixofproficiency
andefficiencyinthequalityofinstructionofferedtostudents.ThedetailsaregiveninAnnexI.

22

Section3ProjectDescription

(v)

Faculty incentive for Continuing Education (CE), Consultancy and R&D: The initiatives taken by
facultyshouldbeencouragedthroughproperincentivesandclearguidelines.Allfacultyaretobe
encouragedtoparticipateinorganizingand/orattendingCEprogrammes,toofferconsultancyto
Industry and to take part in R&D activities in the institution. Institution should prepare at the
beginning of every semester, a faculty engagement chart which should indicate not only the
faculty teaching commitments, but also his/her expected involvement in administration,
Continuing Education, collaborative activities, research and development activities including
curriculumandlaboratorydevelopment,consultancy,etc.Facultyeffortsforgoodachievementsin
this direction should be suitably recognized by the BoG. Institutional efforts for consulting to
IndustryandinvolvementinR&Dshouldalsobeadequatelyencouraged.Thedetailsaregivenin
AnnexI.

(vi) Accreditation of eligible UG and PG programmes: Accreditation of programmes is one of the


qualityassurancemechanisms.Thebenchmarksforeligibilityofinstitutionshavebeengivenin
Section4. The accreditation target (obtained and applied for) to be achieved by the end of the
project is at least 55% of the eligible UG and PG programmes. Institutions need to take
appropriateactionstoobtainaccreditationofeligibleUGandPGprogrammeswithinthespecified
timeframeandalsoforrenewalofaccreditationduringtheProjectperiod.
(b) NonAcademicReforms:
(i)

Exercise of autonomies Academic, Administrative, Managerial and Financial: For institutions


selectedunderthisSubcomponent,obtainingAutonomousInstitutionstatusduringtheProjectis
mendatory (refer AnnexI & II). Institutions are also expected to obtain and exercise reasonable
levels of Administrative, Financial and Managerial autonomies. The details of the Financial,
ManagerialandAdministrativeautonomiestobeexercisedbyInstitutionsaregiveninAnnexI.

(ii) Establishment of Corpus Fund, Faculty Development Fund, Equipment Replacement Fund and
MaintenanceFund:EstablishmentofthefourFundsisessentialtoensurethatthedevelopmental
activities continue beyond the Project period. It is, therefore, compulsory that all institutions
establish the Four Funds and put substantial amount in each Fund, as per the prescribed
mechanismfromtheinstitutionsownfundsbutnotfromtheprojectfunds(referAnnexI).
(iii) Generation, retention and utilization of revenue generated through variety of activities: In
accordancewiththeeligibilitycriteriaforStatesandUnionTerritories,allprojectinstitutionsare
to be permitted to generate, retain and utilize the entire revenue generated by them including
income from tuition fee and other fees and charges from students. All project institutions are
expected to increase revenue generation from a variety of activities such as conducting self
financing teaching and training programmes, testing services, consultancy and research,
innovations, patents, commercialization of R&D outputs, sharing of hightech equipment with
Industries,publicusageofinfrastructureforacademicactivities,etc.(seeAnnexIfordetails).

Institutions are to utilize the revenue for building up the four funds, development activities,
offering incentives to faculty and staff, instituting awards and rewards for students, faculty and
staff, etc. with approval from the BoG in accordance with rules developed in consonance with
GovernmentGuidelines,ifany.Theserulesneedtobeinplaceineachinstitutionwithin2yearsof
joiningtheProject.InstitutionsaretoperiodicallyreportincreasesintheIRGgenerated.

(iv) Fillingupexistingteachingandstaffvacancies:InaccordancewithaneligibilitycriterionforStates
andUnionTerritories,Governmentfundedandaidedprojectinstitutionsaretobeauthorizedby
States/UTstofillupallfacultyvacanciesonaregularbasis(overandabovethebenchmarkvalue).
Tillsuchtimethatthesevacanciesarefilleduponaregularbasis,appointmentson11monthor
longercontractneedtopermittedbytheStates/UTs.Allinstitutionsareaccordinglyexpectedto
achievethefollowingtargetsoffilleduppositionsaspertheAICTEprescribedfacultytostudent
ratio(MHRDnormswillapplyforNITsandotherCFIs):
Within 2 years of joining the Project: For Government funded and Government aided
institutions, 70% (with at least 55% regular and remaining on contract) and for private
unaidedinstitutions,100%(withatleast60%regularandremainingoncontract).

Attheclosureoftheproject:ForGovernmentfundedandGovernmentaidedinstitutions,
80% (with at least 60% regular and remaining on contract) and for private unaided
institutions,100%(withatleast70%regularandremainingoncontract).

23

TEQIPII

AsperAICTEnorms,thefacultystudentratioforUGprogrammesinEngineering/Technologyis
1:15.Itissuggestedthatanattemptshouldbemadetohaveapreferredratioof1:12.Forthe
MastersprogrammesinEngineering/Technology,therequiredfacultystudentratiois1:12but
itshouldpreferablybe1:10.
Whereneeded,theBoardofGovernorsmayrecruitthedesiredfacultywithincentives.The
institutionsshouldalsomakeutmosteffortstofillstaffvacancies.
(v)

Delegationofdecisionmakingpowerstoseniorinstitutionalfunctionarieswithaccountability:
DelegationofadequatepowerstoseniorfunctionarieslikeDeansandHoDswithaccountability
is expected to help better implementation of institutional projects. The powers and
responsibilities of the Director/Principal, Deans, HoDs, Professors and other senior faculty in
thedepartment,laboratoryinchargesandotherfunctionariesshouldbeclearlyspeltoutina
decentralized administrative environment. Even junior faculty and staff should know their
authorityandresponsibilityforwhichtheywouldbeheldaccountable.
Asameasureoffinancialreforms,adequatefinancialpowerstotheDirector/Principalofthe
institutionandotherfunctionariesaretobedelegatedbytheBoardofGovernors.Allactions
oftheDirectorinconnectionwithContinuingEducation,consultancy,facultydevelopment,
seminarsandconferencesshouldbereportedtoBoardofGovernors.
ThedetailsofManagerial,AdministrativeandFinancialreformsaregiveninAnnexI.

(viii) Supporttostudentneeds:

Underthisreform,itisconsideredimportantthatfocusedeffortsbemadebyinstitutionstoimprove
the academic performance of SC/ST/OBC and academically weak students through innovative
methods such as remedial teaching in professional subjects and soft skills development for
increasingtransitionrate,passrateandemployability(referSection9fordetails).

ForincreasinginstitutionalfocusonprovidingacademicandguidancesupporttotheSC/ST/OBCand
academicallyweakstudents,allprojectinstitutionsarerequiredtoconstituteaFinishingSchoolwith
a senior faculty as coordinator. All institutions are expected to spend at least 4% of their project
allocationonthisactivity.

ThesuggestedactivitiesundertheaegisoftheFinishingSchoolwillbe:

a)

Conducting remedial teaching throughout academic sessions for improving transition rate and
passrateofstudents,
(The faculty who teaches students during regular classes should not provide remedial class to
thosesamestudents:thiscreatesunavoidableconflictofinterest.)

b) Conductingspecializedsoftskillsandprofessionalskillsdevelopmenttrainingduringsemester
breaksandvacationsforincreasingemployability,
c)

Conducting high intensity training (of at least 2weeks duration) for development of soft and
professionalskillsinthestudentsthatgraduatebutfailtosecureanyemployment,and

d) Organizing campus interviews and making other efforts to secure employment for graduate
engineersthatcompletethetrainingunderactivity(c)above.

The Finishing School activities are to be conducted using the existing infrastructure, laboratories,
workshops,computercentres,libraryandtheexistingfaculty.Expertisefromoutsidetheinstitution
andfromemployerorganizationscanalsobeused.Therewillbenocoursefeeforstudentsforeither
activityat(a)or(b)or(c).Allstudentsattendingtrainingunderactivity(c)willberesponsiblefortheir
boardingandlodgingarrangementsandexpenditure.
The activities of the Finishing School will be regularly supervised and monitored by the respective
SPFUs,especiallyinrespectofthenumberofgraduatesparticipatinginthe2weektrainingandthe
percentageoftheseparticipantssecuringemploymentwithin3monthsofcompletionoftraining.

24

Section3ProjectDescription

8.ImportantNotes:

Note1 :

The activities like establishment of a new institution, large scale civil works, and
introducingnewUGprogrammeswillnotbeeligibleforfunding.

Note2 :

Procurement of consultant services, if required for the activities listed in Table No. 18
from Sr. No. 28 for Centrally Funded, Government funded and Government aided
institutionsandforPrivateunaidedInstitutionsactivitieslistedinTableNo.18(a)fromSr.
No. 28 are permitted. The expenditure on Procurement of consultant services is to be
bookedagainstthatparticularactivity.Theservicesofconsultantsaretobeprocuredby
followingtheProcurementManualandthroughthePMSS.

Note3 :

TheCentrallyFunded,GovernmentfundedandGovernmentaidedinstitutionsshouldnote
that, the procurement of goods is to be done strictly amongst the activities which are
detailedout in Section2, 3, 6 and 7 under the Improvement in Teaching, Training and
Learning facilities, as required and justified by institutions to in respect of their
institutionalprojectobjectives.

Note4 :

For improving quality of education, overall faculty development through (i) improving
subjectcompetence,and(ii)pedagogicaltraining,isenvisagedintheProject.Pedagogical
training is to be imparted to all teachers in the institutions to enhance teaching
effectiveness.

Note5:

The private unaided institutions are encouraged to participate in the Quality


Enhancement for Engineering Education (QEEE) Programme of Ministry of Human
Resource Development. Such Private unaided institutions can acquire the Mirror Server,
DTHreceiverthroughthesettopbox;classroomwithprojector,speaker,laptopandother
required facilities,WiFiaccessto students, Access bystudentsonsometablets/laptops;
limiting the expenditure to the tune of maximum of Rs.78 Lakhs. The Private unaided
institutions must follow the agreed rules and procedures as set out in the Procurement
ManualwhileusingPMSS.

25

TEQIPII

3.1.2Subcomponent1.2: Scalingup Postgraduate Education and DemandDriven Research &


DevelopmentandInnovation
1.

Objective:

TosignificantlyincreaseenrolmentinPostgraduate20educationandenhanceengineeringresearchand
developmentandinnovation.

2.

Scope:

This competitive fund will support the best Institutional Development Proposals (IDPs) that can meet
the above objective. About 75 institutions including a maximum of 20% i.e. 15 private unaided that
alreadyhaveAutonomousinstitutionstatus(asdefinedbyUGCandasapplicable)meetingtheEligibility
CriteriadescribedinSection4(4.4.1)willbeselectedunderthisSubcomponent.Theinstitutionswillbe
requiredtomeetasetofeligibilitycriteriatodemonstrateanexistingR&Dbasethatcanbeexpended.
Thekeytargetwillbeanincreasedenrolmentofstudentsinpostgraduateeducationprogrammes,in
particularthePhDprogrammestoaddressthefacultyshortage.Asecondarytargetwouldbeincreased
industrycollaborationwithR&DtoproducetechnologicalsolutionswithfirmsandincreasedR&D.The
followingtypesofinstitutionsareeligibletosubmitanIDPunderthisSubcomponent:

(i)

State Government funded, Government aided and private unaided institutions that had
participatedinTEQIPI,

(ii)

StateGovernmentfunded,Governmentaidedandprivateunaidedinstitutionsthathadnot
participatedinTEQIPI,

(iii)

CentrallyFundedInstitutions(CFIs)thathadparticipatedinTEQIPI,

(iv)

CentrallyFundedInstitutions(CFIs)thathadnotparticipatedinTEQIPI,

(v)

Engineering Faculty/Engineering Teaching Departments/Constituent Institutions of


Universities(bothold21andnew),and

(vi)

Engineering Faculty/Engineering Teaching Departments/constituent institutions of Deemed


tobeUniversities(botholdandnew).

Followingtypesofengineering/technicaleducationinstitutionswillnotbeeligibleforfundingunderthis
Subcomponent:

(i)
(ii)
(iii)
(iv)

Nonautonomousinstitutions,
Polytechnicinstitutions,
Architecture,ManagementandPharmacyinstitutionsordepartments,and
MasterofComputerApplicationDepartments/institutions.

3.

Strategy:
Institutions that were supported under TEQIPI, have already upgraded infrastructure for improving
qualityofUGeducation,gainedexperienceinintroducinginnovations inacademicandadministrative
practices and also in implementation of institutional reforms. These institutions are quite ready for
furtherimprovementinimpartingqualityeducationandscalingupPGeducationandresearchactivities.
TheProjectwouldthusselectsuchinstitutionsthatcanmeetthischallenge.

Itisexpectedthatafewnew22institutionswouldalsoqualifytoparticipateinthisSubcomponent.The
privateunaidedinstitutionscanalsoparticipateunderthisSubcomponent.

Applicantinstitutionsaretosubmitcomprehensiveand coherentInstitutionalDevelopmentProposals
thataimtoachievetheabovestatedobjective.

InstitutionsparticipatinginthisSubcomponentcannotapplyinSubcomponent1.1.

20

ThetermPostgraduatecoversbothMastersandDoctoraldegreeprogrammesinengineering.
The term old refers to standalone institutions and Faculty / Department / constituent institutions of Universities and Technical
DeemedUniversitiesthathadparticipatedinTEQIPI.
22
ThetermnewinstitutionsreferstoinstitutionsthathadnotparticipatedinTEQIPI,likewiseoldinstitutionreferstoinstitutionsthat
hadparticipatedinTEQIPI.
21

26

Section3ProjectDescription

4.

Deliverables:

TheinstitutionsunderthisSubcomponentwillberesponsibleforconcretedeliverablesintermsof:
o ScalingupofPGeducationasmeasuredby:
IncreasedenrolmentofMastersandDoctoralstudents(andnumberofMTech/PhDGraduates)
o Increase in the IndustryInstitute collaboration and scalingup of R&D in areas linked to

o
o
o
o

societal/industrialdemandasindicatedby:
Percentage of revenue from externally funded R&D projects and consultancies in total annual
revenuefromallsources
Atleast55%ofitseligibleUGandPGprogrammesaccreditedplusappliedfor.
HavingatleastfourBoardofGovernors(BoG)23meetingsperyearasdocumentedbypublicationofthe
proceedingsoftheBoGmeetingsontheinstitutionswebsite.
Completionofperformanceanddataaudit.
CompletionofdatainputsintheMIS.

Theabovewillbetheprimarydeliverableswithrespecttobaselinefortheinstitutionsselectedunder
thisSubcomponent.
In addition to the above stated deliverables, the project institutions will be expected to improve
performanceonthefollowingaspects:
o Increasedemployabilityofstudentsasmeasuredby:
Improvementintheplacementrateandtheaveragesalaryofplacementpackage
o Overallinstitutionalperformanceasmeasuredthrough:
Increaseintheoverallstudentsandfacultysatisfaction
o Scalingupqualityresearch,developmentandinnovationasindicatedby:
Increaseinthenumberofpublicationsinrefereedjournals,citationsandpatentsobtained/filed
o Increasedcollaborationwithotherinstitutionsasmeasuredby:
Thenumberofjointpublicationsinrefereedjournals
5.

EvaluationandSelection:
Selection will be based on the fulfilment of minimum eligibility benchmarks and merit of proposals
submitted in the prescribed formats [AnnexIV (B)(b)]. Information given in the IDPs should be
verifiable,tothepointandbesupportedbydocuments.

6.

FundingPattern:
The financial allocation to each Centrally Funded, Government Funded and Government Aided
Institutions is expected to be in the range of Rs.12.50 crore and Rs.4.00 crore for Private unaided
institutions on cost sharing basis24 for selected activities (see Table1). For planning of fund
requirements under various groups of activities, refer Section6 [Table16 and Table16 (a)]. Further
allocationsmaybemadebasedoninstitutionalperformanceagainstcertainbenchmarks,onabasisto
be determined by MHRD from time to time. Allocation may also be reduced for non fulfilment of
benchmarks.

7.

ThefollowingactivitiesaresuggestedunderthisSubcomponent:
(A)Preselection:

The institutions desirous to participate in this Subcomponent should determine which activities
they need to undertake in order to meet the objectives of this Subcomponent; such activities
shouldbesetoutintheInstitutionalDevelopmentProposal,asamendedfromtimetotimebythe
institutionsBoardofGovernors.Examplesofactivitiesinstitutionsmaywishtoconsiderinclude:
(i) SWOTAnalysis:
TheinstitutionsarerequiredtocarryoutSWOTanalysis(forguidelinesreferAnnexV)toidentify
Strengths, Weaknesses and to examine the Opportunities and Threats faced, thereby focusing
projectactivitiesintoareaswheretheyarestrong,andwherethegreatestopportunitieslie.Based
upon the SWOT analysis, institutions are to prepare an action plan in the prescribed format that
seeks to remove its weakness in respect of postgraduate education and R&D, increase enrolment
into Masters and Doctoral programmes and scaleup research, development and innovation using
itsstrengths.

23

The term Board of Governors is synonymous with such term as Board of Management or Managing Committee of Faculty /
Departments/constituentinstitutions/collegesofUniversitiesandDeemedtobeUniversities.
FundingforprivateunaidedinstitutionsunderthisSubcomponentwillbeintheratioof60:20:20forpermissibleactivitiesi.e.60%by
theMHRDasgrant,20%byStateasgrantand20%byinstitutionsforselectactivities(seeTable13&16A)

24

27

TEQIPII

(ii) Preparednessforparticipation:
TheselectionofinstitutionsinthisSubcomponentwillbebasedonmeetingofeligibilitycriteriaand

QualityofInstitutionalDevelopmentProposal(IDP).
Institutions need to formulate an Institutional Development Proposal (IDP), based on their action
plan.WhendevelopingtheIDP,institutionscanproposeacombinationofthefollowingactivities:

a.

Improvementinteaching,trainingandlearningfacilitiesthrough:
EstablishmentofnewlaboratoriesfornewandexistingPGprogrammesinengineering
disciplines
Updationoflearningresources
Procurementoffurniture
Modernization and strengthening of libraries and increasing access to knowledge
resources
MinorCivilworks

b.

ProvidingTeachingandResearchAssistantshipsforsignificantlyincreasingenrolmentinexisting
andnewMastersandDoctoralprogrammesinEngineering&appliedsciencesdisciplines.
EnhancementofR&Dandinstitutionalconsultancyactivities.
TheIDPneedstoindicatetheresearchareas,likelynumberofresearchprojects,facultytobe
associated with each research project, expected outputs in terms of applicable products,
patents,publications,etc.
Theinstitutionsarealsoexpectedtoundertakethefollowing:
DevelopingresearchinterestamongundergraduateandMastersstudents
ResourcesharingwithIndustrythroughcollaborativearrangements
Faculty and staff development for improved competence based on Training Needs Analysis
(TNA).
EnhancedInteractionwithIndustry.
InstitutionalManagementCapacityenhancement.
Implementationofinstitutionalreforms.
ProvidingAcademicsupportforweakstudents.

c.

d.
e.
f.
g.
h.

Each Proposal must contain a plan for Faculty and Staff development that accounts for 10 % of the
proposed project fund requirement. Further, civil works is to be limited to maximum 3 % of the
institutionalprojectoutlay.

(B) Postselection:

Theinstitutionsselectedunderthissubcomponentmayundertakeactivitiesassuggestedbelow:

(i)(a)ImprovementinTeaching,TrainingandLearningfacilitiesforGovernmentfundedandGovt.
aidedinstitutions:

Procurement of Goods [equipment; furniture; books & LRs, softwares; and minor items] and
minorcivilworksmayberequiredundertheProjectforimprovementinteaching,trainingand
learningfacilities.Amaximumof45%oftotalprojectallocation(estimatedRs.5.625crore)can
tobemadeforprocurementbyeachprojectinstitution(CentrallyFunded,GovernmentFunded
andGovernmentAided)forthisactivity.[ReferTable16S.No.(1)].
Thevarioussubactivitiesareasfollows:
(a)

Starting new PG programme in emerging engineering disciplines: Starting of new PG


programmes(Masters/Doctoral)canbeproposedintheIDP.TheProjectwillsupportonly
thosenewPGprogrammesinemergingareasofengineeringandtechnologythatareAICTE
approvedandforwhichtheavailabilityofrequiredfacultyisassured.

(b)

Establishment of new laboratories for new and existing PG programmes in engineering


disciplinesrequiredfor:

(c)

28

Meetingadditional/newrequirementsforexistingPGprogrammes
StartingofnewPGprogrammes
Promotionofresearchactivitiesforstudentsandfaculty

UpdationofLearningResources:ContinuousupdatingofLearningResources(Books,CDsand
Software) and procuring the same is part of the improvement to be brought about in the
teaching learning process. Course specific softwares to improve teachinglearning process
may be procured, as required. The faculty needs to be encouraged and trained to use
modernequipmentandcoursespecificsoftwares.

Section3ProjectDescription

(d) Procurement of Furniture: Furniture may be required for library and establishment of new
laboratories. Provision would need to be made for such procurement in the Institutional
DevelopmentProposal.
(d) ModernizationandstrengtheningofLibrariesandincreasingaccesstoknowledgeresources:
Fordetails,pleaserefertoSubcomponent1.1.

(e) Minor Civil works: The minor civil works (repairs and refurbishment) to be undertaken by the
Institution under this category is to be confined to laboratories only. The Works can be the
changingoftheexistingfunctionsofanoldstructure/spacetoanewproposedfunction.
Theexpenditureoncivilworksshouldnotexceed3%oftheInstitutionalprojectoutlay.

Note:Govt.fundedandGovt.aidedInstitutionsshouldfollowscrupulouslytheagreedrulesand
proceduresassetoutintheFinancialManagementandProcurementManual.

(i)(b) ImprovementinTeaching,TrainingandLearningfacilitiesforPrivateunaidedInstitutions:

Acquiringtextbooks,ejournalsandsoftware25:Theseinstitutionsmayacquirethetextbooks,e
journals and software with the approval of Institutions BoG and under information to the
respectiveSPFU.

For participation in Quality Enhancement in Engineering Education (QEEE) programme, the


institutionmaypurchasefollowinghardwarecomponentsfromtheprojectfund(notexceeding
Rs.78Lakhs)byfollowingtheWorldBanknorms.
(i) MirrorServer
(ii) DTHreceiverthroughtheSetTopBox
(iii) Classroomwithprojector,speaker,laptopandotherfacilities
(iv) Wifiaccesstostudents
(v) Accessbystudentsonsometablets/laptops.

Further, these institutions should ensure that the allocated funds be spent judiciously
coveringalltheenvisagedactivitiesundertheprojectfortheprivateunaidedinstitutions,
so that the objectives of the project are achieved. Moreover, it should be ensured that
theseinstitutionsshouldfollowscrupulouslytheagreedrulesandproceduresassetoutin
theFinancialManagementandProcurementManual.

(ii) Providing Teaching and Research Assistantships for significantly increasing enrolment in
existing and new Masters and Doctoral programmes in Engineering & applied sciences
disciplines:
TheaimistoattractstudentstoMastersandDoctoralprogrammesbyprovidingAssistantships.
Scalingup of PG and research programmes will be done either by strengthening the existing
programmesorbyintroducingnewprogrammes.Forthisscalingup,institutionsneedtoensure
availabilityofqualifiedfacultyandessentialtechnicalstaff.

Institutionsreceivingfunds undertheProjectareencouragedtoseek enhancement ofMasters


degree seats from AICTE so as to increase the enrolment in Masters programmes. Employees
sponsoredfromIndustrywillbeallowedtobeenrolledinallMastersandDoctoralprogrammes.
The institutions may also seek permission to convert the unfilled GATEand Industry sponsored
seats to nonGATE and nonIndustry sponsored seats respectively so that seats do not remain
vacant.

GATEqualifiedstudentsenrolledinMasterscourseswillreceivescholarshipsasperAICTEnorms
fromtheGovernmentsources.ThemeritoriousstudentsadmittedbytheinstitutionsforMasters
CoursesthatdonotreceiveGATE/otherscholarships,mayreceiveTeachingAssistantshipsfrom
TEQIPfunds.

TheinstitutionscouldalsoprovideResearchAssistantshipsthroughTEQIPfundstotheenrolled
DoctoralstudentsthatdonotgetanyscholarshipsthroughNDF/otherschemes.
These Teaching and Research Assistantships are to be provided by institutions as per the
prevalentUGC/AICTEnorms.ThestudentsreceivingTeachingorResearchAssistantshipswillbe
required to devote 810 hours per week for teaching or research, as the case may be.
OutstandingcandidatesenrolledforPhD,inselectcases,couldbesentabroadforpaperreading
inconferences,andexposure/interactionwitheminentresearchlaboratoriesformaximumthree
months.

25

th

UpdatedasperMinutesofReviewMeetingheldon19 June2013.

29

TEQIPII

(iii) EnhancementofResearch&DevelopmentandInstitutionalConsultancyActivities:
National Knowledge Commission has stated, Research and Development are prerequisites for
teachers in topflight research institutions that supply manpower for research and for
development of cutting edge Industry. All Technical Education institutions are required to
undertake research as a means of renovation and renewal of educational processes with the
primary aim of producing quality manpower capable of taking up R&D functions. Research for
development should focus on improving present technologies, developing indigenous ones and
enhancingproductionandproductivity.
Institutions are required to develop their plans for quantitatively increasing and qualitatively
improving research by their faculty individually, jointly and collaboratively. Institutions need to
secureIndustrysponsoredresearchprojectsalso.

InstitutionsneedtomarkettheirservicestoIndustry.TheIndustryshouldbeencouragedtogive
live problems to the institution for solutions. The faculty who have expertise should be
encouragedtotakeupconsultancyassignments,whichwoulddirectlyandindirectlybenefitthe
institution,facultyandstudents.InternalRevenueGeneration(IRG)shouldreceiveaboost,and
someoftheincomeshouldbesharedwithfaculty,staffandstudentsasperthenormsapproved
bytheinstitutionsBoG.Regularinteractionsthroughconsultancyarelikelytopromoteahealthy
and useful relationship between the industries and institutions. Care should be taken that
consultancy services offered to Industry do not affect the teaching schedules and processes.
Institutions need to develop a strategy for enabling faculty to secure consultancy assignments
andtocompletethemtimelyandsuccessfully.

Institutions are also expected to offer Seed grant26 for research to faculty members and / or
studentstoventureintoinnovativeresearchandtostrengthenresearchcultureininstitutions.

Inadditiontotheabove,theinstitutionsmayundertakethefollowing:

DevelopmentofresearchinterestamongundergraduateandMastersstudents:
Institutions need to encourage UG and Masters students to get associated with Industry
oriented/sponsored research programmes under the guidance of senior faculty. This is
expectedtoincreasetheirinterestinhighereducationandresearch.
Resourcesharingwithindustrythroughcollaborativearrangements:
TheProjectencouragesinstitutionstoestablishMoUswithneighbouringinstitutionsand
Industriesonviablecollaborative/consultancyprojectswithspecifictimeframesandwell
defined outputs. The projects may be coordinated jointly by faculty member(s) from
institutions as well as personnel from the Industries. A welldefined and transparent
revenue sharing mechanism needs to be evolved and implemented to motivate faculty
memberstoincreasinglyparticipateinsuchactivities.TheProjectencouragesparticipating
institutions to share their resources like faculty and staff, computer centres, major
lab/workshop equipment and libraries, and to also engage experts from Industries on
shortterm and/or on parttime basis for enhancement of R&D and institutional
consultancyactivities.

(iv)

FacultyandStaffDevelopmentforimprovedcompetencebasedonTrainingNeedsAnalysis(TNA):

(v)

(vi)

(vii)

Fordetails,pleaserefertoSubcomponent1.1
EnhancedInteractionwithIndustry:
Fordetails,pleaserefertoSubcomponent1.1
InstitutionalManagementCapacityenhancement:
Fordetails,pleaserefertoSubcomponent1.1.
ImplementationofInstitutionalReforms:
AllinstitutionsparticipatinginthisSubcomponentarerequiredtoimplementalltheacademicand
nonacademicreformsasdescribedinAnnexI.

26

a)

Curricularreforms:Fordetails,pleaserefertoSubcomponent1.1

b)

ExerciseofautonomiesAcademic,Administrative,ManagerialandFinancial:

UpdatedasperMinutesofReviewMeetingheldon19June2013.

30

Section3ProjectDescription

ForinstitutionsselectedunderthisSubcomponent,possessionofAutonomousInstitutionstatus
isamandatoryrequirementforreceivingprojectfunds.Institutionsarealsoexpectedtoexercise
reasonablelevelsofAdministrative,FinancialandManagerialautonomies.Thedetailsofthedesired
Financial, Managerial and Administrative autonomies to be exercised by institutions are given in
AnnexI.
c)

Establishment of Corpus Fund, Faculty Development Fund, Equipment Replacement Fund and
MaintenanceFund:Fordetails,pleaserefertoSubcomponent1.1.

d)

Generation,retentionandutilizationofrevenuegeneratedthroughavarietyofactivities:Fordetails,
pleaserefertoSubcomponent1.1.

e)

Institutionstofillupexistingteachingandstaffvacancies:Allinstitutionsareexpectedtoachieve
thefollowingminimumtargets#offilledpositionsaspertheAICTEprescribedfacultystudentratio
(MHRDnormswillapplyforNITsandotherCFIs):

Within 2 years of joining the Project: For Government funded and Government aided
institutions, 80% (with at least 70% regular and remaining on contract) and for private
unaidedinstitutions,100%(withatleast70%regularandremainingoncontract).

Atclosureoftheproject:ForGovernmentfundedandGovernmentaidedinstitutions,90%
(withatleast75%regularandremainingoncontract)andforprivateunaidedinstitutions,
100%(withatleast75%regularandremainingoncontract).

AsperAICTEnorms,thefacultystudentratioforUGprogrammesinEngineering/Technology
is1:15.Itissuggestedthatanattemptshouldbemadetohaveapreferredratioof1:12.For
theMastersprogrammesinEngineering/Technology,therequiredfacultystudentratiois1:12
butitshouldpreferablybe1:10.

Effortstofillstaffvacanciesaretobemade.

f)

Delegation of decision making powers to senior functionaries with accountability: For details,
pleaserefertoSubcomponent1.1.

g) ImprovedStudentPerformanceEvaluation:Fordetails,pleaserefertoSubcomponent1.1.
h) Performanceappraisaloffacultybystudents:Fordetails,pleaserefertoSubcomponent1.1.

i)

FacultyincentiveforContinuingEducation(CE),ConsultancyandR&D:Fordetails,pleaserefer
toSubcomponent1.1.

j)

AccreditationofUGandPGProgrammes:

Accreditation of programmes is one of the quality assurance mechanisms. The accreditation


target (obtained and applied for) to be achieved by the end of the Project is at least 55% of
eligible programmes. Institutions need to take appropriate actions to obtain accreditation of
eligible PG and UG programmes within the specified timeframe and also for renewal of
accreditationduringtheProjectperiod.

(viii)

Supporttostudentneeds:

Underthisreform,itisconsideredimportantthatfocusedeffortsbemadebyinstitutionstoimprove
the academic performance of SC/ST/OBC and academically weak UG students through innovative
methods such as remedial teaching in professional subjects and soft skills development for
increasingtransitionrate,passrateandemployability(referSection9fordetails).

ForincreasinginstitutionalfocusonprovidingacademicandguidancesupporttotheSC/ST/OBCand
academicallyweakstudents,allprojectinstitutionsarerequiredtoconstituteaFinishingSchoolwith
a senior faculty as coordinator. All institutions are expected to spend at least 2% of their project
allocationonthisactivityinaccordance.

ThesuggestedactivitiesundertheaegisoftheFinishingSchoolforUGstudentswillbe:

a)

Conducting remedial teaching throughout academic sessions for improving transition rate
andpassrateofstudents,
(Thefacultywhoteachesstudentsduringregularclassesshouldnotprovideremedialclassto
thosesamestudents:thiscreatesunavoidableconflictofinterest.)

th

Updatedasper5 NSCMeetingdecision.

31

TEQIPII

b) Conducting specialized soft skills and professional skills development training during
semesterbreaksandvacationsforincreasingemployability,
c)

Conductinghighintensitytraining(ofatleast2weeksduration)fordevelopmentofsoftand
professionalskillsinthestudentsthatgraduatebutfailtosecureanyemployment,and

d) Organizingcampusinterviewsandmakingothereffortstosecureemploymentforgraduate
engineersthatcompletethetrainingunderactivity(c)above.
The Finishing School activities are to be conducted using the existing infrastructure, laboratories,
workshops,computercentres,libraryandtheexistingfaculty.Expertisefromoutsidetheinstitutionand
fromemployerorganizationscanalsobeused.Therewillbenocoursefeeforstudentsforeitheractivity
at(a)or(b)or(c).Allstudentsattendingtrainingunderactivity(c)willberesponsiblefortheirboarding
andlodgingarrangementsandexpenditure.
TheactivitiesoftheFinishingSchoolwillberegularlysupervisedandmonitoredbytherespectiveSPFUs,
especiallyinrespectofthenumberofgraduatesparticipatinginthe2weektrainingandthepercentage
oftheseparticipantssecuringemploymentwithin3monthsofcompletionoftraining.

8.

ImportantNotes:
Note1

:Theactivitieslikeestablishmentofanewinstitution,largescalecivilworks,andintroducing
newUGprogrammeswillnotbeeligibleforfunding.

Note2

: Procurement of consultant services, if required for the activities listed in Table No. 19 from
Sr.No.28forCentrallyFunded,GovernmentfundedandGovernmentaidedinstitutionsand
for Private unaided Institutions activities listed in Table No. 19 (a) from Sr. No. 28 are
permitted. The expenditure on Procurement of consultant services is to be booked against
that particular activity. The services of consultants are to be procured by following the
ProcurementManualandthroughthePMSS.

Note3

: The Centrally Funded, Government funded and Government aided institutions should note
that, the procurement of Goods is to be done strictly amongst the activities which are
detailedoutinSection2,3,6and7underImprovementinTeaching,TrainingandLearning
facilities, as required and justified by institutions in respect of the institutional project
objectives.

Note4

: Forimprovingqualityofeducation,overallfacultydevelopmentthrough(i)improvingsubject
competence,and(ii)pedagogicaltraining,isenvisagedintheProject.Pedagogicaltrainingis
tobeimpartedtoallteachersintheinstitutionstoenhanceteachingeffectiveness.Inaddition
to the institutions efforts for the pedagogical training, pedagogical training will be
implemented by NPIU through IITs. Details of the subcomponent Faculty Development for
Effective Teaching (Pedagogical Training) are described in Section 3.1.4 (Subcomponent
1.3).

32

Section3ProjectDescription

3.1.3Subcomponent1.2.1:EstablishingCentresofExcellence

1.

Objective:
To support establishment of Centres of Excellence for collaborative and multidisciplinary research
withinspecificthematicareasofregionalornationalimportance.

2.

Scope:
Establishment of about 30 Centres of Excellence (CoE) in Centrally Funded Institutions (CFIs),
Governmentfunded,GovernmentaidedandPrivateunaidedInstitutionsforcollaborativeresearchwill
be supported in eligible institutions out of those selected under Subcomponent 1.2 and having the
potentialforundertakingapplicableandcollaborativeresearch.Anadditionalfundwillbegivenforthe
same.
The thematic areas could include the following: Manufacturing, Information & Communication
Technology (ICT), Renewable Energy (Solar, Wind, Wave Energy, etc.),Hydrology and Water Resource
Management, Traffic & Highway Safety, advanced transport systems (urban and rural), Intelligent
Transportation System, Advanced Materials, Disaster Management, Nanotechnology, Security
Technology, Semi Conductors, Logistics and Distribution systems, Biomedical Instrumentation, Waste
Management,BioTechnology,ImageProcessing,SensorTechnology,TurbomachineryandPropulsive
systems,Urbanstructures,Pollutionandclimate,robotics,Biomedicaltechnology(bone,joints,tissue
technology),Forensicscience,Archaeologicalscience(epigraphy,radiocarbondating,heritagebuilding,
archaeometallurgy, etc). Fundamental research areas will be encouraged such as advanced
mechanics,flowcontrolandfluidics,etc.
This is an illustrative list. Centres within other thematic areas of demonstrated regional or national
importancewillbeconsideredaswell.

3.

SalientFeaturesofaCoE:

TheCoEshouldberelevanttoIndiantechnologicalneedsandhavealongtermvisionofevolving
technologicalrequirementsandchangingnatural/societalconstraints

A Centre of Excellence (CoE) is expected to be a collaborative activity between a team of high


quality researchers in the institution and researchers or research users in several companies or
organizations In cases where the nature of research is partially related to production or
improvementofpublicgoods,collaborationmayincludeappropriatepublicagencies.Inallcases,
however,CoEswillneedtodemonstratethatthemajorityoftheircollaboratorsarefromprivate
firms(ifsuchexistwithinthethematicresearchareas).

The CoE is expected to contribute significantly both to economic advancement and to building a
robust research culture in institutions that is more applied and collaborative in nature. In
particular, the CoE is expected to address emerging industry and societal needs in close
collaboration with industries and users. The scientific merit of the research undertaken is as
importantastherelevancetoeconomicgrowthanddevelopment.

TheCoEisexpectedtofurtherscaleupPostgraduateEducationthroughincreasedenrolmentsfor
Masters and Doctoral programmes in topics closely linked to the thematic areas of the CoE and
therefore closely linked to economic and societal needs. Some of these students could also
undertaketheirresearchwithincollaboratingfirms.

The Centre should join faculty members from several departments around a common research
programme, in which all the collaborating departments are expected to share their physical and
intellectual resources with each other. Evaluation will give greater weight to CoEs that are multi
disciplinaryinnature.

The Centre is expected to trigger an R&D culture in the institutions as evidenced by significant
increase in commercial applications and research outputs, collaborative and sponsored research,
publications, in reputed national/international journals and conferences, patents, innovations,
commercializedproductsandPhDenrolments.

The Centre is expected to increase collaboration with National and International academic and
research institutions/organizations. This will facilitate transfer of technology and knowledge to
improvethequalityofresearchanddevelopment,andaimtocreateacriticalmassofresearchers
withpotentialforglobalresearchanddevelopment.

33

TEQIPII

4.
Deliverables:

TheCoEsareexpectedtoensurethefollowingdeliverables:
Increasedcollaborativeandappliedresearchasdocumentedby:
o Increase in external R&D funding, notably Industry sponsored R&D projects and industry
chairs
o Increaseinpatentsfiledandobtainedorothermannersofknowledgecommercialization
andtransfer
Increasedproductionofadvancedhumancapitalasmeasuredby:
o IncreaseinenrolmentofMastersandDoctoralstudents.
o IncreaseinnumberofMTech/PhDGraduates.
o Increase in placement of graduate students and research staff in short and longterm
positionswithincollaboratingfirmsaswellaswithlocalindustry.
o Updatedandmorerelevantundergraduateandpostgraduateengineeringcurricula.
DevelopinglongtermR&Dcapabilityasevidencedby:
o IncreaseinpublicationsinrefereedJournals.
o IncreaseinjointpublicationsinrefereedJournalswithinternationalauthors.
o Increase in joint programmes/projects/exchanges with international research
organisationsandinstitutions.
o ExternalawardsforresearchattheNationalandInternationallevels.
o Publicationsofbooksandtechnicalreports.

5.

Selection:
InstitutionsforestablishingaCoEwillbeselectedthroughacompetitiveprocessbasedonthemeritof
theirproposal(s).OneoftheimportantattachmentswiththeproposalistheMoUagreedwithrelevant
industries/research institutions/organisations [see AnnexIV (B).c]. Domain/subject experts from the
IITs/IISc will evaluate the proposals and recommend meritorious proposals for selection. Some
institutions may be required to undertake improvements in their proposal before commencement of
funding.AmaximumoftwoCentresofExcellencecanbesupportedinGovernmentinstitutionsunder
thisSubcomponent.Itisexpectedthatonlyaveryfewnumberofinstitutionswillreceiveawardoftwo
CoEs,ifanyatall.InstitutionsareencouragedtofocuseffortsononlyoneCoEproposal.

6.

FundingPattern:
The additional funding to the institution for carrying out the activities of a Centre of Excellence is
expectedtobearoundRs.5.00croreover2years(thiswouldbeinadditiontoallocationunderSub
component1.2).ThebulkofthefundingistobespentonresearchwithinIndia.Thisfundingistowards
research equipment, research material, books and learning resources, consultant services, research
studies,training,10to15additionalteaching/researchassistantships,studytours;workshops,seminars,
etc. in thematic areas and commercialisation costs, such as businessplan development, prototyping
andpatenting[seeTable19(b)and19(c)ofProjectImplementationPlan(PIP)onpermissibleandnon
permissibleexpenditures].

ContinuationoffundingbeyondtheSecondYearofawardofCoEwillbesubjecttoreviewofprogress
towardstheagreeddeliverables,andfundutilisationrate.

ThefollowingactivitiesaresuggestedunderthisSubcomponent:

(i)

Improvementinresearchanddevelopmentfacilities:
ForGovernmentfundedandGovernmentaidedInstitutions:
ProcurementofGoods[equipment;furniture;books&LRs,softwares]andminorcivilworksmay
berequiredundertheCoEforimprovementinresearchanddevelopmentfacilities.Amaximumof
55%oftotalallocation(estimatedRs.2.75crore)cantobemadeforprocurementbyeachCoE
(Centrallyfunded,GovernmentfundedandGovernmentaidedInstitutions)forthisactivity.[Refer
Table17S.No.(1)].

34

Section3ProjectDescription

Thevarioussubactivitiesareasfollows:
a)

Establishmentofnewlaboratoriesfor:

StartingnewMastersandDoctoralprogrammesrelevanttothematicareas,
Establishmentofincubationcentres,
EstablishmentofTechnologytransfercell,and
Increased research ambiance by providing stateofart research facilities in thematic
areas.

b) Establishment of a knowledge resource centre (library) in the thematic area: A knowledge


resource centre (library) may be setup for each CoE provided with a comprehensive
collection of books, journals and reference materials (in print and electronic form),
proceedings of conferences and seminars, published and unpublished reports, research
studies, thesis, links to databases and other resource centres, links to experts in thematic
areas,etc.Theknowledgeresourcecentremayalsobeprovidedwithrelevantequipment.
c)

ProcurementofFurniture:Furnituremayberequiredforestablishmentofnewlaboratories
andknowledgeresourcecentre.Provisionwouldneedtobemadeforsuchprocurementin
theInstitutionalDevelopmentProposalforCoE.

d) Minorcivilworks:Theminorcivilworkstobeundertaken,ifany,bytheinstitutionunderthis
categoryaretobeconfinedtolaboratoriesonlysuchaschangingoftheexistingfunctionsof
anoldstructure/spacetoanewproposedfunction.
Theexpenditureoncivilworksshouldnotexceed3%ofthetotalallocationfortheCoE.
Note:Govt.fundedandGovt.aidedInstitutionsshouldfollowscrupulouslytheagreedrulesand
proceduresassetoutintheFinancialManagementandProcurementManual.

ForPrivateunaidedInstitutions:

(e) Acquiringtextbooks,ejournalsandsoftware27: Theseinstitutionsmayacquirethetextbooks,

ejournalsandsoftwarewiththeapprovalofInstitutionsBoGandunderinformationtothe
respectiveSPFU.

Further,theseinstitutionsshouldensurethattheallocatedfundsbespentjudiciouslycoveringall
the envisaged activities under the project for the private unaided institutions, so that the
objectivesoftheprojectareachieved.Moreover,itshouldbeensuredthattheseinstitutions

should follow scrupulously the agreed rules and procedures as set out in the Financial
ManagementandProcurementManual.

(ii)

Providing Teaching and Research Assistantships for enrolment in Masters and Doctoral
programmesintopicslinkedtoeconomicorsocietalneedsinthethematicareas:
The aim is to attract students to Masters and Doctoral programmes started under CoE and
provideAssistantships.ItisenvisagedthattheprogrammesunderCoEwillnecessarilybelinked
to economic and social needs in the thematic areas. Institutions may give emphasis to start
Masters (by research) programmes. Institutions also need to ensure availability of qualified
faculty,Postdoctoralfellows,visitingexpertsandessentialtechnicalstaff.
ItisexpectedthateachinstitutionparticipatinginthisSubcomponentwillprovideatleast10to
15 additional Teaching/Research Assistantships per CoE to the students that do not receive
GATE/other scholarships (scholarships are already available to the GATE qualified students and
thosedoingPhDunderQIP)asperthenormsprescribedbyUGC/AICTE.Candidatessponsored
byIndustrywillbeallowedtoenrolinallPGprogrammes.
Those receiving assistantships will be required to devote 810 hours per week for research.
Outstanding candidates enrolled for PhD, in select cases, could be supported to attend
International workshops, Internship at renowned institutions/laboratories/industry (Indian or
global).
Starting of new AICTE approved PG/Doctoral programmes in thematic area of a CoE will be
supportedundertheProject.

27

th

UpdatedasperMinutesofReviewMeetingheldon19 June2013.

35

TEQIPII

(iii)CollaborationwithIndustryforapplicableresearchandproductdevelopment:
Thiscanbeachievedthroughacombinationofthefollowingaswellasotheractivities:
a)

Industrycollaborationsforapplicablethematicresearch:TheCoEsareexpectedto havepotential
forinteractionwithIndustrytocreateresearchambienceintheinstitutionsandtoprovidestate
ofart research facilities in specific areas of Engineering and Technology. Industryacademia
linkagesaretobeencouragedbyassociatingstudentswithIndustrysponsoredprojectsunderthe
guidance of senior faculty members. CoEs are to motivate Industry to sponsor R&D projects for
indigenousdevelopmentsandforcontinuousupdationoftechnologytokeeppacewiththelatest
developmentsgloballyandtohavecosteffective,Industryrelevantresearchanddevelopmentthat
canmakeinstitutionswithCoEsasCentresofInnovation.

CoEs are to be proactive in increasing Industry involvement in all the relevant areas in the
institution and create a pool of Industry Patrons. It will help to create an environment of
innovation in the institutions and enable absorption of the advanced technologies in niche areas
andtodevelopfuturereadyindigenoustechnologies.

b)

Converting innovative ideas into projects/products in close collaboration with both private and
publicsectorIndustries:CoEsneedtoaddressemergingtechnologiestorealizetheirfullpotential
for creating stronger links between Academia and Industry, which stimulate development of
innovativeideasandsolutions.Theevaluationofinnovativeideasandproductswithregardtotheir
potential in terms of successful market penetration and the degree of innovation is a special
challengeforresearchanddevelopment.

(iv)CollaborationwithIndustryinEducationandResearch:

CoEsarealsorequiredtocollaborateintheareaofeducationandtrainingofPostgraduatestudents.The
Industryacademia linkages are to be encouraged by associating students with Industrysponsored
projectsundertheguidanceofseniorfacultymembersandprivatesectorresearchers.Thiscollaboration
couldtaketheformof:

a)

AttractingtopclasstalentthroughMastersandDoctoralprogrammesintopicslinkedtoeconomic
or societal needs in the Centres thematic areas: A key aim is to attract students to Masters and
Doctoral programmes started under CoE and provide Assistantships. The CoEs are expected to
contribute to the training of R&D manpower for industry. The increased industry collaboration
shouldraisetheprofile,qualityandrelevanceofthepostgraduatesandtherebybeabletoattract
topclasstalenttothePGprogrammes.Further,someofthesegraduatesareexpectedtobespun
out to local industry eventually. Institutions may give emphasis to start Masters (by research)
programmes. CoE proposals should be explicit about the areas of PG education to be
improved/offered,howitrelatestothecoreresearchmandates,and,whereapplicable,howitwill
draw on resources outside the CoE and/or the host institution. Starting of new AICTE approved
PG/DoctoralprogrammesinthematicareaofaCoEcanbesupportedundertheprojectprovided
thattheseprogramscanbestartedbytheendofcalendaryear2012.

b)

Introduce a PhD in Industry Programme: CoEs are encouraged to introduce a PhD in Industry
programme. Such programmes aim to provide an opportunity for PhD students in the CoEs to
pursue research in a corporate setting with the participating company. Each PhD will have an
academicadvisorfromtheinstitutionand anindustryadvisorfromthesponsoringcompany.The
students research project will be part and parcel of the companys research agenda. Thereby,
postgraduate students will be exposed to reallife industry practices, and have firsthand
experience and understanding of the engineering and business skills required to succeed in this
profession.Hostcompanycouldpayincashtothestudentonaregularbasistoincreasethevalue
of their scholarship/assistantship. The company would also offer office space and an industry
mentorstime.Hostcompaniesmayalsoprovideothernoncashsupportsuchastheprovisionof
travelexpensesandadditionaltrainingopportunities,etc.

36

Section3ProjectDescription

(v) National/International collaboration for Research and Development activities with Academic
InstitutionsandR&Dorganizations:
TheinstitutionswithCoEneedtocollaboratewithlaboratories,professionalbodiesandSocieties,R&D
organizations, through Memorandum of Understanding for acquisition of the latest knowledge and
technicalknowhow(GuidelinesforInternationaltravelaregiveninAnnexVII).
The CoEs through collaboration are expected to contribute to the development and elevation in the
positionofEngineeringEducationandEngineeringprofessionalsinsociety,andactasalinkbetweenits
members, societies and International bodies. CoEs are further expected to foster excellence and
innovation in Engineering by excelling in research, public service and practice; and providing quality
products in their regions and around the world through International linkages and cooperative
partnerships.
(vi)Enhancingresearchcompetenceoffacultyandknowledgesharinginthematicareas:
ThefacultytrainingshouldbecloselylinkedtotheobjectivesofCoEandcoordinatedwiththeproposed
investmentinequipment,learningresourcesandfacilities.Institutionsshouldplantospendatleast10%
oftheoutlayforCoEonfacultytraining.
Thefacultytrainingcanbecarriedoutthroughthefollowingactivities.
a)

Subject knowledge and research competence upgradation: Subject knowledge upgradation is to


makethefacultyawareoftheadvancesinknowledge,technologiesandresearchmethodologies
forimprovingtheirperformanceandforachievingtheobjectivesofCoE.Facultyshouldbeonthe
lookoutforappropriateopportunities.

b) Participationinseminars,conferencesandworkshops:Facultyistobeencouragedtoparticipatein
seminars,conferencesandworkshopsbothNationalandInternational.Shorttermresearch/post
doctoral visits to laboratories/institutions; shortleave for carrying out collaborative research at
institutes of repute will be permitted. The faculty participating in such activities need to be
encouraged and supported to visit closeby institutions and laboratories of his/her interest.
Besides,accrualofbenefitstostudentsandintheirownresearches,suchparticipationisexpected
to bring about further collaborations with academic institutions and R&D organizations within
India and outside the India. The institutions are required to establish collaborations through
MoUs.
c) Seedgrant:Smallseedgranttoresearcherstoventureintonewdirectionswithinthespecified
theme.Thiswillgiveindependencetotheindividualresearcher.
d) Accountability:Thefacultyafterundergoingtrainingareexpectedto:
Prepareareportonthetrainingundertakenandtheexperiencegained.
Sharetheirexperiencewithstudentsandotherfaculty/staffthroughseminars.
Host the report on the institutions web site which is to be linked to the NPIUs web
site.

8.

ImportantNotes:
Note1 :

Theactivitieslikeestablishmentofanewinstitution,largescalecivilworks,introducing
newUGprogrammeswillnotbeeligibleforfunding.

Note2

Procurementofconsultantservices,ifrequiredfortheactivitieslistedinTableNo.19
(b) of PIP from Sr. No. 25 for Centrally Funded, Govt. Funded and Aided Institutions
and for Private unaided Institutions activities listed in Table No.19 (c) Sr.No.14
activitiesarepermitted.TheexpenditureonProcurementofconsultantservicesistobe
bookedagainstthatparticularactivity.Theservicesofconsultantsaretobeprocured
byfollowingtheProcurementManualandthroughthePMSS.

Note3 :

The project institutions should note that, the procurement of goods is to be done
strictly amongst the activities which are detailedout in Section2, 3, 6 and 7 of PIP
under the Improvement in Research and Development facilities, as required and
justifiedbyinstitutionstofulfiltheprojectobjectives.

37

TEQIPII

3.1.4Subcomponent1.3:FacultyDevelopmentforEffectiveTeaching(PedagogicalTraining)
1.

Objective:

2.

ToimprovecompetenceoffacultyfromprojectinstitutionsthroughPedagogicalTrainingforeffective
teachingtoimprovethelearningoutcomesofEngineeringstudents.
Scope:

Tocovermaximumfacultymembersfromtheprojectinstitutions.

3.

Strategy:

Studentsoftenfacedifficultieswithfacultywhoarenotabletoimpartthelessons/knowledgebecause
of inadequate skill or experience. Improving the effectiveness of teaching is a very important
interventiontohelpthestudents.

4.

Methodology:

ThepedagogicaltrainingswillbeprovidedthroughIITsinthiscomponent.
a)

The main focus of the project is on improvement in academic quality of the engineering
institutions. Collaboration with IITs to stimulate Quality Circles between IITs and Project
Institutionsisoneoftheinterventions.TheobjectiveoftheQualityCirclesistobringfacultyand
students of different engineering disciplines on a common platform on specific academic
subjects.

b) TheconceptoftheQualityCirclesistocreateasubjectbasedinteractionbetweenIITsandTEQIP
institutionsmappedonaregionalbasis.AllprojectinstitutionswillbemappedtodifferentIITs.
c)

IITscanestablishKnowledgeIncubationCellforTEQIPII(KIT)attheirpremises.

d) To facilitate such activities a dedicated Knowledge Incubation Cell may be setup. Knowledge
IncubationCellaroundanIITwillfocusonfollowingactivities:

1.
2.
3.
4.
5.
6.
5.

Innovationcontentdevelopment
Teachingworkshopsinspecificclusterofresources
Shortcoursesandworkshopsinnicheareas
Seminars/Conference
ShorttermvisitofgraduatestudentsfromTEQIPinstitutions
Sabbatical/longleavestaytoteachersandresearchersfromTEQIPinstitutions

Deliverables:

ThedeliverablesforthisSubcomponentare:

Numberoffacultytrained

Improvementinteachingperformancebasedonstudentsfeedbackduringperformanceaudit

6. FundingPatternandFundReleaseMechanism:

NPIU will bear the full cost for pedagogical training provided by IITs, however, the participants for
attendingtheworkshopswillbooktheirTA/DAandotherexpensesunderfacultyandstaffdevelopment
headofexpenditure.

38

Section3ProjectDescription

3.2

COMPONENT2:IMPROVINGSYSTEMMANAGEMENT
This Component aims to build capacity of Technical Education
Policy Planners, Administrators and Implementers at the
Central, State level and Institutional levels to effectively
implementtheinstitutionalreforms.

It also aims to provide timely, sufficient, precise, and reliable


information to improve and assess performance of the project
institutionsthrougheffectiveProjectManagement.

TherearetwoSubcomponentsunderthisComponent.

39

Section3ProjectDescription

Subcomponent2.1:CapacityBuildingtoStrengthenManagement

1.
Objective:

TobuildcapacityofTechnicalEducationPolicyPlanners,AdministratorsandImplementersat
Central, State and institutional levels for effective implementation of academic and non
academicreforms.

2.

Scope:

Theinitiativestoimprovepoliciesandmanagementpracticesthatcontributetopromotionofqualityin
EngineeringEducationatCentralandStatelevels.

3.

Strategy:

TheProjectatCentrallevelwillsupport:

Professional development of Technical Education and TEQIP administrators in the project


Statesandprojectinstitutions
InitiativesforEffectiveGovernanceSystemofinstitutionsatthelevelofBoardofGovernors,
and

Establishing Management Capacity Development Centres at IIMs for training of TEQIP


institutions

4.

Deliverables:
Improved performance at the State and Institutional levels through the activities/projects28 are
expectedunderthisSubcomponent:

S.
No
i

Indicativeactivities/projects

Deliverables

ConductingProfessionalDevelopment
ProgrammefortheProjectinstitutionsand
TechnicalEducationPolicyPlanners,
AdministratorsandImplementersat
Central,StateandInstitutionallevel

Effectiveprojectimplementation
Implementation of academic and nonacademic
reformsinprojectinstitutions

Establishment of an Expert Advisory Group


forEffectiveSystemGovernance

Guidelines for effective functioning of Board of


Governors

EstablishingManagementCapacity
DevelopmentCentresatIIMsfortrainingof
TEQIPinstitutions

Enhanced knowledge and skills in institutional


management
Efficient
achievement
of
institutional
developmentgoals

ii
iii

5.

FundingPattern:

6.

FundingwillbedecidedbytheNPD.
TheactivitiessuggestedunderthisSubcomponentaredescribedbelow:
(i)

Conducting Professional Development Programme for Technical Education Policy Planners,


AdministratorsandImplementersattheCentral,StateandInstitutionallevels:
Professional development for groups of Technical Education policy planners, administrators
and implementers would be financed. The potential professional development activities are
Study tours in India as well as in foreign countries with strong policy leadership/planning
entitiesinHigher/TechnicalEducationandshorttermprofessionaltrainingprogrammes.
The focus of the programmes will be on practices and policies to improve management of
Technical Education, but could in a few relevant cases equally include professional
developmentwithinProjectManagementandmanagementingeneral.
[

The Professional Development Programme would be available to key officials of Project


institutionsandprojectimplementersfromtheMHRD,theNPIU,theStateTechnicalEducation
DepartmentsandtheSPFUs.

28

Theactivities/projectslistedinthetableareindicative(nonrestrictive).Entitiescansubmitinnovativeprojects.

41

TEQIPII

The minimum group size for these activities would be 1520 participants. The NPIU would
initiate and organize such Professional Development Programmes. Detailed motivation and
learningobjectivesoftheseProgrammeswould bedescribedalongwithajustificationofthe
chosenprovider/destinationandinstitutions/organizationstobevisited.Allforeignstudytours
financed under this activity will be reviewed by the National Project Director in accordance
withtheGuidelines(referAnnexVII).
(ii)

EstablishmentofanExpertAdvisorGroup(EAG)forEffectiveSystemGovernance:
ThepurposeistoestablishanExpertAdvisorGroup(EAG)attheNationallevelwithapprovalof
the NPD composed only of existing Chairs, Members of Board of Governors and eminent
academicians that will be charged with the responsibility of developing and recommending
GuidelinesforeffectivefunctioningofBoardofGovernors.ThefunctioningofthisGroupwillbe
supportedadministrativelyandfinanciallybytheNPIU.Theguidelinescouldbedevelopedinto
apublicationforexistingandnewlyappointedBoGmembers.Theguidelinesmayinclude:

Generalprinciplesofgovernance,

Theroleofthegoverningbodies,and

Legalandethicalaspectsofcorporategovernance.

ThesupportcouldbeextendedtoincludeDiscussionandDisseminationConferencesforBoGs.
Intermediate outcomes of this aspect of the capacity building will be a developed set of
Guidelines for Board of Governors, and awareness among the Board of Governors regarding
theirroleandresponsibilitiesandtheavailabletoolsattheirdisposal.

(iii) Establishing Management Capacity Development Centres at IIMs for training of TEQIP
institutions:

42

The establishment of Capacity development Centres at IIMs aims to enhance interest,


knowledge and skills in management and leadership areas. Resulting in quality enhanced
knowledge and skills in institutional management, resulting into efficient achievement of
institutionaldevelopmentgoals.

Section3ProjectDescription

3.2.2Subcomponent2.2:ProjectManagement,MonitoringandEvaluation

1.

Objectives:

ThebroadlydefinedobjectivesofProjectmanagement,monitoringandevaluationare:

To plan, organize and manage resources to bring about successful achievement of Project
objectives.
Tomonitorandevaluatetheperformanceofprojectinstitutions.
To mentor the project institutions towards quality improvement and to audit the institutional
performanceinachievingtheirrespectivetargets.

2.

ProjectManagement:
i) Objective:
To ensure effective implementation of the Project at all levels and achievement of the Project
objectivesanddeliverablesundereachcomponent.
ii)Scope:
The MHRD, the NPIU, the SPFUs and the project institutions will be covered under this Sub
component.
iii)Strategy:

EnsuringsuccessfulandtimelyimplementationoftheProjectattheNational,StateandInstitutional
levels and achieving targets for the deliverables, coordinating resources and integrating all the
activitiesundertheProjectcomponentsinaccordancewiththeProjectImplementationPlan.

TheProjectwillbemanagedinaparticipatorymannerattheNational,StateandInstitutionallevelsas
follows:
a) AttheNationallevel,theProjectwillbeguidedbyaNationalSteeringCommittee(NSC).
The NSC will validate recommendations of National Evaluation Committees (NECs) for
selectionofStatesandinstitutionsundertheProject,andapprovecorrespondingfunding
fortheiractivities.TheNSCwillalsoprovideoverallpolicydirectionsforProjectactivities
andforimplementationofsystemicpolicyreforms.
b) TheProjectattheNationallevelwillbemanagedbyaNationalProjectDirectorate,located
in the MHRD and headed by a National Project Director (NPD) at the level of Special
Secretary/Additional Secretary/Joint Secretary to the Government of India. The NPD will
be assisted by a National Project Directorate in MHRD and the National Project
ImplementationUnit(NPIU).
c) AttheStatelevel,theProjectwillbeguidedbyStateSteeringCommittees(SSCs)assisted
bytherespectiveStateProjectFacilitationUnits(SPFUs)locatedwithintheDepartmentof
theStateGovernmentresponsibleforEngineeringEducation.
d) AttheInstitutionallevel,theProjectwillbeimplementedbytheInstitutionalTEQIPUnits
undertheoverallguidanceofrespectiveBoardsofGovernors(BoG).
e) CIHECwilladvisetheNSConenhancingIndustryInstitutionlinkages.
f)
State Private Sector Advisory Groups (SPSAGs) will advise the respective SSCs on
enhancingIndustryInstitutelinkages.
iv)FundingPattern:
TheactivitiesoftheNationalSteeringCommittee(NSC),theNationalEvaluationCommittees(NECs),
the National Project Directorate (NPD), the National Project Implementation Unit (NPIU) will be
funded through the NPIU. The activities of the State Steering Committee, the State Private Sector
Advisory Group (SPSAG) and the State Project Facilitation Unit (SPFU) will be funded through the
respectiveSPFUs.TheexpensesonBoGactivitieswillbemetthroughtheInstitutionalprojectfunds.

3.

ProjectMonitoring:

i) Objective:
To provide reasonably complete, correct and reliable data through a webbased Management
InformationSystem(MIS)tostakeholdersthatwillleadtoimprovementsinProjectimplementation,
decisionmakingandlearningfromshortcomings.
43

TEQIPII

ii) Scope:
TheProjectmonitoringandreportingactivitiesaremandatoryfortheNPIU,theSPFUsandallproject
institutionsandalsononprojectinstitutions.
iii) Strategy:
AlltheinstitutionsundertheProject,theSPFUsandtheNPIUwillbelinkedthroughaManagement
InformationSystem(MIS)developedfortheProject.
iv)

FundingPattern:
AllmonitoringactivitiesatthenationallevelwillbefundedthroughNPIUsbudget.

v)

ProjectMonitoring:
Theprojectwillbemonitoredthrough:
(i) Performance Indicators including Key Performance Indicators with Target values (KPIs) :
referTable3andTable4.
(ii)Web Based Management Information System (MIS): A webbased Management Information
System (MIS) will be used as a tool to meet the Monitoring & Evaluation requirement of the
Project. MIS will track implementation of Key Project Inputs, Outputs, Outcomes and Impact
correspondingtoProjectactivitiesthroughPerformanceIndicatorsdevelopedfortheProject.

ItwillbeawebbasedapplicationwithGraphicUserInterface(GUI),whichwillallowtimelyand
transparentstorageofdata,processingandretrievalofdata,flowofinformation,searchingand
sortingofspecificinformationuniformly,accuratelyandquicklyandgenerationofreports.

TheMISdevelopedfortheProjectwilllinkalltheprojectinstitutions,theSPFUsandtheNPIU.All
respondent entities will access MIS through the internet. Access will be conditional to persons
nominatedbytherespondententitiesandwithdefinedlevelofaccessandsecuritymeasures.

TheMISwillalsohavealimitedinterfaceforaccessbythegeneralpublic.TheMISwillhavelinks
tothewebsitesoftheAICTE,NBA,NAAC,UGC&MHRD.

(iii)WebBasedFinancialMonitoringReport(eFMR):
ThedetailsaregiveninSection6.
(iv) WebBasedProcurementManagementSupportSystem(PMSS):
ThedetailsaregiveninSection8.

44

Section3ProjectDescription

Table3
PerformanceIndicatorswithProjectendtargetvalues

Sr.
No

Projectendtarget
(Oct2016)

Indicator

55%

Shareofsupportedprogramsthatareaccreditedorappliedfor

PercentageFacultywithatleastanM.Tech(regularandcontract)

TotalnumberofMasterandPhDstudents

41000

Numberofpublicationsinrefereedjournals(withinthefieldofEngineering)

15000

PercentageofFacultywithorpursuingM.TechandPhD(regularandcontract)

90

Percentageofexternallyfundedresearchanddevelopmentprojectsand
consultanciesintotalrevenue

12

Transitionrateofstudentsfromdisadvantagedbackgroundsfromthefirstyearto
secondyearofundergraduatestudy

DirectBeneficiaries(number)

405,000

ofwhichfemale(percentage)

30%

88

60%

70

Percentageofinstitutionswithacademicautonomy

10

Numberoffacultymembersthathavebenefittedfromtheteachingeffectiveness
training(undersubcomponent1.3)throughIITs

11

ShareofTEQIPSupportedEngineeringInstitutionsfromlaggingstatesasagreedby
DEAandWorldBank(i.e.Bihar,Chhattisgarh,Rajasthan,Jharkhand,Orissa,Uttar
Pradesh,MadhyaPradesh)

20

12

Numberofgovernanceselfreviewsreceived

190

13

NumberofGovernanceDevelopmentplansreceived

180

14

FullyfunctionalMIS:Numberofinstitutionsreportingatleast70%ofthe
indicators

160

15

Increaseinthesatisfactionindexofstudentandfaculty

4.30

16

Transitionrateofallstudentsfromthefirstyeartothesecondyearofundergraduate
study

65%

17

No.ofTEQIPAssistantships

2200

a)

M.Tech

3350

b)

PhD

2000

18

Numberoffacultymembersattendedtraininginsubjectdomain

7800

19

Numberoffaculty/officialsattendedmanagementdevelopmenttrainingatIIMs

2300

20

PercentageofregularfacultypositionsfilledinGovernmentfundedandaided
institutionsunder:

21

a)

Subcomponent1.1

62

b)

Subcomponent1.2

75

PercentageofregularfacultypositionsfilledinPrivateunaidedinstitutions

100

Note:First15areKeyPerformanceIndicators(KPIs)

45

TEQIPII

Table4#
KeyPerformanceIndicatorswithTargetValues

S.
No.
1
2
3
4

Indicator

Shareofsupportedprogramsthatareaccreditedorappliedfor

PercentageFacultywithatleastanM.Tech(regularandcontract)

TotalnumberofMasterandPhDstudents

Baseline
(20092010)

30

Projectend
target
(Oct2016)
55

45

88

30000
7032

41000

15000

63

90

12

45

60

300,000
26%

405,000
30%

Numberofpublicationsinrefereedjournals(withinthefieldofEngineering)

PercentageofFacultywithorpursuingM.TechandPhD(regularand
contract)
Percentageofexternallyfundedresearchanddevelopmentprojectsand
consultanciesintotalrevenue
Transitionrateofstudentsfromdisadvantagedbackgroundsfromthefirst
yeartosecondyearofundergraduatestudy
DirectBeneficiaries(number)
ofwhichfemale(percentage)

Percentageofinstitutionswithacademicautonomy

30

70

10

Numberoffacultymembersthathavebenefittedfromtheteaching
effectivenesstraining(undersubcomponent1.3)throughIITs
ShareofTEQIPSupportedEngineeringInstitutionsfromlaggingstatesas
agreedbyDEAandWorldBank(i.e.Bihar,Chhattisgarh,Rajasthan,Jharkhand,

2200

17.7

20

190

180

160

4.30

5
6
7

11

Odisha,UttarPradesh,MadhyaPradesh)

12
13
14
15

Numberofgovernanceselfreviewsreceived

NumberofGovernanceDevelopmentplansreceived

FullyfunctionalMISNumberofinstitutionsreportingatleast70%ofthe
indicators
Increaseinthesatisfactionindexofstudentandfaculty

4.

ProjectEvaluation:
i)

Objective: To assess achievements and shortfalls in Project implementation through surveys,


audits,studiesandnationallevelreviews.

ii)

Scope: The Project evaluation activities are mandatory for the NPIU, the SPFUs and all the
projectinstitutions.

iii)

Strategy:TheProjectevaluationactivitieswillcoverallentitiesparticipatingintheProject,and
willbedonethrough:
a)

Assessment of Institutional performance towards improving education quality and service


deliverythroughInstitutionalPerformanceAudits.

b)

AssessmentofInstitutionaldatathroughDataAuditsforensuringgooddataquality.

c)

Assessment of the implementation strategy through Implementation Surveys adopted during


Projectdesignandcorrectivemeasurestobetakenforimprovement.

d)

Assessment of performance achieved against set targets through biannual and MidTerm
ReviewsconductedjointlybytheMHRD/NPIUandtheWorldBank.

e)

Overall assessment of the objectives achieved under the Project through a rigorous Impact
AssessmentStudy.

TheAssessmentSurveysandPerformanceandDataAuditswill beconducted untiltheProject


closure. Consulting firms will be employed to conduct the surveys as and when required.
PerformanceandDataAuditswillbeconductedbiannually.NationallevelJointReviewsofthe
wholeProjectwillbecarriedouttwiceinayear.

46

Section3ProjectDescription

iv) FundingPattern:AllactivitiesunderProjectevaluation,exceptmentoringwillbefundedbythe
NPIUandtheSPFUs.TheexpensesincurredformentoringoftheInstitutionswillbemetthrough
respectiveInstitutionalprojectfunds.
v) ThefollowingactivitiesaresuggestedforProjectEvaluation:
a)

AssessmentSurveys:TheAssessmentSurveys,conductedbytheNPIU,willmeasurechangesin
the quality of education in the project institutions through formative and summative
assessmentsofperformance.AssessmentSurveystobeundertakenare:
Student Satisfaction Surveys: To measure the quality of education being provided by
project institutions, Student Satisfaction Surveys will be conducted. The Surveys will
measurestudentssatisfactionwithmethodsandqualityofteachingandlearning,quality
offaculty,adequacyandqualityofinfrastructureandfacilitiesavailableforacademicand
othercocurricularactivities,etc.
FacultySatisfactionSurveys:FacultySatisfactionSurveywillalsobeconducted.TheSurveys
willmeasurefacultyssatisfactionwiththequalityofstudents,opportunitiesavailablefor
career advancement, upgradation of skills viz. educational qualification, modern
pedagogicaltraining,etc.

b)

Implementation Surveys: The Implementation Survey will get feedback from officials of nodal
implementing agencies [MHRD, NPIU, and SPFU] and personnel from Institutions involved in
Project implementation about Project design, implementation, impact and performance. The
feedback will be assessed by the NPIU and the World Bank and shared with all respondents so
thattheoutcomesofthefeedbackcanbeutilizedforcorrectiveactionattheNational,Stateand
Institutional levels. The Surveys will be web based. It will be conducted twice, firstly before the
MidTermReview(aftertwo yearsfromtheimplementationoftheProject)andsecondlyatthe
endoftheProject.

InstitutionalAudits:Auditswillbeconductedtoascertainthevalidityandreliabilityofinformationand
toalsoprovideanassessmentofProject'sinternalcontrol.Auditorswillassessprogressmadeunder
the Project and processes related to technical and fiduciary aspects of the Project. These audits will
verify implementation in accordance with the agreed NPIU/MHRDWorld Bank procedure and
guidelinesandwillcombinefactualassessmentwithqualitativeassessment.

PerformanceandDataAudits:PerformanceandDataauditswillbecarriedoutannuallytoassess
progressmadebyallprojectinstitutionstoachievesetgoalsaspertheirplansgiveninIDPslike
implementation of agreed reforms, accuracy, and validity of data, progress in faculty
development,utilizationofresourcesandachievementoftargetssetbytheInstitutiontoachieve
academic excellence. The Performance Auditors will be senior academicians, appointed out of a
poolofmentorscreatedfrompersonssuggestedbytheSPFUsandthoseidentifiedbytheNPIU.
TheywillbeappointedforallprojectinstitutionsbytheNPIU.ThePerformanceAuditorswillbe
assisted by skilled professionals for conducting the Data Audits. The Data Auditors will be
appointedbytheSPFUsfortheirinstitutionsandtheNPIUforCFIs.AllexpensesforPerformance
andDataauditswillbemetbytheSPFUsandtheNPIUaspernormsapprovedbytheNPDfrom
time to time. The results of performance audits will be disclosed at NPIU website. Kindly refer
HandbookforMentorsandPerformanceAuditors.

Fiduciary Reviews: The Fiduciary Reviews, conducted by the World Bank, will cover Post
ProcurementReviewsandFinancialManagementReviews.Theemphasiswillbetoverifythatthe
institutions follow the fiduciary guidelines described in this PIP and in the procurement and
financialmanagementmanuals.

a)

ResourcesUtilizationStudy:TheobjectiveoftheResourcesUtilizationStudy,tobeconductedbythe
NPIU, is to assess the extent of availability and utilization with respect to equipment, books and
learning resources and suggest strategies for their optimum utilization and sustenance. It will be
conductedtwice;(i)duringtheimplementationoftheProjectand(ii)attheendoftheProject.

b)

Bibliometric Study: It will quantitatively assess research output and publication performance in
EngineeringInstitutions.ItwillbegotconductedtwicebytheNPIU,firstlybeforethecommencement
oftheProject(for102TEQIPIInstitutionshavingPGcourses)andsecondlyattheendoftheProject
forallprojectinstitutions.

c)

ImpactAssessmentStudy:TheobjectiveoftheImpactAssessmentStudywillbetoassesstheimpact
that can be attributed to the Project in upgrading the quality of Engineering Education offered by
project institutions and in producing better skilled and more employable graduates. The study,
conductedbytheNPIUwillmeasuretheextenttowhichProjectobjectiveshavebeenachieved.The
StudywillbeundertakentowardstheendoftheProjectandwillbeoutsourced.

47

TEQIPII

f)

Reviews:TwotypesofreviewswillbeorganizedbytheNPIUtoassessthequalitativeimprovements
achievedbytheindividualInstitutionsandStates.

MidTermReviewMission:AMidTermReviewundertheProjectwillbeconductedjointlybythe
MHRDandtheWorldBanktoassesstheachievementsofprojectinstitutionsandStatesagainst
the set targets. Mid Term Review is basically designed to acknowledge the good performing
Institutions and States and identify corrective measures for maximizing gains from the Project.
The financial allocation of the Institutions for the remaining period of the Project will also be
adjustedbasedontheirneedsandperformance.

5.

BiannualJointReviewMissions(JRM):JointReviewMissionswillbeconductedsixmonthlybythe
MHRDandtheWorldBanktoreviewtheoverallprogressachievedundertheProject.
Mentoring:
Mentoringisastrengtheningmechanismbythethirdpartyattheinstitutionallevel.Mentorsprovidethe
institutions with clear guidance on reforms, implementations plans, and remedial actions to improve
performanceoftheinstitutions.Mentorswillbeassignedtoallprojectinstitutionstoprovidecontinuous
guidance for Project implementation 2 to 3 times in a year based on institutional requirements. All
expenses for mentoring will be met by the mentored institution. The Mentors will also act as the
Performance Auditors at different Institutions29 and asses the progress made by individual Institutions.
KindlyreferHandbookforMentorsandPerformanceAuditors.

29

OtherthantheMentoringInstitutions.

48

Section4
SELECTIONPROCESS

4.1

Introduction:

The Project will support around 200 competitively selected engineering institutions amongst
eligible Government funded, Government aided and private unaided Engineering Institutions
from the selected States and Centrally Funded Institutions through two subcomponents i.e.
Subcomponent1.1(Strengtheninginstitutionstoimprovelearningoutcomesandemployability
of graduates) and Subcomponent 1.2 (Scalingup post graduate education and demand driven
researchanddevelopmentandinnovation).

InstitutionscanapplyonlyforoneofthetwoSubcomponentseitherfor1.1or1.2.

Thanmainstepsfortheselectionofinstitutionsare:

a) SelectionofStatesthroughareviewofStateproposals.
b) EvaluationofInstitutionalEligibilityProposalsfrominstitutions.
c) EvaluationandselectionofInstitutionalDevelopmentProposalsfrominstitutions.
d) SigningofMoUswithStatesandInstitutions.
Theselectionofaround200institutionswilltakeplaceintworounds.Thetworoundswillphase
the intensive evaluation and implementation startup phase. Further, the two rounds will give
timetoinstitutionsandStatestoimprovethequalityandpotentialimpactofproposals.Ineach
round, the technical evaluation, scoring and feedback of institutional proposals will be
undertakenbyexpertsintechnicaleducationtoensureameritbased,transparentandobjective
evaluation.

4.2

SelectionofStates:

Asetofeligibilitycriteriaforstateswillbeenforcedtoachieveahighendsustainedimpactofthe
TEQIP. The criteria will seek to enhance reforms in the system and give TEQIP institutions an
enablingpolicyframework,withadequatedecisionpowerandincentives,whichwillenableand
encouragethemtodeliverqualityeducationandresearchinaneffectiveandefficientmanner.A
primary focus is to shift the traditional role of inputcontrol towards a role of leading change,
focusingonoutcomesandincentivizingimprovementintheinstitutions.

4.2.1EligibilityCriteriaforSelectionofStatesandUnionTerritories:

The States and Union Territories will be selected based on merit of their proposals and on
meetingthefollowingEligibilityCriteria:

1. Autonomous Institution Status: The Institutions selected to participate in Subcomponent


1.1 have to obtain Autonomous Institution Status as per UGC norms to enable them to
improve quality and relevance of the knowledge and skills of their graduates through
betterment in curricula and assessment methods. The States need to issue orders to such
projectinstitutionstoseekandobtainautonomousinstitutionstatusasperUGCnormsand
procedures(referAnnexII)beforesigningofanMoUwithMHRD[referAnnexIII(a)].

2. DecentralizationofFinancingFramework:TheStatesneedtocreateanEnablingFinancing
Framework that decentralizes a reasonable share of financial discretion to the Institutions
leadershiptoincentivizetheInstitutiontoincreaseitsinternallygeneratedrevenue,andto
establishfundstoallowformidtermfinancialplanning.TheStatesneedto:

a) AdoptaBlockGrantpattern:(asdescribedinAnnexI)forfundrelease ofatleastthe
nonsalarynonPlancomponentofgrantstotheGovernmentfundedandGovernment
aided(asthecasemaybe)projectinstitutions.Thefundsutilizationistobelefttothe
decisionoftheprojectinstitutionasitdeemsfitduringeachfinancialyeartoachieveits
mission,respectingregularGovernmentpurchasingandaccountingguidelines.

49

TEQIPII

b) Retention of IRG: Permit Government funded and Government aided project


institutionstoretainandutilizetherevenuegenerated,including100%oftuitionand
otherfeeandchargesfromstudentswithoutadjustingtherevenueretainedintheir
nonPlangrants.

c)

Establishmentoffourfunds:PermittheGovernmentfundedandGovernmentaided
project institutions to establish four funds (as elaborated in AnnexI), each in a
separate Bank Account, namely the Corpus Fund, Faculty Development Fund,
Equipment Replacement Fund and Maintenance Fund (for maintenance of buildings
andequipment).TheStatesinthisregardneedto:

3.

Direct project institutions to build these funds with annual contribution into
each Fund equal to at least 0.5% of annual recurring expenditure of the
Institution, and direct each project institution to also additionally contribute
fromsavingsintotheCorpusFund;

IssueguidelinesforpropermanagementofthefourFundsafterclosureofthis
Project.

Fillingupthefacultyvacancies:Thebenchmarkvalueforthefacultypositionsonregularfull
timebasisforInstitutionsunderSubcomponents1.1and1.2arementionedinTables6and
8 respectively. The States need to authorize each project institution to fillup all faculty
vacanciesthrough11monthorlongercontractstillsuchtimethatthesevacanciesarefilled
uponaregularbasis.

4.

Establishment of SPFU: Establish an SPFU, located in the Department of the State


GovernmentresponsibleforTechnicalEducation.TheheadoftheSPFUwillbetheDirector
ortheequivalentofficerresponsibleforTechnicalEducationinthatDepartmentandwillbe
designated as the State Project Advisor (SPA). The SPA will be assisted by a State Project
Coordinator(SPC)whowillbeanacademician.EachStateshouldbewillingtotakeadecision
nottotransfer/changetheSPFUofficialsforthedurationoftheProject.

Note: ReleaseofthefirstinstalmentofCentralShareofProjectfundstoaStateforits
Institutions and SPFU will be subject to signing of MoU with MHRD and MoUs
with the institutions by the State and receipt by the NPIU of the necessary
documentation from the selected States in respect of compliance with the
EligibilityCriteria14.

5. Constitution of Board of Governors in each project institution: Establish a governance


model that will hold each Government funded and Government aided Institution
accountabletowardsGovernment,civilsocietyandIndustry.Inparticular,theStatesneedto
constitute/ensure formation of a BoG in each project institution as suggested in Section5
andAnnexIIandensurethattheBoGmeetsatleast4timesinayear.

6.

Reforms implementation: Each State is to implement the Project according to the Project
Implementation Plan. This includes support and facilitation to project institutions to
implementbothacademicandnonacademicreformsprescribedforimplementation.(refer
AnnexI)

7.

OrganizingPedagogicalTraining:EachStatehastoensurethateachprojectinstitutiongets
impartedPedagogicalTrainingtofacultymembers.

4.2.2

StateSelectionProcess:

ThestepsfortheselectionofStatesareasfollow:

(a) State Governments would be invited by MHRD to submit the StateProposals in the
prescribed format [(refer AnnexIV (A)] by a specified date. The State Proposal should
providethefollowing:

EvidencethattheStatesparticipation inthe Projectislinkedtoitspolicyobjectives


forTechnicalEducation.

50

Section4SelectionProcess

Evidence that the State has identified, understood and discussed with key
stakeholders (State Finance Department) the main steps and challenges for
implementationoftherequiredreforms.

EvidencethattheStatehasaplantosustainthegainsoftheProjectafterithasbeen
closed.

(b) ReceiptofStateProposalsbytheNPIU.
(c) EvaluationofStateProposalsbyaNationalEvaluationCommittee(NEC)appointedbythe
NPDinrespectofEligibilityCriteria,actionsproposedandinformationasrequiredinthe
prescribedformat.EvaluationparametersaregiveninTable5.
(d) Feedback of NEC observations to the States for improvements in the Proposal, if any
required.
(e) ConsiderationofnewandimprovedStateProposals.
(f) Review and validation of NECs reports on State Proposals and its recommendations for
StateselectionbytheNationalSteeringCommittee(NSC).
(g) AnnouncementofselectionofStatesbyNSCthroughtheNPIU.
Table5
ParametersforEvaluationofStateProposals

S.
EvaluationParameters
No.
(i) Clarityandimportanceofthekeypolicyobjectivesandchallengestoenhancequalityof
TechnicalEducationaswholeintheStatewithparticipationintheProject
(ii) Plan to implement increased academic autonomy to Institutions (for Subcomponent
1.1)andestablishingaBoardofGovernors
(iii) CapacityandplantoimplementtheEnablingFinancingFrameworkinconsultationwith
theStateFinanceDepartment
(iv) PlanandfeasibilityforsustainingthegainsfromtheProjectafterProjectclosure

Note:TheschemeforproposalevaluationisgiveninAnnexX[Table45].

4.3

Selection of Institutions under Subcomponent 1.1 (Strengthening Institutions to Improve


LearningOutcomesandEmployabilityofGraduates):
TheinstitutionswillbeselectedonfulfilmentofeligibilitycriteriaasgiveninTable6andonthe
meritoftheInstitutionalDevelopmentProposals(IDPs).
Solely for equity purposes, Institutions from the new States lagging in Technical Education and
SpecialCategoryStatesshallbeconsideredeligibletosubmitIDP,subjecttotheconditionsthat
the Institutions: (i) are at least four years old, and (ii) show commitment to meet all the
Eligibility Criteria as prescribed for institutions from regular States during the Project period
andtoachieveallinstitutionaltargets(Table30).
Note: NewStateslagginginTechnicalEducationareobjectivelydefinedforthisprojectasthosethat
eitherhaveonlyoneEngineeringInstitutionorlessthanoneEngineeringInstitutionpermillion
populationasperAICTEsapprovedlistofEngineeringDegreeInstitutionsin2004andhavenot
participated in TEQIPI. These States are namely: Andaman & Nicobar Islands, Arunachal
Pradesh, Assam, Bihar, Chhattisgarh, Jammu & Kashmir, Meghalaya, Manipur, Mizoram,
Rajasthan,SikkimandTripura.

51

TEQIPII

4.3.1 EligibilityCriteriaforSubcomponent1.1:
InstitutionstobeeligibleforparticipationintheProjectundertheSubcomponent1.1mustmeet
thefollowingbenchmarks:
Table6#
EligibilityCriteriaforSubcomponent1.1

S.
No.

EligibilityParameters

1.

Agreement to implement all academic and nonacademic reforms listed


below:

Benchmark
values

Yes

CurricularReforms
Exerciseofautonomies
Establishment of Corpus Fund, Faculty Development Fund,
EquipmentReplacementFundandMaintenanceFund
Generation,retentionandutilizationofrevenuegeneratedthrough
avarietyofactivities
Fillingupallexistingteachingandstaffvacancies
Delegation of decision making powers to senior Institutional
functionarieswithaccountability
Improvedstudentperformanceevaluation
Performanceappraisaloffacultybystudents
Faculty incentives for Continuing Education (CE), consultancy and
R&D
AccreditationofeligibleUGandPGprogrammes

2.

AgeoftheInstitutionfromthestartofitsfirstacademicsession(inyears)
a)RegularStates
b) New States lagging in Technical Education and Special Category
States
TotalnumberofUGandPGprogrammescurrentlyconducted

3.
4.

Facultypositionsfilledonfulltimebasisaspercentageofthetotal
facultypositionssanctionedinaccordancewiththeAICTEprescribed
studenttofacultyratiofor

a)

GovernmentfundedandGovernmentaidedinstitutions

b) Privateunaidedinstitutions
PresenceofBoardofGovernorswithaneminenteducationistor
IndustrialistastheChairperson

5.

6
4
4

*
**
Yes***

Minimum40%regularfacultyofthesanctionedstrengthandminimumoverallfacultystrengthof50%
includingfacultyonelevenmonthsorlongerdurationcontract.

These institutions will essentially have to have a minimum of 50% regular faculty as per the AICTE
prescribedfacultystudentratio(forNITsandotherCFIs,MHRDnormswillapply)withinoneyearof
signingofMoU,failingwhichprojectfundingwillbestopped.
** Faculty strength as per AICTE approved norms out of which at least 50% should be appointed on
regularbasis.
*** PleasereferAnnexII.

4.3.2 ScrutinyofInstitutionalEligibilityProposals:

The Institutions are required to prepare the Institutional Eligibility Proposals (IEPs) in the
prescribed formats [AnnexIV(B)(a)(i)]. A scrutiny will be done for meeting the Eligibility
Parameters(referTable6).ThestepsleadingtoScrutinyofInstitutionalEligibilityProposals(IEPs)
andcallforsubmissionofInstitutionalDevelopmentProposals(IDPs)areasfollow:

rd

(a)

Advertisement will be issued in newspapers by the NPIU followed by State advertisement


invitingInstitutionalEligibilityProposalsfromeligibleInstitutionsintheprescribedformat.

(b)

Only those Institutions that meet the minimum benchmarks for Eligibility Criteria should
prepareandsubmitInstitutionalEligibilityProposalstotheStateDepartmentresponsiblefor
TechnicalEducation(inmostcasesStatesDirectorateforTechnicalEducation,DTE).

(c)

InstitutionalEligibilityProposalswillbescrutinizedforeligibilitybytheconcernedDirectorate
andapprovedbytheStateSteeringCommittee(SSC).

th

Updatedasper3 and4 NSCMeetingdecision.

52

Section4SelectionProcess

(d)StatesforwardtheendorsedInstitutionalEligibilityProposalstotheNPIU.Statesshouldforward
onlythoseproposalswhichmeetalltheeligibilitycriteriaandforwhichStategovernmentis
willingtocosponsor.
(e) NewCFIswillsubmittheInstitutionalEligibilityProposalsdirectlytotheNPIU.
(f) The NPIU will scrutinize the Institutional Eligibility Proposals as received from States, UTs and
newCFIsforeligibilityandcompleteness.
(g) NSCwillapprovethelistofeligibleInstitutionsforinvitationtosubmittheIDPs.
(h) TheNPIUwillforwardthelistoftheeligibleInstitutionstoStatesandCFIsforinvitationofIDPs.
ResultsofscrutinywillbehostedontheNPIUwebsite.

4.3.3

EvaluationofInstitutionalDevelopmentProposalsunderSubcomponent1.1:
The Institutions found eligible will be invited for submission of Institutional Development
Proposals(IDPs).
TheIDPswillbeinvitedandevaluatedinthefollowingmanner:
(a) StatesinviteIDPsfromtheeligibleInstitutions
(b) StatesscreenIDPsforcompletenessandshortlisttheInstitutions
(c) StatesforwardshortlistedIDPstotheNPIU
(d) EligibleCFIssubmittheirIDPsdirectlytotheNPIU
(e) TheNPIUscreenstheIDPsreceivedbyacutoffdateforcompleteness(onlytheproposalsfound
completewillbeplacedbeforetheNEC)
(f) EvaluationandrankingofIDPsbytheNEC
(g) Review and validation of the NECs report on IDPs and its recommendations for selection and
fundallocationbytheNationalSteeringCommittee(NSC)
(h) Declaration of selected Institutions to States. The selection of certain Government funded and
GovernmentaidedInstitutionsmaybesubjecttoafewmandatoryimprovementsbeingmadein
theirIDP
(i)

DeclarationofselectedCFIsaftersigningofMemorandumofUnderstanding[referAnnexIII(b)]

Table7#
EvaluationSchemeforInstitutionalDevelopmentProposalunderSubcomponent1.1

S.
No
I

EvaluationParameters
InstitutionalPreparednessandImplementationFeasibility

II

Marks

ClarityofInstitutionalbasicinformationincludingbaselinedata

QualityofSWOTanalysis

10

OverallimplementationfeasibilityofInstitutionalproject

15

CoherenceofproposalwithStates/RegionalDevelopmentPlan
SubTotal(I)
ClarityandQualityoftheActionPlansfor:

Implementationofreforms
Improvinglearningoutcomesofstudentsintermsofhigherpassratesand

35
15
10

higheracademicachievements

Identification of weak students and for improvement in their learning

outcomesthroughfinishingschool

Improvingemployabilityofgraduates
Strengthening of existing PG programmes and starting new PG

5
5

programmes

Facultydevelopmentincludingpedagogicaltraining
EnhancedinteractionwithIndustry
III

55

SubTotal(III)
Total(I+II+III)

5
5
10
100

Qualityoffaculty
Statusoffaculty

SubTotal(II)
FacultyQualificationandStatus

10

Note:ThefullschemeforIDPevaluationisgiveninAnnexX[Table47].

th

Updatedasper4 NSCMeetingdecision.

53

TEQIPII

4.4
SelectionofInstitutionsunderSubcomponent1.2(ScalingupPostgraduateEducationandDemand
DrivenResearch&DevelopmentandInnovations):
State sponsored (Government funded, Government aided and Private unaided) institutions will be
selectedfrom theselectedStatessubjecttotheirmeetingtheEligibilityCriteriaand baseduponthe
meritoftheirInstitutionalDevelopmentProposals(IDPs).SimilarlyCentrallyFundedInstitutions(CFIs)
willalsobeselectedmeetingtheeligibilitycriteriaandbaseduponthemeritoftheirIDPs.

4.4.1 EligibilityCriteriaforSubcomponent1.2:

InstitutionstobeeligibleforparticipationintheProjectundertheSubcomponent1.2mustmeetthe
followingbenchmarks:
Table8#
EligibilityCriteriaforSubcomponent1.2

S.
EligibilityParameters
No
1. Agreementtoimplementallacademicandnonacademicreformsgivenasbelow:
CurricularReforms
Exerciseofautonomies
EstablishmentofCorpusFund,FacultyDevelopmentFund,EquipmentReplacement
FundandMaintenanceFund
Generation, retention and utilization of revenue generated through variety of
activities
Institutionstofillupallexistingteachingandstaffvacancies
Delegationofdecisionmakingpowerstoseniorfunctionarieswithaccountability
Improvedstudentperformanceevaluation
Performanceappraisaloffacultybystudents
FacultyincentiveforContinuingEducation(CE),consultancyandR&D
AccreditationofUGandPGprogrammes
2. AutonomousInstitutionStatusbyUGC
3. PresenceofBoardofGovernorswithaneminenteducationistorIndustrialistasthe
Chairperson
4. PercentageofeligibleUGprogrammesaccreditedplusappliedfor
5. PercentageofeligiblePGprogrammesaccreditedplusappliedfor
6. CumulativenumberofPhDsproducedinthelastthreeacademicyears(200708,2008
09and200910)
or
Cumulative number of MTech produced in the last three academic years (200708,
200809and200910)
7. Facultypositionsfilledonregularfulltimebasisaspercentageoftotalfacultypositions
sanctionedinaccordancewiththeAICTEprescribedstudenttofacultyratiofor
a) GovernmentfundedandGovernmentaidedinstitutions
b) Privateunaidedinstitutions
8. PercentageofregularfacultywithPhDinEngineering
a. Regular States: Minimum 15% of faculty with PhD in Engineering against total
availablefacultyforEngineeringdisciplinesonly.

Benchmark
values
Yes

Yes*
Yes**
60%
40%
5

50

***
****
15%

b.SpecialCategoryStates:Minimum15%offacultyinEngineeringandBasicSciences
with PhD against the total available faculty for Engineering disciplines and Basic
Sciences.

InstitutionsthathavealreadyappliedforinductionasAutonomousInstitutionstatuscanalsoapply.Howeverthe
selection of such institutions and consequent signing of MoU will be subject to the Institution having actually
obtainedAutonomousInstitutionstatusfromtheUGC.
** PleasereferAnnexII
*** Minimum 55% regular faculty ofthe sanctioned strength and a minimum overall faculty strength of65% including
facultyonelevenmonthsorlongerdurationcontract.

Theseinstitutionswillessentiallyhavetohaveaminimumof65%regularfacultyaspertheAICTEprescribedfaculty
student ratio (for NITs and other CFIs, MHRD norms will apply) within one year of signing of MoU, failing which
projectfundingwillbestopped.
**** ThePrivateunaidedinstitutionsshouldhavefacultystrengthasperAICTEapprovednormsoutofwhichatleast65%
shouldbeappointedonregularbasis.
Note:
In respect of accreditation benchmarks for Undergraduate and Postgraduate programmes in Universities, Deemed
Universities, University Constituent Colleges/Faculties/Departments, NAAC accreditation is acceptable at the entry
point. However, all such project entities will have to essentially achieve the Undergraduate and Postgraduate
programmestargetsofNBAaccreditationasgiveninTable35forSubcomponent1.2.

rd

th

Updatedasper3 and4 NSCMeetingdecision.

54

Section4SelectionProcess

4.4.2

EvaluationofInstitutionalDevelopmentProposalsunderSubcomponent1.2:
Institutions meeting the Eligibility Criteria will be invited for submission of Institutional
DevelopmentProposals(IDPs).
InstitutionalDevelopmentProposals(IDPs)willbeevaluatedasperthefollowing:

(a) States invite through advertisement in newspapers for submission of IDPs from eligible
Institutions[onlythoseInstitutionsthatmeettheEligibilityCriteriashouldprepareandsubmit
suchProposals][FormatgiveninAnnexIV(B)(b)]
(b) StatesscreenIDPsforcompletenessandshortlisttheInstitutions
(c) StatesforwardshortlistedIDPstotheNPIU.Statesshouldforwardonlythoseproposalsfor
whichmeetalltheeligibilitycriteriaandforwhichStategovernmentiswillingtocosponsor
(d) The NPIU screens the received IDPs for completeness (only complete Proposals will be
evaluated)
(e) EvaluationandrankingofIDPsbytheNEC(EvaluationSchemeisgiveninTable9)
(f) ReviewandvalidationoftheNECsreportonIDPsanditsrecommendationsforselectionand
fundallocationbytheNationalSteeringCommittee
(g) DeclarationofselectedInstitutionstoStates.TheselectionofcertainGovernmentfundedand
GovernmentaidedInstitutionsmaybesubjecttoafewmandatoryimprovementstobemade
intheirIDPs
(h) DeclarationofselectedCFIsaftersigningofMemorandumofUnderstanding(referAnnexIII
(b))

Table9
EvaluationSchemeforInstitutionalDevelopmentProposalunderSubcomponent1.2

S.
No
I

II

EvaluationParameters
InstitutionalPreparednessandImplementationFeasibility
Clarityofinstitutionalbasicinformationincludingbaselinedata
Overallproposalimplementationfeasibility
QualityofSWOTanalysis
CoherenceofproposalwithStates/regionaldevelopmentplan
Reasonabilityofproposedbudget
Subtotal(I)
ClarityandQualityoftheActionPlansfor:
Scalingupresearchandinnovation
ScalingupPhDenrolmentthroughexistingandnewprogrammes
Scalingup enrolment into Masters programmes in existing and new
programmes
Research collaborative activities with Institutions at National and
Internationallevels
PotentialimpactanddepthofproposedIndustrycollaboration
Facultydevelopmentincludingpedagogicaltraining
Identificationofweakstudentsandforimprovementintheirlearning
outcomesthroughFinishingSchool
Subtotal(II)
Total(I+II)

Marks
5
15
10
5
5
40
10
10
10
10
5
10
5
60
100

Note:TheschemeforproposalevaluationisgiveninAnnexX[Table48].

4.5

SelectionofInstitutionsunderSubcomponent1.2.1(EstablishingCentresofExcellence):

4.5.1

PreScreening of Institutions: Only the Institutions, which have already been selected under
Subcomponent1.2,canoninvitationsubmitproposalsforestablishingaCentreofExcellence(CoE).

55

TEQIPII

4.5.2

EligibilityCriteriaforSubcomponent1.2.1:

InstitutionstobeeligibleundertheSubcomponent1.2.1mustmeetthefollowingbenchmarks:

Table10
EligibilityCriteriaforSubcomponent1.2.1

S.
No.
1

AutonomousInstitutionStatusbyUGC

PercentageofeligibleUGprogrammesintheinstitutionaccreditedorappliedfor

75%

PercentageofeligiblePGprogrammesintheinstitutionaccreditedorappliedfor

60%

PercentageofregularfacultywithPhDinEngineeringaspercentageoftotal
facultyavailableinEngineeringintheinstitution
Numberofsponsoredresearchprojectscompletedintheinstitutioninthelast
threeacademicyears(200910,201011,201112)
CumulativenumberofPhDsproducedinthelastthreeacademicyears(200910,
201011,201112)intheDepartmentsparticipatingforestablishingCoEs

20*

5
6
7

EligibilityParameters

Faculty positions filled on regular full time basis as percentage of total faculty
positionssanctionedinaccordancewiththeAICTEprescribedstudenttofaculty
ratiointheDepartmentsparticipatingforestablishingCoEs

Benchmark
values
Yes

07
12**
70%

Institutionshaving50%ofregularfacultywithPhDinEngineeringofthetotalregularfacultyinEngineering;
outofwhich75%intheproposedthemeareawillbegivenweightage.
** Institutionshavingproduced25Nos.ofPhDsinlastthreeacademicyearwillbegivenweightage.

Note1: The benchmarks prescribed for Subcomponent 1.2 are deemed to have been met by the applicant
Institutions.
Note2: Minimumnumberofparticipatingfacultyinthecentre4.
Note3: In respect of accreditation benchmarks for Undergraduate and Postgraduate programmes in
Universities, Deemed Universities, University Constituent Colleges/Faculties/Departments, NAAC
accreditationisacceptableattheentrypoint.However,allsuchprojectentitieswillhavetoessentially
achieve the Undergraduate and Postgraduate programme targets of NBA accreditation as given in
Table35ofPIPforSubcomponent1.2.

4.5.3

EvaluationofInstitutionalDevelopmentProposalsunderSubcomponent1.2.1#:
Atwostageevaluationprocesswillbeimplemented.Thestepsforevaluationoftheseproposalsare:
InvitationandPrescreeningofInstitutionsbyNPIU:

(a)

Invitation by email to the Institutions selected under Subcomponent 1.2 to submit


proposals to the NPIU for establishing Centres of Excellence in the prescribed format
[FormatgiveninAnnexIV(B)(c)].

(b)

NPIUscreensthereceivedproposalsforcompletenessandforeligibilitycriteria.

(c)

Incompleteproposalsand/orproposalsthatdonotmeetthecriteriawillnotbeevaluated.

EvaluationofProposalsbasedonImplementationFeasibilityandActionPlans:
(a)

A rigorous technical appraisal and ranking of the proposals meeting the eligibility
benchmarksbydomainexpertsfromIITs/IIScaspertheevaluationschemegiveninTable
11takingintoaccountthecommentsandrecommendationsoftheexperts.

(b)

NPIU will send the recommendations of the experts to the National Steering Committee
(NSC).

(c)

Selection of Institutions by the National Steering Committee (NSC) along with fund
allocation.

(d)

DeclarationofselectedInstitutions.

UpdatedasperdiscussionwithStakeholders.

56

Section4SelectionProcess

Table11
EvaluationSchemeforInstitutionalDevelopmentProposalunderSubcomponent1.2.1

S.
CATEGORIES
No.
1 ImplementationFeasibility

MARKS

Overallproposalimplementationfeasibility

10

Institutionalpreparedness

35

Reasonabilityofproposedbudget

Subtotal(a)
ClarityandQualityofActionPlansfor:
establishment of CoE in terms of physical arrangements and
workingarrangements
conducting research and obtaining results in the identified
thematicareas
communication of research findings to policy makers and
potentialusers
commercializationofresearchresults
scalingupPhDandMastersenrolmentinthematicareas
insuringsustenanceofCoEaftertheendoftheproject
Subtotal(b)
Total
Note:TheschemeforproposalevaluationisgiveninAnnexX[Table49].

50
10
10
5
5
10
10
50 Marks
100Marks

57

Section5
PROJECTIMPLEMENTATION

5.1

ImplementationArrangementattheNational,StateandInstitutionalLevels:

The implementation arrangement at various levels are illustrated in ChartI (page No.72) and
describedsubsequently.

5.1.1

NationalLevelImplementationArrangements:

Thecompositionandfunctionsofthethreebodies,namelytheNationalSteeringCommittee(NSC),
the National Project Directorate (NPD) and the National Project Implementation Unit (NPIU)
responsible at the Central level for overall guidance, policy decisions and project management,
coordinationandimplementationaredescribedbelow:

5.1.1.1NationalSteeringCommittee(NSC):
(i) Composition:
TheMinistryofHumanResourceDevelopment(MHRD)willconstitutea16memberNational
SteeringCommittee(NSC),composedasbelow:

Secretary of the Department of Higher Education in the Union Ministry of Human


ResourceDevelopment,astheChairperson,
Secretary,PlanningCommissionornominee,
Secretary,DepartmentofScience&Technologyornominee,
FinancialAdvisortoMHRD,
ChairpersonoftheAICTEortheNBA,
Four Chairpersons of State Steering Committees (SSCs), nominated by the NSC
Chairperson,inannualrotation,
Threemembersnominated by MHRD,whomust bepersonswithrecognizedexpertise
andinterestinHigherTechnicalEducation,inannualrotation,
OnerepresentativefromtheCIHEC.
Two Industry representatives, nominated one each by the Confederation of Indian
Industry (CII) and the Federation of Indian Chambers of Commerce & Industry (FICCI),
and
TheNationalProjectDirector(NPD)intheMHRD,astheMemberSecretary.
(ii) Meetings:

TheNSCwillmeetbiannuallyorasoftenasrequired.Itwillbeassistedinitsfunctioningbythe
NationalProjectDirectorate.TheoperationalcostsoftheNSCwillbefinancedbytheProject
throughtheNPlUsbudget.

(iii) Functions:

TheNSC,besidesprovidingguidanceanddirectionsformaximizinggainsfromtheProject,will:
ReviewandvalidaterecommendationsoftheNationalEvaluationCommittees(NECs)for
selectionofStatesandUTsandtheirsponsoredEngineeringEducationInstitutionsand
of the Centrally Funded Institutions (CFIs) for participation in the Project and decide
their respective fund allocations under the two components: (i) Improving Quality of
EducationinSelectedInstitutions,and(ii)ImprovingSystemManagement.Itwillensure
fairnessandtransparencyintheselectionprocessforInstitutions.
Recommend corrective actions with regard to the nonperforming States, UTs and
InstitutionsincludingCFIs.
AllocatefundstotheNPIUandtheSPFUs.
Reviewfindingsfrompolicyreform,thematicandevaluationstudies.

(iv)Disclosure:

The Minutes of all NSC meetings will, for ensuring transparency in selections and other
decisions,beregularlypublishedontheNPIUswebsite.

59

TEQIPII

5.1.1.2 NationalEvaluationCommittees(NECs):
(i)

Composition:
The National Project Directorate will constitute a National Evaluation Committee (NEC)
consisting of academicians from India for the selection of States and UTs, and selection of
InstitutionsfromtheselectedStatesandCFIs.
NPD will approve a panel of about 80100 experts to serve on the National Evaluation
Committee.SpecificEvaluationCommitteeswillalsobeformedbytheNPDfromtheapproved
panel for selection of States; selection of Institutions under Subcomponent 1.1, Sub
component1.2andSubcomponent1.2.1andforselectionofproposalsforgrantsunderthe
Innovation Fund. The committee for selection of Institutions for establishing Centres of
Excellencewillbecomposedofsubjectexpertsonly.
Meetings:

(i)

TheNationalEvaluationCommittees(NECs)willmeetonneedbasisafterreceiptofEligibility
andDevelopmentProposalsofInstitutionsandproposalsforgrantsunderInnovationFund.It
willbeassistedinitsfunctioningbytheNationalProjectImplementationUnit(NPIU).
Functions:

(ii)

TheNationalEvaluationCommitteeswillcarryoutthefollowingfunctions:

EvaluationofproposalsforselectionofStates,

Evaluation of Eligibility and Institutional Development Proposals based on States


recommendations under Subcomponent 1.1 and evaluation of Institutional
DevelopmentProposalsunderSubcomponent1.2,

EvaluationofproposalsforselectionofCentrallyFundedInstitutions(CFIs)underSub
component1.1andSubcomponent1.2,and

EvaluationofproposalsfrominstitutionsforestablishingCentresofExcellenceunder
Subcomponent1.2.1andEvaluationofproposalsforInnovationFund.

5.1.1.3 NationalProjectDirectorate:

The National Project Directorate will be located within the Department of Higher Education in the
MHRDandwillbeheadedbyaNationalProjectDirector(NPD).TheNationalProjectDirector(NPD)
willbenominatedbytheMHRDintherankofaSpecialSecretary/AdditionalSecretary/JointSecretary
totheGovernmentofIndia.TheNPDwillbeassistedby:
(i) NationalProjectDirectoratewithintheMHRD,and
(ii) NationalProjectImplementationUnit(NPIU)headedbyaCentralProjectAdvisor(CPA).
The National Project Directorate will be headed by the NPD and assisted by a Director in the
Department of Higher Education, MHRD dealing with the Project with adequate infrastructure, key
and support staff including a Finance Specialist, a Project Management Specialist etc. It will be
responsiblefor:

60

ConstitutingaNationalSteeringCommitteeandorganizingitsmeetings,

Constituting separate National Evaluation Committees (with welldefined Terms of


Reference) for selection of States and Institutions under Subcomponents 1.1, 1.2 and 1.2.1
andalsoproposalsforInnovationFund,

OverallProjectfundmanagementincludingCentralfundreleases,monitoringmatchingfund
releasesbytheStatesandUTs,andmonitoringoverallutilizationofProjectfunds,

EnsuringtimelyreleaseoffundstoStates,UTsandCFIsandotherrecipientsasperapproved
annualallocations,

CoordinatingwithprojectStatesandUTs,concernedMinistries/DepartmentsofGoIandthe
WorldBank,

OverseeingProjectimplementationattheNationalandStatelevels,

Periodicreviewoftheproject,

Section5

ProjectImplementation

Facilitating holding of sixmonthly Joint Review Missions (JRMs), MidTerm Review Mission,
ImplementationSupportMissionsandsuchotherreviewsasmaybecalledfor,and

Facilitating smooth and efficient working of the NPIU and ensuring adequate staffing of the
NPIUwithappropriateexpertiseatalltimesduringtheProjectLife.

5.1.1.4 NationalProjectImplementationUnit(NPIU):
TheexistingNPIUwillberestructuredtocarryoutitsfunctionsthrough6functionalUnitsandwillbe
headedbytheCentralProjectAdvisor(CPA):

InstitutionalDevelopmentUnit

PGEducationandR&D&IUnit

FacultyDevelopmentUnit

FinancialManagementUnit

ProcurementManagementUnit

MonitoringandEvaluationUnit

These Units may be modified by the CPA from time to time. The Institutional Development, PG
EducationandR&D&IandFacultyDevelopmentUnitswillbeheadedbysenioracademicians(inthe
rank of Professor/Associate Professor), and experienced professionals will head the Procurement,
FinanceandM&EUnits.EachUnitheadwillbeassistedbyadequatenumberofsuitablesupportstaff.
TheProjectwillfinancethesalarycostofthefulltimekeyandsupportstaffintheNPIUandMHRD,
fee to Consultants, salaries of contractual support staff, expenditure on rent and refurbishment of
hired offices, goods, minor works, assessment, surveys, institutional audits, studies, reviews,
mentoring,studytoursandvarioustrainingworkshops,travel,staffwelfareandotheroperatingcosts
oftheNPlUandMHRD.
(i) Role of the Central Project Advisor: The CPA will be suitably empowered, financially and
administrativelytoperformthefunctionslistedbelow:

Disseminating toStatesandCFIs,throughitswebsiteinformation,ontheProjectdesign,
eligibilityandselectioncriteriaforStatesandInstitutionsandtheassociatedprocesses,

Preparing Annual Work Plans, including Annual Budgets and detailed semiAnnual Plans
andBudget,

CarryingoutorientationoftheNECstotheirToRsfortheirconcernedevaluations,

OrganizingreceiptofproposalsforselectionfromStatesandUTs,checkingcompleteness
of proposals, submitting results of scrutiny to the National Project Directorate for
considerationoftheNationalSteeringCommittee(NSC)andcommunicatingthedecisions
of the NSC to the States along with recommendations for improvement of proposals, as
mayberequired,

Organizing receipt of separate eligibility and Institutional Development Proposals (IDPs)


fromInstitutionsforSubcomponents1.1and1.2andproposalsforSubcomponent1.2.1,

Organizing receipt, processing and evaluation of Proposals for Innovation Fund,


communicatingrecommendationsforimprovementofproposalsassuggestedbyNEC,if
any,andobtainingapprovalforfundingfromtheNSC,

ArrangingtrainingfortheNPIUstaff,

DevelopingproposalsforlocaltechnicalassistanceforactivitiesundertakenattheNational
levelandwithapprovalfromtheNPDandfacilitating/operationalizingthesame,

OrganizingmeetingsofWorkingGroups,NECs,Mentors,PerformanceAuditors,andsuch
otherCommittees/GroupsofExpertsasareconstitutedfromtimetotime,

Building capacity of the States and UTs and Institutions for implementation of Equity
Assurance Plan (EAP), Environment Management Framework (EMF) and Disclosure
ManagementFramework(DMF)requirements,

LiaisingwiththeSPFUstodiscussProjectimplementationprogresstoidentifyandsolve
emergingproblems,

61

TEQIPII

Organizing Professional Development Programmes for Engineering Education policy


planners, administrators and implementers (from the MHRD, the State Directorates,
theNPIU,theSPFUs,etc.),
OrganizingJointReviewMissions,MidtermandImplementationCompletionMissions
andotherSupervisionandImplementationSupportMissions,asrequired,and
Carrying out other related tasks as may be requested by the NPD and the National
ProjectDirectorate.

(ii) RoleoftheNPIUsFunctionalUnits:

(a) InstitutionalDevelopmentUnitintheNPIU:UndertheguidanceoftheCPA,thisUnitwill:
Organize training workshops and technical assistance for the SPFUs of new States on
preparationofeligibilityproposalsandIDPs,basedonSWOTanalysis,forseekingfunds
underSubcomponent1.1,
Scrutinize Eligibility of the short listed proposals for this Subcomponent as received
from States and UTs for completeness, validation of State/UT recommendations,
eligibilityparameters,andpreparereportsonthesameforconsiderationoftheNSC,
Scrutiny followed by evaluation of Institutional Development Proposals for Sub
component 1.1 of all short listed Institutions (for those that have State sponsorship)
through NEC, submit recommendations of NEC to the NSC for selections and
communicate decisions of the NSC to the States, UTs and CFIs along with
recommendationsforimprovementofproposals,asmayberequired,
Review funding requirements from Institutions and monitor fund utilization for Sub
component1.1,
Develop guidelines for capacity building of BoGs and develop appropriate orientation
programmeandidentifyresourcepersonsinconsultationwiththeSPFUs,
IdentifyasetofmentorsforCFIs,
Approve (based on their experience and capability) mentors for State sponsored
institutions,
Empanelperformanceanddataauditorsforallprojectinstitutions,
DevelopclearTORs,guidelinesandmethodologiesformentorsand,performanceand
dataauditors,
Promote organization of separate workshops by States and select Institutions for
sharingthegoodacademicandgovernancepracticesandinnovations,
Developandoverseeproceduresforeffectivementoring,performanceauditsanddata
auditsofallprojectinstitutions30,and
Obtain reports from mentors and auditors; review these for satisfactory progress in
implementationoftheproposedactivitiesandachievementoftargets.

(b) PG Education and R&D&I Unit in the NPIU: Under the guidance of the CPA, this Unit, in
respect of Proposals for Scalingup PG Education and Research & Development and
Innovationundersubcomponent1.2will:

ScrutinizeproposalsoftheshortlistedproposalsforthisSubcomponentasreceived
fromStatesandUTsforcompletenessand validationofState/UTrecommendations,
andpreparereportsonthesameforconsiderationofevaluationbyNEC,

OrganizemeetingsoftheNECforindepthreviewoftheIDPsforthisSubcomponent,

Submit NEC recommendations for selection and fund allocation to the NSC, and
communicatethedecisionoftheNSCtotheStates/UTsandtheInstitutions,and

MonitorfundutilizationandimplementationprogressfortheSubcomponent1.2.

30

ProjectInstitutionsarethoseInstitutionsthathavebeenselectedtoparticipateinthisProject,andcontinuetoparticipate.

62

Section5

ProjectImplementation

InrespectofProposalsforEstablishingCentresofExcellenceunderSubcomponent1.2.1,
theunitwill:

Scrutinize Proposals for this Subcomponent as received from States and UTs for
completenessandpreparereportsonthesameforconsiderationoftheNEC,

BasedontherecommendationsoftheNEC,referproposalsforCentresofExcellence
toIndianandForeignexpertsandindustryexpertsthroughpostandemail,followup
on their observations/recommendations and put these up to the NEC for
consideration,

Under guidance of the NEC, develop procedure and criteria for assessing viability of
proposalsforCentresofExcellence,andfacilitatecarryingoutofviabilityassessment
byvisitingCommittees,asapprovedbytheNPD,andsubmitthefindingstotheNEC,
and

CollateNECrecommendationsandtheViabilityAssessmentReportsforconsideration
oftheNSCforfinalselection.

Inadditiontoabove,theUnitwill:

(c)

Develop and oversee procedures for effective mentoring and performance audits of
InstitutionsparticipatinginthesetwoSubcomponents,

Obtain reports from mentors and auditors, review these for satisfactory progress in
implementationoftheproposedactivitiesandachievementoftargets,and

Organizeatleast2regionalworkshopseachyearfortheparticipatingInstitutionsto
share and peer review their achievements and innovations, and to seek expert
guidancefromseniorsfromIndustryandacademia,andinvitedForeignExperts.

Faculty Development Unit in the NPIU: This Unit will be responsible for promoting faculty
qualification upgradation, subject area knowledge enhancement and training in pedagogy. In
thiscontext,theUnit,undertheguidanceoftheCPA,will:

Identifyindividualexpertsandagenciesthatcanhelptodevelopguidelinesandalso
provide insitu training to senior faculty to build their capacity for Training Needs
Analysis(TNA),andpublishtheinformationontheNPIUswebsite,

PromoteconductofTNAinallprojectinstitutions,

Compile a training calendar for good quality opportunities in subject knowledge


enhancement,publishthecalendarontheNPIUswebsiteandperiodicallyupdatethe
calendar,

Periodically followup with the SPFUs to encourage project institutions (including


unaidedInstitutions)totakeadvantageoftheopportunitymadeavailableunderthe
ProjectforsubsidizedPedagogyTraining,

Monitor achievements in all types of training in project institutions and the


expendituremade,

Developing norms for selection of candidates for foreign study tours and
training/studyvisitsincludingdurationandpermissibleexpenditure,

Organize foreign study tours of officials of the MHRD, the NPIU, the SPFUs, the CFIs
etc.forbuildingcapacityforacademicandgovernancereforms,

CoordinatingtheactivitieswithIITsandIIMsforfacultytraining.

(d) MonitoringandEvaluation(M&E)UnitintheNPIU:UndertheguidanceoftheCPA,thisUnit
will:

Develop,implementandmaintainaProjectManagementInformationSystem(MIS),

MonitorandevaluatetheinternaloperationsoftheProject,

Guide the operations of M&E specialists in the SPFUs and the project institutions
throughprovidingadviceandoperatingasaclearinghouseforissues(problemsand
solutions)raisedbyStates,UTsandInstitutions,

MonitorstatusofKPIsandachievementsofFinishingSchools,
63

TEQIPII

IncorporatedataontheperformanceofInstitutionsintotheMIS,

Developproceduresforregularmonitoringofperformanceofprojectinstitutions,

Conduct/commission surveys, audits and studies envisaged under Subcomponent


2.2,and

Publish on its website results of all National level selections and such other
informationasrequiredunderDisclosureManagementFramework.

(e)ProcurementManagementUnitintheNPIU:UndertheguidanceoftheCPA,thisUnitwill:

Ensure full knowledge and systematic application of the World Banks Procurement
Guidelines and provide guidance on queries from States, UTs and institutions,
regardingtheWorldBanksProcurementProceduresanduseofPMSS,

Build capacity of procurement officers in the SPFUs and the project institutions to
procureGoodsandWorksinaccordancewiththeWorldBankProcurementGuidelines
byconductingthefirstroundoftrainingwithinthreemonthsofProjectinceptionand
thereafterrepeatingtheworkshopseverysixmonths,

GuidetheSPFUsandtheCFIsinthepreparationofgoodbiddocuments,integrating
environmentalconcernsinbiddocumentsforworks,andinqualityassurance,

Review the procurement documents and certify technical specifications before


forwardingthedocumentstotheWorldBankforpriorreview,

Makeawarealltheconcernedofthepostreviewprocedure,documentationrequired
forpostreviewandfacilitatepostreview,whichmaybeconductedbytheWorldBank
fromtimetotime,

BuildcapacityintheSPFUsforcarryingoutprocurementauditsattheStatelevel,and

ActasasupportandreferencepersonforallProjectrelatedprocurementtasks.

(f) FinancialManagementUnitintheNPIU:UndertheguidanceoftheCPA,thisUnitwill:

Ensure full knowledge and systematic application of the Project procedures and
requirementsforfinancialmanagement,

Providing guidelines for financial, accounting, reporting and audit aspects through
facilitatingpreparationofFinancialManagementManual,

Guide/monitorandprovidesupportonadherencetofiduciaryguidelinesandfinancial
management arrangements by working in close coordination with the World
Bank/MHRD/CAAA,

Provide support to the Financial Management/accounting staff for issues related to


FinancialManagementaspectsoftheProject,

Prepare annual estimates and budget for the Project and play an important role in
releaseoffunds,

FacilitateimplementationoftheProjectandprovideadvisoryservicesandsupportfor
financialmanagementandotheralliedissues,

Monitor/Consolidate and Review Quarterly/SixMonthly/Annual Reports of the


participatingStatesandCFIs,

PrepareconsolidatedProjectFinancialMonitoringReports(FMRs)andensuretimely
submissionofFMRstotheWorldBank/CAAA,

CoordinatereceiptofannualauditreportsfromtheStates/theUTs/theCFIsandother
recipientsandauditoftheNPIU,

Prepare and submit Consolidated Audit Report to the World Bank through National
ProjectDirectorateonatimelybasis,

EnsuretimelycomplianceofauditobservationsbyalltheStates,UTs,CFIsandother
recipients;andcoordinatetimelyresponsefromallconcernedonauditobservations,

PrepareandimplementaplanforcapacitybuildinginfinancialmanagementoftheFM
staff in the SPFUs and the project institutions and review the capacity building
requirementsofFMstaffatalllevelsonaregularbasis,

64

Section5

ProjectImplementation

5.1.2

Guide the Finance Officers in the SPFUs through advice and operate as a clearing
houseforissues(problemsandsolutions)raisedbyStates/UTs,

Act as a support and reference person for all projectrelated financial management
tasks,

Impartcomprehensiveandtopicspecifictrainingtoprojectstaffatvariouslevelson
Financial Management and manage those training programmes through preparation
oftrainingplan,includingscheduleoftrainings/workshops/seminars/orientationand
monitoringandimplementationofthesame,

ParticipateinreviewsandmonitoringofStatesandCFIs,

MonitordisclosureofFMinformation,and

CarryoutrevisionofFinancialManagementManualasmayberequired.

StateLevelProjectImplementationArrangements:
TheprojectStatesandtheUTs31throughtherespectiveStateSteeringCommittee(SSC)andtheState
Project Facilitation Unit (SPFU) will be directly responsible for management, coordination,
implementationandmonitoringoftheProjectattheState/UTlevels.

5.1.2.1 StateSteeringCommittee(SSC):
(i)Composition:
TheState/UTDepartmentresponsibleforEngineeringEducationwillconstitutea910member
StateSteeringCommittee(SSC),composedasbelow:

Principal Secretary/Secretary responsible for Engineering Education, as the


Chairperson;

FinancialControlleroftheStateDepartmentconcernedwithEngineeringEducationin
theState/UTorhis/hernominee;

Directororequivalent,DepartmentofHigherEducation,MHRDornominee;

TwoIndustrymembers,nominatedbymajorIndustryAssociations;

Three members having recognized expertise and interest in Engineering Education,


nominatedbytheStateGovernment;

OnenomineeoftheStatePrivateSectorAdvisoryGroup(SPSAG)32;and

Director for Engineering Education in the State (being the head of the SPFU), as the
MemberSecretary.

(ii) Meetings:

TheSSCwillmeetquarterly.SpecialmeetingsmayalsobeconvenedbytheChairperson.
It will be assisted in its functioning by the SPFU. The operational costs of the SSC,
including sitting fees for nonofficial members, will be financed by the Project through
theSPFUsbudget.

(iii)Functions:
TheSSCwillberesponsiblefor:(a)guidingtheworkoftheSPFUandauthorizingreports
totheStateGovernmentandtotheNationalProjectDirectorate/NPIU;(b)shortlisting
Institutions eligible for participation in the Project; (c) assessing and recommending
Institutional and the SPFU proposals for financing under the Project; (d) overseeing
operational activities within the State; (e) preparing State proposals, and forwarding
these and also proposals from other entities for seeking grants under the Innovation
Fund;(f)reviewingandapprovingforeigntrainingandforeignstudytours;and(g)taking
stock of the Project and facilitating Project implementation under all Components and
SubcomponentsaspertheproposalsapprovedforfundingbytheNSC.

31

ProjectStates/UTsarethoseStatesandUTsthathavebeenselectedtoparticipateintheProject,andcontinuetoparticipate.
FormationofSPSAGisoptionalforaState.IftheSPSAGisconstitutedforaState,thenonlythenominationfromSPSAGwillbe
thereintheSSC.

32

65

TEQIPII

5.1.2.2

StateProjectFacilitationUnit:
The Department of the State Government responsible for managing Technical Education will
establishaStateProjectFacilitationUnit(SPFU)withadequatestaff.
The SPFUs will be located within the Department of the State Government responsible for
TechnicalEducation.TheheadoftheSPFU,designatedastheStateProjectAdvisor(SPA),willbe
theDirectorofTechnicalEducationortheequivalentofficerresponsibleforTechnicalEducation
inthatDepartment.TheSPAwillbeassistedbyaStateProjectCoordinator(SPC)whowillbean
academician.
(i) RoleofStateProjectAdvisor(SPA):TheSPAwillperformwiththefunctionalassistance
fromtheSPC,thefollowingfunctions:
Disseminating to institutions, through its website, information on the Project
design, eligibility and selection criteria for Institutions and the associated
processes,
PreparingAnnualBudgetsanddetailedsemiAnnualPlansandBudget,
OrganizingreceiptofseparateeligibilityandInstitutionalDevelopmentProposals
(IDPs) from Institutions for Subcomponents 1.1 and 1.2 and proposals of Sub
component1.2.1,
OrganizingpreparationsofproposalsforInnovationFund,
Developingproposalsforlocaltechnicalassistancetoinstitutions,
According final approval to the Institutions Procurement Plan on
recommendationsofSPCandProcurementunitoftheSPFU,
Organizingmeetingsofmentorsandexperts,
Building capacity of Institutions for implementation of Equity Assurance Plan
(EAP),EnvironmentManagementFramework(EMF)andDisclosureManagement
Framework(DMF)requirements,
Liaising with the NPIU to discuss project implementation progress to identify
andsolveemergingproblems,
Facilitating Joint Review Missions, Midterm and Endterm Missions and other
SupervisionandImplementationSupportMissions,asrequired,and
CarryingoutotherrelatedtasksasmayberequestedbytheNPIU.
(iii) RoleoffunctionalUnitsintheSPFU: TheSPFUwillhave4Units,namelyAcademicUnit,
Procurement Unit, Financial Management Unit, and Monitoring and Evaluation
(M&E)Unit.Stateswithlessthan5projectinstitutionsmayreducethenumberof
Unitsto2,namely:(a)AcademicandM&EUnit,and(b)ProcurementandFinancial
ManagementUnit,mergingtheirrespectivefunctions.Functionsofeachofthe4
unitsaredescribedbelow:
a) AcademicUnit:UndertheguidanceoftheSPA,thisUnitwill:
OrganizetrainingworkshopsforInstitutionsasrequiredfromtimetotime,on
preparation of Eligibility and Institutional Development Proposals (IDPs) for
Subcomponent 1.1, IDPs for Subcomponent 1.2 and for Establishment of
CentresofExcellence,
ReviewEligibilityProposalsfromInstitutions,andpreparereportsonthesame
forconsiderationoftheSSC,
ForwardtherecommendationsofSSConeligibilityofInstitutionstotheNPIU
alongwithalltheoriginaleligibilityapplicationsreceivedbytheSPFU,
ForwardalleligibleproposalsreceivedtotheNPIUwithduerecommendations
fromtheSSC,
ProvideguidanceandarrangetechnicalassistancetoInstitutionsfor carrying
out realistic and meaningful Training Needs Analysis (TNA) to achieve their
Developmental Goals and to also provide avenues for professional
developmentofindividualfacultymembers,

66

Section5

ProjectImplementation

Monitor progress in faculty and staff development for each Institution and
take corrective actions, as required, to ensure that Institutions achieve their
targetsasgivenintheirFacultyandStaffDevelopmentPlans,
Initiate and promote preparation of proposals for funding under the
InnovationFund,
IdentifyMentorsandPerformanceAuditorsfortheprojectinstitutions,
Carry out orientation of BoGs at the respective Institutions and disseminate
goodgovernancepractices,
Organizeworkshopsforsharinggoodacademicpracticesandinnovationswith
otherSPFUsandprojectinstitutions,and
Oversee mentoring, performance and technical audits of project institutions,
obtain and review the reports and share these reports with the SSC and the
NPIU.
OrganizePedagogicalTrainings
o

TheSPFUscanfacilitatePedagogicalTrainingintheStatesponsored
institutions.TheSPFUsshallfollowthefollowingsteps,ifpedagogical
trainingsarearranged.

Compile a list of project institutions desirous of training on their


campus in the First Year of the Project along with their location,
number of participating faculty and the time slots convenient to
them.

TheSPFUwouldselecttrainingprovidersforindividualorclusterof
institutions by following the World Bank Consultant procurement
procedure. It will appoint a senior faculty member as the Training
Coordinatorwhowillfacilitateandcoordinatethetrainingandcarry
outthefollowupactivities.

Thetrainingproviderswillberequiredtoevaluatetheeffectiveness
of the training given, and the results will be shared with the
institution,theSPFUandtheNPIU.

TheSPFUwillmonitorprogressandeffectivenessoftraining,review
faculty feed back and endofcourse assessment reports for their
institutions.

b) ProcurementUnit:UnderthedirectguidanceoftheSPA,thisUnitwill:
Ensure full knowledge and systematic application of the World Bank
GuidelinesforProcurementofWorks,GoodsandServicesanduseofPMSSby
allprojectinstitutions,
Guide Institutions in preparation of their Procurement Plans, review these,
andforwardtotheWorldBankthroughtheNPIU,
Managetheprocurementofworks,goodsandconsultanciesrequiredforState
levelactivitiesundertheProjectandmanagetheprocurementofInternational
Consultancies,
Verifythejustificationofprocurementofitemsanditslinkwithobjectivesand
thelistedactivitiesoftheproject,
Recommendtheprocurementplanofeachinstitutionforfindapprovaltothe
State ProjectAdvisor (SPA)through the State Project Coordinator (SPC) after
thoroughscrutinyoftheplanforascertainingfullcompliancewiththeWorld
BanklaidproceduresofprocurementandcompleterequirementofPMSS,
Conduct postprocurement audits of Institutions for ensuring full compliance
withtheWorldBankprocedures,
EnsurecompliancewithEMFrequirementsandqualityguidelines(asgivenin
theCivilWorksManual)forallcivilworksinInstitutions,
67

TEQIPII

Act as a support and reference unit to Institutions for all Projectrelated


procurementtasks,and
SubmitquarterlyprocurementprogressreportstotheSSC.
c) FinancialManagementUnit:UnderthedirectguidanceoftheSPA,thisUnitwill:

Provide guidance on financial, accounting and reporting aspects to the project


institutionsattheStatelevel,

Ensure full knowledge and systematic application of the Project procedures and
requirementsforfinancialManagement,

Prepare budget for project at State level and arrange timely flow of funds to
institutions,

Accept Quarterly Financial Monitoring Reports (FMRs) from the participating


institutionsandguide/monitorandprovidesupportforadherencetothefiduciary
guidelines,financialmanagementissues,

ConsolidateFMRsfortheprojectandsubmissiontotheNPIU,soastofacilitate
disbursementoffundswithintherequiredtimeframe,

HireInternalandExternalAuditors,

Monitor quality of audit arrangements in all agencies in the State which will be
fundedundertheproject.Regularlymonitorcomplianceofauditobservationsby
institutions,

Timely submit consolidated Audit Report of ProjectInstitutions and the SPFU to


theNPIU,

Provide support to Financial Management/accounting staff of institutions for


resolving various issues related with accounting/Financial Management aspects,
reporting system etc. Facilitate implementation of the project and providing
advisoryservicesandsupportforfinancialmanagementandotheralliedissues,

Impartcomprehensiveandtopicspecifictrainingtoprojectstaffatvariouslevels
on Financial Management and manage these training programmes through
preparation of training plan, including schedule of trainings/workshops/
seminars/orientation, and monitor implementation of the plan in close co
ordinationwiththeNPIU,and

Otherprojectaspectsrelatedtofinancialmanagement,

d) MonitoringandEvaluationUnit:UndertheguidanceoftheSPA,thisUnitwill:

68

FacilitateMIStrainingofpersonnelfromallprojectinstitutions,

EnsureperiodicalupdationoftheMISdataattheInstitutionalandStatelevels,

MonitorprogressinimplementationofvariousProjectelementsonadaytoday
basis,

AssisttheMonitoringandEvaluationSpecialistintheNPIU,

Implementandoverseeproceduresfortheregularmonitoringofperformanceof
projectinstitutions,

Undertake regular field visits to Institutions and develop a simple monitoring


checklist,andconsolidatequarterlymonitoringreportsbasedonthemonitoring
checklists,and

Proposecorrectiveactions(ifany)thatneedtobetaken.Thesewillbeactedupon
bytheSPA/StateGovernment.TheNPIUMonitoringandEvaluationUnitwillbe
responsible for collating these monitoring reports, and preparing semiannual
monitoringreports.

Section5

ProjectImplementation

5.1.3

InstitutionalLevelImplementationArrangements:
TheProjectattheInstitutionallevelwillbemanagedbytwobodies(i)theBoardofGovernors(BoG)
and(ii)anInstitutionalTEQIPUnit.

5.1.3.1 BoardofGovernors(BoG):
(i)Composition:

EachInstitutionwillnecessarilyhaveitsownBoG,(pleaseseeeligibilityconditions)asper
UGC Guidelines and Composition or as per the NIT Act 2007, as the case may be, either
appointedbythesponsoringGovernmentorbyitselfthroughdueprocedure(seeAnnex
II),and

The BoG will, in all cases, be headed by an eminent Industrialist/Engineering Education


expertwithadequaterepresentationfromotherstakeholders.

(ii) Meeting:
TheBoGwillmeetatleastquarterlyorasoftenasrequiredandtheminutesofBoGmeetingswill
be published on Institutions website as promptly as possible. It will perform the following
functionsinthecontextofthisProject.
(iii) Functions:

Takeallpolicydecisionswithregardtosmooth,costeffectiveandtimelyimplementation
oftheInstitutionalproject,

Form, supervise and guide various Committees required for project implementation and
internalprojectmonitoring,

Ensureoverallfacultydevelopment,

EnableimplementationofallacademicandnonacademicInstitutionalreforms,

EnsureproperutilizationofProjectfundandtimelysubmissionofFinancialManagement
Reports(FMRs)andUtilizationCertificates,

Ensure compliance with the agreed procedures for procurement of Goods, Works and
ServicesandFinancialManagement,

Ensure compliance with other fiduciary requirements under the Project such as Equity
Assurance Plan (EAP), Environment Management Framework (EMF) and Disclosure
ManagementFramework(DMF),

Monitorprogressinthecarryingoutofalltheproposedactivities,resolvebottlenecks,and
enabletheInstitutiontoachievetargetsforallkeyindicators,

Timelyinitiationandcompletionofexternalandinternalaudits;and
Satisfactorycompliance/resolutionofexternalandinternalauditorsobservations.

5.1.3.2 InstitutionalTEQIPUnit:
EachInstitutionwillformanInstitutionalTEQIPUnitwithappropriaterepresentationfromacademic
officialsoftheInstitution,faculty,senioradministrativeofficers,technicalandnontechnicalsupport
staff and students. The Unit, headed by the Head of the Institution called as Institutional Project
Director (IPD), will be responsible for implementation of the Institutional project. He/she is to be
assisted by a Senior Professor called as Institutional Project Coordinator(IPC) for coordinating the
activitiesoftheinstitutionalproject.
TheInstitutionalTEQIPUnitwilloperatethroughcommitteesforprocurementofGoods,Worksand
Services; financial management; implementation of faculty and staff development activities and
programmes; monitoring project implementation, achievement of targets for all indicators as
proposed and keeping MIS updated; ensuring compliance with EAP, EMF and DMF requirements;
ensuring implementation of Institutional reforms; organizing efficient conduct of monitoring and
performanceaudits,etc.

69

TEQIPII

5.2

RoleofPrivateSector:
The Project expects to maximize collaboration between local Industries and project institutions by
providing the National Steering Committee and the State Steering Committees (through CIHEC and
SPSAG) with timely, precise, and concrete advice and summarized feedback on AcademiaIndustry
partnershipstomeettheNationaldemandforgraduatesandpostgraduatesequippedwithskillsand
knowledgerelevanttothechangingmarketrequirements.
The collaboration and coordination at the Central and State levels will enable establishment and
effectivefunctioningofAcademiaIndustrycollaborations.Theexpectedbenefits,amongothers,will
be:

5.2.1

Improvementoftheskillsoffuturejobcandidatesthroughinputsoncurricula,

Earlyaccesstohighlyeducatedtalent,

Relevantresearchandtechnologydevelopmentdemandedbythemarket,

Access to new ideas and early research results through such means as offering
problemsforsolutionthroughconsultancy,

Technicalassistancethroughinteractionwithresearchers,

AccesstospecializedR&Dequipmentandlaboratories,

Professionaldevelopmentofemployedengineersandtechnicians,and

Accesstointellectualproperty.

CouncilofIndustryHigherEducationCollaboration(CIHEC):
Toidentifyinitiativestopromoteresearch,mobilizeresources,developmarketreadymanpowerand
enhance employability CIHEC has been operationalize. The Council will collaborate with placement
cells of Central Universities for identification of the emerging areas as per requirement of
neighbouring industries to make students employment ready. The CIHEC will also help train
counsellors at all placement cells for better counselling and placements. Central universities have
beenaskedtoestablishaplacementcellforalldisciplines.Everyplacementcellwillhavecounsellors
whoshouldgiveinhousetrainingforskilldevelopmentandcoordinateplacements

5.2.2

StatePrivateSectorAdvisoryGroup(SPSAG):
a)

StateGovernmentsareexpectedtoestablishStatelevelPrivateSectorAdvisoryGroups.
TheAdvisoryGroupsattheStatelevelwillconsistofrepresentativeoftheprivatesector
conducting business activities in the respective States with relevance and knowledge of
TEQIP.Thenumberofparticipants(maximumof10)intheStateleveladvisorygroupwill
dependonthesizeoftheStateandtherangeofindustrialactivitiestakingplaceinthe
State. States with less than 3 Institutions may form a cluster of States and establish
SPSAGatoneState.TheStatelevelAdvisoryGroupswillequallyberepresentedinthe
StateSteeringCommittee.

b)

The SPSAG will oversee the AcademiaIndustry partnerships within its respective State
andactivelyinteractwithboththeInstitutionsandtheprivatesectortoensureeffective
functioningofthepartnership.

c)

EachSPSAGwillsetupamechanismtoidentifyissuesanddifficultiesatanearlystage
that potentially obstruct/restrict promotion of the partnerships and slow down
implementationoftherelatedprojectactivities.

d)

Taking into account the identified issues and difficulties, the SPSAG will provide timely
andpracticaladvicetotheSSC,theInstitutionsandtheprivatesector.

70

Section5

5.2.3

ProjectImplementation

FundingfortheAdvisoryGroups:
InordertosupportthePrivateSectorAdvisoryGroupsattheNational andStatelevels,limited but
reasonable funds can be made available through the NPIU to support activities of the CIHEC and
throughtheSPFUstosupportactivitiesofSPSAG.Thefundscouldbeusedfor:
a)

MemberstraveltoattendthemeetingsheldbytheAdvisoryGroups,inaccordancewith
theGovernmentrules,

b)

Recurrentcostsformeetings,and

c)

OtherrelevantcostsasagreedtobytheNSC,butmemberstimeinAdvisoryGroupswill
notbepaidfor.

5.3

RoleoftheWorldBankduringProjectImplementation:
ForeffectiveProjectimplementation,theWorldBankwillhavefrequentinteractionswithCentraland
StateGovernments,andInstitutions.TheWorldBankwillparticipateinReviewMissionsandalsovisit
NPIU, various States and institutions to provide implementation support and guidance for their
projectactivities.

71


TEQIPII

ChartI
ImplementationarrangementsatNational,StateandInstitutionLevels

NationalSteeringCommittee
(NSC)

Institutionallevel

Statelevel

Nationallevel

StateSteeringCommittee
(SSC)

BoardofGovernors(B0G)

SPSAG

InstitutionTEQIPUnit
InstitutionalProjectDirector(IPD)
(HeadofInstitution)

NationalProjectDirectorate
NationalProjectDirector(NPD)
(SpecialSecretary/Addl.Secretary/Jt.Secretary)

StateProjectFacilitationUnit(SPFU)
SateProjectAdvisor(SPA)
(Director/Commissioner,Tech.Edu.)

NationalProjectImplementationUnit
(NPIU)CentralProjectAdvisor(CPA)

InstitutionalProject
Coordinator(IPC)

StateProjectCoordinator(SPC)

SPSAG
1
2
3

72

:StatePrivateSectorAdvisoryGroup
: AcademicUnit
: ProcurementUnit
: FinancialManagementUnit

4
5
6
7

:
:
:
:

M&EUnit
InstitutionalDevelopmentUnit
PGEducationandR&DUnit
FacultyDevelopmentUnit

Section6
FINANCIAL MANAGEMENT
6.1

Financial Plan:
The total Project cost is expected to be Rs. 2430.00 crore. The Project cost will be borne by
Government of India and the States and UTs in the manner of matching shares, in the ratio of 75:25
for the general category states and 90:10 for the special category States. The Central share will be
Rs.1981.00 crore (World Bank share Rs.1364.00 crore and MHRD Rs.617.00 crore), the States share
will be Rs. 419.00 crore and the share of private unaided Institutions will be Rs. 30.00 crore.

6.2

Funds will be made available through the SPFUs to the selected institutions from the selected
States and UTs under two Subcomponents 1.1 (Strengthening Institutions to Improve
Learning Outcomes and Employability of Graduates) and 1.2 (Scalingup Postgraduate
Education and Demand Driven Research and Development and Innovation) and also to
around 30 Centres of Excellence selected under Subcomponent 1.2.1 (Establishing Centres
of Excellence).

Funds will be made available to the selected CFIs under both the Components through
MHRD.

Fund Allocation:
Indicative funding by components, funding pattern and cost sharing details with respect to Central,
State and Private unaided Institutions, approximate componentwise distribution of cost with respect
to Central and State Project Management entities and Private unaided institutions, Indicative
categorywise funding for suggested activities (for Centrally Funded, Government funded,
Government aided and Private unaided institutions under Subcomponent 1.1, 1.2 and 1.2.1) are
indicated in Tables 12 to 17.

73

TEQIPII
Table12#
Indicative Funding by Components
(Rs. in crore)
No. of
S.
Institutions/
Costing Parameters
No
Entities
(estimate)
Component 1: Improving quality of Education in Project Institutions
1

Project Institutions under Subcomponent 1.1


Centrally funded, Government funded and
(i)
Government Aided Institutions
(ii) Private unaided Institutions
Project Institutions under Subcomponent 1.2

Cost per
Institution/
Entity

Total
Cost

100

10

1000

25

100

125

75

(i)

Centrally funded, Government funded and


Government Aided Institutions

60

12.5

750

(ii)

Private unaided Institutions

15

60

30

150

200

40

Establishment of Centres of Excellence under Sub


component 1.2.1 from Centrally Funded, Government
funded, Government aided and Private unaided
Institutions
Pedagogical Training under Subcomponent 1.3 for
Project Institutions (Centrally funded, Government
funded, Government aided and Private unaided
Institutions)
Subtotal

2100

Component 2: Improving System Management


1

Capacity Building to Strengthen Management

74

60

40

22

Unallocated amount

Subtotal
Grand Total

NPIU / MHRD (Project management through MIS,


PMSS, eFMR including Monitoring and Evaluation,
conduct of surveys, studies etc. and Incremental
Operating Cost)
SPFUs

th

Updated as per 5 NSC Meeting decision.


Projected total number of institutions from two cycles of selection.
th

Updated as per 7 NSC Meeting decision.

100

130
330
2430

Section6

Financial Management

Table13
Funding Pattern and cost sharing details with respect to Central, State and Private unaided Institutions

Government Funded &


Aided for all components

S.
No.

CFI for all components

Type of Institution

100

75*

60

60

75*

100

100

75*

100

Share of State Government

25**

20

20

25**

25**

Share of Private unaided Institutions

20

20

100

100

100

100

100

100

100

100

100

Percentage Share of Governments /


Institution

Share of Central Government

2
3

TOTAL

All project
institutions

Private unaided

NPIU /
MHRD

SPFU

Un
allocated
amount

Under Sub Under Sub Under Sub Under Sub


component component component component
1.1
1.2
1.2.1
1.3, 2.1

Note:
*
**

The share of Central Government will be 90% for the Special Category States and 75% for the General Category States and UTs.
The share of State Government will be 10% for the Special Category States and 25% for the General Category States and UTs.

75

TEQIPII
Table14#
Approximate Componentwise Distribution of cost with respect to Central and State Project Management
entities and Private Unaided Institutions
(Rs .in crore)
Cost Share
S.
No.

Nature of Fund

2
a. Fund for
project
institution
allocation

Costing Parameters
Project Institutions under Subcomponent 1.1
Centrally funded institutions (8 Nos.)
Government funded and Government aided
Institutions (79) from Regular States (funding
ratio 75:25)
Government funded and Government aided
Institutions (03) from Special Category States
(funding ratio 90:10)
Private unaided Institutions (23 Nos.)
(i) Total cost of Project Institutions under Sub
component 1.1
Project Institutions under Subcomponent 1.2
Centrally funded institutions (18 Nos.)
Government funded and Government aided
Institutions (43) from Regular States
(funding ratio 75:25)
Government funded and Government aided
Institutions (2) from Special Category States
(funding ratio 90:10)
Private unaided State Institutions (14)
(ii) Total cost of Project Institutions under Sub
component 1.2

7
8

8 CoEs from 7 CFIs


22 CoEs from 17 Govt. funded, Govt. aided
and 3 Private unaided Institutions
(iii) Total cost of Project Institutions under
Subcomponent 1.2.1
Subtotal (a=i+ii+iii)
Pedagogical Trainings under Subcomponent 1.3
b. Fund for
to Project Institutions (Centrally Funded,
Pedagogical
Government funded, Government aided and
Trainings
Private unaided Institutions)
Subtotal (b)
c. Capacity
Capacity Building under Subcomponent 2.1 of
Building Fund project institutions, MHRD/State, NPIU officials
Subtotal (c)
NPIU / MHRD (Project management through MIS,
PMSS, eFMR including Monitoring and Evaluation,
d. Systems
conduct of surveys, studies etc. and Incremental
Support
Operating Cost)
Fund
SPFU
Unallocated Amount
Subtotal (d)
GRAND TOTAL (a+b+c+d)

th

Updated as per 5 NSC Meeting decision.

76

State
Govt.

Private
unaided

Total Cost

80

80

592.50

197.50

790

27

55.20

18.40

18.40

92

754.70

218.90

18.40

992

225

225

403.13

134.37

537.50

22.50

2.50

25.00

33.60

11.20

11.20

56

684.23

148.07

11.20

843.50

30

Establishment of 30 Centres of Excellence under Subcomponent 1.2.1

Central
Govt.

40

40

82.50

27.50

110

122.50

27.50

150

1561.43

394.47

29.60

1985.50

40

40

40

40

60

60

60

60

40

40

75
204.50
319.50
1980.93

25

25
419.47

29.60

100
204.50
344.50
2430

Section6

Financial Management

Table15
Indicative Categorywise Funding for Suggested Activities per Project Institution (Centrally Funded,
Government Funded and Government Aided Institution) selected under Subcomponent 1.1 :
(Strengthening Institutions to Improve Learning Outcomes and Employability of Graduates)
S.
No.
1

Suggested Activities
Procurement of Goods (equipment, furniture,
books LRs, software and minor items) and civil
works for improvement in teaching, training and
learning facilities
Providing Teaching and Research Assistantships
to increase enrolment in existing and new PG
programmes in Engineering and applied sciences
disciplines
Enhancement of R&D and institutional
consultancy activities

3
4

Faculty and Staff development for improved


competence

Enhanced interaction with Industry

Institutional Management Capacity enhancement

Implementation of Institutional reforms

Support to student needs

Incremental Operating Cost

Category of
Expenditure#
(Head of expenditure)
Improvement in
Teaching & Learning
facilities

Percentage
(%)

Cost
(Rs. in
crore)

55

5.50

Assistantships
3.50
R&D
FSD

35

III Cells
Capacity development
Reforms
Student support
IOC

TOTAL

10

1.00

100

10.00

Note:

Salary expenditure of faculty and staff appointed on contract against the existing vacancies can not be charged
to the Project. However, the salary expenditure of regular and contractual faculty and staff appointed against
new posts created under the Project can be charged to the Project.

The Incremental Operating Cost means the costs of operation and maintenance of equipment, office
expenses, hiring of vehicles, consumables, salaries and allowances of regular and contract faculty and staff
against posts created under the Project. It will also include travel costs incurred for the Project Management
activities i.e visit to the NPIU, the SPFU, Universities, etc.

Procurement of consultant services, if required, for the activities listed from Sr. No. 28 are permitted. The
expenditure on procurement of consultant services is to be booked against the head of expenditure of that
particular activity. The services of consultant are to be procured by following the World Bank norms and
procedures through the PMSS.

Fund from Procurement and IOC Head of expenditure can also be reappropriated to Head of expenditure for
academic activities (S.No.28) but not vice versa.

Updated as per discussion with Stakeholders.

77

TEQIPII

Table15(a)
Indicative Categorywise Funding for Suggested Activities per Project Institution (Private Unaided
Institution) Selected under Subcomponent 1.1 : (Strengthening Institutions to Improve Learning Outcomes
and Employability of Graduates)
S.
No.

Suggested Activities

Acquiring text books, ejournals and software33

Providing Teaching and Research Assistantships to


increase enrolment in existing and new PG
programmes in Engineering & applied sciences
disciplines
Enhancement of R&D and Institutional consultancy
activities
Faculty and Staff development for improved
competence

3
4
5

Enhanced interaction with Industry

Institutional Management Capacity enhancement

Implementation of Institutional reforms

Support to student needs

Incremental Operating Cost

Category of
Expenditure#
(Head of expenditure)

Percentage
(%)

Cost
(Rs. in
crore)

Learning resources

25

1.00

65

2.60

10

0.40

100

4.00

Assistantships

R&D
FSD
III Cells
Capacity development
Reforms
Student Support
IOC

TOTAL
Note:

These institutions may acquire the text books, ejournals and software with the approval of Institutions BoG
and under information to the respective SPFU. Further, these institutions should ensure that the allocated
funds be spent judiciously covering all the envisaged activities under the project for the private unaided
institutions, so that the objectives of the project are achieved. Moreover, it should be ensured that these
institutions should follow scrupulously the agreed rules and procedures as set out in the Financial
Management and Procurement Manual.

Salary expenditure of faculty and staff appointed on contract against the existing vacancies cannot be charged
to the Project. However, the salary expenditure of regular and contractual faculty appointed against new posts
created under the Project can be charged to the Project.

The Incremental Operating Cost means the consumables, salaries and allowances of regular and contract
faculty and staff against posts created in the project. It will also include travel costs incurred for the Project
Management activities i.e. visit to the NPIU, the SPFU, Universities, etc.

Procurement of consultant services, if required, for the activities listed from Sr. No. 28 are permitted. The
expenditure on procurement of consultant services is to be booked against the head of expenditure of that
particular activity. The services of consultant are to be procured by following the World Bank norms and
procedure through the PMSS.

Fund from IOC Head of expenditure can also be reappropriated to Head of expenditure for academic activities
(S.No.28) but not vice versa.

Updated as per discussion with Stakeholders.


th
Updated as per Minutes of Review Meeting held on 19 June 2013.

33

78

Section6

Financial Management

Table16
Indicative Categorywise Funding for Suggested Activities per Project Institution (Centrally Funded,
Government funded and Government Aided Institution) Selected under Subcomponent 1.2 : (ScalingUp
Postgraduate Education and DemandDriven Research & Development and Innovation):
S.
No.
1

Suggested Activities
Procurement of Goods (equipment, furniture,
books LRs, software and minor items) and civil
works for improvement in teaching, training
and learning facilities
Providing
Teaching
and
Research
Assistantships for significantly increasing
enrolment in existing and new Masters and
Doctoral programmes in Engineering & applied
sciences disciplines
Enhancement of R&D and Institutional
consultancy activities

3
4

Faculty and Staff development for improved


competence

Enhanced interaction with Industry

Percentage
(%)

Cost
(Rs. in
crore)

Improvement in Teaching &


Learning facilities

45

5.625

45

5.625

10

1.250

100

12.500

Assistantships

R&D
FSD
III Cells

Institutional
enhancement

Implementation of Institutional reforms

Support to student needs

Incremental Operating Cost

Management

Category of Expenditure#
(Head of expenditure)

Capacity

Capacity development
Reforms
Student Support
Incremental Operating Cost

TOTAL
Note:

Salary expenditure of faculty and staff appointed on contract against the existing vacancies can not be charged
to the Project. However, the salary expenditure of regular and contractual faculty and staff appointed against
new posts created under the Project can be charged to the Project.

The Incremental Operating Cost means the costs of operation and maintenance of equipment, office expenses,
hiring of vehicles, consumables, salaries and allowances of regular and contract faculty and staff against posts
created in the project. It will also include travel costs incurred for the Project Management activities i.e. visit to
the NPIU, the SPFU, Universities etc.

Procurement of consultant services, if required, for the activities listed from Sr. No. 28 are permitted. The
expenditure on procurement of consultant services is to be booked against the head of expenditure of that
particular activity. The services of consultant are to be procured by following the World Bank norms and
procedures through the PMSS.

Fund from Procurement and IOC Head of expenditure can also be reappropriated to Head of expenditure for
academic activities (S.No.28) but not vice versa.

Updated as per discussion with Stakeholders.

79

TEQIPII
Table16 (a)#
Indicative Categorywise Funding for Suggested Activities per Private unaided Institution Selected under
Subcomponent 1.2 : (ScalingUp Postgraduate Education and DemandDriven Research & Development and
Innovation):
S.
No.

Suggested Activities

Category of
Expenditure#
(Head of expenditure)

Percentage
(%)

Cost
(Rs. in
crore)

Learning Resources

25

1.00

65

2.60

10

0.40

100

4.00

Acquiring text books, ejournals and software34

Providing Teaching and Research Assistantships for


significantly increasing enrolment in existing and
new Masters and Doctoral programmes in
Engineering & applied sciences disciplines

Assistantships

Enhancement of R&D and Institutional consultancy


activities

R&D

Faculty and Staff development for improved


competence

FSD

4
5

Enhanced interaction with Industry

Institutional Management Capacity enhancement

Implementation of Institutional reforms

Support to student needs

III Cells
Capacity development
Reforms
Student Support

Incremental Operating Cost

IOC
TOTAL

Note:

#
#

These institutions may acquire the text books, ejournals and software with the approval of Institutions BoG
and under information to the respective SPFU. Further, these institutions should ensure that the allocated
funds be spent judiciously covering all the envisaged activities under the project for the private unaided
institutions, so that the objectives of the project are achieved. Moreover, it should be ensured that these
institutions should follow scrupulously the agreed rules and procedures as set out in the Financial
Management and Procurement Manual.

Salary expenditure of faculty and staff appointed on contract against the existing vacancies cannot be charged
to the Project. However, the salary expenditure of regular and contractual faculty appointed against new posts
created under the Project can be charged to the Project.

The Incremental Operating Cost means the consumables, salaries and allowances of regular and contract
faculty and staff against posts created in the project. It will also include travel costs incurred for the Project
Management activities i.e. visit to the NPIU, the SPFU, Universities, etc.

Procurement of consultant services, if required, for the activities listed from Sr. No. 28 are permitted. The
expenditure on procurement of consultant services is to be booked against the head of expenditure of that
particular activity. The services of consultant are to be procured by following the World Bank norms and
procedure through the PMSS.

Fund from IOC Head of expenditure can also be reappropriated to Head of expenditure for academic activities
(S.No.28) but not vice versa.

th

Included as per 7 NSC Meeting decision.


Updated as per discussion with Stakeholders.
Updated as per Minutes of Review Meeting held on 19 June 2013.

34

80

Section6

Financial Management
Table17
Indicative Categorywise Funding for Suggested Activities per Centre of Excellence
from Centrally Funded, Government funded and Government aided Institution selected
under Subcomponent 1.2.1 : (Establishing Centres of Excellence)

S.
No.
1

Suggested Activities
Procurement of Goods (equipment,
furniture, books LRs, software and minor
items) and civil works for improvement in
Research and Development facilities
Providing
Teaching
and
Research
Assistantships for enrolment in Masters
and Doctoral programmes in topics linked
to economic or societal needs in the
thematic areas

Category of Expenditure#
(Head of expenditure)

Percentage
(%)

Cost (Rs. in
crore)

Improvement in Teaching
& Learning facilities

55

2.75

35

1.75

10

0.50

100

5.00

Assistantships

Collaboration with Industry for applicable


research and product development

III Cells

National/International collaboration for


Research and Development activities with
academic
institutions
and
R&D
organizations

R&D

Enhancing research competence of faculty


and knowledge sharing in thematic areas,

FSD

Incremental Operating
Cost

Incremental Operating Cost


TOTAL

Note:

Salary expenditure of faculty and staff appointed on contract against the existing vacancies can not be charged to
the Project. However, the salary expenditure of contractual faculty/staff appointed against new posts created for
the CoE can be charged to the Project.

The Incremental Operating Cost means the costs of operation and maintenance of equipment acquired under the
project for the CoE, office expenses, hiring of vehicles, consumables, salaries and allowances of contract faculty
and staff against posts created in the project for CoE. It will also include travel costs incurred for the Project
Management activities i.e. visit to the NPIU, the SPFU and Universities etc.

Procurement of consultant services, if required, for the activities listed from Sr. No. 25 are permitted. The
expenditure on procurement of consultant services is to be booked against the head of expenditure of that
particular activity. The services of consultant are to be procured by following the World Bank norms and
procedures through the PMSS.

Fund from IOC Head of expenditure can be reappropriated to Head of expenditure for academic activities
(S.No.25) but not vice versa.

Updated as per discussion with Stakeholders.

81

TEQIPII
Table17 (a)
Indicative Categorywise Funding for Suggested Activities per Centre of Excellence
from Private unaided Institution selected under Subcomponent 1.2.1 : (Establishing Centres of Excellence)
S.
No.
1

Suggested Activities
Acquiring text
software35

books,

ejournals

Category of Expenditure#
(Head of expenditure)

Percentage
(%)

Cost (Rs. in
crore)

Learning resources

25%

1.25

65%

3.25

10

0.50

100

5.00

and

Providing
Teaching
and
Research
Assistantships for enrolment in Masters
and Doctoral programmes in topics linked
to economic or societal needs in the
thematic areas

Assistantships

Collaboration with Industry for applicable


research and product development

III Cells

National/International collaboration for


Research and Development activities with
academic
institutions
and
R&D
organizations

R&D

Enhancing research competence of faculty


and knowledge sharing in thematic areas

FSD

Incremental Operating
Cost

Incremental Operating Cost


TOTAL

Note:

These institutions may acquire the text books, ejournals and software with the approval of Institutions
BoG and under information to the respective SPFU. Further, these institutions should ensure that the
allocated funds be spent judiciously covering all the envisaged activities under the project for the private
unaided institutions, so that the objectives of the project are achieved. Moreover, it should be ensured
that these institutions should follow scrupulously the agreed rules and procedures as set out in the
Financial Management and Procurement Manual.

Salary expenditure of faculty and staff appointed on contract against the existing vacancies can not be
charged to the Project. However, the salary expenditure of contractual faculty/staff appointed against
new posts created for the CoE can be charged to the Project.

The Incremental Operating Cost means consumables, salaries and allowances of contract faculty and staff
against posts created for CoE. It will also include travel costs incurred for the Project Management
activities i.e. visit to the NPIU, the SPFU and Universities etc.

Procurement of consultant services, if required, for the activities listed from Sr. No. 25 are permitted.
The expenditure on procurement of consultant services is to be booked against the head of expenditure
of that particular activity. The services of consultant are to be procured by following the World Bank
norms and procedures through the PMSS.

Fund from IOC Head of expenditure can also be reappropriated to Head of expenditure for academic
activities (S.No.25) but not vice versa.

th

Included as per 7 NSC Meeting decision.


Updated as per discussion with Stakeholders.
Updated as per Minutes of Review Meeting held on 19 June 2013.

35

82

Section6
6.3

Financial Management

Strategy:
It is essential to ensure that the Project funds received by an Institution are used only for the
purpose for which given, with due regard to economy, efficiency and sustainable achievement
of the Projects objectives.
For regular monitoring of actual financial position, daily accounting of Books of Accounts is
required. The Books of Account for the Project are to be maintained using doubleentry
bookkeeping principles. Also, standard books of account (Cash and Bank Books, Journals,
Ledgers etc) are to be maintained at the SPFUs and the project institutions.
The disbursement of funds to the project institutions will be based on the quarterly Financial
Monitoring Report (FMR), which includes comparison of budgeted and actual expenditure and
analysis of major variances.
Release of funds to all entities will be accounted for as Advance in the Books of Accounts and
treated as expenditure only upon submission of expenditure information through FMR.
Release of funds to faculty, staff and suppliers will be accounted for as Advance in the Books of
Accounts and treated as expenditure only upon submission of expenditure bills.

6.4

Fund Flow:
The fund flow pattern for the Project will be as follows:
At the State level the Department responsible for Technical Education will annually prepare a
budget for entire 100% expenditure for all the Statesponsored Institutions and the SPFU and
obtain the necessary approval of the State Legislature. The budget will be provided under the
Head Centrally Sponsored Scheme in the State budget.
Each CFI will annually prepare a budget for entire expenditure under the Project.
The forecast of expenditure by CFIs and States will be forwarded to the MHRD and accordingly
the advances will be provided by it to participating CFIs and States by budget approval in the
Parliament.
MHRD will straightaway release the funds to CFIs based on the Financial Monitoring Reports
(FMRs).
MHRD will release the Central Government share to States through GoI channels and funds will
be received in the respective State Treasury.
State Finance Department will make the allocations based on the approved budget estimate of
the Department responsible for Technical Education in the State.
The Principal Secretary/Secretary of the Department responsible for the Technical Education in
the State will accord administrative sanction for incurring the expenditure for the allocated
amount.
The Treasury will give the budget authorization.
The Director of Technical Education/Commissioner of Technical Education/or equivalent officer,
will submit the bill to the Treasury (Pay & Accounts Office) after (i) the administrative sanction
and (ii) the budget authorization.
The amount then will be credited by the treasury into the Personnel Deposit Account
(PDA)/Personal Ledger Account (PLA) opened in favour of The Director of Technical
Education/Commissioner of Technical Education/or equivalent officer, in any Nationalized Bank
for further operation of funds.
The SPFU will receive the funds through cheque in a commercial bank account opened for the
Project from the Director of Technical Education/Commissioner of Technical Education/or
equivalent officer.
The project institutions will receive the funds from the SPFU through cheque in a commercial
bank account opened for the Project.
The Private Unaided Institutions will deposit its 20% share into the bank account and submit the
Certificate received from the bank to the SPFU and only after that, the SPFU will release 80%
share (60% Central Share and 20% state share) to the Private Unaided Institutions accordingly.

83

TEQIPII

6.5

The project institutions will submit Financial Monitoring Report (FMR) quarterly to the SPFU.
The SPFU will consolidate the FMR of all its project institutions and itself will submit the
consolidated FMR to the NPIU. FMR will provide expenditure information for the previous
quarter and a forecast of expenditure to be made in the next six months.

CFIs will send FMR to the NPIU.

The NPIU will submit consolidated FMR of all States and CFIs and also of the NPIU to CAAA and
the World Bank.

The expenditure reported in FMR will be finally confirmed subject to its certification in the
Annual Audit Reports for each State/CFIs and the NPIU.

Timely submission of FMR by States/CFIs is mandatory for further disbursement of the grant by
MHRD which is 45 days at the close of each quarter.

The World Bank will make disbursements on the basis of FMR to GoI. Funds will be disbursed in
a special account with the Reserve Bank of India, Central Accounts Section, operated by the
Department of Economic Affairs (DEA) of the Government of India. The disbursement will be
determined as the Forecast expenditure less Funds available. Funds available are defined as
opening balances less reported expenditure.

Electronic Financial Monitoring Report (eFMR):


The Financial Monitoring Reports (FMRs) are to be submitted electronically. A software has been
developed to enable all the project institutions, the SPFUs and the NPIU to enter the FMRs electronically
through online access of a website. The data required for FMRs would be entered into the software by
each individual project institution and which then will be consolidated by the software. The FMR
generated by the software shall be shared with the World Bank for disbursements. A user manual for
the software will be made available separately.

6.6

Auditing:
Statutory Audit at State Level:
The SPFU will appoint a firm of chartered accountants for audit of the SPFU and project institutions
within the State.
Audit at the SPFU: The audit at the SPFU level will include audit of Financial Monitoring Report (FMRs),
and project accounts. The SPFU will be required to maintain the records of FMRs and the project
accounts separately to enable the auditor to carry out necessary checks and verification effectively.
Audit of Institutes: Further, the auditor will audit the project accounts of the institutions. For this
purpose, the institutions are required to furnish all documents / records to the auditors to facilitate
timely audit. Each institution will put up the audit report to Board of Governors within a reasonable
period of completion of audit.
Consolidated Audit Report of State: The SPFU will be required to submit a consolidated audit report for
st
the State to the NPIU by 31 July of every project year.
Statutory Audit at CFIs:
Centrally Funded Institutions will appoint a firm of Chartered Accountant to audit the accounts and the
audit will be completed by 30th June of every financial year. For this purpose, the institutions are
required to furnish all documents / records to the auditors to facilitate timely audit. Audit of Centrally
Funded Institutions will be as per the Terms of Reference mentioned in the Manual (Refer AnnexXXIV
of the Financial Management Manual).
Statutory Audit at the NPIU:
th

Annual audit of the NPIU by a firm of chartered accountants will be completed by 30 June of every
financial year.
Consolidated Audit Report for Project:
The NPIU will consolidate the audit reports of the States, CFIs and the NPIU. There will be one single
audit report for the entire project which will be submitted by the NPIU to the World Bank by
30th September of every financial year.

84

Section6

Financial Management

The audit report will be as per prescribed format. Please refer to format of consolidated audit
report in Annex XVII of the Financial Management Manual. However, in case of any adverse
observation/remarks, the auditor may provide a qualified report with details of observations and
reasons for qualifications.

6.7

Financial Management Manual:


The Financial Management Manual (FMM) developed for the Project provides the essential information,
to enable the SPFUs, the NPIU and project institutions to carry out effectively the financial operations in
the Project. It is a guide to the implementation agencies for understanding the detailed Financial
Management of the Project. For details refer to FMM at AppendixI.

85

Section7
PERMISSIBLEANDNONPERMISSIBLEEXPENDITURES#

Introduction:

PermissibleandnonpermissibleexpendituresundertheProjectforInstitutions,theSPFUsandtheNPIUare
giveninTable18to21.Thesetablesareexpectedtofacilitateprojectentitiesplanningoffundrequirement
andtoavoidnonreimbursableexpenditureundertheProject.

After discussion with States and Institutions during workshops, approved and identified activities are brought under head of
expenditureofactivitiestohavecoherencewithTableNo.15,15A,16,16A,17&17A.

87

TEQIPII

Table18

Permissible36andNonpermissibleExpenditures(Indicative)
forCentrallyFunded,GovernmentFundedandGovernmentAidedInstitutionParticipatinginSubcomponent1.1:
StrengtheningInstitutionstoImproveLearningOutcomesandEmployabilityofGraduates

SuggestedActivity*

1.

Procurementofgoods
(equipment,furniture,
books&learning
resources,software
andminoritems)and
civilworksfor
improvementin
teaching,trainingand
learningfacilities

CentrallyFunded,GovernmentFundedandAidedInstitutions
Permitted
NotPermitted

Equipmentandfurniture37for:

Equipmentand

o modernizing and strengthening of existing UG and PG


laboratories, workshops, computer centre, library and
supportfacilities
o modernization of laboratories in supporting
departments
o modernizingclassrooms
o establishing new UG and PG laboratories, if any,
requiredfortheexistingprogrammes
o establishing laboratories for starting new PG
programmesinengineeringdisciplines
o facultyresearchandinstitutionalconsultancywork
o campuswide networking of academic and
administrativebuildings,hostelsandfacultyresidences,
and enhancing internet facilities, books & learning
resources
o Coursespecificsoftwares
o procurementofequipmentlikecomputer,printer,etc.
forInstitutionalTEQIPUnit
o ICTenablelearningandrelatedsoftwareandhardware
o Languagelaboratory

furniturefor:
o starting new
UG
programmes,
and
o improving
hostel facilities
other
than
electronic
networking
Purchaseofvehicles

Modernizationandstrengtheningoflibraries:

o Procurementoflearningresources(print/digitalbooks
andjournals)
o Digitizationoflibrarybooks.
o EstablishmentofCDbank.
o MembershipofINDESTAICTEetc.

Civilworks38uptoabout5%ofprojectallocationforthe
institutionfor:
o Refurbishment, repair works, extension of existing
academic buildings such as classrooms, laboratories,
workshops,computercentreandlibrary
o Reducingenvironmentdegradationandcomplyingwith
EMF(seeCivilWorksManual

2.

ProvidingTeachingand
ResearchAssistantships
toincreaseenrolment
inexistingandnew

PG39programmesin
Engineering&applied
sciencesdisciplines

*Note:

Teaching Assistantships40 for Masters students in


Engineering&appliedsciencesdisciplinesthatdonot
receiveGATE/otherscholarships
Research Assistantships to Doctoral students in
Engineering&appliedsciencesdisciplinesthatdonot
receiveanyscholarshipsthroughNDF/otherschemes
Postdoctoralfellowshipsinengineeringdisciplines

Civil
works
undertaken
for
betterment
of
hostels,
staff
quarters and non
academicstructures

(1) The approving authority for these activities is BoG / Competent Authority of the institutions except few cases of
procurement (including services) where World Banks No objection is required. In addition, institution may also conduct
other activities (not listed here) under the scope of the project and those fulfil the objectives of the project with the
approvalofBoG/CompetentAuthorityoftheinstitution.
(2) Procurementofconsultantservices,ifrequired,fortheactivitieslistedfromSr.No.28arepermitted.Theexpenditureon
procurementofconsultantservicesistobebookedagainsttheheadofexpenditureofthatparticularactivity.Theservices
ofconsultantsaretobeprocuredbyfollowingtheWorldBanknormsandproceduresthroughthePMSS.

36

ExpenditureispermissibleonlyfortheAICTE/UGCapprovedUGandPGteachingprogrammes,providedthatGoods,CivilWorksand
ConsultancyServicesareprocuredinaccordancewiththeprocurementmethodsandproceduresgivenintheProcurementManualand
arenotdeclaredineligibleexpenditurebytheexternalFinancialAuditors.
37
Expenditure for procurement of any equipment and furniture will not be admissible if procured with cofinancing from any other
source.
38
ExpenditureforanyCivilWorkactivitywillnotbeadmissibleifundertakenwithcofinancingfromanyothersource.
39
ThetermPGcoversbothMastersandDoctoralprogrammes.
40
The amount of Teaching and Research Assistantships will be governed by the norms as prescribed by the UGC/AICTE or BoG of the
institution.

88

Section7

3.

Enhancementof
Researchand
Developmentand
Institutional
ConsultancyActivities

PermissibleandNonPermissibleExpenditure

Securing sponsored projects and consultancy Fiscal incentives for


assignments
increasedparticipationin
research,
sponsored
Publicationofresearchpapersinrefereedjournals
projects
and
consultancy
Commercializationofresearchproducts
work (the incentives can,
Patentingofresearchproducts
however, be given from
Travel cost, hospitality and honorarium paid to
Institutional resources
experts for participation in Research &
includingIRG)
Development activities and for delivering expert

lecturesintheprojectinstitutions
OrganizingconferencesonR&Dtopics/themes
Expense on characterization of sample of R&D
projectsundertakenbystudents/faculty
Presentation of paper in International Seminar,
Conferenceetc.byDoctoralstudents

o Registration fee; travel expenses; boarding,


lodging, and sundry expenses/allowances as
pernormsapprovedbyBoG

DevelopingresearchinterestamongUGand
Mastersstudents:
o

Fiscal incentive (as per norms approved by the


BoG)tostudentsthatvoluntarilyassociatewith
IndustryorientedR&Dprojects
Expenses on travel, boarding and lodging of
students that associate with an Industry for
about 34 weeks during vacations to continue
workonR&Dprojects
Consumables

4. (a)Facultydevelopment
forimproved
competenceonsubject
area
(applicableforfacultyof
engineeringdisciplines
andsupporting
departments)

Seedgrantforresearchtofacultymembersand/
or students to venture into innovative research
41
andtostrengthenresearchculture

Appointment of retired teachers from


IITs/NITs/other reputed institutions as Senior
Research Advisor for enhancement of Research &
41
Developmentactivities
(j) Qualificationupgradation:
Salary, living expenses
If faculty is enrolled for qualification upgradation
and travel expenses of
either through fulltime or parttime or by
faculty registered for
sandwichjointarrangementotherthantheparent
qualification upgradation
Institution:
(onfullorparttimeorby
o Fees charged for course work, registration fee
sandwich
joint
etc.
arrangement)
either
o Useofresearchfacilities
within
the
parent
o Consumables
Institution or through
o Expenses towards thesis printing and
deputation to another
publicationofthesisbasedresearchpapers
Institution
Iffacultyisregisteredforqualificationupgradation
on fulltime or parttime basis within the parent
Institution:
o Consumables
o Expenses towards thesis printing and
publicationofthesisbasedresearchpapers
(ii)EnhancingKnowledgeinResearchCompetence:
Any other payment to
the faculty for attending
Subject upgradation and research competence :
theCourse
Undertaking trainings in subject knowledge and

research competence upgradation by faculty as

plannedthroughTNA:

41

st

th

st

UpdatedasperMinutesof1 JRMheldduring18 Feb1 March2013.

89

TEQIPII

Course fee; travel expenses, boarding and lodging,


and sundry expenses/allowances as per applicable
normsandruleswhenfacultyisdeputedoutstation
[as per Guidelines on International Travel (Annex
VII)] to another Institution (within India or abroad)
for the duration of the Course, travel time and the
time permitted by the BoG for visits to
Institutions/Organizations of interest and relevance
tothefacultyinthevicinityofthelocationoftraining
Coursefeeandlocaltravelexpensesasperapplicable
norms and rules when faculty attends a Course in
station but at an Institution other than the parent
Institution

Participation by faculty in seminars, conferences,

workshops and in Continuing Education

42
Programmes(CEPs) etc.:

Any other payment to


o Registration fee; travel expenses; boarding,
the
faculty for attending
lodging, and sundry expenses/allowances as
seminars,
workshops,
per applicable norms and ruleswhen faculty is
conferences, etc. if
deputed outstation [as per Guidelines on
organized within the
International Travel (AnnexVII)] to another
parent Institution or at
Institution (within India or abroad) for the
duration of the seminar, conference or
another Institution but
workshop, travel time and the time permitted
withinstation
o

by
the
BoG
for
visits
to
Institutions/Organizations of interest and
relevance to the faculty in the vicinity of the
locationofseminar,workshoporconference
o Registration fee; and local travel expenses as
per applicable norms and rules when
participation is withinstation but at an
InstitutionotherthantheemployerInstitution

Organizing subject area training programmes,


pedagogical trainings, workshops, seminars,
conferencesandContinuingEducationProgramme
(CEP):

Hospitalitytoparticipants
Venueandlogisticarrangements
Replicationofprintedtrainingmaterials.
Publicationofproceedings
o Travel, boarding and lodging for invited experts
and honorarium for delivering/organizing expert
lectures,CEPsetc.
o
o
o
o

4(b)Staffdevelopmentfor
improvedcompetence
inskills

Training of senior nonteaching staff,


administrativeandfinanceofficers,etc.:
o Coursefee;travelexpenses;boarding,lodging,
and sundry expenses/allowances as per
applicable norms and rules when the staff is
deputed outstation to another Institution
withinIndia.
o Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an institution /
organizationotherthantheparentinstitution
Trainingoftechnicalsupportstaff:

(applicable for staff of engineering disciplines and


supportingdepartments)

o Course fee; travel expenses; boarding, lodging,

Anyotherpaymentto
thestaffforattending
thetraining
programme.

Anyotherpaymentto
thestaffforattending
thetraining
programme.

and sundry expenses/allowances as per


applicable norms and rules when the technical
support staff is deputed outstation to another
Institution/OrganizationwithinIndia.
42

90

CEPsaretobetargetedforworkingprofessionalsonly.Thedurationoftheprogrammemustbeatleast1week(5workingdays).The
participantspreferablyshouldhaverepresentationsfromindustries,facultyfromotherAICTErecognizedEngineeringinstitutionsand
fewfacultyofhostinstitution.TheCEPsbeconductedpreferablyincuttingedgetechnologies.

Section7

PermissibleandNonPermissibleExpenditure

o Course fee and local travel expenses as per


applicable norms and rules when training is
attended instation but at an Institution other
thantheparentInstitution

Training of administrative and general support


staffinfunctionalareas:
o Course fee; travel expenses; boarding, lodging,
and sundry expenses/allowances as per
applicable norms and rules when the technical
support staff is deputed outstation to another
Institution/OrganizationwithinIndia.
o Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an Institution other
thantheparentInstitution

Anyotherpaymentto
thestaffforattending
thetrainingprogramme

5.Enhancedinteractionwith
Industry

Travel cost, hospitality and honorarium to


industry personnel for participation in curriculum
development/revision/
restructuring,studentassessmentandInstitutional
bodies,andfordeliveringexpertlectures
ExpenditureforincreasingIIIthroughPSAG
Expenditure towards inviting industry (excluding
travel cost and lodging boarding) for campus
interviews and hospitality during campus
interviews
Tutoring by industry experts to prepare students
foronandoffcampusjobinterviews
Organizing short term training programme in
collaborationwithIndustry
Studentattendinginternshipinindustry

o Travel expenses, boarding, lodging and sundry


expenses/allowancesaspernormsapprovedby
BoG

6.InstitutionalManagement
CapacityEnhancement

ManagementdevelopmenttrainingofInstitutions
seniorofficialsandseniorfaculty:
o Coursefee;travelexpenses,boardingandlodging,
and sundry expenses /allowances as per
applicable norms and rules when deputed out
station to another Institution (within India or
abroad)forthedurationoftheCourse,traveltime
and the time permitted by the BoG for visits to
Institutions/Organizations of interest and
relevance to the faculty in the vicinity of the
locationoftraining
o Study Tours; travel expenses, boarding and
lodging,andsundryexpenses/allowancesasper
applicable norms and rules when deputed for
study tour within India or abroad [as per
GuidelinesonInternationalTravel(AnnexVII)]for
thedurationofthetourandtraveltime
o Trainers fee and overheads; and sundry
expenditure if training programmes organized
withintheparentInstitution

Anyotherpaymentto
theofficialsandsenior
facultyforattending
theCourse

7.Implementationof
InstitutionalAcademic
Reforms

Orientation of BoG Members: Travel costs,


boardingandlodgingexpenditureandsittingfeeto
Board Members; sundry expenses in organizing
OrientationProgramme

CurricularReforms:
o Travel cost, hospitality and honorarium paid to
industry personnel / academic expert for
participation in curriculum development/
revision/restructuringandcurricularreforms
o Sundry expenditure on holding meetings of the
concernedCommittees
o Organizingworkshopsonreforms

91

TEQIPII

Accreditation:
Any payment in cash of
o AccreditationfeestoNBA
kind or expenses related
Autonomy:
to the hosting of
o Assessment fees to UGC or University for
Accreditation Committee
obtainingAutonomousInstitutionStatusfrom
or any other assessment
theUGC
committee.
Honorarium to faculty and staff for taking bridge Cost
towards
the
Courses, remedial teaching classes and skill
boarding and lodging of
developmenttraining
students for attending
Honorarium, TA and DA to outside experts for
theFinishingSchool
specialized training in soft components including

communicationpresentationskills.
AspernormsdecidedbyBoG
Honorarium, TA and DA to outside experts for
specializedtraininginFinishingSchool
Consultancy services procured for technical
assistance
related
to
knowledge/skill
enhancement for weak students and establishing
aFinishingSchool

OrganizingBoGandotherCommitteeMeetings
(Travel expenses; boarding, lodging, and sundry
expenses/allowances for outstation nonofficial
membersasperapplicablenormsandrules,
Local travel expenses for instation nonofficial
membersasperapplicablenormsandrules,
Sittingfeetononofficialmembers)
TA&DAforfacultyandstaffattendingworkshops
and meetings organized by the NPIU and the
SPFUs
TA&DAforfacultyandstaffattendingtrainingin
the World Bank procedures as arranged by the
NPIUandtheSPFUs
Studenttrainingmaterialsandotherconsumables
Organising Industrial visits, attending workshops,
Technology exhibitions, publications in National /
InternationalconferencesheldinIndiaofstudents
UG and PG Registration Fees, Travelling,
boarding&lodgingandincidentalcharges
Occasional hiring of vehicles for project related
works

8.Supporttostudentsneed

9.IncrementalOperating
Cost

Maintenance of furniture and equipment Maintenance of buildings


includingcomputersandotherassets:
(thisshouldbecarriedout
o Maintenanceoffurniture
through Institutions own
o Maintenance of equipment including
budget)
computers and related devices through
AnnualMaintenanceContracts

Hiringtechnicalservicesfor:
o mentoring
o externalfinancialauditforTEQIPfunds
Salaries:
Salaries to contract
o Salaries of additional fulltime regular and
faculty
and
staff
contract faculty including adjunct faculty and
appointed
against
staff appointed against posts created under
existingvacancies
the project subject to due approval from the
SalariesofAdjunctfaculty
competentauthorityoftheinstitution/State
appointed
against
existing vacancies (These
are to be borne by the
Institution)

92

Section7

PermissibleandNonPermissibleExpenditure

Table18(a)

Permissible43andNonpermissibleExpenditures(Indicative)
forPrivateUnaidedInstitutionParticipatinginSubcomponent1.1:StrengtheningInstitutionstoImproveLearning
OutcomesandEmployabilityofGraduates

SuggestedActivity

1. Acquiringtextbooks,

ejournalsand
software44

(a) Participationin
QEEE
programme

PrivateUnaidedInstitutions
Permitted

2. ProvidingTeachingand
ResearchAssistantships
toincreaseenrolment
inexistingandnew

PG45programmesin
Engineering&applied
sciencedisciplines

3. Enhancementof
Researchand
Developmentand
Institutional
Consultancy
47 48
Activities ,

NotPermitted

Textbooks
ejournals
software
Hardwarecomponent(notexceedingRs.78Lakhs)
(i)
MirrorServer
(ii) DTHreceiverthroughtheSetTopBox
(iii) Class room with projector, speaker, laptop and
otherfacilities
(iv) Wifiaccesstostudents
(v) Accessbystudentsonsometablets/laptops.

Teaching Assistantships46 for Masters students in


Engineering & applied sciences disciplines that do not
receiveGATE/otherscholarships
Research Assistantships to Doctoral students in
Engineering & applied sciences disciplines that do not
receiveanyscholarshipsthroughNDF/otherschemes
Postdoctoralfellowshipsinengineeringdisciplines
Securing sponsored projects and consultancy Fiscal incentives for
assignments
increased
participation
in
Publicationofresearchpapersinrefereedjournals
research, sponsored
Commercializationofresearchproducts
projects
and
Patentingofresearchproducts
consultancy work
Travel cost, hospitality and honorarium paid to experts
(the incentives can,
for participation in Research & Development activities
however, be given
and for delivering expert lectures in the project
from Institutional
institutions
resources including
OrganizingconferencesonR&Dtopics/themes
IRG)
Expense on characterization of sample of R&D projects

undertakenbystudents/faculty
Presentation of paper in International Conference etc.
[as per Guidelines on International Travel (AnnexVII)] by
Doctoralstudents
o Registration fee; travel expenses; boarding,
lodging, and sundry expenses/allowances as per
normsapprovedbyBoG

DevelopingresearchinterestamongUGandMasters
students:
o Fiscal incentive (as per norms approved by the
BoG) to students that voluntarily associate with
IndustryorientedR&Dprojects
o Expenses on travel, boarding and lodging of
students that associate with an Industry for about
34 weeks during vacations to continue work on
R&Dprojects
o Consumables

Note:(1)

Procurementofconsultantservices,ifrequired,fortheactivitieslistedfromSr.No.28arepermitted.Theexpenditureon
procurementofconsultantservicesistobebookedagainsttheheadofexpenditureofthatparticularactivity.Theservices
ofconsultantsaretobeprocuredbyfollowingtheWorldBanknormsandproceduresthroughthePMSS.

43

ExpenditureispermissibleonlyfortheAICTEapprovedUG&PGteachingProgrammes,providedthatConsultancyServices(including
Pedagogical Training) are procured in accordance with the procurement methods and procedures given in the Procurement Manual
andarenotdeclaredineligibleexpenditurebytheexternalFinancialAuditors.
44
UpdatedasperMinutesofReviewMeetingheldon19June2013.
45
ThetermPGcoversbothMastersandDoctoralprogrammes
46
TheamountofTeachingandResearchAssistantshipswillbegovernedbythenormsasprescribedbytheUGC/AICTE.
47
UpdatedasperMinutesofReviewMeetingheldon19June2013.
48
st
th
st
UpdatedasperMinutesof1 JRMheldduring18 Feb1 March2013.

93

TEQIPII

4. (a)Faculty
developmentfor
improved
competencein
subjectarea
(applicableforfaculty
ofengineering
disciplines&
supporting
department)

Seedgrantforresearchtofacultymembersand/
or students to venture into innovative research
andtostrengthenresearchculture49
Appointment of retired teachers from
IITs/NITs/other reputed institutions as Senior
Research Advisor for enhancement of Research
50
&Developmentactivities
(i)Qualificationupgradation:
Iffacultyisenrolledforqualificationupgradation
either through fulltime or parttime or by
sandwich joint arrangement other than the
parentInstitution:
o Feeschargedforcoursework,registrationfee
etc.
o Useofresearchfacilities
o Consumables
o Expenses towards thesis printing and
publicationofthesisbasedresearchpapers
If faculty is registered for qualification
upgradation on fulltime or parttime basis
withintheparentInstitution:
o Consumables
o Expenses towards thesis printing and
publicationofthesisbasedresearchpapers

Salary, living expenses


and travel expenses of
faculty registered for
qualification upgradation
(onfullorparttimeorby
sandwich
joint
arrangement)
either
within
the
parent
Institution or through
deputation to another
Institution

Anyotherpaymenttothe
faculty for attending the
Course

49
50

(iv) EnhancingKnowledgeandResearch
Competence:
Subject upgradation and research competence :
Undertaking trainings in subject knowledge and
research competence upgradation by faculty as
plannedthroughTNA:
o Course fee; travel expenses, boarding and
lodging, and sundry expenses / allowances as
perapplicablenormsandruleswhenfacultyis
deputed outstation [as per Guidelines on
International Travel (AnnexVII)] to another
Institution (within India or abroad) for the
duration of the Course, travel time and the
time permitted by the BoG for visits to
Institutions/ Organizations of interest and
relevance to the faculty in the vicinity of the
locationoftraining.
Course fee and local travel expenses as per
applicable norms and rules when faculty
attendsaCourseinstationbutatanInstitution
otherthantheparentInstitution.

UpdatedasperMinutesofReviewMeetingheldon19June2013.
st
th
st
UpdatedasperMinutesof1 JRMheldduring18 Feb1 March2013.

94

Section7

PermissibleandNonPermissibleExpenditure

Participationby facultyinseminars,conferences,
workshops
and
Continuing
Education
51
Programmes(CEPs )etc.:

o Registration fee; travel expenses; boarding,


lodging, and sundry expenses/ allowances as
perapplicablenormsandruleswhenfacultyis
deputed outstation [as per Guidelines on
International Travel (AnnexVII)] to another
Institution (within India or abroad) for the
duration of the seminar, conference or
workshop, travel time and the time permitted
by the BoG for visits to Institutions/
Organizations of interest and relevance to the
facultyinthevicinityofthelocationofseminar,
workshoporconference

Anyotherpaymenttothe
faculty for attending
seminars,
workshops,
conferences, etc. if
organized within the
parent Institution or at
another Institution but
withinstation

o Registration fee; and local travel expenses as


per applicable norms and rules when
participation is withinstation but at an
InstitutionotherthantheemployerInstitution

Organizing subject area training programmes,


pedagogical trainings, workshops, seminars,
conferences
and
Continuing
Education
Programmes(CEPs):
o Hospitalitytoparticipants.
o Venueandlogisticarrangements.
o Replicationofprintedtrainingmaterials.
o Publicationofproceedings.
o Travel,boardingandlodgingforinvitedexperts
and honorarium for delivering/organizing
expertlectures,CEPs,etc.

4(b)Staffdevelopmentfor
improved
competenceinskills

Training of senior nonteaching staff,


administrativeandfinanceofficers,etc.
o Course fee; travel expenses; boarding,
lodging, and sundry expenses/allowances as
perapplicablenormsandruleswhenthestaff
is deputed outstation to another Institution
withinIndia.
o Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an institution /
organizationotherthantheparentinstitution
Trainingoftechnicalsupportstaff:

(applicableforstaffofengineeringdisciplinesand
supportingdepartments)

Anyotherpaymenttothe
staffforattendingthe
trainingprogramme.

Anyotherpaymenttothe
staffforattendingthe
trainingprogramme.

o Course fee; travel expenses; boarding, lodging,


and sundry expenses/allowances as per
applicable norms and rules when the technical
support staff is deputed outstation to another
Institution/OrganizationwithinIndia
Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an Institution other
thantheparentInstitution
o

Training of administrative and general support


staffinfunctionalareas:
o Course fee; travel expenses; boarding, lodging,
and sundry expenses/allowances as per
applicable norms and rules when the technical
support staff is deputed outstation to another
Institution/OrganizationwithinIndiaandtravel
time

Anyotherpaymenttothe
staffforattendingthe
trainingprogramme

51

CEParetobetargetedforworkingprofessionalsonly.Thedurationoftheprogrammemustbeatleast1week(5workingdays).The
participantspreferablyshouldhaverepresentationsfromindustries,facultyfromotherAICTErecognizedEngineeringinstitutionsand
fewfacultyofhostinstitution.TheCEPbeconductedpreferablyincuttingedgetechnologies.

95

TEQIPII

o Course fee and local travel expenses as per


applicable norms and rules when training is
attended instation but at an Institution other
thantheparentInstitution

5. Enhanced interaction
withIndustry

Travelcost,hospitalityandhonorariumtoindustry
personnel for participation in curriculum
development/revision/ restructuring, student
assessment and Institutional bodies, and for
deliveringexpertlectures
ExpenditureforincreasingIIIthroughPSAG.
Expenditure towards inviting industry (excluding
travel cost and lodging boarding) for campus
interviews and hospitality during campus
interviews.
Arranging tutoring by industry experts to prepare
studentsforonandoffcampusjobinterviews.
Organizing short term training programme in
collaborationwithIndustry
Studentattendinginternshipinindustry

o Travel expenses, boarding, lodging and sundry


expenses / allowances as per norms approved
byBoG

6.Institutional
ManagementCapacity
Enhancement

ManagementdevelopmenttrainingofInstitutions
seniorofficialsandSeniorfaculty:
o

course fee; travel expenses, boarding and


lodging,andsundryexpenses/allowancesas
perapplicablenormsandruleswhendeputed
outstation[asperGuidelinesonInternational
Travel (AnnexVII)] to another Institution
(withinIndiaorabroad)forthedurationofthe
Course,traveltimeandthetimepermittedby
theBoGforvisitstoInstitutions/Organizations
ofinterestandrelevancetothefacultyinthe
vicinityofthelocationoftraining.
study tours; travel expenses, boarding and
lodging, and sundry expenses/ allowances as
perapplicablenormsandruleswhendeputed
for study tour within India or abroad for the
durationofthetour.
trainers fee and overheads; and sundry
expenditure if training programmes organized
withintheparentInstitution.

Anyotherpaymenttothe
officialsandseniorfaculty
forattendingtheCourse

Orientation of BoG Members: Travel Costs,


boardingandlodgingexpenditureandsittingfeeto
Board Members; sundry expenses in organizing
OrientationProgramme.

7.Implementationof
InstitutionalAcademic
Reforms

CurricularReforms:
o Travel cost, hospitality and honorarium paid
to industry personnel / academic expert for
participation in curriculum development /
revision / restructuring and curricular
reforms;
o Sundry expenditure on holding meetings of
theconcernedcommittees.
o Organizingworkshopsonreforms

Accreditation:
Anypaymentincashofkind
o AccreditationfeetoNBA
or expenses related to the

Autonomy:
hosting of Accreditation
o
AssessmentfeepaidtoUGCorUniversityfor
Committee or any other
obtainingAutonomousInstitutionstatusfrom
assessmentcommittee.

8.Supporttostudentsneed

theUGC.

96

Honorariumtofacultyandstafffortakingbridge Cost towards the boarding


Courses, remedial teaching classes and skill
and lodging of students for
developmenttraining
attending the Finishing
Honorarium, TA and DA to outside experts for
School
specializedtraininginsoftcomponentsincluding

Section7

PermissibleandNonPermissibleExpenditure

communicationpresentationskills
AspernormsdecidedbytheBoG.

Honorarium, TA and DA to outside experts for


specializedtraininginFinishingSchool

Consultancy services for establishing a Finishing


School and providing technical assistance
relatedtoacademicsupportforweakstudents

9.IncrementalOperating
Cost

TA & DA for faculty and staff attending


workshopsandMeetingsorganizedbytheNPIU
andtheSPFUs
TA & DA for faculty and staff attending training
in the World Bank procedures as arranged by
theNPIUandtheSPFUs.
Student training materials and other
consumables

OrganisingIndustrialvisits,attendingworkshops,
Technologyexhibitions,publicationsinNational/
International conferences held in India of
students UG and PG Registration Fees,
Travellingandincidentalcharges

Hiringtechnicalservicesfor:
o Mentoring
o ExternalfinancialauditingforTEQIPfunds
Salaries:
Salaries to contract faculty
o Salaries of additional fulltime regular and
and staff appointed against
contractfacultyandstaffappointedagainst
existingvacancies.
posts created under the Project subject to Salaries of Adjunct faculty
dueapprovalofCompetentAuthorityofthe
appointed against existing
Institution/State
vacancies (These are to be
bornebytheInstitution).

97

TEQIPII

Table19

Permissible52andNonpermissibleExpenditures(Indicative)
forCentrallyFunded,GovernmentFunded&GovernmentAidedInstitutionsParticipatinginSubcomponent1.2:
ScalingupPostgraduateEducationandDemandDrivenResearch&DevelopmentandInnovation

SuggestedActivity*

1. Procurementofgoods
(equipment,furniture,
books&learning
resources,softwareand
minoritems)andcivil
worksforimprovementin
teaching,trainingand
learningfacilities

CentrallyFunded,GovernmentFundedandGovernmentAidedInstitutions
Permitted
NotPermitted
Equipmentandfurniture53for:
Equipment and furniture
o Establishing new PG laboratories for
for:
existingprogrammes.
o starting new UG
o Establishing laboratories for starting new
programmes,and
PGprogrammesinengineeringdisciplines
o improving
hostel
o Faculty research and Institutional
facilities other than
consultancywork.
electronic
o Campuswide networking of academic and
networking.
administrativebuildings,hostelsandfaculty Purchaseofvehicles
residencesandenhancinginternetfacilities.
o Coursespecificsoftware
o Procurementofequipmentslikecomputer,
printeretc.forInstitutionalTEQIPUnit
o ICT enable learning and related software
andhardware
o Languagelaboratory

Modernizationandstrengtheningoflibraries:
o Procurement of learning resources (print /
digitalbooksandjournals)
o Digitizationoflibrarybooks
o EstablishmentofCDbank
o MembershipofINDESTAICTEetc
Civilworks54uptoabout3%ofprojectallocation
fortheinstitutionfor:
o Refurbishment of existing structures/
spaces to create new laboratories for PG
programmesandresearch
o Reducing environment degradation and
complying with EMF (see Civil Works
Manual)

2. ProvidingTeachingand
ResearchAssistantships
forsignificantlyincreasing
enrolmentinexistingand
NewMastersandDoctoral
programmesin
engineering&applied
sciencesdisciplines

*Note:(1)

Civilworksundertakenfor
betterment of academic
buildings such as UG
classrooms; UG existing
laboratories, workshops,
computer centre and
library; constructing new
spaces and betterment of
hostels.

TeachingAssistantships55forMastersstudents
in Engineering & applied sciences discipline
thatdonotreceiveGATE/otherscholarships
ResearchAssistantshipstoDoctoralstudentsin
Engineering&appliedsciencesdisciplinesthat
donotreceiveanyscholarshipsthroughNDF/
otherschemes
Post doctoral fellowships in engineering
disciplines.

The approving authority for these activities is BoG / Competent Authority of the institutions except few cases of
procurement (including services) where World Banks No objection required. In addition, institution may also conduct
other activities (not listed here) under the scope of the project and those fulfil the objectives of the project with the
approvalofBoG/CompetentAuthorityoftheinstitution.

(2) Procurementofconsultantservices,ifrequired,fortheactivitieslistedfromSr.No.28arepermitted.Theexpenditureon
procurementofconsultantservicesistobebookedagainsttheheadofexpenditureofthatparticularactivity.Theservices
ofconsultantsaretobeprocuredbyfollowingtheWorldBanknormsandproceduresthroughthePMSS.

52

ExpenditureispermissibleonlyfortheAICTE/UGCapprovedUGandPGteachingprogrammes,providedthatGoods,CivilWorksand
ConsultancyServicesareprocuredinaccordancewiththeprocurementmethodsandproceduresgivenintheProcurementManual
andarenotdeclaredineligibleexpenditurebytheexternalFinancialAuditors.
53
Expenditure for procurement of any equipment and furniture will not be admissible if procured with cofinancing from any other
source.
54
ExpenditureforanyCivilWorkactivitywillnotbeadmissibleifundertakenwithcofinancingfromanyothersource.
55
The amount of Teaching and Research Assistantships will be governed by the norms as prescribed by the UGC/AICTE or BoG of the
institution.

98

Section7

3.

Enhancementof
Researchand
Developmentand
InstitutionalConsultancy
Activities

PermissibleandNonPermissibleExpenditure

Securing sponsored projects and consultancy Fiscal incentives for


assignments.
Publication of research papers in refereed
journals.
Commercializationofresearchproducts.
Patentingofresearchproducts.
Travelcost,hospitalityandhonorariumpaidto
expert for participation in Research &
Development activities and for delivering
expertlecturesintheprojectinstitutions.
OrganizingconferencesonR&Dtopics/themes
ExpenseoncharacterizationofsampleofR&D
projectsundertakenbystudents/faculty
Presentation of paper in International
Conferenceetc.byDoctoralstudents
o

increased participation in
research,
sponsored
projects and consultancy
work (the incentives can,
however, be given from
Institutional
resources
includingIRG).

Registration fee; travel expenses; boarding,


lodging,andsundryexpenses/allowancesas
pernormsapprovedbyBoG

DevelopingresearchinterestamongUGand
Mastersstudents:
o

Fiscal incentive (as per norms approved by


the BoG) to students that voluntarily
associate with Industry oriented R&D
projects
Expensesontravel,boardingandlodgingof
students that associate with an Industry for
about 34 weeks during vacations to
continueworkonR&Dprojects
Consumables

Resource sharing
arrangements:

through

collaborative

Travel expenses; boarding, lodging, and


sundry expenses/allowances for faculty
visiting Institutions and Industries within
India to develop and implement joint
projectswithwelldefineddeliverables

Anyotherpaymenttothe
faculty for visits to
Institutions and industries
forjointprojects.

Seed grant for research to faculty members


and / or students to venture into innovative
56
researchandtostrengthenresearchculture
Appointment of retired teachers from
IITs/NITs/other reputed institutions as Senior
ResearchAdvisorforenhancementofResearch
57
&Developmentactivities
4.(a)Facultydevelopment
(i)Qualificationupgradation:

forimproved
If faculty is enrolled for qualification
competenceonsubject
upgradation either through fulltime or part
area
time or by sandwich joint arrangement other
(applicable for faculty of
thantheparentInstitution:
engineering & supporting
o Fees charged for course work, registration
departments)
feeetc.

o Useofresearchfacilities

o Consumables

o Expenses towards thesis printing and

publicationofthesisbasedresearchpapers

If faculty is registered for qualification


upgradation on fulltime or parttime basis
withintheparentInstitution:
o Consumables
o Expenses towards thesis printing and
publicationofthesisbasedresearchpapers

Salary, living expenses


and travel expenses of
faculty registered for
qualification upgradation
(onfullorparttimeorby
sandwich
joint
arrangement)
either
within
the
parent
Institution or through
deputation to another
Institution

56
57

UpdatedasperMinutesofReviewMeetingheldon19June2013.
st
th
st
UpdatedasperMinutesof1 JRMheldduring18 Feb1 March2013.

99

TEQIPII

(ii)Enhancingknowledgeandresearch

competence:
Subject
upgradation
and
research
competence:Undertakingtrainingsinsubject
knowledge and research competence
upgradation by faculty as planned through
TNA:

Anyotherpaymenttothe
faculty for attending the
Course

Course fee; travel expenses, boarding and


lodging,andsundryexpenses/allowancesas
perapplicablenormsandruleswhenfaculty
isdeputedoutstation[asperGuidelineson
International Travel (AnnexVII)] to another
Institution (within India or abroad) for the
duration of the Course, travel time and the
time permitted by the BoG for visits to
Institutions/Organizations of interest and
relevancetothefacultyinthevicinityofthe
locationoftraining.
Course fee and local travel expenses as per
applicable norms and rules when faculty
attends a Course instation but at an
InstitutionotherthantheparentInstitution.

Participation by faculty in seminars,


conferences, workshops and Continuing
58
EducationProgrammes(CEPs) etc.:

Registration fee; travel expenses; boarding,


lodging,andsundryexpenses/allowancesas
perapplicablenormsandruleswhenfaculty
is deputed outstation [as per Guidelines on
International Travel (AnnexVII)] to another
Institution (within India or abroad) for the
duration of the seminar, conference or
workshop, travel time and the time
permitted by the BoG for visits to
Institutions/ Organizations of interest and
relevancetothefacultyinthevicinityofthe
locationofseminar,workshoporconference
Registrationfee;andlocaltravelexpensesas
per applicable norms and rules when
participation is in station but at an
Institution other than the employer
Institution

Anyotherpaymenttothe
faculty for attending
seminars,
workshops,
conferences,
etc.
if
organized within the
parent Institution or at
another Institution but
withinstation

Organizing subject area training programmes,


pedagogical trainings, workshops, seminars,
conferences and Continuing Education
Programmes(CEPs):
o Hospitalitytoparticipants
o Venueandlogisticarrangements
o Replicationofprintedtrainingmaterials
o Publicationofproceedings
o Travel, boarding and lodging for invited
experts
and
honorarium
for
delivering/organizing expert lectures,
CEPsetc.

Training of senior nonteaching staff,


administrativeandfinanceofficers,etc.:
o Course fee; travel expenses; boarding,
lodging, and sundry expenses/allowances
asperapplicablenormsandruleswhenthe
staff is deputed outstation to another
InstitutionwithinIndia

Anyotherpaymenttothe
staffforattendingthe
trainingprogramme.

4(b)Staffdevelopmentfor
improvedcompetence
inskills

58

CEPsaretobetargetedforworkingprofessionalsonly.Thedurationoftheprogrammemustbeatleast1week(5workingdays).The
participantspreferablyshouldhaverepresentationsfromindustries,facultyfromotherAICTErecognizedEngineeringinstitutionsand
fewfacultyofhostinstitution.TheCEPbeconductedpreferablyincuttingedgetechnologies.

100

Section7

PermissibleandNonPermissibleExpenditure

o Course fee and local travel expenses as per


applicable norms and rules when training is
attended instation but at an institution /
organizationotherthantheparentinstitution

Trainingoftechnicalsupportstaff:

(applicable for staff of engineering disciplines


andsupportingdepartments)

Anyotherpaymenttothe
staffforattendingthe
trainingprogramme.

Course fee; travel expenses; boarding,


lodging,andsundryexpenses/allowancesas
per applicable norms and rules when the
technicalsupportstaffisdeputedoutstation
to another Institution/ Organization within
India
{ Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an Institution
otherthantheparentInstitution
o

Training of administrative and general support


staffinfunctionalareas:
o Course fee; travel expenses; boarding,
lodging, and sundry expenses/allowances as
per applicable norms and rules when the
technical support staff is deputed outstation
toanotherInstitution/Organization
o Course fee and local travel expenses as per
applicable norms and rules when training is
attendedinstationbutatanInstitutionother
thantheparentInstitution

Anyotherpaymenttothe
staffforattendingthe
trainingprogramme

5. Enhanced interaction with


Industry

Travel cost, hospitality and honorarium to


industry personnel for participation in
curriculum development / revision /
restructuring, student assessment and
Institutional bodies, and for delivering expert
lectures
ExpenditureforincreasingIIIthroughPSAG.
Expenditure towards inviting industry
(excludingtravelcostandlodgingboarding)for
campus interviews and hospitality during
campusinterviews.
Arranging tutoring by industry experts to
prepare students for on and offcampus job
interviews.
Organizing short term training programme in
collaborationwithIndustry
Studentattendinginternshipinindustry
o Travelexpenses,boarding,lodgingandsundry

expenses/allowancesaspernormsapproved
byBoG

6. Institutional

Management Capacity
Enhancement

Management development training of


Institutionsseniorofficialsandseniorfaculty:
o

Course fee; travel expenses, boarding and


lodging,andsundryexpenses/allowancesas
per applicable norms and rules when
deputed outstation [as per Guidelines on
International Travel (AnnexVII)] to another
Institution (within India or abroad) for the
duration of the Course, travel time and the
time permitted by the BoG for visits to
Institutions/Organizations of interest and
relevancetothefacultyinthevicinityofthe
locationoftraining.
Study Tours; travel expenses, boarding and
lodging, and sundry expenses / allowances
as per applicable norms and rules when
deputed for study tour within India or
abroad [as per Guidelines on International
Travel(AnnexVII)].

Anyotherpaymenttothe
officialsandseniorfaculty
forattendingtheCourse

101

TEQIPII

Trainers fee and overheads; and sundry


expenditure if training programmes
organizedwithintheparentInstitution.

Orientation of BoG Members: Travel costs,


boarding and lodging expenditure and sitting
fee to Board Members; sundry expenses in
organizingorientationprogramme.
7. Implementationof
InstitutionalAcademic
Reforms

CurricularReforms:
o

8. Supporttostudents
need

9.IncrementalOperatingCost

o
Accreditation:
o AccreditationfeetoNBA

Honorarium to faculty and staff for taking


bridge Courses, remedial teaching classes and
skilldevelopmenttraining
Honorarium,TAandDAtooutsideexpertsfor
specialized training in soft components
includingcommunicationpresentationskills.
AspernormsdecidedbyBoG
Honorarium,TAandDAtooutsideexpertsfor
specializedtraininginFinishingSchool
Consultancy services procurement for
technicalassistancerelatedtoknowledge/skill
enhancementforweakstudents
ConsultantservicesforestablishingaFinishing
School
Organizing BoG and other Committee
Meetings.
(Travel expenses; boarding, lodging, and
sundry expenses/allowances for outstation
nonofficial members as per applicable norms
andrules,
Localtravelexpensesforinstationnonofficial
membersasperapplicablenormsandrules,
Sittingfeetononofficialmembers)
TA & DA for faculty and staff attending
workshops and Meetings organized by the
NPIUandtheSPFUs.
TA&DAforfacultyandstaffattendingtraining
in the World Bank procedures as arranged by
theNPIUandtheSPFUs.
Student training materials and other
consumables
Organising Industrial visits, attending
workshops,
Technology
exhibitions,
publications in National / International
conferences held in India of students UG and
PG Registration Fees, Travelling, boarding &
lodgingandincidentalcharges
Occasional hiring of vehicles for project
relatedworks.

102

Travelcost,hospitalityandhonorariumpaid
to industry personnel / academicexpert for
participation in curriculum development/
revision / restructuring and curricular
reforms.
Sundry expenditure on holding meetings of
theconcernedCommittees.
Organizingworkshopsonreforms

Any payment in cash of


kind or expenses related
to the hosting of
Accreditation Committee
or any other assessment
committee.
Costtowardstheboarding
and lodging of students
forattendingtheFinishing
School.

Section7

PermissibleandNonPermissibleExpenditure

Maintenance of furniture and equipment Maintenance of buildings


includingcomputersandotherassets:
o Maintenanceoffurniture
o Maintenance of equipment including
computers and related devices through
AnnualMaintenanceContract
Hiringtechnicalservicesfor:
o Mentoring
o ExternalfinancialauditingforTEQIPfunds

Salaries:

o Salariesofadditionalfulltimeregularand
contract faculty and staff appointed
against posts created under the Project,
subject to due approval of competent
authorityoftheinstitution/state

(thisshouldbecarriedout
through Institutions own
budget)

Salariestocontractfaculty
and staff appointed
againstexistingvacancies
SalariesofAdjunctfaculty
appointedagainstexisting
vacancies(Thesearetobe
bornebytheInstitution)

103

TEQIPII

Table19(a)

Permissible59andNonpermissibleExpenditures(Indicative)
forPrivateUnaidedInstitutionsParticipatinginSubcomponent1.2:ScalingupPostgraduateEducationandDemand
DrivenResearch&DevelopmentandInnovation

SuggestedActivity

1.Acquiringtextbooks,e

journalsandsoftware60

(a)ParticipationinQEEE
programme

2.ProvidingTeachingand
ResearchAssistantshipsfor
significantlyincreasing
enrolmentinexistingand
NewMastersandDoctoral
programmesinengineering
&appliedscience
disciplines
3.EnhancementofResearch
andDevelopmentand
InstitutionalConsultancy
Activities

PrivateUnaidedInstitutions
Permitted

NotPermitted

Textbooks
ejournals
software
Hardwarecomponent(notexceedingRs.78Lakhs)
(a) MirrorServer
(b) DTHreceiverthroughtheSetTopBox
(c) Classroom with projector, speaker, laptop and
otherfacilities
(d) Wifiaccesstostudents
(e)Accessbystudentsonsometablets/laptops.
Teaching Assistantships61 for Masters students in
Engineering & applied science discipline that do not
receiveGATE/otherscholarships
Research Assistantships to Doctoral students in
Engineering & applied sciences disciplines that do not
receiveanyscholarshipsthroughNDF/otherschemes
Postdoctoralfellowshipsinengineeringdisciplines

Securing sponsored projects and consultancy


assignments.
Publicationofresearchpapersinrefereedjournals.
Commercializationofresearchproducts.
Patentingofresearchproducts.
Travelcost,hospitalityandhonorariumpaidtoexpertfor
participation in Research & Development activities and
fordeliveringexpertlecturesintheprojectinstitutions.
OrganizingconferencesonR&Dtopics/themes
Expense on characterization of sample of R&D projects
undertakenbystudents/faculty
Presentation of paper in International Seminar,
Conferenceetc.byDoctoralstudents

Registration fee; travel expenses; boarding, lodging,


and sundry expenses/allowances as per norms
approvedbyBoG

Fiscal incentives
for increased
participation in
research,
sponsored
projects
and
consultancy
work
(the
incentives can,
however,
be
given
from
Institutional
resources
includingIRG).

DevelopingresearchinterestamongUGstudents:
o

Fiscalincentive(aspernormsapprovedbytheBoG)to
students that voluntarily associate with Industry
orientedR&Dprojects
Expenses on travel, boarding andlodging of students
that associate with an Industry for about 34 weeks
duringvacationstocontinueworkonR&Dprojects
Consumables

Boarding and
lodging
and
sundryexpenses
for
spending
timeinIndustry.

Note: (1) Procurementofconsultantservices,ifrequired,fortheactivitieslistedfromSr.No.28arepermitted.Theexpenditureon


procurementofconsultantservicesistobebookedagainsttheheadofexpenditureofthatparticularactivity.Theservices
ofconsultantsaretobeprocuredbyfollowingtheWorldBanknormsandproceduresthroughthePMSS.

59

Expenditure is permissible only for the AICTE approved PG teaching programmes, provided that Consultancy Services (including
PedagogicalTraining)areprocuredinaccordancewiththeprocurementmethodsandproceduresgivenintheProcurementManual
andarenotdeclaredineligibleexpenditurebytheexternalFinancialAuditors.
60
UpdatedasperMinutesofReviewMeetingheldon19June2013.
61
TheamountofTeachingandResearchAssistantshipswillbegovernedbythenormsasprescribedbytheUGC/AICTE

104

Section7

PermissibleandNonPermissibleExpenditure

through collaborative Any other payment to

Resource sharing
arrangements:
o Travel expenses; boarding, lodging, and
sundry expenses/allowances for faculty
visiting Institutions and Industries within
India to develop and implement joint
projectswithwelldefineddeliverables

the faculty for visits to


Institutions
and
industries for joint
projects.

Seedgrantforresearchtofacultymembersand/
or students to venture into innovative research
62
andtostrengthenresearchculture

Appointment of
retired teachers from
IITs/NITs/other reputed institutions as Senior
ResearchAdvisorforenhancementofResearch&
63
Developmentactivities
4.(a)Facultydevelopment
(i)Qualificationupgradation:

forimproved
Iffacultyisenrolledforqualificationupgradation
competenceonsubject
either through fulltime or parttime or by
area
sandwich joint arrangement other than the
(applicable for faculty of
parentInstitution:
engineering & supporting
o Fees charged for course work, registration fee
departments)
etc.

o Useofresearchfacilities
o Consumables

o Expensestowardsthesisprintingandpublication

ofthesisbasedresearchpapers

If faculty is registered for qualification


upgradation on fulltime or parttime basis
withintheparentInstitution:

Salary, living expenses


and travel expenses of
faculty registered for
qualification
upgradation (on full or
part time or by
sandwich
joint
arrangement)
either
within the parent
Institution or through
deputation to another
Institution

o Consumables
o Expensestowardsthesisprintingandpublication
ofthesisbasedresearchpapers

(ii)Enhancingknowledgeandresearchcompetence:

Subjectupgradationandresearchcompetence:
Undertaking trainings in subject knowledge and
research competence upgradation by faculty as
plannedthroughTNA:
o

Any other payment to


the
faculty
for
attendingtheCourse

Course fee; travel expenses, boarding and


lodging, and sundry expenses/allowances as
perapplicablenormsandruleswhenfacultyis
deputed outstation [as per Guidelines on
International Travel (AnnexVII)] to another
Institution (within India or abroad) for the
duration of the Course, travel time and the
time permitted by the BoG for visits to
Institutions/Organizations of interest and
relevance to the faculty in the vicinity of the
locationoftraining.
Course fee and local travel expenses as per
applicable norms and rules when faculty
attends a Course instation but at an
InstitutionotherthantheparentInstitution.

62
63

UpdatedasperMinutesofReviewMeetingheldon19June2013.
st
th
st
UpdatedasperMinutesof1 JRMheldduring18 Feb1 March2013.

105

TEQIPII

Participationbyfacultyinseminars,conferences,
workshops
and
Continuing
Education
Programmes(CEPs)64etc.:
o Registration fee; travel expenses; boarding,
lodging, and sundry expenses/allowances as
perapplicablenormsandruleswhenfacultyis
deputed outstation to another Institution
(withinIndiaorabroad)[asperGuidelineson
International Travel (AnnexVII) for the
duration of the seminar, conference or
workshop,traveltimeandthetimepermitted
by
the
BoG
for
visits
to
Institutions/Organizations of interest and
relevance to the faculty in the vicinity of the
locationofseminar,workshoporconference
o Registration fee; and local travel expenses as
per applicable norms and rules when
participation is withinstation but at an
InstitutionotherthantheemployerInstitution

Any other payment to


the
faculty
for
attending
seminars,
workshops,
conferences, etc. if
organized within the
parent Institution or at
another Institution but
withinstation

Organizing subject area training programmes,


pedagogical trainings, workshops, seminars,
conferences
and
Continuing
Education
Programmes(CEPs):

o
o
o
o
o

Hospitalitytoparticipants
Venueandlogisticarrangements
Replicationofprintedtrainingmaterials
Publicationofproceedings
Travel, boarding and lodging for invited experts
andhonorariumfordelivering/organizingexpert
lectures,CEPsetc.

4(b)Staffdevelopmentfor
improvedcompetence
inskills

Training of senior nonteaching


administrativeandfinanceofficers,etc.:

staff,

o Course fee; travel expenses; boarding, lodging,


and sundry expenses/allowances as per
applicable norms and rules when the staff is
deputedoutstationtoanotherInstitutionwithin
India
o Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an institution /
organizationotherthantheparentinstitution

Trainingoftechnicalsupportstaff:

(applicableforstaffofengineeringdisciplinesand
supportingdepartments)
o Course fee; travel expenses; boarding, lodging,
and sundry expenses/allowances as per
applicable norms and rules when the technical
support staff is deputed outstation to another
Institution/OrganizationwithinIndia
o Course fee and local travel expenses as per
applicable norms and rules when training is
attended instation but at an Institution other
thantheparentInstitution

Training of administrative and general support


staffinfunctionalareas:
o Course fee; travel expenses; boarding, lodging,
and sundry expenses/allowances as per
applicable norms and rules when the technical
support staff is deputed outstation to another
Institution/OrganizationwithinIndia

64

Anyotherpaymentto
thestaffforattending
thetraining
programme.

Anyotherpaymentto
thestaffforattending
thetraining
programme.

Anyotherpaymentto
thestaffforattending
thetrainingprogramme

CEPsaretobetargetedforworkingprofessionalsonly.Thedurationoftheprogrammemustbeatleast1week(5workingdays).The
participantspreferablyshouldhaverepresentationsfromindustries,facultyfromotherAICTErecognizedEngineeringinstitutionsand
fewfacultyofhostinstitution.TheCEPbeconductedpreferablyincuttingedgetechnologies.

106

Section7

PermissibleandNonPermissibleExpenditure

o Course fee and local travel expenses as per


applicable norms and rules when training is
attended instation but at an Institution other
thantheparentInstitution

5. Enhanced interaction with


Industry

Travel cost, hospitality and honorarium to


industrypersonnelforparticipationincurriculum
development / revision / restructuring, student
assessment and Institutional bodies, and for
deliveringexpertlectures
ExpenditureforincreasingIIIthroughPSAG.

Expenditure towards inviting industry (excluding


travel cost and lodging boarding) for campus
interviews and hospitality during campus
interviews.
Arrangingtutoringbyindustryexpertstoprepare
studentsforonandoffcampusjobinterviews.

Organizing short term training programme in


collaborationwithIndustry
Studentattendinginternshipinindustry

o Travel expenses, boarding, lodging and sundry


expenses/allowancesaspernormsapprovedby
BoG

6. Institutional Management
CapacityEnhancement

Management
development
training
of
Institutionsseniorofficialsandseniorfaculty:
o

Course fee; travel expenses, boarding and


lodging, and sundry expenses/allowances as
per applicable norms and rules when deputed
outstation [as per Guidelines on
International Travel (AnnexVII) to another
Institution (within India or abroad) for the
duration of the Course, travel time and the
time permitted by the BoG for visits to
Institutions/Organizations of interest and
relevance to the faculty in the vicinity of the
locationoftraining.
Study Tours; travel expenses, boarding and
lodging, and sundry expenses / allowances as
per applicable norms and rules when deputed
for study tour within India or abroad for the
durationofthetour
Trainers fee and overheads; and sundry
expenditure if training programmes organized
withintheparentInstitution.

Any other payment to


the officials and senior
faculty for attending
theCourse

Orientation of BoG Members: Travel costs,


boarding and lodging expenditure and sitting fee
toBoardMembers;sundryexpensesinorganizing
orientationprogramme.

7.Implementationof
InstitutionalAcademic
Reforms

CurricularReforms:
o Travelcost,hospitalityandhonorariumpaid
to industry personnel / academic expert for
participation in curriculum development/
revision / restructuring and curricular
reforms.
o Sundry expenditure on holding meetings of
theconcernedCommittees.
o Organizingworkshopsonreforms

Accreditation:

o AccreditationfeestoNBA

Anypaymentincashof
kind or expenses
related to the hosting
of
Accreditation
Committeeoranyother
assessmentcommittee.

107

TEQIPII

8.Supporttostudentsneed

Honorariumtofacultyandstafffortakingbridge
Courses, remedial teaching classes and skill
developmenttraining
Honorarium, TA and DA to outside experts for
specialized training in soft components including
communicationpresentationskills.
AspernormsdecidedbyBoG
Honorarium, TA and DA to outside experts for
specializedtraininginFinishingSchool.
Consultancy services procurement for technical
assistance
related
to
knowledge/skill
enhancementforweakstudents
Consultant services for establishing a Finishing
School

Cost towards the


boardingandlodgingof
students for attending
theFinishingSchool.

TA & DA for faculty and staff attending


workshops and Meetings organized by the NPIU
andtheSPFUs.
TA&DAforfacultyandstaffattendingtrainingin
the World Bank procedures as arranged by the
NPIUandtheSPFUs.
Student training materials and other
consumables
OrganisingIndustrialvisits,attendingworkshops,
Technologyexhibitions,publicationsinNational/
International conferences held in India of
students UG and PG Registration Fees,
Travelling boarding & lodging and incidental
charges

9.IncrementalOperatingCost

Hiringtechnicalservicesfor:
o Mentoring
o ExternalfinancialauditingforTEQIPfunds

Salaries:

o Salaries of additional fulltime regular and


contract faculty and staff appointed against
posts created under the Project subject to
due approval of competent authority of the
institution/state

108

Salaries to contract
faculty
and
staff
appointed
against
existingvacancies
Salaries of Adjunct
faculty
appointed
against
existing
vacancies (These are to
be borne by the
Institution)

Section7

PermissibleandNonPermissibleExpenditure

Table19(b)

Permissible65andNonpermissibleExpenditures(Indicative)
66
forCentreofExcellenceatCentrallyFunded,GovernmentfundedandGovernmentaidedInstitutions Participatingin
Subcomponent1.2.1:EstablishingCentresofExcellence

SuggestedActivity*

1. Procurementofgoods

67

(equipment,furniture ,
booksandlearning
resources,softwareand
minoritems)andcivil
worksforimprovementin
researchanddevelopment
facilities

CentrallyFunded,GovernmentFundedandAidedInstitutions
Permitted
NotPermitted
New equipment and furniture for laboratories Equipment and furniture
forthematicresearch
for:
o starting new UG and

PGprogrammes,and
improvinghostel
facilities

Purchaseofvehicles

Establishmentofaknowledgeresourcecentre
(library):

o
o
o

Print and digitized Books, ejournals and


referencematerial
Electronic equipment for storage and
disseminationthroughweb
Procurementoffurniture

Civil works undertaken


for
betterment
of
academic buildings such
as classrooms; existing
laboratories, workshops,
computer centres and
libraries; constructing
new
spaces
and
bettermentofhostels

Travel expenses; boarding, lodging, and sundry


expenses/allowances for faculty visiting
Industries within India and abroad to develop
and implement joint projects with well defined
deliverables
Commercializationofresearchproducts.
Patentingofresearchproducts

Any other payment to


the faculty for visits to
industries for joint
projects

Civilworksfor:

o
o

2.ProvidingTeachingand
68
ResearchAssistantships
forenrolmentinMasters
andDoctoralprogrammes
intopicslinkedto
economicorsocietal
needsinthethematic
areas

3.CollaborationwithIndustry
forapplicableresearch
andproductdevelopment

refurbishmentofexistingstructures/spaces
to create new laboratories for thematic
research
reducing environment degradation and
complying with EMF (see Civil Works
Manual)

TeachingAssistantshipsforMastersstudentsin
Engineering & applied sciences discipline that
donotreceiveGATE/otherscholarships
ResearchAssistantshipstoDoctoralstudentsin
Engineering&appliedsciencesdisciplinesthat
donotreceiveanyscholarshipsthroughNDF/
otherschemes
Post doctoral fellowships in engineering
disciplines

*Note:(1) TheapprovingauthorityfortheseactivitiesisBoG/CompetentAuthorityoftheinstitutionsexceptfewcasesofprocurement
(includingservices)whereWorldBanksNoObjectionrequired.Inaddition,institutionmayalsoconductotheractivities(not
listedhere)underthescopeoftheprojectandthosefulfiltheobjectivesoftheprojectwiththeapprovalofBoG/Competent
Authorityoftheinstitution.

(2) Procurement of consultant services, if required, for the activities listed from Sr. No. 25 are permitted. Hiring technical
services for : Mentoring / guidance for CoE activities, Legal advice and research on market potential of R&D outputs and
ExternalfinancialauditforTEQIPadditionalfundsforCoE.Theexpenditureonprocurementofconsultantservicesistobe
bookedagainsttheheadofexpenditureofthatparticularactivity.Theservicesofconsultantaretobeprocuredbyfollowing
theWorldBanknormsandproceduresthroughthePMSS.

65

ExpenditureispermissibleonlyfortheAICTE/UGCapprovedUGandPGteachingProgrammes,providedthatGoods,CivilWorksand
ConsultancyServicesareprocuredinaccordancewiththeprocurementmethodsandproceduresgivenintheProcurementManualand
arenotdeclaredineligibleexpenditurebytheexternalFinancialAuditors.
66
ThetermAidedInstitutionalsoincludesinstitutionsestablishedandoperatedunderPublicPrivatePartnershipmode.
67
Expenditure for procurement of any equipment and furniture will not be admissible if procured with cofinancing from any other
source.
68
The amount of Teaching and Research Assistantships will be governed by the norms as prescribed by the UGC/AICTE or BoG of the
institution.

109

TEQIPII

4.National/International
collaborationforResearch
andDevelopment
activitieswithAcademic
InstitutionsandR&D
organizations

Securing sponsored projects and consultancy


assignments
Publication of research papers in peer reviewed
journals
Commercializationofresearchproducts
Patentingofresearchproducts
Travel cost, hospitality and honorarium paid to
consultant for participation in Research &
Developmentandfordeliveringexpertlectures
Travel expenses; boarding, lodging, and sundry
expenses/allowancesforfacultyvisitingInstitutions

within India and abroad to develop and implement


jointprojectswithwelldefineddeliverables

Expense on characterization of sample of R&D


projectsundertakenbystudents/faculty
Presentation of paper in International Conference
etc.byDoctoralstudents
o

5.Enhancingresearch
competenceoffacultyand
knowledgesharingin
thematicareas

Registration fee; travel expenses; boarding,


lodging, and sundry expenses/allowances as per
normsapprovedbyBoG

Faculty training for enhancement of Research


competenceinthematicareas:

Course fee; travel expenses, boarding and lodging,


andsundryexpenses/allowancesasperapplicable
normsandruleswhenfacultyisdeputedoutstation
to another Institution within India and abroad for
thedurationoftheCourse,traveltimeandthetime
permitted by the BoG for visits to
Institutions/Organizationsofinterestandrelevance
to the faculty in the vicinity of the location of
training

Course fee and local travel expenses as per


applicable norms and rules when faculty attends a
course instation but at an Institution other than
theparentInstitution
Participation by faculty in seminars, conferences,
workshops and Continuing Education Programmes
69
(CEPs) etc.:

o Registration fee; travel expenses; boarding,


lodging, and sundry expenses /allowances as per
applicablenormsandruleswhenfacultyisdeputed
outstationtoanotherInstitutionforthedurationof
the seminar, conference or workshop, travel time
and the time permitted by the BoG for visits to
Institutions/ Organizations of interest and
relevance to the faculty in the vicinity of the
locationofseminar,workshoporconference
o Registration fee; and local travel expenses as per
applicable norms and rules when participation is
withinstation but at an Institution other than the
employerInstitution

Fiscal incentives for


increased
participation
in
research,sponsored
projects
and
consultancy work
(the incentives can,
however, be given
from Institutional
resources including
IRG)
Any other payment
to the faculty for
visits to Institutions
forjointprojects

Organizing thematic area training programmes,


workshops, seminars, conferences and Continuing
EducationProgrammes(CEPs):

Any other payment


to the faculty for
attending
the
Course

Any other payment


to the faculty for
attending seminars,
workshops,
conferences, etc. if
organized
within
the
parent
Institution or at
another Institution
butwithinstation

TA&DA
participants

to

Hospitalitytoparticipants
Venueandlogisticarrangements
Replicationofprintedtrainingmaterials
Publicationofproceedings
o Travel, boarding & lodging for invited Experts and
alsohonorariumfordeliveringexpertlectures,CEPs
etc.

o
o
o
o

69

CEParetobetargetedforworkingprofessionalsonly.Thedurationoftheprogrammemustbeatleast1week(5workingdays).The
participantspreferablyshouldhaverepresentationsfromindustries,facultyfromotherAICTErecognizedEngineeringinstitutionsand
fewfacultyofhostinstitution.TheCEPbeconductedpreferablyincuttingedgetechnologies.

110

Section7

PermissibleandNonPermissibleExpenditure

Training of technical support staff for skill


improvementwithinIndia:
o Coursefee;travelexpenses;boarding,lodging,and
sundry expenses / allowances as per applicable
normsandruleswhenthetechnicalsupportstaffis
deputed outstation to another Institution /
OrganizationwithinIndia
Course fee and local travel expenses as per
applicable norms and rules when training is
attendedinstationbutatanInstitutionotherthan
theparentInstitution
o

6.IncrementalOperatingCost

Seed grant to researchers to venture into new


70
directionsinthespecifiedtheme
Organizing BoG and other Committee Meetings
exclusivelyforCoE
(Travel expenses; boarding, lodging, and sundry
expenses/allowances for outstation nonofficial
membersasperapplicablenormsandrules,

Local travel expenses for instation nonofficial


membersasperapplicablenormsandrules,Sittingfee
tononofficialmembers)

TA & DA for faculty and staff attending workshops


andmeetingsorganizedbytheNPIUandtheSPFUs
forCoEactivities
Student training materials and other consumables
forresearchscholarsfromCoE
Organising Industrial visits, attending workshops,
Technology exhibitions, publications in National /
International conferences held in India of students
UG and PG Registration Fees,Travelling boarding
&lodgingandincidentalcharges
OccasionalhiringofvehiclesforCoErelatedworks
Maintenance of furniture and equipment including
computers and other assets acquired under this
projectforCoE:
o Maintenanceoffurniture
o Maintenance of equipment including computers
and related devices through Annual Maintenance
Contracts.

Salaries:

o Salariesofadditionalfulltimeregularandcontract
faculty and staff appointed against posts created
for the CoE subject to due approval of competent
authority

Maintenance
of
buildings
and
furniture
(this
should be carried
out
through
Institutions
own
budget)
Salaries to contract
faculty and staff
appointed against
existingvacancies.
Salaries of Adjunct
faculty appointed
against
existing
vacancies
(These
are to be borne by
theInstitution)

70

UpdatedasperMinutesofReviewMeetingheldon19June2013

111

TEQIPII

Table19(c)

Permissible71andNonpermissibleExpenditures(Indicative)
forCentreofExcellenceatPrivateunaidedInstitutionsParticipatinginSubcomponent1.2.1:EstablishingCentresof
Excellence

SuggestedActivity

PrivateunaidedInstitutions
Permitted

1.

Acquiringtextbooks,e
journalsandsoftware

Textbooks
ejournals
software
TeachingAssistantships72forMastersstudentsin
Engineering&appliedsciencesdisciplinethatdo
notreceiveGATE/otherscholarships
Research Assistantships to Doctoral students in
Engineering&appliedsciencesdisciplinesthatdo
notreceiveanyscholarshipsthroughNDF/other
schemes
Post doctoral fellowships in engineering
disciplines

2.ProvidingTeachingand
ResearchAssistantships
forenrolmentinMasters
andDoctoralprogrammes
intopicslinkedto
economicorsocietal
needsinthethematic
areas

3.CollaborationwithIndustry Travel expenses; boarding, lodging, and sundry


forapplicableresearch
expenses/allowances for faculty visiting Industries
andproductdevelopment
todevelopandimplementjointprojectswithwell
defineddeliverables
Commercializationofresearchproducts.
Patentingofresearchproducts

NotPermitted

Any other payment to


thefacultyforvisitsto
industries for joint
projects

4.National/International
collaborationforResearch
andDevelopment
activitieswithAcademic
InstitutionsandR&D
organizations

Securing sponsored projects and consultancy


assignments
Publication of research papers in peer reviewed
journals
Commercializationofresearchproducts.
Patentingofresearchproducts
Travel cost, hospitality and honorarium paid to
consultant for participation in Research &
Developmentandfordeliveringexpertlectures
Travel expenses; boarding, lodging, and sundry

expenses/allowances for faculty visiting


Institutions within India and abroad to develop
and implement joint projects with well defined
deliverables
Expense on characterization of sample of R&D
projectsundertakenbystudents/faculty
Presentation of paper in International Seminar,
Conferenceetc.byDoctoralstudents
o Registration fee; travel expenses; boarding,
lodging,andsundryexpenses/allowancesas
pernormsapprovedbyBoG

Fiscal incentives for


increasedparticipation
inresearch,sponsored
projects
and
consultancy work (the
incentives
can,
however, be given
from
Institutional
resources
including
IRG)
Any other payment to
thefacultyforvisitsto
Institutions for joint
projects

Note:

Procurementofconsultantservices,ifrequired,fortheactivitieslistedfromSr.No.14arepermitted.Hiringtechnicalservices
for : Mentoring / guidance for CoE activities, Legal advice and research on market potential of R&D outputs and External
financial audit for TEQIP additional funds for CoE. The expenditure on procurement of consultant services is to be booked
against the head of expenditure of that particular activity. The services of consultant are to be procured by following the
WorldBanknormsandproceduresthroughthePMSS.

71

Expenditure is permissible only for the AICTE approved PG teaching Programmes, provided that Consultancy Services (including
Pedagogical Training) are procured in accordance with the procurement methods and procedures given in the Procurement Manual
andarenotdeclaredineligibleexpenditurebytheexternalFinancialAuditors.
72
TheamountofTeachingandResearchAssistantshipswillbegovernedbythenormsasprescribedbytheUGC/AICTE.
.

112

Section7

5.Enhancingresearch
competenceoffacultyand
knowledgesharingin
thematicareas

PermissibleandNonPermissibleExpenditure

Faculty training for enhancement of


Researchcompetenceinthematicareas:

Coursefee;travelexpenses,boardingand
lodging,andsundryexpenses/allowances
as per applicable norms and rules when
faculty is deputed outstation to another
InstitutionforthedurationoftheCourse,
traveltimeandthetimepermittedbythe
BoGforvisitstoInstitutions/Organizations
ofinterestandrelevancetothefacultyin
thevicinityofthelocationoftraining

Course fee and local travel expenses as


per applicable norms and rules when
facultyattendsacourseinstationbutat
an Institution other than the parent
Institution
Participation by faculty in seminars,
conferences, workshops and Continuing
73
EducationProgrames(CEPs) etc.:
o Registration fee; travel expenses;
boarding, lodging, and sundry
expenses /allowances as per
applicable norms and rules when
faculty is deputed outstation to
another Institution within India and
abroad for the duration of the
seminar, conference or workshop,
travel time and the time permitted
by the BoG for visits to Institutions/
Organizations of interest and
relevancetothefacultyinthevicinity
ofthelocationofseminar,workshop
orconference
o Registration fee; and local travel
expenses as per applicable norms
and rules when participation is
withinstation but at an Institution
otherthantheemployerInstitution

Organizing thematic area training


programmes, workshops, seminars,
conferences and Continuing Education
Programmes(CEPs):
o Hospitalitytoparticipants
o Venueandlogisticarrangements
o Replication of printed training
materials
o Publicationofproceedings
o Travel,boarding&lodgingforinvited
Experts and also honorarium for
deliveringexpertlectures,CEPsetc.

Trainingoftechnicalsupportstaffforskill
improvementwithinIndia:
o Course fee; travel expenses;
boarding, lodging, and sundry
expenses / allowances as per
applicablenormsandruleswhenthe
technical support staff is deputed
outstation to another Institution /
OrganizationwithinIndia

Any other payment to the


faculty for attending the
Course

Any other payment to the


faculty
for
attending
seminars,
workshops,
conferences, etc. if organized
within the parent Institution
or at another Institution but
withinstation

TA&DAtoparticipants

73

CEPsaretobetargetedforworkingprofessionalsonly.Thedurationoftheprogrammemustbeatleast1week(5workingdays).The
participantspreferablyshouldhaverepresentationsfromindustries,facultyfromotherAICTErecognizedEngineeringinstitutionsand
fewfacultyofhostinstitution.TheCEPbeconductedpreferablyincuttingedgetechnologies.

113

TEQIPII

Course fee and local travel expenses


as per applicable norms and rules
when training is attended instation
but at an Institution other than the
parentInstitution
Seedgranttoresearcherstoventureinto
new directions within the specified
74
theme
o

6.IncrementalOperatingCost

Organizing BoG and other Committee


MeetingsexclusivelyforCoE
(Travel expenses; boarding, lodging, and
sundry expenses/allowances for out
station nonofficial members as per
applicablenormsandrules,
Local travel expenses for instation non
official members as per applicable norms
and rules, Sitting fee to nonofficial
members)
TA & DA for faculty and staff attending
workshopsandmeetingsorganizedbythe
NPIUandtheSPFUsforCoEactivities
Student training materials and other
consumables for research scholars from
CoE
Organising Industrial visits, attending
workshops, Technology exhibitions,
publications in National / International
conferences held in India of students UG
and PG Registration Fees, Travelling
boarding&lodgingandincidentalcharges
Occasional hiring of vehicles for CoE
relatedworks
Salaries:

o Salariesofadditionalfulltimeregular
and contract faculty and staff
appointed against posts created for
the CoE subject to due approval of
competentauthority

74

UpdatedasperMinutesofReviewMeetingheldon19June2013

114

Salaries to contract faculty


and staff appointed against
existingvacancies.
Salaries of Adjunct faculty
appointed against existing
vacancies (These are to be
bornebytheInstitution)

Section7

PermissibleandNonPermissibleExpenditure

Table20
Permissible75andNonpermissibleExpenditures(Indicative)
fortheNationalProjectImplementationUnit(NPIU)

SuggestedActivity

1.

Procurementofequipment
andfurniture

2.

Training of senior and


supportstaffoftheNPIUin
functionalareas

Permitted
Allequipmentandfurniturerequired
foranefficientandmodernofficesof
the NPIU and National Project
DirectorateatMHRD

NotPermitted

Course fee; travel expenses;


boarding, lodging, and sundry
expenses / allowances as per
applicablenormsandruleswhenthe
NPIU staff is deputed outstation to
another Institution / Organization
withinIndiaandtraveltime
Course fee and local travel expenses
as per applicable norms and rules
when training is attended instation
but at an Institution/Organization
otherthantheparentInstitution
Travel expenses; boarding, lodging,
and sundry expenses/allowances for
outstation nonofficial members as
perapplicablenormsandrules
Local travel expenses for instation
nonofficial members as per
applicablenormsandrules
Operationalcost
Printingcost
Honorarium to the members
attendingmeetings

Any other payment to the NPIU


staff for attending the training
programme

Organizing Quality Circle workshops


atIITs.
Organizing various activities under
KIT
Teaching workshops in specific
clusterofresources
Shortcourses and workshops in
nicheareas
Seminars/Conference
Shortterm visit of graduates
studentsfromTEQIPinstitutions
Sabbatical/longleave
stay
to
teachersandresearchersfromTEQIP
institutions
Establishing Management Capacity
Development Centres at IIMs for
TEQIPInstitutions

TA/DAtotheparticipants

3.

Meetingsofvarious
Committees(CIHEC,NSC,
NEC,PedagogyCurriculum
Development,Working
Groups,PIPformulation
etc.)

4.

Pedagogical
through IITs
Circles)

trainings
(Quality

5.

Capacity
activities

Enhancement

Operational cost for organizing


Management
Capacity
Development Programmes for
Policy Planners and Senior
Administrators at the National
and State levels including senior
officials of the MHRD/NPIU and
theSPFUs

75

ExpenditureispermissibleonlyforGoods,CivilWorksandConsultancyServicesthatareprocuredinaccordancewiththeprocurement
methodsandproceduresgivenintheProcurementManual.

115

TEQIPII

Travel, boarding, lodging and


sundry expenditure for the
duration of the programme and
travel time for National level
Policy
Planners
and
implementers, and officials of
theMHRD/NPIU
ProfessionalTrainingProgrammes:

6.

Organizing
regional
workshops each year for
sharinggoodacademicand
governance practices and
innovations

Operational cost for organizing


thematic training programmes
for policy planners and senior
administrators at the National
andStatelevelsincludingsenior
officials of the MHRD/NPIU and
theSPFUs
Travel, boarding, lodging and
sundry expenditure for the
duration of the training
programme and travel time for
National level policy planners
and senior administrators,
Central
University
Vice
Chancellors and officials of the
NPIUandtheMHRD

Operational
expenditure
for
organizingandhostingworkshops
Travel expenses; boarding, lodging,
and sundry expenses/allowances for
nonofficial outstation experts from
academia and Industry including
Foreign Experts as per Central
Government applicable norms and
rules
Localtravelexpensesforinvitednon
official local experts from academia
andIndustryasperapplicablenorms
andrules

TA & DA to members of PSAG,


officials of Industry Associations,
other
officials
and
representatives from the SPFUs
and project and nonproject
institutions

7.

IncrementalOperatingCost

Orientation meetings for Evaluation


Committee Members and Mentors,
Performance,TechnicalandFiduciary
Auditors
Conduct of meetings with World
Bank, States and other organizations
forreviewofprojectimplementation
Training and orientation workshops
forSPFUofficials,institutionalfaculty
andstaff
Conduct of all review and
implementationsupportmissions
ConsultationMeetings
ExpenditureonparticipationofNPIU
staffinmeetings,workshops,etc.:
o Travel expenses; boarding,
lodging,
and
sundry
expenses/allowances as per
applicable norms and rules and
traveltime
o Local travel expenses as per
applicable norms and rules
when participation is within
stationbutataplaceotherthan

116

Section7

PermissibleandNonPermissibleExpenditure

theoffice
PostprocurementauditsofCFIs
Contractfeeforoutsourcedservices
Rentalofofficespace
MaintenanceoftheNPIUswebsite
Hiring of vehicles for project related
work only at NPIU and at National
ProjectDirectorateatMHRD
Officeoperationincludingstationery,
printing of various documents,
postage, electronic communication,
advertising, telephone, electricity,
water, TA&DA, purchase of books &
LRs,bankchargesetc.
Printing of Project Implementation
Plan(PIP).
Staffwelfareexpenses.

Consultancy Services engaged for


technicalassistancerelatedto:
o MIS,PMSSandeFMR
o handholdingofNewStates
o studiesandsurveys
o development and webhosting
of annual Training Calendar for
faculty
o mentoring
o performance and technical
auditing
o externalfinancialauditing
Othertasks
Maintenance of infrastructural
facilities:
o Maintenance of office vehicle
andfurniture
o Maintenance of equipment
includingcomputersandrelated
devices
through
Annual
MaintenanceContracts

Salaries:
o Salaries of fulltime regular and
contract officials and staff at
NPIU and MHRD against posts
createdundertheProject

117

TEQIPII

Table21
Permissible76andNonpermissibleExpenditures(Indicative)
fortheStateProjectFacilitationUnits(SPFUs)

SuggestedActivity

1.
2.
3.

Procurementofcivilworks

Procurement of equipment
andfurniture
Training of senior and support
staff of the SPFU in functional
areas

4.

Permitted

Meetings of State Steering


Committee(SSC)

5.

State Private Sector Advisory


Group
(optional)

Refurbishmentofofficebuilding
All equipment and furniture required
foranefficientandmodernSPFUoffice
Course fee; travel expenses; boarding,
lodging, and sundry expenses /
allowances as per applicable norms
and rules when the SPFU staff is
deputed outstation to another
Institution/OrganizationwithinIndia
Coursefeeandlocaltravelexpensesas
per applicable norms and rules when
trainingisattendedinstationbutatan
Institution/Organizationotherthanthe
parentInstitution
Travelexpenses;boarding,lodging,and
sundry expenses/allowances for out
station nonofficial members as per
applicablenormsandrules
Local travel expenses for instation
nonofficial members as per applicable
normsandrules
Sittingfeetononofficialmembers
Operationalcost
Travelexpenses;boarding,lodging,and
sundry expenses/allowances for out
station members as per applicable
normsandrules
Local travel expenses for instation
nonofficial members as per applicable
normsandrules
Salaries of support staff in StatePSAG
Secretariat (hosted by either CII or
FICCI) after one year experience of
PSAGfunctioning
Operational cost of StatePSAG
Meetings
Workshops for training Institutions in
the preparation of Eligibility and
DevelopmentProposals
JointReviewMissions
Training programmes for faculty and
stafffromInstitutions
Orientation meetings for mentors,
performance, technical and fiduciary
auditors
Field visits to Institutions for
monitoringprojectimplementation.
Consultationmeetings
Postprocurement audits of project
institutions.
MaintenanceoftheSPFUswebsite.
Contractfeeforoutsourcedservices.

NotPermitted

Purchaseofvehicles

Any other payment to the


SPFUstaffforattendingthe
trainingprogramme

Sitting fee for StatePSAG


Members
Rental for StatePSAG
Secretariatoffice
Salaries of support staff in
StatePSAG
Secretariat
duringtheFirst Yearofthe
Project
StatePSAG Meeting venue
rental

6.

IncrementalOperatingCost

76

ExpenditureispermissibleonlyforGoods,CivilWorksandConsultantServicesthatareprocuredinaccordancewiththeprocurement
methodsandproceduresgivenintheProcurementManualandthroughPMSS.TotalexpenditureonProcurementofGoodsandCivil
Worksshouldbelimitedtomaximumof25%oftheSPFUsallocation.

118

Section7

PermissibleandNonPermissibleExpenditure

Hiring of vehicles for project related


work
Office operation including stationery,
printingofvariousdocuments,postage,
electronic communication, advertising,
telephone,TA&DA,etc
Expenditure on participation of staff in
meetings, workshops, etc. related to
theProject
o Travelexpenses;boarding,lodging,
and sundry expenses/ allowances
as per applicable norms and rules
andtraveltime
o Local travel expenses as per
applicable norms and rules when
participation is withinstation but
ataplaceotherthantheoffice
Consultancy services engaged for
technicalassistancerelatedto:
o Experts to guide Institutions carry
outqualitySWOTandTNA
o Experts for helping State
institutions prepare proposals and
implement institutional projects
(permittedfornewStatesonly)
o Experts for helping / guiding
Institutions to implement EAP and
EMF
o Studiesandsurveys,ifany
o Performance
and
technical
auditing
o Postprocurement
audits
of
Institutions
o External financial auditing for
TEQIPfunds

Othertasks

Hiring of Experts to help


Institutions
prepare
Proposals and implement
Institutional projects (not
permittedforoldStates)

MaintenanceofInfrastructurefacilities:
o Maintenanceofofficebuildingand
furniture
o
Maintenance
of
equipment
including computers and related
devices
through
Annual
MaintenanceContracts

Salaries:
Salaries of fulltime regular and
contract officials and staff against
posts created under the Project
subject to due approval of state
competentauthority
Full fee (training cost + overheads
towards travel, boarding, lodging,
travel, training materials, etc.) charged
bytheTrainingProviderselectedbythe
SPFU by following the World Bank
norms.

7. Inhouse Pedagogical Training of


faculty
from
Engineering
disciplines and supporting
departments
of
Project
Government funded and aided
Institutions
under
Sub
component1.1and1.2

Anypaymenttothefaculty
for attending the training
programme

119

TEQIPII

8. Inhouse Pedagogical Training of


faculty
from
Engineering
disciplines and supporting
departments of Project Private
unaided Institutions under Sub
component1.1and1.2

120

Training fee charged by the Training


Provider selected by the SPFU by
followingtheWorldBanknorms.

Expendituretowardstravel,
boarding, lodging, training
materials, etc. for training
provider.
Rentalfortrainingvenue,if
any.
Anypaymenttothefaculty
for attending the training
programme

Section8
PROCUREMENTMANAGEMENT

8.1

ProcurementGuidelines:
ProcurementofallGoodsandWorksundertheProjectaretobecarriedoutinaccordancewiththe
World Bank "Guidelines: Procurement under IBRD Loans and IDA Credits" May 2004 and revised
October 2006 (Procurement Guidelines); and the agreed procedures and limits described in the
FinancingAgreement.Theguidelinesshouldbestrictlyfollowedtoavoidpenalties.

8.2

ProcurementArrangements:
Projectinstitutionsmustformseparate(i)GoodsProcurementCommitteeand(ii)Building&Works
CommitteetomanageallInstitutionalprocurementactivitiesforGoodsandWorks.TheCommittees
willneedtoseekapprovalfrom,andwillfunctionunderthesupervisionoftheBoG.Institutionsmust
alsonominateaCoordinatorforallprocurementactivitiesundertheProject.

8.3

ProcurementManagementSupportSystem(PMSS):

AwebbasedProcurementManagementSupportSystem(PMSS)willbeusedintheprojecttocapture
endtoend procurement process, generate standard bidding documents (SBDs), Bid Evaluation
Report (BER), Purchase order (PO), identify contract milestones like warranty period, performance
guarantee, delivery schedule etc and meet documentation / report requirements of all project
entities. PMSS will help the procurement activities by reducing time, standardizing the processes
followed,ensuringtransparency,improvedmonitoring,supportdecisionmakingandcompliancewith
theProcurementguidelines.

TheCentrallyFunded,GovernmentfundedandGovernmentaidedInstitutionsarerequiredtonote
that,theprocurementofgoodsistobedonestrictlyamongsttheactivitieswhicharedetailedoutin
Section 2, 3, 6 and 7 under the Improvement in Teaching, Training and Learning facilities, as
requiredandjustifiedbyinstitutionstofulfiltheprojectobjectives.

Procurement ofconsultant services,ifrequired,forthe activitiesatS.No.28listedinTableNo.18,


Sr.No.28inTable18(a),Sr.No.28inTable19,Sr.No.28inTable19(a),Sr.No.25inTable19(b)
andSr.No.14inTable19(c)arepermitted.Theexpenditureonprocurementofconsultantservices
is to be booked against that particular activity. The services of consultants are to be procured by
followingtheWorldBanknormsandproceduresandthroughthePMSS.

8.4

ProcurementManual:

8.5

TheProcurementManualdevelopedfortheProjectprovidestheessentialinformationandstepby
stepprocedures,aboutprocurementofGoods,WorksandServicestoguideprocurementunderthe
Project.

The Procurement Manual is intended to guide the implementation agencies to understand the
procedures to be followed for procurement (for details refer AppendixII) and to also ensure
compliancewiththeagreedprocedures.
InstitutionalProcurementPlan:
AProcurementPlanneedstobepreparedclearlylayingdownthebudgetrequiredbytheInstitutions
for procurement activities. It is an essential tool for proper monitoring and execution of the
procurement activities. The Procurement Plan should cover Goods, Works, and Consultant Services
requiredforthewholeoftheProjectlife.
Institutions are required to submit a Procurement Plan along with the Institutional Development
Proposalintheprescribedformats(Table22and23).

Revision/updationofProcurementPlan:OncethesubmittedProcurementPlanisreviewedbyBoG
of the Institution and given a no objection, subsequent changes / revision / modification can be
doneatinstitutionlevelwiththeapprovalofrespectiveBoGs.TheProcurementPlancanberevised/
updatedasrequiredtoreflecttheactualprojectimplementationneedsandimprovementsbutwithin
frameworkoftheWorldBankguidelines.

121

TEQIPII

8.6
ProcurementofGoods:

8.7

TheProcurementofGoodsbytheGovernmentandGovernmentaidedprojectinstitutionswillbein
fourcategories:equipment,furniture,books&learningresourcesandminoritems.
ProcurementofWorks:

The Project does not envisage large scale civil works but makes provisions to meet the essential
requirements for acquiring excellence. Civil works in project institutions include (i) repair works (ii)
refurbishmentworksand(iii)extensionofexistingbuildings.
TheCivilWorksManual(seeAppendixIII)developedfortheProject,describesthetypesofcivilworks
to be undertaken in the Project, and provides guidance for understanding of the procedures to be
followed for each type of works. The Manual also provides guidance on the various environmental
aspectsthatneedtobeintegratedintothedesignandconstructionofcivilworks.

8.8

SelectionandEmploymentofConsultants/Services:

8.9

Theprojectinstitutions,forspecialisedrequirements,canavailsupportandservicesofConsultantsto
achieveInstitutionsgoal.ProcurementofservicesundertheProjectwillbecarriedoutinaccordance
with the World Bank Guidelines: Selection and Employment of Consultants by the World Bank
Borrowers"May2004andrevisedOctober2006(ConsultancyGuidelines)andtheagreedprocedures
andlimitsdescribedintheFinancingAgreement.Theguidelinesshouldbestrictlyfollowedtoavoid
penalties.
ProcurementAudits:
TheWorldBankwillappointauditorstomonitortheprocurementactivitiesperiodically.Additionally,
teamsfromtheNPIUandtheSPFUswillalsovisitInstitutionstomonitortheprocurementactivities
undertaken.
YearlyselfauditsaretobeconductedatInstitutionallevelbytheSPFUsandInstitutionalofficialsfor
procurement activities, and reports on the findings are to be sent to the NPIU (in the reporting
format given in Procurement Manual) along with remedial actions taken to make improvement for
thedeviationsnoticed.

122

Section8

ProcurementManagement

Table22
ProcurementPlanforWorksandGoods*
NameoftheInstitutionwithlocation:

Activities

Descriptionof
Works/
Goods

Estimate
dCost
(Rs)

Method
ofProcurement

(5)

(6)

(1)

(2)

(3)

(4)

Estimate
Sanctioned
(Dateand
Value)

Preparation
ofBid
Document
(Date)

(8)

(9)

(10)

(7)

Opening
(Date)

S.
No.

Bids

Invitation
(Date)

Package
No.

Dateof
Receiptof
BanksNo
Objectionto
Bidding
Document**

(11)

(12)

Contract
Award
(Date/
Value)

Dateofcompletion
ofContract

Design/
Investigation
Completion/
Specification
Finalization
(Date)

(13)

(14)

*GoodscoverEquipment,FurnitureandBooks&LearningResources
**ApplicableincaseofPriorReviewbytheWorldBank.
Note:ForColumn6,stateICB/NCB/DirectContracting/Shoppingmethodasappropriate

123

TEQIPII

Table23
ProcurementPlanforConsultantServices

NameoftheInstitutionwithlocation:

Sl
No

Activities

Description
ofServices

Estimated
Cost
(Rs)

Methods
of
Selection
@

ToR
Finalization
(Date)

Adver
tisement
(Date)

RFPFinal
Drafttobe
Forwarded
totheBank
(Date)**

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

NoObjection
fromthe
BankforRFP
(Date)**

RFP
Issued
(Date)

Proposals
Received
(Date)

Evaluation
(Date)

No
Objection
bytheBank
(Date)**

Contract
Value&Date
ofAward

Contract
Completion
(Date)

(9)

(10)

(11)

(12)

(13)

(14)

(1)

@Statewhether(i)Singlefirmorindividual;or(ii)Competitiveprocedure.IfCompetitive,thenstatewhetherQuality&CostBasedSelection(QCBS)orLeastCostSelectionprocedure,etc.
RFP(RequestforProposal):SameasBidDocument
**ApplicableincaseofPriorReviewbytheWorldBank

124

Section9
EQUITYACTIONPLAN
9.1

Objective:
Toensurethatallstudentsandfacultyintheprojectinstitutionshaveequalopportunitytoavailthe
benefitsoftheProjectwithsubstantialimprovementintheperformanceofweakstudents.

9.2

Scope:
AllprojectinstitutionswillberesponsibletoensureadherencetotheEquityActionPlan(EAP).

9.3

Strategy:
Every institution faces a different challenge to improve academic performance. In addition to the
caliberofstudentsinaninstitution,itsmanagement,teachingforce,andactionstoremedystudents
difficultieshaveabearingonstudentperformance.TheProjectinstitutionsaretomakeActionPlans
to improve learning outcomes for students and employability of graduates. They are required to
allocatebudgeteveryyeartoAcademicSupportforWeakStudents.Theprojectaimstoensurethat
allparticipatinginstitutionsimprovethetransitionrateofFirstYear(enrolled)studentstotheSecond
Year(akeyperformanceindicatoroftheproject).Institutionaltargetsaresetforallstudentsaswell
asSC,ST,OBCandWomenstudents.Achievementmustbemaintainedduringsubsequentyearsso
thathighqualificationratesareachievedbyeveryinstitution.
The NPIU and the SPFUs will assess the efforts of project institutions in the implementation of the
Equity Action Plan to ensure equity at all levels in the project institutions. All Institutions should
include Institutional EAP in their Institutional Development Proposals. The EAP should be a part of
eachInstitutionsMoUwiththeconcernedprojectauthorities.

9.4

ActivitiesofEquityActionPlanforImprovingAcademicPerformanceofweakstudentsthrough
innovativemethods:
Weakstudentsmaybethosewhofailmorethan40or50percentoftheirsubjectsinagivenyear,
lose a year or more during their degree programme, or get low marks. Some students may fail to
secure employment at the end of their degree programme because of overall low performance or
inadequateskillsatthecompletionofthecourse.Someofthereasonsfortheseweaknessesare:low
entry level marks (i.e., inadequate preparedness for the rigorous engineering curriculum), irregular
attendanceofclasses,lackofselfconfidence,lowproficiencyinthemediumofinstruction(English)or
eveninthemainvernacularlanguage.Veryoftenweakstudentsdonotcommunicatetheirdifficulties
anddonotseekhelp.
The participating institutions must ensure that all students perform well academically and achieve
theirpostcollegegoalsi.e.securinggoodjobsorenteringpostgraduatecourses,accordingtotheir
choice,suitedtotheircapabilities,andinlinewiththeeducationtheyhavereceived.Institutionsmust
also ensure that all the faculty be trained in Pedagogy particularly to improve the performance of
weakstudents.
Somepossibleinterventionstoimprovetheperformanceofweakstudentsaregivenbelow:

(i)

DiagnosingStudentWeaknessesandTrackingPerformance.Adiagnostictestwhenstudentsenter
the college can supplement knowledge of their entry marks. Properly devised tests provide
informationaboutspecificareaswhereastudentisweak,andthereforewhatadditionalcoachingis
required. They can identify which topics need to be emphasized by the subject teacher for the
student group. Such tests can be particularly helpful before tough subjects begin each semester,
and efforts made to strengthen teaching, and/or provide extra teaching. Reviewing student
attendance in connection with performance and advising students to attend classes and make up
missedclassesisalsouseful.

(ii)

Improving Performance in Academic Subjects. To help students deal with specific academic
weaknesses, remedial classes either during the semester or during vacations is helpful. Another
approach is to provide a slot or period when no classes are held but teachers are available to help
studentsaddresstheirweaknesses.Extrainputscouldalsobeprovidedinmoreinnovativewayssuch
as: tutorial classes where students interact with each other and also with a faculty / PG student. A
Academic Support Programme could also be organized . Such programme provides extra classes,
notesandguidancewhereteachersareavailabletostudentsformallyandinformally.

125

TEQIPII

(iii)
EnhancingEnglishandCommunicationandPresentationSkills.ThiscouldincludeEnglishlanguagelabs,
tutorials for technical and everyday English, opportunities to make presentations in the classroom, etc.
Languageandsoftskillsdevelopmentshouldbeprovidedthroughoutthedegreeprogrammeandnotonly
inthefinalsemestersinpreparationforjobinterviews.Interactiveandconfidencebuildingprogrammes
canbesuccessful.

(iv)

PeerLearningGroups.Peerlearninggroupshelpstudentsastheyfindthatothershavesimilarproblems,
andgetachancetodiscusstheiracademicdifficulties.Studentsoftenliketostudyingroups,andforming
groupsof1012goodandweakmixedstudentscanbeeffective.Theycanreviselessonsandundertake
group projects also. Good students canhelp weakones theact of tutoring alsohelps good students.
Therecanbeverticalintegration,i.e.,seniorstudentswithjuniorsandstudentfacultyinteractionscan
be enhanced with faculty being available as resource persons to the student groups and interacting
informallywiththem.

(V)

Appointing Faculty Advisers for Students. A Faculty Adviser (FA) can be appointed for every 1015
studentsenteringinthefirstyearandestablishacloserelationshipwiththesestudents,orientingthemto
college practices and following their progress regularly (e.g., through fortnightly or monthly meetings).
Studentsinallfouryearsmayneedthisguidanceasdifferentproblemsdevelopatdifferenttimes.The
relationshipcanbemoreinformalthanformal,allowingstudentstoaskforhelpwhentheyneeditand
sharetheirproblemswithoutfear.TheFAcanfindoutanynonacademicreasonsforastudentsweakor
decliningperformance,andadviseonappropriatestudyorothermeasurestobetaken.TheFAcanalso
mediate between a student and other faculty, if necessary, or seek help from an HOD, Dean, Principal,
etc.,andgetintouchwithparentswhennecessary.Facultymaybegivensomeprofessionaltrainingin
mentoringandcounselingtoplaythisrole.

Table24givesthedetailsofEquityActionPlanforthestudentsandfacultyundertheproject.

Table24
DetailsofEquityActionPlan
S.
No
(i)

(ii)

(iii)

126

Items
To
identify
weaknesses in all
students and take
remedialsteps

Actions

Institutions to plan
and execute bridge
courses/remedial
teaching (e.g. extra
classes, tutorials)
andothermeasures
tobringallstudents
to the required
level of proficiency
to cope with the
mainsubjects
Institution to improve Tobedecidedby
communication
theinstitution
presentation
skills
through their wide
use in curricula and,
where needed, to
provide special skills
training to students
with priority to the
weakstudents
Give underqualified Institutions
to
teachers priority in identify needs and
opportunities
to indicate in their
upgradequalifications Faculty

Development Plan
how they would
build equity to
upgrade
faculty
qualifications

Implementation
Agency
Project
institutions

Project
institutions

Project
institutionsand
SPFUs

Frequency

Monitoring
Indicators
Percent
of
students transiting
from First to
Second year with
all
first
year
coursespassed

Diagnostic tests
and
plans
completed
within
first
month of each
academic year;
remedial
measures
carried
out
continuously
thereafter
Continuous
Improvementin
jobplacementof
students,
especiallyamong
thosewith
disadvantaged
backgrounds

Yearly

Increaseinthe
percentageof
teachersenrolled
inMTechreported
yearly

Section9

S.
No
(iv)

(v)

Items
Training of teachers
in subject matter
and
pedagogy,
particularly
to
improve
the
performance
of
weakstudents

Make
campuses
physically
and
socially
gender
friendly; especially
provide adequate
and
suitable
facilities to women
studentsandfaculty

(vi) Selection of State


and
Institutions
fromweakregions
(vii) Hold
Knowledge
Workshops yearly
to
improve
knowledge sharing
andinformation

Actions
Training Needs Analysis (TNA) to
becarriedoutforallteachersinall
project
institutions
by
appropriately
qualified/trained
experts, especially to teach weak
students
All institutions to prepare Faculty
Development Plan for the Project
period (using identified providers
for Pedagogy or National Training
Calendar for subject training),
givingprioritytotheteacherswith
the most significant gaps in
knowledge and skills as diagnosed
bytheTNA
All teachers are to be covered by
training in pedagogy including
teachingofweakstudents
Domain training is to be done on
thebasisofneed
InstitutionstoreporttotheSPFUs
on progress in training plan every
6 months (by name, department,
individualcharacteristics(including
SC/ST/OBC, M/F, age, years of
service,
level,
degree
qualifications), type and duration
of training received, etc., and the
SPFUs to send aggregated reports
totheNPIU
Training providers to furnish
training evaluation results (which
indicate the extent to which the
gaps in a trainees knowledge or
skills including teaching of weak
students have been addressed) to
InstitutionsandtheSPFUs
InadditiontheProjectwouldcarry
out Satisfaction Surveys to assess
trainingachievements
InstitutionstospecifyintheirIDPs
whatactionstheywouldtaketo
ensureagenderfriendlycampus
bothsoftactions,andcivilworks
wherenecessary

EquityActionPlan
Implementation
Agency

Project
institutionsand
SPFUs

Project
institutionsand
SPFUs

Frequency

Monitoring
Indicators

TNAtobe
donebefore
the
preparationof
Institutional
Development
Proposals;
reporting
everysix
monthsand
remedial
actionsona
continuous
basis

Percentof
planned
training
completed
asreported/
aggregated
6monthly

Atthetimeof
IDPand
actions
implemented
asproposed

Institutions
toprovide
descriptive
reportsof
actions
taken
including
numberof
beneficiaries

Project
institutionsand
SPFUs
Project
institutionsand
SPFUs

Project
institutionsand
SPFUs

Project
institutionsand
SPFUs
Project
institutions

Alreadydiscussedextensivelyand
includedintheselectionprocess

MHRD/SPFUs/
NPIU

Atthetimeof
selection

The SPFUs and Institutions to


organize workshops with thematic
focus

SPFUs/Groupsof
3project
institutions

Yearly

127

Section10
ENVIRONMENTMANAGEMENTFRAMEWORK
10.1

Objective:
ToensurecompliancewithEnvironmentManagementFramework(EMF)inallprojectinstitutions.

10.2

Scope:
All project institutions will be responsible for ensuring adherence to the Environment Management
Framework(EMF).

10.3

Strategy:

The NPIU and the SPFUs will frequently monitor compliance with the Environment Management
Framework(EMF)inallprojectinstitutionsandensureimplementationofcorrectiveactions,asmay
berequired.
10.4

EnvironmentManagementFramework:
TheEMFseekstoreduceenvironmentaldegradationthatmayariseduetoprojectactivitiesandto
also help in compliance with various related regulations and norms. It lays out various
options/measures for enhancing environmental performance during the planning, designing,
implementationandoperationstageoftheproposedcivilworks.

TheEMFwillensuresaferandenvironmentalfriendlydesigningoftheinfrastructureasperapplicable
norms for water supply arrangements, sanitation arrangements, waste water discharge
arrangements,withadoptionofrelevantcode/sapplicableforearthquake,cyclone,flood,landslides
andaspertherecommendationsofNationalDisasterManagementAuthority(NDMA),etc.Itwillalso
ensureotherarrangements/facilitiessuchasbarrierfreeaccessforthephysicallychallenged,signages
insideandoutsideofthebuilding,noticeboardsfordisplayofinformation,fireandelectricalsafety
arrangements,provisionofalarmsorhooterstoalertbuildingoccupiersincaseofemergency,clear
demarcation of escape routes and assembly points for emergency situations, provision of parking,
preservationofexistingtreestotheextentpossible,etc.
Inaddition,EMFwillalsoencourageprojectInstitutionstoadoptvariousenvironmentaugmentative
measures like rain water harvesting, use of heat reflecting glass, promotion of energy efficient
lighting, use of renewable energy, minimization of paved area, appropriate use of colours for
buildingsandwalkways,useoflocallyavailablematerials,etc.forallworksundertakenintheProject.
The expenditure for all such activities can be booked under the head of expenditure Minor Civil
Worksintheinstitution.

TheEMFhasbeenintegratedandmadeapartoftheCivilWorksManualpreparedfortheProjectto
ensurecompliancewithvariousenvironmentmanagementaspects(fordetailsreferAppendixIII).

129

Section11
DISCLOSUREMANAGEMENTFRAMEWORK
11.1

Objective:
Toensureaccountabilityandtransparencyinprojectimplementationanditsachievementsincluding
thoserelatedtoFiduciaryAspects,EnvironmentalManagementFramework(EMF)andEquityAction
Plan(EAP).

11.2

Scope:
TheNPIU,theSPFUandtheprojectInstitutionswillberesponsibletoensureadherencetoDisclosure
ManagementFramework.

11.3

Strategy:
The NPIU, the SPFUs and the project Institutions will implement the Disclosure Management
FrameworkundertheProjecttoensurehighleveloftransparencyandaccountability.Informationon
Project progress in all areas such as Academic, Procurement, Financial, EMF, EAP etc. will be made
availabletothepublicthroughrespectivewebsites.

11.4

ActivitiesofDisclosureManagementFramework:
ThefollowingtablegivesinbriefthemechanismforDisclosureManagement:

131

TEQIPII

Table25(a)
DisclosureManagementbytheNationalProjectImplementationUnit

S.
No
1

SelectionofStates,Institutions,
andmonitoringimplementation
oftheProject
Accountabilityonproject
achievements

FinancialManagement

ProgressinuseofFundsand
submissionoftimelyreportsfor
monitoring,facilitationand
accountingpurposes
ProcurementManagement

Transparencyandaccountability
inprocurementinconformityto
theWorldBankGuidelines

Field

ComplaintMechanism

Action

Frequency

TheMinutesofallNSCmeetingsonselectionandothermatterswillbepublishedonthe
NPIUswebsite.SummaryofEvaluationReportsofallInstitutionsandalldetailsregarding
theProjectincludingallannouncements/documentsetcwillbesentbyemail
Performanceanddataaudits:
ThefollowingdocumentswouldbeputontheNPIUswebsite
a)PerformanceandDataAuditReports.
b)Student/Facultysatisfactionsurveys
c)Employersatisfactionsurvey
The NPIU will organize workshops to train officials from the project institutions and
SPFUofficials.
FinancialManagementManualhasbeenpreparedandmadeavailableontheNPIUs
WebsiteforguidanceoftheSPFUsandprojectinstitutions
QuarterlyFinancialMonitoringReport
ConsolidatedAuditCertificate
Procurement Manual has been prepared and made available on the NPIUs Website
for guidance of Institutions. In addition, the NPIU will organize workshops to train
officialsfromtheprojectinstitutionsandtheSPFUs

Asandwhenoccurs

All data related to procurement made by Institutions will be maintained through


PMSS.
MakingofthefollowinginformationpubliclyavailableonthewebsiteoftheNPIU:
All general and specific procurement notices, notices inviting tenders
expressions of interest, request for proposals, NCB documents and
agenda/corrigenda to bids, information on bids received, and details of
contractsawarded
ProjectReviewandMidTermReviewreports
Handling complaints relating to procurement, fraud and corruption and quality of
construction in accordance with GoI and participating States administrative
procedures
Aprocurementcomplaintsmonitoringdatabaseshallbemaintained
SubmittingyearlyreportstotheWorldBank

Twiceannually

InitiallycoverallStatesandallInstitutionsin
span of 3 months and will conduct
workshopsoncein6months

Quarterly
Yearly
InitiallycoverallStatesandallInstitutionsin
aspanof3months
Willconductworkshopsoncein6months

Continuous

132

To be implemented from project


effectiveness

After each Joint Review Mission and


MidTermReviewMission
To be implemented from project
effectiveness
To be implemented from project
effectiveness
Within30daysoftheendoftheyear


Section11DisclosureManagementFramework

Table25(b)
DisclosureManagementbytheStateProjectFacilitationUnits

S.
No.
1
2

Field
MonitoringimplementationoftheProject
EquityActionPlan
To ensure that all students and faculty have
equal opportunity to avail the benefits of the
Project and to improve performance of weak
students which includes SC/ST/OBC and
academicallyweakstudents
FinancialManagement

ProgressinuseofFundsandsubmissionof
timelyreportsformonitoring,facilitationand
accountingpurposes
ProcurementManagement

Action

Frequency

TheminutesofStateSteeringCommitteemeetingswillalsobepublishedonthe
SPFUswebsite.

Asandwhenoccurs

EnsuringcompliancewithrequirementsofEAPintheprojectInstitution.

Tobeimplementedfromprojecteffectiveness

QuarterlyFinancialMonitoringReport
ConsolidatedAuditCertificateoftheSPFUandallprojectinstitutionsinthe
State

All data related to procurement made by Institutions will be maintained


throughPMSS.
Making of the following information publicly available on the website of
SPFUs:
Information relating to physical and financial progress under each
contractawardedonthebasisofNCBprocedures.Suchinformation
to be made available within 30 days from the end of each calendar
quarter
Allgeneralandspecificprocurementnotices,noticesinvitingtenders
expressions of interest, request for proposals, NCB documents and
agenda/corrigendatobids.
Allinformationonbidsreceived,anddetailsofcontractsawardedfor
NCB
Handling complaints relating to procurement, fraud and corruption and
quality of construction in accordance with GoI and participating States
administrativeprocedures
Aprocurementcomplaintsmonitoringdatabaseshallbemaintained
SubmittingyearlyreportstotheNPIU

Continuous

Quarterly
Yearly

Transparencyandaccountabilityinprocurement
inconformitytotheWorldBankGuidelines

ComplaintMechanism

EnvironmentalManagementFramework(EMF)

ToCreateawarenessamongInstitutionstotake
actionsrelatedtoEnvironmentManagement

EnsuringcompliancewithrequirementsofEMFgiventheinCivilWorksManual
undertakenintheprojectInstitutions.

To be implemented
effectiveness

from

project

To be implemented
effectiveness

from

project

To be implemented from project


effectiveness
Tobeimplementedfromprojecteffectiveness

Tobeimplementedfromprojecteffectiveness
Within30daysoftheendoftheyear

Tobeimplemented fromprojecteffectiveness

133

TEQIPII

Table25(c)
DisclosureManagementbytheProjectInstitutions

S.
No.
1
2

Field
Accountabilityonprojectachievements
EquityActionPlan
Toensurethatallstudentsandfacultyhave
equal opportunity to avail the benefits of
theProjectandtoimproveperformanceof
weak students which includes SC/ST/OBC
andacademicallyweakstudents
FinancialManagement
ProgressinuseofFundsandsubmissionof
timely reports for monitoring, facilitation
andaccountingpurposes
ProcurementManagement

Transparency and accountability in


procurement in conformity to the World
BankGuidelines

Action
MinutesoftheBoGsmeetingsattheInstitutionwouldbeputonInstitutions
website.
EnsuringcompliancewithrequirementsofEAPintheprojectInstitution.

Asandwhenoccurs

QuarterlyFinancialMonitoringReport

Quarterly

AlldatarelatedtoprocurementmadebyInstitutionswillbemaintainedthrough
PMSS.
Making of the following information publicly available on the website of
respectiveProjectInstitutions:
Informationrelatingtophysicalandfinancialprogressundereachcontract
awarded on the basis of NCB procedures. Such information to be made
availablewithin30daysfromtheendofeachcalendarquarter
All general and specific procurement notices, notices inviting tenders
expressions of interest, request for proposals, NCB documents and
agenda/corrigendatobids.
Allinformationonbidsreceived,anddetailsofcontractsawardedforNCB

Handlingcomplaintsrelatingtoprocurement,fraudandcorruptionandqualityof
construction in accordance with GoI and participating States administrative
procedures
Aprocurementcomplaintsmonitoringdatabaseshallbemaintained
SubmittingyearlyreportstotheSPFU

ComplaintMechanism

Environmental Management Framework


(EMF)
ToCreateawarenessamongInstitutionsto
take actions related to Environment
Management

134

Frequency

EnsuringcompliancewithrequirementsofEMFgivenintheCivilWorksManual
undertakenintheprojectInstitutions

Tobeimplementedfromprojecteffectiveness

Continuous

To be implemented from project


effectiveness

To be implemented from project


effectiveness

To be implemented from project


effectiveness
To be implemented from project
effectiveness

To be implemented from project


effectiveness
Within30daysoftheendoftheyear
Tobeimplementedfromprojecteffectiveness

AnnexI

GUIDELINESONIMPLEMENTATIONOFREFORMS
1. Exerciseofautonomies:

AutonomousInstitutionsunderaUniversitywillbeabletoexercisefullacademicautonomyexceptforthe
awardofdegrees,whichwillcontinuetobeconferredbytheUniversity.Allinstitutionsarerequiredto
haveaBoardofGovernors.Allpowersforinstitutionalmanagementthroughexerciseofthe4autonomies
is to be vested in the BoG and will be exercised as per the Memorandum of Association
(MoA)/Government Orders/Government Regulations. The BoG will in turn suitably delegate functional
powerstovariousinstitutionalfunctionariesandcommittees.
Briefdescriptionofautonomiesisasfollows:
(i) ManagerialAutonomy:
a)

TheBoGwill:

delegate suitable Academic, Financial and Administrative powers to various institutional


functionaries to streamline the running of the institution. The BoG will frame rules and
proceduresforaccountabilityateachlevel;

formcommittees,subcommitteesoradvisorycommitteesinappropriateareastosupport
functioningoftheBoG.TheBoGmayempowertheHeadofInstitutiontodoso;

haveFinancialAutonomywithregardtopreparation,sanctioningandspendingthebudget
toachievetheobjectivesoftheinstitution;

have the powers to appropriate the funds and to reappropriate the same undercertain
circumstances;

evolve proper set of rules and procedures for exercise of its powers as per the
MoA/GovernmentOrders/Regulations;

delegate the financial powers to various levels of functionaries for efficient discharge of
theirfunctions;

delegatefinancialandadministrativepowerstothefacultyconcernedforoperatingR&D
projects, consultancies, continuing education programmes, organising conferences/
seminars,etc.;and

evolvenormsforoperatingtheFourFundsandoperatingrecurringexpenditure.

b) Allacademic,administrative,financialproceduresanddecisionsshouldbetransparentandcare
should be taken to involve maximum participation of stakeholders (faculty, staff, students,
parentsofstudents,industry,etc.)inthedecisionmakingprocess.
(ii) AdministrativeAutonomy:
a)

All actions of the Director in connection with continuing education programmes, faculty
consultancy,facultydevelopmentprogrammes,Industrialconsultancy,organisationofseminars
andconferencesshouldbereportedtotheBoG.

b) On the recommendation of the Head of the Department, the Director will approve the
deputationoffacultytoattendseminars,conferences,andtrainingprogrammes.BoGwillneed
toevolvethenormsforthesame.
c)

ItissuggestedthatDirectorsmaydelegatesomeofhis/heradministrativepowerstotheDeans,
HeadsofDepartmentandProfessors.

(iii) FinancialAutonomy:
a)

FordaytodayfunctioningadequatefinancialpowerstotheDirectorandotherfunctionariesare
tobedelegatedbytheBoG.Thefinancialpowerstobedelegatedaresuggestedasunder:

Director or Principal of an institution or Dean of a University institutions/ Head of


UniversityFaculty/DepartmentRs.50.00lakhforsinglepurchaseorder.

HeadoftheDepartmentorequivalentRs.1.00lakhforsinglepurchaseorder.

All single item expenditure above Rs. 50.00 lakh will need to be approved by the BoG.
Similarly,allsingleitemexpenditureaboveRs.1.00lakhbyaHeadoftheDepartmentwill
needapprovalfromtheDirector/Principal/Dean.

135

b) Reappropriationoftheprojectfundallocationforanyacademicactivitymaybedoneby
the institution with concurrence of the BoG subject to following conditions in sub
categoriesofexpenditure:

Academic Support to Weak Students : Institutions under subcomponent 1.1 and


1.2 are expected to spend at least 4% and 2% of their project allocation for this
activityheadrespectively
Faculty & Staff Development : Government and Government aided institutions
shouldplantospendatleast10%ofprojectallocationforthishead

c) Fund from Procurement and IOC Head of expenditure can also be reappropriated to
Headofexpenditureforacademicactivitiesbutnotviceversa.

(iv) AcademicAutonomy:
Theprojectinstitutionsarerequiredtopossess/obtainAutonomousInstitutionStatusandcarryout
allthefunctionslistedbelow:
Table26
AcademicfunctionstobecarriedoutasanAutonomousInstitution

S.
No.
1

Parameters/Functions

Admission of students based on merit as per State/GoI Admission Policy (as applicable) on common
entranceexamination,counselling,andreservation
Determineowncurricula,coursecontent,curriculaimplementationandmethodsoftraining

Developcreditbasedcurriculum

Permitcreditexemptionforpreviousattainments

Introduceflexibilityinthecurriculumwithchoiceofelectives

6
7

Evolve new methods of summative evaluation and their frequency, conducting examinations and
declaringresults
DevelopnewmethodsofformativeandinternalevaluationasperadvicefromExperts

Addvalueadditioncoursesaspermarketdemand

Developaneffectivesystemforfacultyevaluationbystudents

10

Start new courses, new programmes and reorient and restructure or delete existing programmes
(theseactions,ifundertakenundertheProject,willneedtoobserveprojectdirectivesasgiveninthe
maintextofPIP)
Introduceinnovationsinteaching/learningprocessesthroughcontrolledexperimentation

11
12
13
14
15
16

ConductContinuingEducation,DistanceLearningandeLearningandskillenhancementprogrammesas
permarketneeds
Enter into collaborative arrangements with outside bodies /experts for curricula development,
employmentorientedvalueadditiontocourses,newteachinglearningmethodologiesandinnovations
Deputefacultyforacademicadvancement
Developfacultytrainingneedsassessmentschemeinlinewithacademicrequirementsandinstitutional
objectives
InvitingexpertsincludingIndustryexpertsforspeciallectures

2. Governancesystemwithparticipationofstakeholders:
StakeholdersinTechnicalEducationinstitutionsarestudentsandtheirparents,faculty,staff,employers,
communityleaders,Government,qualityassurancebodies,University,Industryetc.Itmaynotbepossible
to include all stakeholders in the governance of an institution but mechanism should be evolved for
interactingwiththosewhofindnodirectrepresentationinthegovernancesystem.
ItissuggestedthatthefollowingCommitteesmaybeformedforgovernanceofinstitutions:
Board of Governors (BoG): The BoG is to be constituted with the relevant structure according to UGC
guidelines as given in AnnexII for Government funded, government aided, private unaided institutions
andUniversityconstituentcolleges.TheBoGofDeemedtobeuniversityshouldbeasperUGCRegulations
2010(seeAnnexII),andforNITsandCFIs,aspertheirAct/MoA.However,theChairmanofBoGmustbe
aneducationist,industrialist,orprofessionalfromoutsidetheGovernment.TheBoGshouldmeetatleast
fourtimesinayear.
136

The BoG will, in addition to performing functions listed under AnnexI (1) (i), carry out the following
functions:
FixthefeesandotherchargespayablebythestudentsontherecommendationsoftheFinance
Committee;
Institute scholarships, fellowships, studentships, medals, prizes and certificates on the
recommendationsoftheAcademicCouncil;

Approvestartingofnewprogrammesofstudyleadingtodegreesanddiplomas;
Determinepaypackagestoattractandretainqualityfacultyandstaff;
Assessjustification/necessityofforeigntravelbyfaculty;and
Performsuchotherfunctionsandformsuchcommittees,asmaybenecessaryanddeemedfitfor
the proper development, and fulfilment of the objectives for which the institution has been
declaredasautonomous.

TheBoGmayconstitutefollowingCommitteesfortakingdecisionsonitsbehalf:

AcademicCouncil/Committee:AsperAct/MoA
AcademicQualityAssuranceCommittee
FinanceCommittee:AsperAct/MoA
(ThesetwoCommitteeswillhaverepresentativesoffacultyastheirmembers)
BuildingandWorksCommittee
PurchaseCommittee
DisciplinaryCommittee
InstitutionDevelopmentCommittee
StudentsAffairsCommittee
LibraryCommittee
GrievanceCommittee
AntiSexualHarassmentCommittee(ASH)
AnyotherAdvisoryCommittees(asperneed)

Except for the Academic Council/ Committee and the Finance Committee, all othercommittees may be
permittedtobeconstitutedbytheDirectorwithapprovaloftheBoG.TheseCommitteeswillconsistof
representatives of stakeholders, functionaries of the University including students in some of the
Committeeswheretheirpresenceisrequired.
The Director should ensure that opinion of all stakeholders on the issues related to Institutional
GovernanceisavailabletotheBoG/managementthroughtheirrepresentationinconcernedcommittee.
Proper formulation and functioning of these Committees would lead to transparent, congenial, fair and
participativemanagementbasedonmutualtrust.
3. UseofBlockGrant:
BlockGrantforatleastthenonsalary,nonplangranttoGovernmentfundedandaidedinstitutionsisan
eligibilityconditiontobecompliedwithbyallStatesforparticipationintheProject.
TheBoGwill:

allocate/reallocate the Block Grant to expenditure categories except Salaries in the best
interestoftheinstitution.

take fiscal decisions for better financial management of the institution based on broad
guidelinesagreedwiththeStateGovernment.

specialgrantswillneedtobeprovidedbyStatesas`forcemajeureintheeventofrevisionof
scalesofpayandforotherunforeseenevents.

4. EstablishmentoffourFunds:

a) CreationandestablishmentofFourFundsisaProjectrequirementthatistobecompliedwithbyall

institutions.
b) The purpose of these Funds is to ensure sustainability of the reform process beyond the Project

period.
137

c) SeparateBankAccounthastobeopenedforeachoftheFourFundsnamely;

CorpusFund

FacultyDevelopmentFund

EquipmentReplacementFund

MaintenanceFund

d)

These Funds should not be used during the Project period as funds for various activities are
availableundertheProject.

e)

The authority for opening these Accounts will be with the BoG of the institution. Each project
institutionistobuildtheseFundswithannualcontributionintoeachFundequaltoatleast0.5%
(total 2%) of annual total recurring expenditure of the institution. Sources could be a definite
percentageoffeecollectionfromstudents,savingsfromBlockGrant,donationsfromalumniand
charitable organizations, IRG including commercial use of facilities, consultancy earnings
(institutionalshare),andmatchingGrantsfromGovernment/managementonIRGetc.

f)

EachinstitutionmayadditionallycontributefromannualsavingstotheCorpusFund.

5. RevenueGeneration:
a)

Inorderthatfacultyandstafffeelencouragedtodevelopandtakeuprevenueraisingactivities
andprogrammesoverandabovetheirroutineacademicandotherdutiesintheinstitution,they
shouldbegivenanappropriateshareoftherevenueearnedasanincentive.

b) Contributions and performance of faculty and staff in such activities needs to be recognised
throughawards,rewardsorpromotions.
c)

Theconcernedpersons(facultyandstaffinvolvedinrevenuegeneratingactivity)shouldbegiven
duefreedomtoutilizepartoftheearningstodevelopofficeandlaboratoryfacilities,purchaseof
literatureandattendanceatconferences.

d) Revenuegenerationactivitiescouldinclude:

Consultancyprojectssponsoredbyprivateorpublicsectorindustry,
Sponsoredresearchprojects,
Offeringspeciallytailoredcontinuingeducationprogrammes,
Offering specially designed Degree programmes for candidates from public sector
undertakings,
IndustryInstitute interactive programmes ensuring mutual benefits including revenue
generationfortheinstitution,and
Commercial activities [commercial use of facilities, earning from Incubation Centres and
ScientificandTechnologyEntrepreneurshipProgramme(STEP)].

e) Improvingfacilitiesforpersonalacademicresearchandtravelforattendingconferencescouldbe
permittedfromthesponsoredprojectfundsasperrulesofthesponsoringorganisation.

6. FillingupFacultyandStaffVacancies:

Vacanciesmustbefilledsubjecttoanyrationalizationofcadrenecessitatedbystudentincrease/decrease,
andcurriculacompulsionsasperAICTEnorms.Banonfillingvacancies,ifany,needstobeliftedbythe
concerned Government/management. Till such time regular appointments are made by the concerned
Government/management, BoGs need to be empowered to appoint faculty and staff with the required
qualificationsandexperienceoncontractbasisfor11monthsorlongerterms.

a)

Reassessandrationalisetherequirementofthetotalfaculty(includingPhysics,Chemistryand
Mathematics)byfollowingtheAICTEnorms.

b) For Faculty requirements as per AICTE norms, the faculty student ratio for UG programmes in
Engineering / Technology is 1:15. It is suggested that an attempt should be made to have a
preferredratioof1:12.FortheMastersprogrammesinEngineering/Technology,therequired
facultystudentratiois1:12butpreferablyitshouldbe1:10.
c)

Thepostsequivalenttofacultyisnottobeconsideredforthecalculationoffacultystudentratio.

138

7. StudentPerformanceEvaluation:

Student Performance Evaluation is generally of two types: Summative and Formative. The Summative
onescarrymarks/gradesandleadtothestudentsfinalperformancegrading,whiletheFormativeones
are used to encourage the student to do better by pointing out their weakness/mistakes and advising
themhowtoperformbetter.Suchevaluationsareinstrumentalinreallearningpromotionsincetheseare
not used for grading purposes although grades/marks are given to keep track of improvement in
performance.TomaketheSummativeEvaluationrobustandreliable,anumberoftestsmustbetakenas
oneannualorsemesterexaminationmaynotgivereliableevaluation.

a)

SalientPoints:

Studentperformanceupgradationisthebasicgoalforanygoodinstitution.

Thepresentpracticeofmerelyevaluatingisnotsufficient.Itisbasicallyinspectionfocused.
TheQualityemphasismustinspireamarkedimprovementfocusedapproach.

Thus,anewprocessmustbeevolvedwiththisfocusinmind.Thismaybeadaptedtobring
aboutimprovementfocusedreform.

Students and faculty will benefit largely from this reformation of student evaluation
process. It must be redesigned to improve formative inputs as well. The faculty may
decidetoleadbyexamplebygivingexamplesofhowtoanswersomemocktests.

TheFormativeevaluationmustbeusedtohelpthestudentstoimprovetheirperformance
by pointing out the areas of potential improvement, related to various deficiencies and
weaknessesidentifiedbythefacultyinvariousformsoftests/assessments.

The examples of using Formative approach are giving open and closedbook mock tests,
mock assignments, mock quizzes, mock presentations, orals, individual and group
assignments,etc.Notethatthesearenotmeantforstudentevaluationforgrading.These
aretobeusedforidentifyingtheareasforimprovement.

Such Formative evaluations are useful in real learning promotion, as it is not used for
grading purposes. A brainstorming by faculty with students can help to identify various
Formativeoptionsthatmayaddsignificantvalueaddition.Itshouldbemadeamplyclear
tothestudentsthatFormativetestsareforimprovementonly.

While Summative evaluation involves marks and/or grade assessment (present practice),
theFormativeonesmustbeusedtoencouragethestudentstoperformbetter.

A combination of Formative and Summative (grading/marks) will help to keep track of


improvement in performance. The faculty and students need to selfassess how the
formativeinputsarebeneficial.

For a reliable and robust evaluation process a number of summative tests must be
taken(morethan3suggested)duringeachsemester.

Transparency, fairness, consistency and accountability in grading must be ensured. The


aggrievedstudentmaybeallowedtoseetheevaluation.

The tests must have components like fundamentals of academics, industry relevant
problems and innovative questionnaire/creativity development challenges. More the
varietyoftests,thegreaterwillbetherobustnessofevaluation.

Weakstudentsshouldbegiveneveryopportunitytoimprove.Thiswilldevelopagreater
respectfortheinstitutionbythestudents.

Many a times, the student does not have an idea of how he/she can perform better,
thoughhe/shepossessestheknowledge.TheFormativeapproachwillhelpachievethis.

Asaneducationsystem,theaimistoimprovethequalityproductfromtheinstitution.So,
acombinationofsummativeandformativeteststojudgevariousattributesofstudentsis
veryimportant.

139


b) Steps:
Organize regular workshops for the faculty, to sensitize them towards Total Quality
Management as applied to Education. It is important to change the conventional mindset
from inspection to a quality improvement mindset. Performance evaluation is both
Summative(measure)andFormative(improve).

Thereshouldbesomesummativeandmany(greatervarietyof)formativeevaluations.The
variety may include identifying how students approach various types of problems
(quantitative, qualitative, logical reasoning, etc). Even the presentation approach may be
tested.Thenthefacultymayidentifyhowtoimprovethese,basedonstudentperformance.

Set new goals for a fair, consistent, transparent and accountable evaluation. Evaluation of
studentsperformanceshouldbedisclosedtothestudents.

Ensure,atleastthreesummativeevaluationsinasemester.Startingoneat4weeksfollowed
by a midsemester evaluation. These are for the purpose of midsemester corrections and
also in identifying critically where the faculty/students need more improvement in the
teaching/learningprocess.

Facilitate faculty efforts to help students to improve their performance through improved
knowledgeandbybetterpresentations.

Developmodusoperandiforvarioustypesofassessmentsincludingopenbooktests/closed
book tests/take home tests/assignment/tutorial/group work test/oral presentation, etc.
Brainstormingwithstudentswillgivemoreinputs.

Theevaluationmusttestnotonlythefundamentalstaughtbutalsotheinnovativeskillsof
the students. Promote a healthy culture for dealing with some challenging and industry
relevantproblems.

Identify mistakes and achievement of desired levels of performance. Develop a detailed


AcademicImprovementPlan.Thiscanbemademandatoryincaseofweakstudents.Their
performanceimprovementmustbecloselymonitored.

Set a process of monitoring the improvement in the performance of all students. A self

c)

assessment by the faculty and the resulting counselling sessions with academically weak
studentsmustbeencouraged.
Benefits:

Improvementinstudentsknowledge,abilitiesandcompetencies.
Improvementinstudentsselfdirectedlearningandinnovativethinking.
Weakstudentswillgetadequateguidanceandopportunitytoimprove.
Academicswillbecloselyrelatedtoindustrialrelevanceandwillpreparestudentsinsolving
challengingsemistructuredproblems(industrycasesetc).

Standardizationoftheevaluationimprovementprocesses.
Developmentof a knowledge base for improvement and its documentation for future use.
Interimchangeinfacultywillhaveminimaleffectintheperformance.

AqualityimprovementfocusedEducationSystemwillthusevolve.
8. Performanceappraisaloffacultybystudentsandfacultycounselling:
This is a very useful tool in improving teaching effectiveness. The purpose of this evaluation should be
clearly understood. The main purpose should be to help a faculty to improve his/her teaching/learning
management skills. Both, the assessment by students and the counselling followed by such assessment
aretohelpafacultyrecognizehis/herweaknessandremedythemtoimprovethelearningofstudents.
There are various variations of the frequency of such assessments. Weaknesses in delivery, lack of
interactivity,emphasisonselflearningandchoiceofassignmentscanallberemediediftheassessmentis
doneduringtheearlypartofthecourse,sayafter10lectures.Anexitassessmenttakenattheendofthe
course gives an insight into the total effectiveness of the course and the learning achievement and
deficiencies.Thisassessmentisusefulbothforthefacultywhoisgoingtotakethenextlevelofthecourse
withthesamebatchofstudents(toascertainthelevelofknowledgeandskillsgainedintheprerequisite
course) and the faculty who delivered the course to rectify his/her shortcomings for the next batch of
students taking the same course (by noting what portions require more emphasis, what additional
knowledge skills and applications to be included). A combination of an initial assessment and an exit
assessment along with a midterm assessment would be the ideal solution as this would allow self
correctionbythefacultyasthecourseprogressesandwouldenhanceteaching/learningeffectiveness.
140

Facultymustbetakenintoconfidencefortheseassessmentsandtheinstrumentsshouldbesodesigned
astoeliminatecasual,bogusorfaultyassessment.Thefacultyshouldsharetheresultsoftheassessment
onlywithhis/herHeadofDepartment.Someinstitutionspublishtheassessmenttorewardgoodteaching
in form of best faculty awards, etc. Faculty is always apprehensive that these assessments could affect
their promotion or vertical mobility. They must be assured that this is not the purpose and in any case
since promotion opportunities occur only once in five years, counselling would have improved the
assessmentgradingofeventhepoorestfacultyoverthisperiod.

a)

SalientPoints:

This is a very useful tool in improving teaching effectiveness. It is important to re


emphasize, that the basic purpose is to help the faculty improve without feeling
threatenedaboutjoblossorpromotion,etc.
Preferably there must be three stages for faculty evaluationEarly (by 1 month),
MidCourse(by23months)andFinal(byendofcourse).
Thefirsttwoshouldbeutilizedformidcoursecorrectionstohelpfacultytobecomemore
effective.
The final assessment is aimed at both assessing the improvements as well as collecting
feedbackthatmaybeusefulforfuturedeliveryofthecoursebythefaculty.
Faculty must be taken into confidence during each assessment and the benefits to the
faculty and students and the improvement in quality of education should be well
explained.
Processmustbedesignedforeffectivedatacollectionforfacultyevaluation.
Eachfacultymustbemotivatedforregularselfassessment.Thiswillgivethefacultyaclear
perspectiveofwhatisexpectedfromher/himforprovidingqualityeducation.
StudentfeedbackandselfassessmentmustbesharedonlywithHoD(forpurelyfacilitative
purposesandtowardsimprovements).
TheBoGmustensurethattheseassessmentsareusedonlyforfacultyimprovementnot
forpromotion,givingincentives,etc.
TheHoDmayappointasuitableCounsellor(e.g.someoneseniorenough/highlyrespectful
withgoodteachingqualities)tohelpthefaculty.
Improvementinteachingmaybemonitoredandresultssharedwiththefaculty.

b) Steps:

Developformatsforstudentfeedbackregardingtheassessmentofafacultyonacourse.
Some benchmarks of IITsystem Feedback Forms may be suitably adopted to individual
contexts.

Similarly, develop the faculty selfassessment formats. This should have important
teaching parameters including use of teaching aids, development of course file,
accessibility of faculty, summary of formative work done by him/her, syllabus covered,
beyondsyllabusefforts,typesoftestsgiven,mandaysdevotedtoformativeefforts,etc.

Promotefacultyselfassessmentandfacilitatefacultysselfimprovementefforts.Thismay
need sharing of improvement areas, joining special courses, etc. But never use negative
methods to pressurize faculty. The focus must remain selfimprovement. So approach
mustbemotivationalandconstructive.

Plantocollectthecomprehensivestudentsfeedbackforfacultyevaluation(atleastthree
timespersemester):

Early (by 1 month) i.e. macro level feedback on the basis of knowledge, skills,
attitudeandvalues.
MidCourse(by23months)detailedfeedbackonthebasisoftotaleffectivenessof
the course contents, delivery and teachinglearning process. Student suggestions
mayhelpinmidsemestercorrections.
Final (by endofcourse) detailed feedback regarding achievement of objectives,
knowledgeskillsandimprovementsneededfurther.

141

c)

Counselling recommendation on the basis of class performance of students and their


feedback. The management skills and participation in other institutional activities must
also be taken into account. These inputs are not for promotion, etc. Ensure that the
assessmentisforthepurposeofimprovementandnotforpromotions,increments,etc.

StudentfeedbackandselfassessmentmustbesharedwithHoDonly.

Assessmentofachievementanddeficiency,ifanymustbecounselledbyHoD.Itmaybe
usefultonominatearespectfulandwidelyacceptablefacultyasacounsellor.Furtherthe
counsellorshouldbeseniortothefacultyconcerned.

Benefits:
Informationthroughthisconceptcanbeusedto:

Helpfacultytoimproveeitherbythemselvesorthroughpropercounsellors,

Improvethequalityoftheteachinglearningprocessanditseffectiveness,

Helptoimprovethecoursecontent,industrialrelevanceandinstructionaldelivery,

Helpcontinuousimprovementinteachingqualityandlearningobjectives,

Helptoimprovetheperformanceofstudentsandthequalityofteaching,and

Continuallymotivatefacultyforgreaterqualityandencouragethemtodobetter.Thiswill
ensure a proper mix of proficiency and efficiency in the quality of instruction offered to
students.

9. IncentivizationofFacultyforContinuingEducation,Consultancy,ResearchandDevelopment,etc.:

All faculty should be encouraged to participate in organizing and/or contributing to, and attending
ContinuingEducation(CE)Programmes,toofferconsultancytoIndustryandtotakepartinResearchand
Development (R&D) activities in the institution. Institutions should prepare, at the beginning of every
semester,afacultyengagementchartwhichshouldindicatenotonlythefacultysteachingcommitments,
but also his/her expected involvement in administration, Continuing Education, network activities,
researchanddevelopmentactivitiesincludingcurriculumandlaboratorydevelopment,consultancy,etc.
Atthebeginningofthenextsemester,everyfacultyshouldfillintheFacultyAchievementChartindicating
theactualhoursspentinvariousactivitiesintheprevioussemesterincludingthevacationperiod(ifused
forsomeoftheseactivities).Thereasonsforoverorunderachievementfromplannedhoursshouldbe
explained. He/She should also indicate his/her achievements during the period e.g. publications,
recognitionandawards,patents,invitedlectures,participationinNationalPolicymakingbodies,student
assessmentgrading,consultancyearnings,etc.

a)

Highlights:

142

Faculty should take active interest in organizing and/orcontributing to and attending CE


programmes.Theinstitutionmustfacilitatesuchpositiveefforts.

Promote resource generation and knowledge dissemination activities, and the benefits
mustbesharedwithotherfaculty.

Institutionsshouldfacilitatebetterworkingconditionsandpromotecriticalandinnovative
thinkinginitiatives.Developacultureforimprovedearningthroughvalueaddedeffortsfor
runningstateofarteducationprogrammesinnewareas/fields.

InstitutionaleffortsforconsultingindustryandinvolvementinR&Dshouldbeadequately
encouraged.

Theemphasisshouldbelaidonmotivatingfacultyfortheseactivities.

A balance has to be maintained between a facultys teaching commitments and his/her


involvementinadministration,CE,networking,R&Dactivities,etc.

Active involvement in each of these activities can be measured by the number of hours
spentonthesetasksinasemester.

Due recognition for involvement in these activities must be given to the faculty. Both
monetary and nonmonetary awards must be given for significant contributions from
institutionalfunds.

b) Steps:

Identifyacademicandcareerprogressionneedsofthefaculty.

Managementshouldbecomeafacilitatortothefacultyscareergrowthandinsupporting
variousCE,consultancy,R&Dactivities,etc.

Motivate faculty for CE. Full institutional support must be extended for attending
conferences, workshops, seminars, etc. outside India. The CE programmes within the
campusorwithinIndiacanbe1or2inatwoyeartimeframe.Abudgetmaybesetaside
forthisactivityeveryyear.

Faculty motivation for consultancy (industry problem solving) must be encouraged. This
should include institutional as well as individual effort through higher benefit sharing.
Similarly, the CE programmes coordinated by faculty must be given due weightage. The
benefitsmustbeadequatelysharedwitheachfaculty.

Motivate faculty for R&D by providing books and journal allowance. Encourage and
support faculty for obtaining higher qualifications such as PhD Faculty may be rewarded
forpublishingqualitypapersinjournalsofhighrepute.

Facilitateanincreasedresearchinteractioninthenetworkforacquiringwiderbenefits.

Systematic assessment of faculty teaching commitments and his/her expected


involvement in administration, Continuing Education, network activities, etc., should be
carriedout.

Eachfacultyshouldberequiredtosubmitaselfassessmentcharteverysemester.Aplan
forvariousactivities,goals,objectivesduringeachyearmayalsobeencouraged.

Motivatethedevelopmentofqualityimprovementproposalsandsupportthesewherever
feasible. Promote innovation and industry relevant enrichments in the academic
programmes.Also,facilitatetheprofessionalcareergrowthoffaculty.

Bestowawardsandmerittothedeservingfacultyforexcellentoverallperformance.

c)

Benefits:

Greateropportunitiesforacademicandprofessionalgrowthfordeservingfaculty.

Facultycanearnmoreandcreatemorevalueforcommunityandindustry.

Better academic reputation and ranking of the institution. All stakeholders will benefit
adequately.

Increase in innovation potential (R&D) and industrial relevance (Consultancy, CE etc.) to


improvethevalue/qualityofacademics.Thiswillresultinimmensebenefitsforstudents
also.

Jobenrichmentandopportunitiestocreatemorevaluewillactasanadditionalincentive
toattractbestfacultyintheincreasinglycompetitivemarket.

143

AnnexII
UNIVERSITYGRANTSCOMMISSION(UGC)GUIDELINES
FORSCHEMEOFAUTONOMOUSINSTITUTIONS
(reproducedfromtheUGCGuidelinesXIPlan)
1.

Objective:

The National Policy on Education (198692) formulated the following objectives for Autonomous
Institutions.AnAutonomousInstitutionwillhavethefreedomto:

2.

Determineandprescribeitsowncoursesofstudyandsyllabi,andrestructureandredesignthe
coursestosuitlocalneeds;

PrescriberulesforadmissioninconsonancewiththeReservationPolicyoftheStateGovernment;

Evolve methods of assessment of students performance, the conduct of examinations and


notificationsofresults;and

Usemoderntoolsofeducationaltechnologytoachievehigherstandardsandgreatercreativity;
and promote healthy practices such as community service, extension activities, project for the
benefitofthesocietyatlarge,neighbourhoodprogrammes,etc.

RelationshipwiththeparentUniversity,theStateGovernmentandothereducationalinstitutions:
Autonomous Institutions are free to make use of the expertise of University departments and other
institutions to frame their curricula, devise methods of teaching, examination and evaluation. They can
recruittheirfacultyaccordingtotheexistingprocedures.
TheparentUniversitywillacceptthemethodologiesofteaching,examination,evaluationandthecourse
curriculum of its autonomous institutions. It will also help the institutions to develop their academic
programmes,improvethefacultyandtoprovidenecessaryguidancebyparticipatinginthedeliberations
ofthedifferentbodiesoftheinstitutions.
TheroleoftheparentUniversitywillbe:

TobringmoreAutonomousInstitutionsunderitsfold;

To promote academic freedom in Autonomous Institutions by encouraging introduction of


innovativeacademicprogrammes;

Tofacilitatenewcoursesofstudy,subjecttotherequiredminimumnumberofhours,instruction
contentandstandards;

Topermitthemtoissuetheirownprovisional,migrationandothercertificates;

Todoeverythingpossibletofosterthespiritofautonomy;

ToensurethatDegrees/Diplomas/Certificatesissuedindicatethenameoftheinstitution;

TodeputevariousnomineesoftheUniversitytoserveinvariouscommitteesoftheautonomous
institutionsandgetthefeedbackontheirfunctioning;and

To create separate wings wherever necessary to facilitate the smooth working of the
AutonomousInstitutions.

TheStateGovernmentwillassisttheAutonomousInstitutionsby:

Avoiding, as far as possible, transfer of faculty, especially in institutions where academic


innovationandreformsareinprogress,exceptforneedbasedtransfers;

Conveying its concurrence for the extension of autonomy of any institution to the Commission
withinthestipulatedtimeof90daysafterreceiptoftheReviewCommitteeReport,failingwhich
itwillbeconstruedthattheStateGovernmenthasnoobjectiontotheinstitutioncontinuingto
beautonomous;and

Deputing nominees on time to the Governing Body and other bodies wherever their nominees
aretobeincluded.
145

3.

Requirement:
TheparentUniversitywillconferthestatusofautonomyuponaninstitutionthatispermanentlyaffiliated,
withtheconcurrenceoftheStateGovernmentandtheUniversityGrantsCommission(UGC).
TheActandStatutesoftheUniversitymayneedtobeamendedtoprovideforthegrantofautonomyof
affiliatedinstitutions.
Before granting autonomy, the University will ensure that the management structure of the applicant
institution is adequately participatory and provides ample opportunities for academicians to make a
creativecontribution.

4.

ProcedureforApprovalbytheUGC:
The approval for the grant of autonomous status will be done in two stages. At StageI, a Screening
CommitteewillbeconstitutedbytheUGC.ThecompositionoftheCommitteewillbeasfollows:

a) Three to five experts nominated by the UGC (one of the experts will be nominated as
Convener)

b) SecretaryofHigherEducationorhis/hernominee(inthecaseofTEQIPII,Secretaryresponsible
fortertiarylevelengineeringeducation)

c) Chairman,StateCouncilforHigherEducationorhis/hernominee(inthecaseofTEQIPII,the
Councilresponsiblefortertiarylevelengineeringeducation)

d) Director of Collegiate Education or his/her nominee (in the case of TEQIPII, the Director
responsiblefortertiarylevelengineeringeducation)

e) ViceChancellororhis/hernominee
f)

JointSecretary(AutonomousInstitutions),MemberSecretary

The Convener will chair the Committee. The cases of short listed institutions shall be sent to the State
Government for approval, wherever required. If no response is received from the State Government
withinaperiodofsixweeks,itwillbeassumedthatithasNoObjectiontotheproposal.
AtStageII,shortlistedinstitutionswillbevisitedbyanotherExpertCommitteeconstitutedbytheUGC.
TheCommitteewillsubmititsreportwithitsfindingsandrecommendationstotheUGC.Thereafter,the
UGCmaysenditsrecommendationtotheUniversityconcernedforconfermentofautonomy.
TheUniversitywillnotifytheinstitutionsconcerned.Autonomywillbeconferredinitiallyforaperiodofsix
years.
5.

UGCguidelinesforcompositionandfunctionsofBoardofGoverningBody:

i) ConstitutionofGoverningBodyofGovernmentFunded/AidedAutonomousInstitution
Number

Category

Educationist, Industrialist,
3Members,
one of them to be Professional
Chairperson
2Members
Facultyoftheinstitution
1Member
1Member
1Member
1Member
1Member

146

Educationistor
Industrialist
UGCnominee
State
Government
nominee
Universitynominee
Principalofinstitution

Nature
NominatedbytheStateGovernment.Persons
of proven academic interest with at least PG
levelqualification
Nominated by the Principal, based on
seniority
NominatedbythePrincipal,fortwoyears
NominatedbytheUGC
NominatedbytheStateGovernment
NominatedbytheUniversity
Exofficio

ii) ConstitutionofGoverningBodyofPrivateUnaidedAutonomousInstitution

Number

Category

Nature

5Members

Management

2Members

Facultyoftheinstitution

1Member

Educationistor
Industrialist
UGCnominee
NominatedbytheUGC
State
Government Academician notbelowtherankofProfessor
nominee
orStateGovernmentofficialofDirectorateof
Higher Education/ State Council of Higher
Education
Universitynominee
NominatedbytheUniversity
Principalofinstitution
Exofficio

1Member
1Member

1Member
1Member

Trust or management as per the constitution


orbyelaws,withtheChairmanorPresident/
DirectorastheChairperson.
Nominated by the Principal, based on
seniority
NominatedbytheManagement

iii)ConstitutionofGoverningBodyofUniversityConstituentAutonomousInstitution

Number

Category

3 Members, one of them Educationist,


tobeChairperson
Industrialist,
Professional
2Members
Facultyoftheinstitution
1Member
State
Government
nominee
1Member
Universitynominee
1Member
UGCnominee
1member
Principalofinstitution

Nature
Nominated by the University, persons of
proven academic interest with at least PG
levelqualification
NominatedbythePrincipal,basedonseniority
NominatedbytheStateGovernment
NominatedbytheUniversity
NominatedbytheUGC
Exofficio

Term:Twoyears,exceptfortheUGCnomineewhosetermwillbeafullsixyears.

Note: TheinstitutionsarerequiredtoconstituteBoGasperUGCafterobtainingautonomousinstitutionstatusfromUGC.

6.

Functions:

Subjecttotheexistingprovisioninthebyelawsofrespectiveinstitutionandruleslaiddownbythe
StateGovernment,theGoverningBody*oftheaboveinstitutionsshallhavepowersto:

Fix the fees and other charges payable by the students of the institution on the
recommendationsoftheFinanceCommittee.

Approve institution of scholarships, fellowships, studentships, medals, prizes and


certificatesontherecommendationsoftheAcademicCouncil.

ApproveinstitutionofnewprogrammesofstudyleadingtoDegreesand/orDiplomas.

Perform such other functions and institute such committees, as may be necessary and
deemedfitfortheproperdevelopment,andfulfilltheobjectivesforwhichtheinstitution
hasbeendeclaredasautonomous.

*Governing Body/Governing Board/Board of Management/Executive Committee/Management


Committee,asmaybenamed.

DeemedtobeUniversities:

TheDeemedtobeUniversitieshavetocomplywiththeBoGstructureasperUGCRegulation2010.

The highest governing body of the deemed to be university shall be a Board of


ManagementtobeheadedbytheViceChancellororadistinguishedacademic.Thisbody
shallconsistofaminimumoftenmembersandamaximumoftwelvemembers.

The number of representative(s)/ nominee(s) of the trust(or) society on the Board of


Managementshallbelimitedtoamaximumoftwo.

TheDepartmentsdealingwithalliedsubjectscouldbegroupedintofaculties.Eachfaculty
maybeheadedbyaDean.

147

BoardofManagementconsistingofthefollowing:
i) ViceChancellor.........Chairperson
ii) ProViceChancellor(whereverapplicable)
iii) DeansofFacultiesnotexceedingtwo(byrotationbasedonseniority)
iv) ThreeeminentacademicsasnominatedbytheChancellor
v) OneeminentacademictobenominatedbytheCentralGovernmentinconsultationwithUGC
vi) Twoteachers(fromProfessors,AssociateProfessors)byrotationbasedonseniority
vii) OnenomineeofthesponsoringSociety
viii) TheRegistrar,whoshallbetheSecretary

148

AnnexIII(a)
DRAFT

MEMORANDUMOFUNDERSTANDING
BETWEEN
MINISTRYOFHUMANRESOURCEDEVELOPMENT
GOVERNMENTOFINDIA
AND
THESTATE/UTOF_______________
FORIMPLEMENTATIONOFPROJECT(TEQIPII)UNDER
TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME

THISMEMORANDUMOFUNDERSTANDINGismadeonthis_____dayof___________2014betweenthe
President of India acting through Shri/Smt _____________________ Education Secretary/ Special
Secretary,MinistryofHumanResourceDevelopment(MHRD),GovernmentofIndia(hereinaftercalledthe
THE FIRST PARTY) and the Governor/Administrator of the State/UT of (name of the State/UT) acting
through Shri/Smt _____________________, Principal Secretary/ Secretary, State/UT of
__________________(hereinaftercalledtheTHESECONDPARTY).

WHEREAS it has been the concern of the THE FIRST PARTY to scaleup and support ongoing efforts to
improve quality of Technical Education and enhance existing capacities of the institutions to become
dynamic,demanddriven,qualityconscious,efficientandforwardlooking,responsivetorapideconomic
and technological developments occurring both at National and International levels. Accordingly, the
GovernmentofIndialaunchedaTechnicalEducationQualityImprovementProgramme(TEQIP)asalong
term Programme of 1012 years duration to be implemented in three phases. The first phase of the
TechnicalEducationQualityImprovementProgramme(TEQIP)commencedinMarch2003andendedin
March2009.Incontinuation,thesecondphaseoftheTEQIPisnowplannedasProjectTEQIPII.

ANDWHEREASinpursuanceofthisconcern,theProjectobjectivesare:
Strengtheninginstitutionstoimprovelearningoutcomesandemployabilityofgraduates
ScalingupPGeducationandDemandDrivenResearch&DevelopmentandInnovation
EstablishingCentersofExcellenceforfocusedapplicableresearch
Trainingoffacultyforeffectiveteaching
EnhancinginstitutionalandSystemManagementeffectiveness

ANDWHEREASthecomprehensivedescriptionandoperatingconditionsfortheProjectarecontainedin
thedocumententitledtheProjectImplementationPlan(hereinaftercalledTHEPIP).

THEPARTIESAGREEASFOLLOWS:

SECTIONA:

AsconditionsforparticipationinTHEPROJECT,THESECONDPARTYagreesto:
establish the State Project Facilitation Unit (hereinafter called THE SPFU) in the Department of
State Government responsible for Technical Education/State Directorate of Technical Education,
headed by Director of Technical Education or the equivalent officer responsible for Technical
Education in that department. He/She will be assisted by an academician in Technical Education
with adequate staff to facilitate implementation and supervision of the project activities, in the
State with 4 Units, namely Academic Unit, Procurement Unit, Financial Management Unit, and
Monitoring&EvaluationUnit[Stateswithlessthan5projectinstitutionstoestablishtwonumber
ofUnitsnamely:(a)AcademicandM&EUnit,and(b)ProcurementandFinancialManagementUnit]
andsustainitwithcontinuitythroughouttheProjectperiod.TheSPFUwillsupervisetheprojectin
theStateprojectinstitutionsandwillfacilitateitssupervisionbyTHEFIRSTPARTYandtheWorld
Bank.

establishStateEvaluationCommitteeandanyotherrelevantCommitteeasandwhennecessary.
establisha910memberStateSteeringCommittee(SSC),withthecompositionasbelow:
Principal Secretary/ Secretary responsible for tertiary level Engineering Education, as the
Chairperson;
Financial Controller of the State Department concerned with tertiary level Engineering
EducationintheState/UTorhis/hernominee;
149

150

Director,DepartmentofHigherEducation,MHRDorhis/hernominee
Twoindustrymembers,nominatedbymajorindustryAssociations;
Three members having recognized expertise and interest in engineering education,
nominatedbytheStateGovernment;
OnenomineeoftheStatePrivateSectorAdvisoryGroup(SPSAG)1;
Commissioner/DirectorforTechnicalEducationintheState[beingHeadoftheStateProject
FacilitationUnit(SPFU)],astheMemberSecretary.

follow the Project guidelines and procedures prescribed in the Project Implementation Plan (PIP)
andasmaybeprescribedfromtimetotimebytheGovernmentofIndiaforimplementationofthe
ProjectinpursuanceoftheobligationssetforthorreferredtointheFinancingAgreementdated
July14,2010betweenIDAandGovernmentofIndia.

follow the procedures for Procurement of all Goods, Works and Services in accordance with the
World Bank Guidelines: Procurement under IBRD Loans and IDA Credits May 2004 and revised
October2006(ProcurementGuidelines);andGuidelines:SelectionandEmploymentofConsultants
by World Bank Borrowers May 2004 and revised October 2006 (Consultancy Guidelines) and the
agreedproceduresandlimitsdescribedintheFinancingAgreement.

establishaStatePrivateSectorAdvisoryGroupintheState(optional).
complywiththefollowing:
toissueorderstoprojectinstitutionstoseekandobtainautonomousstatusaspertheUGC
normsandprocedures.
tocontinuefundingtoprojectinstitutionsbeyondthesecondyearoftheProjectsubjectto
their obtaining the autonomous status (applicable to institutions participating in Sub
component1.1).
to adopt a Block Grant pattern for fund releases of at least the nonsalary nonPlan
componentofgrantstotheprojectinstitutions.
topermitprojectinstitutionstoretainandutilizetherevenuegenerated,including100%of
tuitionandotherfeeandchargesfromstudentswithoutadjustingtherevenueretainedin
theirnonPlangrants.
todirecttheprojectinstitutionstoestablishFourFundseachinaseparateBankaccount,
namely the Corpus Fund, Faculty Development Fund, Equipment Replacement Fund and
MaintenanceFund(formaintenanceofbuildingsandequipment).
to direct each project institution to build these funds with annual contribution into each
fundequaltoatleast0.5%(total2%)ofannualrecurringexpenditureoftheinstitution.
todirecteachinstitutiontoadditionallycontributetheamountofannualsavingsintothe
CorpusFund;andtoissueguidelinesforpropermanagementofthesefundsafterclosureof
thisProject.
to authorize each project institution to fill up the faculty vacancies (over and above the
benchmark value) to 100% on 11 month or longer contracts till such time that these
vacanciesarefilleduponaregularbasis.
toconstituteBoardofGovernorsateachprojectinstitutionandensurethattheBoardof
Governorsmeetsatleast4timesinayear.
to ensure implementation of both academic and nonacademic reforms by all project
institutions.
toensurethatprojectinstitutionssecurepedagogicaltrainingfortheirfaculty.
toextendthebenefitofpedagogicaltrainingtofacultyfromnonprojectinstitutions.
tosponsorandsupportprivateunaidedinstitutions.
to seek allocation of funds under Innovation Fund and Pedagogical Training as per the
provisionsmade.
tosupportandparticipateinthesupportsystemsdevelopedfortheProjectlikeMIS,PMSS,
etc.
to follow the guidelines as per the various manuals developed for the Project like
ProcurementManual,CivilWorksManual,FinancialManagementManual,etc.

FormationofSPSAGisoptionalforaState.IftheSPSAGisconstitutedforaState,thenonlythenominationfromSPSAGwillbe
thereintheSSC.

signMoUswiththeGovernmentfunded,Governmentaidedandprivateunaidedinstitutionsin
theformatssuggestedinPIP.
implement the Disclosure Management Framework under the Project to ensure high level of
transparencyandaccountability.
comply with the terms and conditions for the release of first and subsequent Grant by THE
FIRSTPARTYasdescribedatSectionCandreleaseitsmatchingshareofGrantaccordingly.
submit to THE FIRST PARTY all reports and documents relating to progress of the Project,
Accounts,Audit,Procurement,DisbursementandAnnualWorkPlan,asspecifiedinthePIPand
atsuchfrequencyasmayberequiredbyTHEFIRSTPARTY.
maintainaseparateaccountandrecordoftheProjectGrantreceivedfromTHEFIRSTPARTY
throughtheStateTreasuryandrenderannualaccountsandUtilizationCertificates.
furnishtoTHEFIRSTPARTYquarterlytheFinancialMonitoringReports(FMRs)intheprescribed
formatinaccordancewiththeproceduresasmentionedintheFinancialManagementManual.
gettheaccountsoftheSPFUat(NameoftheprojectState)andtheprojectinstitutionsaudited
as indicated in the PIP. The audited accounts along with a copy of the audit report shall be
furnishedtoTHEFIRSTPARTYeveryyearasperthescheduleindicatedinthePIP.
submitnecessaryUtilizationCertificatestoTHEFIRSTPARTYforreleaseofsubsequentGrant.
meetallnecessaryandincidentalexpensesfortheperformanceofresponsibilitieslikeexpenses
formeetings,travel,professionalfees,costforpreprojectactivities,etc.whichwillnotbethe
liability of the THE FIRST PARTY, unless specifically mentioned under this MoU or otherwise
agreedinwriting.

SECTIONB:

THEFIRSTPARTYagreesto:
releasetheGrantasdescribedatSectionC.
render or arrange to render such technical assistance and guidance as may be needed by THE
SECONDPARTY,fromtimetotimeforaneffectiveandefficientimplementationoftheProject.
takecorrectiveactionswithregardtothenonperforminginstitutionsinStates/UTs.
reviewthefindingsofauditsandmaintainthepolicyreformsandconductevaluationstudies.

SECTIONC:

THE FIRST PARTY and THE SECOND PARTY will jointly share expenditure as approved by the
NationalSteeringCommitteeforTHEPROJECT.THEFIRSTPARTYineachprojectyearwillrelease
the share of Grant for funding Government funded/ Government aided institutions towards the
approvedprojectcostofTHESECONDPARTY,intheratioof75:25betweenTHEFIRSTPARTYand
THESECONDPARTYforallStatesexceptintheSpecialCategoryStates,forwhichtheratiowillbe
90:10.
For private unaided institutions the project cost will be shared in the ratio of 20:20:60 i.e. 20%
funding from institutions, 20% funding as Grant from THE SECOND PARTY and 60% funding as
GrantfromTHEFIRSTPARTYforallStatesexceptintheSpecialCategoryStates,theratiowillbe
90:10.
THE FIRST PARTY will release the Grant as described above to THE SECOND PARTY in four
instalments during eachprojectyear ina timely mannerfor theanticipated expenditures of THE
SECONDPARTYforimplementationofeligibleactivities,providedTHESECONDPARTYreleasesits
matching share as required to be provided by THE SECOND PARTY as the case may be under
intimationtoTHEFIRSTPARTY.DisbursementofGranttoTHESECONDPARTYwillbebasedon
QuarterlyFinancialMonitoringReports(FMRs).
THESECONDPARTYwillmake100percentprovisionintheirbudgetandwillcertifythatthishas
beendonewhenmakingarequestforreleaseofeachinstalmentofCentralshare.
THESECONDPARTYwillberesponsibleforreleaseof Granttotherespectiveinstitutionsasper
theagreementbetweentheStateandtheinstitutionandwillcertifythatthishasbeendonewhen
makingarequestforthereleaseofeachinstalmentofCentralshare.

151

THE FIRST PARTY and THE SECOND PARTY agree to accept the following Key Performance
Indicators(KPIs):
PercentageofUGandPGprogrammesthatareaccredited
Percentageofinstitutionswithacademicautonomy
PercentageoffacultywithaMastersoraPhDdegree
NumberofMastersandPhDstudentsenrolled
PercentagerevenuefromexternallyfundedR&Dprojectsandconsultanciesintotalrevenue
Increaseinthenumberofpublicationsinrefereedjournals
Transitionrateforstudentsfromdisadvantagedbackgroundandbygender

SECTIOND:

THEFIRSTPARTYwillprovideallnecessarysupporttoTHESECONDPARTYinparticular,througha
NationalProjectImplementationUnit(hereinaftercalledTHENPIU).ThefunctionsofTHENPIU
areindicatedinSection5ofTHEPIP.

THESECONDPARTYwillmainlyberesponsibleforimplementingandmonitoringtheProjectinthe
State/UTof_________________withtheassistanceofTHESPFU.ThefunctionsofTHESPFUare
indicatedinSection5ofTHEPIP.
SECTIONE:
TheProjectimplementationschedule:
TheProjectbecameeffectiveonAugust6,2010.
The Project is expected to proceed at uniform rate over four years commenced on August 6,
2010,andexpectedtobecompletedinDecember2014.
SECTIONF:
If,asaresultofslowimplementationbyTHESECONDPARTY,THEFIRSTPARTYincurs
commitmentchargesinrespectoftheFinancingAgreement,THEFIRSTPARTYshallseek
compensationfromTHESECONDPARTYforthesecharges.
SECTIONG:
By this Memorandum of Understanding both parties affirm their commitment to carry out the
activitiesandachievetheobjectivesmutuallyagreedupon.
Any dispute between the parties shall always be resolved by mutual consultation without any
resorttoarbitrationorotherformoflegalremedyincludingresorttoCourtofLaw.
ThisMemorandumofUnderstandingwillcontinuetobeeffectiveuptotheclosureoftheProject.
AdherencetotheimplementationoftheMoUwillbemonitoredbiannually.
Amendment to this MoU, if required, shall be carried out in writing duly authenticated and
executedbyboththeparties.
SignedatNewDelhionthis_____dayof__________2014.

FORANDONBEHALFOF

FORANDONBEHALFOF
TheGovernor/Administrator

ThePresidentofIndia
State/UTGovernmentof
____________________

(Shri/Smt____________________)

(Shri/Smt____________________)
PrincipalSecretary/Secretary

EducationSecretary/SpecialSecretary
(NameoftheProjectState

DepartmentofHigherEducation,
_____________________)

Ministry
of
Human
Resource
Development

GovernmentofIndia

Witness1_____________________

Witness2_____________________
152

AnnexIII(b)
DRAFT

MEMORANDUMOFUNDERSTANDING
BETWEEN
..(NameoftheCentrallyFundedInstitution)
AND
MINISTRYOFHUMANRESOURCEDEVELOPMENT(MHRD)
GOVERNMENTOFINDIA
FORIMPLEMENTATIONOFTEQIPPHASEIIUNDER
TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME

THISMEMORANDUMOFUNDERSTANDINGismadeonthis_____(day)of_______(month)of2014between
the President of India acting through Shri ___________________________ Education Secretary/ Special
Secretary, Ministry of Human Resource Development (MHRD), Government of India (hereinafter called the
THE FIRST PARTY) and ___________________________(name of the Centrally Funded Institution) through
Prof ___________________________, the Director ___________________________(name of the Centrally
FundedInstitution)(hereinaftercalledtheTHESECONDPARTY).

WHEREASithasbeentheconcernoftheTHEFIRSTPARTYtoscaleupandsupportongoingeffortstoimprove
qualityofTechnicalEducationandenhanceexistingcapacitiesoftheinstitutiontobecomedynamic,demand
driven, quality conscious, efficient and forward looking, responsive to rapid economic and technological
developments occurring both at National and International levels. Accordingly, the Government of India
launchedaTechnicalEducationQualityImprovementProgramme(TEQIP)asalongtermProgrammeof1012
years duration to be implemented in three phases. The first phase of the Technical Education Quality
ImprovementProgramme(TEQIP)commencedinMarch2003andendedinMarch2009.Incontinuation,the
secondphaseoftheTEQIPisnowplannedasTEQIPII(hereinaftercalledTheProject).

ANDWHEREASinpursuanceofthisconcern,theProjectobjectivesare:

Strengtheninginstitutionstoimprovelearningoutcomesandemployabilityofgraduates

ScalingupPGeducationandDemandDrivenResearch&DevelopmentandInnovation

EstablishingCentersofExcellenceforfocusedapplicableresearch

Trainingoffacultyforeffectiveteaching

EnhancinginstitutionalandSystemManagementeffectiveness

ANDWHEREASthecomprehensivedescriptionandoperatingconditionsfortheProjectarecontainedinthe
DocumententitledtheProjectImplementationPlan(hereinaftercalledTHEPIP).

THEPARTIESAGREEASFOLLOWS:

SECTIONA:

AsconditionsforparticipationinTHEPROJECT,THESECONDPARTYagreesto:

followtheProjectguidelinesandproceduresprescribedinthePIPandasmaybeprescribedfromtime
totimebytheGovernmentofIndiaforimplementationoftheProjectinpursuanceoftheobligations
setforthorreferredtointheFinancingAgreementdatedJuly14,2010betweenGovernmentofIndia
andIDA.

followtheproceduresforProcurementofallGoods,WorksandServicesinaccordancewiththeWorld
BankGuidelines:ProcurementunderIBRDLoansandIDACreditsMay2004,revisedOctober2006;and
Guidelines:SelectionandEmploymentofConsultantsbytheWorldBankBorrowersMay2004,revised
October2006andtheagreedproceduresandlimitsdescribedintheFinancingAgreement.
achievetargetsgivenintheInstitutionalDevelopmentPlan(IDP).
implement all academic and nonacademic reforms as committed under the Project and contained in
ProjectImplementationPlan,THEPIP.
complywithEnvironmentManagementFramework(EMF).
adheretoEquityActionPlan(EAP).

153

constitute an Institutional TEQIP Unit with senior faculty experienced in their respective functional
areasandsustainitwithcontinuitythroughoutProjectlife.
implement the Disclosure Management Framework under the Project to ensure high level of
transparencyandaccountability.
securepedagogicaltrainingforalltheinstitutionsfaculty.
comply with the terms and conditions for the release of first and subsequent Grants by THE FIRST
PARTYasdescribedatSectionC.
to seek allocation of funds under Innovation Fund and Pedagogical Training as per the provisions
made.
tosupportandparticipateinthesupportsystemsdevelopedfortheProjectlikeMIS,PMSSetc.
to follow the Guidelines as per the various manuals developed for the Project like Procurement
Manual,CivilWorksManual,FinancialManagementManual,etc.
submittoTHEFIRSTPARTYallreportsanddocumentsrelatingtoprogressoftheProject,Accounts,
Audit, Procurement, Disbursement and Annual Work Plan, as specified in the PIP and at such
frequencyasmayberequiredbyTHEFIRSTPARTY.
maintain a separate Account and record of the Project Grant received from THE FIRST PARTY and
renderannualAccountsandUtilizationCertificates.
furnish to THE FIRST PARTY the quarterly Financial Monitoring Reports (FMRs) in the prescribed
formatinaccordancewiththeproceduresasmentionedintheFinancialManagementManual.
gettheAccountsofTHESECONDPARTYauditedasindicatedinthePIP.Theauditedaccountsalong
withacopyoftheAuditReportshallbefurnishedtoTHEFIRSTPARTYeveryyearaspertheschedule
indicatedinthePIP.
submitnecessaryUtilizationCertificatestoTHEFIRSTPARTYforreleaseofsubsequentGrants.
meetallnecessaryandincidentalexpensesfortheperformanceofresponsibilitieslikeexpensesfor
meetings,travel,professionalfeesandothercostsforpreprojectactivities,andthesewillnotbethe
liability of THE FIRST PARTY, unless specifically mentioned under this MoU or otherwise agreed in
writing.

SECTIONB:
THEFIRSTPARTYagreesto:

releasetheGrantasdescribedatSectionC.

render or arrange to render such technical assistance and guidance as may be needed by THE
SECONDPARTY,fromtimetotimeforaneffectiveandefficientimplementationoftheProject.

supervisetheimplementationoftheProjectintheSECONDPARTYsinstitution.

takecorrectiveactionswithregardtothenonperformanceinimplementationoftheProjectbythe
SECONDPARTY.

review the findings of performance audits and maintain the policy reforms and conduct evaluation
studies.

SECTIONC:

154

THE FIRST PARTY will release funds towards the approved project cost to the SECOND PARTYs
institution in four instalments during each Project year in a timely manner for the anticipated
expendituresforimplementationofeligibleactivities.DisbursementofGranttotheSECONDPARTY
willbebasedonQuarterlyFinancialMonitoringReports(FMRs).

THE FIRST PARTY and THE SECOND PARTY agree to accept the following Key Performance
Indicators(KPIs):

PercentageofUGandPGprogrammesthatareaccredited,

PercentageoffacultywithaMastersandPhDdegree,

NumberofMastersandPhDstudentsenrolled,

Fillingvacantpositionsinfacultyandstaff,

PercentagerevenuefromexternallyfundedR&Dprojectsandconsultanciesintotalrevenue,

Increaseinthenumberofpublicationsinrefereedjournals,and

Transitionrateforallstudentsincludingthosewithdisadvantagedbackgroundandbygender.

SECTIOND:

THEFIRSTPARTYwillprovideallnecessarysupporttoTHESECONDPARTYinparticular,througha
NationalProjectImplementationUnit(hereinaftercalledTHENPIU).ThefunctionsofTHENPIUare
indicatedinSection5ofTHEPIP.

SECTIONE:

TheProjectimplementationschedule:

TheProjectbecameeffectiveon6thAugust2010.

TheProjectisexpectedtoproceedatuniformrateoverfouryearscommencedon6thAugust2010
andisexpectedtobecompletedin2014.

SECTIONF:

By this Memorandum of Understanding both parties affirm their commitment to carry out the
activitiesandachievetheobjectivesmutuallyagreedupon.

Any dispute between the parties shall always be resolved by mutual consultation without any
resorttoarbitrationorotherformoflegalremedyincludingresorttoCourtofLaw.

ThisMemorandumofUnderstandingwillcontinuetobeeffectiveuptotheclosureoftheProject.

AdherencetotheimplementationoftheMoUwillbemonitoredbiannually.

Amendment to this MoU, if required, shall be carried out in writing duly authenticated and
executedbyboththeparties.

SignedatNewDelhionthis____dayof_______(month)2014.

FORANDONBEHALFOF
ThePresidentofIndia

FORANDONBEHALFOF
Chairman,BoardofGovernors
.
(NameoftheCentrallyFundedInstitution)

(Prof___________________________)
Director

(Shri/Smt ___________________________)
AdditionalSecretary

..

(NameoftheCentrallyFundedInstitution)

DepartmentofHigherEducation

MinistryofHumanResourceDevelopment

GovernmentofIndia

Witness1___________________________

Witness2___________________________

155

AnnexIII(c)
DRAFT
MEMORANDUMOFUNDERSTANDINGBETWEEN
THESTATE/UTOF__________
AND

(NAMEOFTHEGOVERNMENTFUNDED/GOVERNMENTAIDEDINSTITUTIONUNDERSUBCOMPONENT1.1
OR1.2/PRIVATEUNAIDEDINSTITUTIONUNDERSUBCOMPONENT1.2)FORIMPLEMENTATIONOFPROJECT
TEQIPIIUNDERTECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)PhaseII

THIS MEMORANDUM OF UNDERSTANDING is made on this _____ day of ________ 2014 between the
Governor/AdministratoroftheState/UTof(nameoftheState)throughShri__________________,Secretary,
State of __________________ (hereinafter called the THE FIRST PARTY) and (name of institution) through
Prof __________________, the Director __________________ (hereinafter called the THE SECOND PARTY)
owned and supervised by (name of society/trust) __________________ under Act (if any)
__________________, name of the place ______________, registration number of society/trust
_________________.

WHEREAS it has been the concern of the Government of India to scaleup and support ongoing efforts to
improvequalityofTechnicalEducationandenhanceexistingcapacitiesoftheinstitutionstobecomedynamic,
demanddriven, quality conscious, efficient and forward looking, responsive to rapid economic and
technologicaldevelopmentsoccurringbothatNationalandInternationallevels.Accordingly,theGovernment
ofIndialaunchedaTechnicalEducationQualityImprovementProgramme(TEQIP)asalongtermProgramme
of1012yearsdurationtobeimplementedinthreephases.ThefirstphaseoftheTechnicalEducationQuality
ImprovementProgramme(TEQIP)commencedinMarch2003andendedinMarch2009.Incontinuation,the
secondphaseoftheTEQIPisnowplannedasProjectTEQIPII.

ANDWHEREASinpursuanceofthisconcern,theProjectobjectivesare:
Strengtheninginstitutionstoimprovelearningoutcomesandemployabilityofgraduates
ScalingupPGEducationandDemandDrivenResearch&DevelopmentandInnovation
EstablishingCentersofExcellenceforfocusedapplicableresearch
TrainingoffacultyforeffectiveTeaching
EnhancinginstitutionalandSystemManagementeffectiveness

ANDWHEREASthecomprehensivedescriptionandoperatingconditionsfortheProjectarecontainedinthe
DocumententitledtheProjectImplementationPlan(hereinaftercalledTHEPIP).

THEPARTIESAGREEASFOLLOWS:

SECTIONA:

AsconditionsforparticipationinTHEPROJECT,THESECONDPARTYagreesto:
followtheProjectguidelinesandproceduresprescribedinthePIPandasmaybeprescribedfromtime
totimebytheGovernmentofIndiaforimplementationoftheProjectinpursuanceoftheobligations
setforthorreferredtointheFinancingAgreementdatedJuly14,2010betweenIDAandGovernment
ofIndia.
followtheproceduresforProcurementofallGoods,WorksandServicesinaccordancewiththeWorld
BankGuidelines:ProcurementunderIBRDLoansandIDACreditsMay2004andrevisedOctober2006
(Procurement Guidelines); and Guidelines: Selection and Employment of Consultants by World Bank
Borrowers May 2004 and revised October 2006 (Consultancy Guidelines) and the agreed procedures
andlimitsdescribedintheFinancingAgreement.
obtain Autonomous institution status within a period of two years from the start of the Project
(applicableforinstitutionsselectedunderSubcomponent1.1).
achievetargetsgivenintheInstitutionalDevelopmentPlan(IDP).
implement all academic and nonacademic reforms as committed under the Project and contained in
ProjectImplementationPlan,THEPIP.
complywithEnvironmentManagementFramework(EMF).

156

adheretoEquityActionPlan(EAP).

constituteanInstitutionalProjectUnitwithseniorfacultyexperiencedintheirrespectivefunctional
areasandsustainitwithcontinuitythroughouttheperiodoftheProject.

implement the Disclosure Management Framework under the Project to ensure high level of
transparencyandaccountability.

securepedagogicaltrainingforalltheinstitutionsfaculty.

complywiththetermsandconditionsforthereleaseoffirstandsubsequentGrantsbyTHEFIRST
PARTYasdescribedatSectionC.

to seek allocation of funds under Innovation Fund and Pedagogical Trainingas perthe provisions
made.

tosupportandparticipateinthesupportsystemsdevelopedfortheProjectlikeMIS,PMSS,etc.

to follow the Guidelines as per the various manuals developed for the Project like Procurement
Manual,CivilWorksManual,FinancialManagementManual,etc.

submit to THE FIRST PARTY all reports and documents relating to progress of the Project,
Accounts,Audit,Procurement,DisbursementandAnnualWorkPlan,asspecifiedinthePIPandat
suchfrequencyasmayberequiredbyTHEFIRSTPARTY.

maintain a separate Account and record of the Project Grant received from THE FIRST PARTY
throughStateTreasuryandrenderAnnualAccountsandUtilizationCertificates.

furnish to THE FIRST PARTY quarterly the Financial Monitoring Reports (FMRs) in the prescribed
formatinaccordancewiththeproceduresasmentionedintheFinancialManagementManual.

gettheaccountsofthe_________________(Nameoftheprojectinstitution)auditedasindicated
inthePIP.TheauditedaccountsalongwithacopyoftheAuditReportshallbefurnishedtoTHE
FIRSTPARTYeveryyearasperthescheduleindicatedinthePIP.

submit necessary Utilization Certificates to SPFUname of State/State for release of subsequent


Grants.

meetallnecessaryandincidentalexpensesfortheperformanceofresponsibilitieslikeexpensesfor
meetings,travel,professionalfees,costforpreprojectactivitiesetc.whichwillnotbetheliability
ofTHEFIRSTPARTY,unlessspecificallymentionedunderthisMoUorotherwiseagreedinwriting.

SECTIONB:

THEFIRSTPARTYagreesto:

releasetheGrantasdescribedatSectionC.

render or arrange to render such technical assistance and guidance as may be needed by THE
SECONDPARTY,fromtimetotimeforaneffectiveandefficientimplementationoftheProject.

takecorrectiveactionswithregardtothenonperforminginstitutions.

reviewthefindingsofauditsandmaintainthepolicyreformsandconductevaluationstudies.

SECTIONC:

The MHRD will release the Grant to THE FIRST PARTY in four instalments based on Quarterly
FinancialMonitoringReports(FMRs)duringeachprojectyearinatimelymannerfortheanticipated
expenditures of THE FIRST PARTY for implementation of eligible activities, provided THE FIRST
PARTYreleasesitsmatchingshareasrequiredtobeprovidedbyTHEFIRSTPARTYasthecasemay
beunderintimationtotheMHRD.THEFIRSTPARTYineachprojectyearwillreleasefundstoTHE
SECONDPARTYtowardstheapprovedprojectcostofTHESECONDPARTYinfourinstalments,inthe
ratioof75:25betweenMHRDandTHEFIRSTPARTY.

THEFIRSTPARTYandTHESECONDPARTYagreetoacceptthefollowingKeyPerformanceIndicators
(KPIs):
PercentageofUGandPGprogrammesthatareaccredited

PercentageoffacultywithaMastersoraPhDdegree

NumberofMastersandPhDstudentsenrolled

157

PercentagerevenuefromexternallyfundedR&Dprojectsandconsultanciesintotalrevenue
Increaseinthenumberofpublicationsinrefereedjournals

Transitionrateforstudentsfromdisadvantagedbackgroundandbygender

Institutionsfoundtobechargingcapitationfeeorindulginginanyothermalpracticewillfacepunitive
actionamountingtoeithertheirexclusionfromtheProjectandrecoveryofCentralandStatefunds
providedtothemtillthedateoftheirexclusionorcurtailmentofProjectfunding.

SECTIOND:

THEFIRSTPARTYwillprovideallnecessarysupporttoTHESECONDPARTYinparticular,througha
StateProjectFacilitationUnitnameofState/UT(hereinaftercalledTHESPFU).ThefunctionsofTHE
SPFUareindicatedinSection5ofTHEPIP.

SECTIONE:

TheProjectimplementationschedule:
TheProjectbecameeffectiveon6thAugust2010.

TheProjectisexpectedtoproceedatuniformrateoverfouryearscommencedon6thAugust2010
andisexpectedtobecompletedin2014.

SECTIONF:

By this Memorandum of Understanding both parties affirm their commitment to carry out the
activitiesandachievetheobjectivesmutuallyagreedupon.

Anydisputebetweenthepartiesshallalwaysberesolvedbymutualconsultationwithoutanyresort
toarbitrationorotherformoflegalremedyincludingresorttoCourtofLaw.

ThisMemorandumofUnderstandingwillcontinuetobeeffectiveuptotheclosureoftheProject.

AdherencetotheimplementationoftheMoUwillbemonitoredbiannually.

AmendmenttothisMoU,ifrequired,shallbecarriedoutinwritingdulyauthenticatedandexecuted
byboththeparties.

Signedatonthisdayof2014.

FORANDONBEHALFOF

FORANDONBEHALFOF
Chairman,BoardofGovernors

Governor,State/UTof

___________________

________________
(NameoftheInstitution)

Prof_______________
Shri
Director
PrincipalSecretary/Secretary
________________

NameoftheprojectState/UT
(NameoftheInstitution)

________________

________________
(NameoftheprojectState/UT)

Witness1_____________________

Witness2_____________________

158

AnnexIII(d)
DRAFT
MEMORANDUMOFUNDERSTANDING
BETWEEN
(THESTATE/UTOF____________)
AND
_________________________________
(NAMEOFTHEPRIVATEUNAIDEDINSTITUTIONUNDERSUBCOMPONENT1.1)
FORIMPLEMENTATIONOFPROJECT(TEQIPII)UNDER
TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)PhaseII

THIS MEMORANDUM OF UNDERSTANDING is made on this _____ day of ________ 2014 between the
Governor/AdministratoroftheState/UTof(nameoftheState)throughShri__________,Secretary,State/UT
of__________(hereinaftercalledtheTHEFIRSTPARTY)and(nameofinstitution)throughProf__________,
the Director__________ (hereinafter called the THE SECOND PARTY) owned and supervised by (Name of
Society/Trust _________ under Act_________ Name of the place, Registration Number of society/trust
__________.

WHEREAS it has been the concern of the Government of India to scaleup and support ongoing efforts to
improvequalityofTechnicalEducationandenhanceexistingcapacitiesoftheinstitutionstobecomedynamic,
demanddriven, quality conscious, efficient and forward looking, responsive to rapid economic and
technologicaldevelopmentsoccurringbothatNationalandInternationallevels.Accordingly,theGovernment
ofIndialaunchedaTechnicalEducationQualityImprovementProgramme(TEQIP)asalongtermProgramme
of1012yearsdurationtobeimplementedinthreephases.ThefirstphaseoftheTechnicalEducationQuality
ImprovementProgramme(TEQIP)commencedinMarch2003andendedinMarch2009.Incontinuation,the
secondphaseoftheTEQIPisnowplannedasProjectTEQIPII.

ANDWHEREASinpursuanceofthisconcern,theProjectobjectivesare:
StrengtheninginstitutionstoproducehighqualityEngineersforbetteremployability

ScalingupPGeducationandDemandDrivenResearch&DevelopmentandInnovation

EstablishingCentersofExcellenceforfocusedapplicableresearch

Trainingoffacultyforeffectiveteaching

EnhancinginstitutionalandSystemManagementeffectiveness

ANDWHEREASthecomprehensivedescriptionandoperatingconditionsfortheProjectarecontainedinthe
DocumententitledtheProjectImplementationPlan(hereinaftercalledTHEPIP).

THEPARTIESAGREEASFOLLOWS:

SECTIONA:

AsconditionsforparticipationinTHEPROJECT,THESECONDPARTYagreesto:
follow the Project guidelines and procedures prescribed in the PIP and as may be prescribed from
time to time by the Government of India for implementation of the Project in pursuance of the
obligationssetforthorreferredtointheFinancingAgreementdatedJuly14,2010betweenIDAand
GovernmentofIndia.
follow the procedures for procurement of all Goods, Works and Services in accordance with the
World Bank Guidelines: Procurement under IBRD Loans and IDA Credits May 2004 and revised
October2006(ProcurementGuidelines);andGuidelines:SelectionandEmploymentofConsultantsby
the World Bank Borrowers May 2004 and revised October 2006 (Consultancy Guidelines) and the
agreedproceduresandlimitsdescribedintheFinancingAgreement.
obtainautonomousinstitutionalstatuswithinaperiodoftwoyearsfromthestartoftheProject.
achievetargetsgiveninInstitutionalDevelopmentPlan(IDP).
implementallacademicandnonacademicreformsascommittedundertheProjectandcontainedin
ProjectImplementationPlan,THEPIP.
complywithEnvironmentManagementFramework(EMF).

159

adheretoEquityActionPlan(EAP).

constituteanInstitutionalProjectUnitwithseniorfacultyexperiencedintheirrespectivefunctional
areasandsustainitwithcontinuitythroughouttheperiodoftheProject.

contribute 20% of the project cost for the implementation of project activities as per Project
ImplementationPlan(PIP).

implement the Disclosure Management Framework under the Project to ensure high level of
transparencyandaccountability.

securepedagogicaltrainingforalltheinstitutionsfaculty.

complywiththetermsandconditionsforthereleaseoffirstandsubsequentGrantsbyTHEFIRST
PARTYasdescribedatSectionC.

toseekallocationoffundsunderPedagogicalTrainingaspertheprovisionsmade.

tosupportandparticipateinthesupportsystemsdevelopedfortheProjectlikeMIS,PMSS,etc.

to follow the guidelines as per the various manuals developed for the Project like Procurement
Manual,CivilWorksManual,FinancialManagementManual,etc.

submit to THE FIRST PARTY all reports and documents relating to progress of the Project,
Accounts,Audit,Procurement,DisbursementandAnnualWorkPlan,asspecifiedinthePIPandat
suchfrequencyasmayberequiredbyTHEFIRSTPARTY.

maintain a separate Account and record of the Project Grant received from THE FIRST PARTY
throughStateTreasuryandrenderannualaccountsandUtilizationCertificates.

furnish to THE FIRST PARTY quarterly the Financial Monitoring Reports (FMRs) in the prescribed
formatinaccordancewiththeproceduresasmentionedintheFinancialManagementManual.

gettheAccountsofthe________________(Nameoftheprojectinstitution)auditedasindicatedin
thePIP.TheauditedAccountsalongwithacopyoftheAuditReportshallbefurnishedtoTHEFIRST
PARTYeveryyearasperthescheduleindicatedinthePIP.

submitnecessaryUtilizationCertificatestoSPFU/StateforreleaseofsubsequentGrants.

meetallnecessaryandincidentalexpensesfortheperformanceofresponsibilitieslikeexpensesfor
meetings,travel,professionalfees,costforpreprojectactivitiesetc.whichwillnotbetheliability
ofTHEFIRSTPARTY,unlessspecificallymentionedunderthisMoUorotherwiseagreedinwriting.

SECTIONB:

THEFIRSTPARTYagreesto:

releasetheGrantasdescribedatSectionC.

render or arrange to render such technical assistance and guidance as may be needed by THE
SECONDPARTY,fromtimetotimeforaneffectiveandefficientimplementationoftheProject.

takecorrectiveactionswithregardtothenonperforminginstitutions.

reviewthefindingsofauditsandmaintainthepolicyreformsandconductevaluationstudies.

SECTIONC:

The MHRD will release the Grant to THE FIRST PARTY in four instalments based on Quarterly
FinancialMonitoringReports(FMRs)duringeachprojectyearinatimelymannerfortheanticipated
expenditures of THE FIRST PARTY for implementation of eligible activities, provided THE FIRST
PARTYreleasesitsmatchingshareasrequiredtobeprovidedbyTHEFIRSTPARTYunderintimation
to the MHRD. THE FIRST PARTY in each project year will release funds to THE SECOND PARTY
towardstheapprovedprojectcostofTHESECONDPARTYinfourinstalmentsintheratioof20:20:60
i.e.20%fundingfromTHESECONDPARTY,20%fundingasGrantfromTHEFIRSTPARTYand60%
fundingasGrantfromtheMHRD.

Theprivateunaidedinstitutionsselectedundersubcomponent1.1willbefundedforcarryingoutthe
followingactivities:
ProcurementofLearningResources
StartingnewPGprogrammes
Curricularreforms

160

FacultyandStaffDevelopmentforimprovedcompetenceincludingpedagogicaltrainingof
faculty
Enhancedinteractionwithindustry
Institutionalmanagementcapacityenhancement
Implementationofinstitutionalreforms
Academicsupportforweakstudents

THEFIRSTPARTYandTHESECONDPARTYagreetoacceptthefollowingKeyPerformanceIndicators
(KPIs):
PercentageofUGandPGprogrammesthatareaccredited
PercentageoffacultywithaMastersoraPhDdegree
NumberofMastersandPhDstudentsenrolled
PercentagerevenuefromexternallyfundedR&Dprojectsandconsultanciesintotalrevenue
Increaseinthenumberofpublicationsinrefereedjournals
Transitionrateforstudentsfromdisadvantagedbackgroundandbygender
Institutionsfoundtobechargingcapitationfeeorindulginginanyothermalpracticewillfacepunitive
actionamountingtoeithertheirexclusionfromtheProjectandrecoveryofCentralandStatefunds
providedtothemtillthedateoftheirexclusionorcurtailmentofprojectfunding.

SECTIOND:

THEFIRSTPARTYwillprovideallnecessarysupporttoTHESECONDPARTYinparticular,througha
State Project Facilitation Unit (hereinafter called THE SPFU). The functions of THE SPFU are
indicatedinSection5ofTHEPIP.

SECTIONE:

TheProjectimplementationschedule:
TheProjectbecameeffectiveon6thAugust2010.

TheProjectisexpectedtoproceedatuniformrateoverfouryearscommencedon6thAugust2010
andisexpectedtobecompletedin2014.

SECTIONF:

BythisMemorandumofUnderstandingbothpartiesaffirmtheircommitmenttocarryoutthe
activitiesandachievetheobjectivesmutuallyagreedupon.

Anydisputebetweenthepartiesshallalwaysberesolvedbymutualconsultationwithoutany
resorttoarbitrationorotherformoflegalremedyincludingresorttoCourtofLaw.

This Memorandum of Understanding will continue to be effective up to the closure of the


Project.

AdherencetotheimplementationoftheMoUwillbemonitoredbiannually.

Amendment to this MoU, if required, shall be carried out in writing duly authenticated and
executedbyboththeparties.

SignedatNewDelhionthisdayof2014.

FORANDONBEHALFOF

FORANDONBEHALFOF
Chairman,BoardofGovernors

GovernorofState/UT

________________

(NameoftheInstitution)

Prof
Shri
Director
PrincipalSecretary/Secretary
________________

________________
(NameoftheInstitution) (NameoftheprojectState/UT)
________________
(NameoftheprojectState/UT)

Witness1_____________________
Witness2_____________________
161

AnnexIV(A)

TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)
(PHASEII)

PROPOSALFORMATFOR
SELECTIONOFSTATESANDUNIONTERRITORIES(UTs)

163


EligibilityCriteriaforSelectionofState:

The States2 will be selected based on merit of their proposal and their commitment to the following
eligibilitycriteria:

S.
AttainmentParameters
No.
1. Autonomous Status: The States need to encourage the project institutions participating in sub
component1.1toobtainAutonomousInstitutionstatusasperUGCnormstoenablethemtoimprove
qualityandrelevanceoftheknowledgeandskillsoftheGraduatesthroughbettermentincurriculum
and assessment methods. The States need to issue orders to project institutions before signing of
MoUwithMHRD[referAnnexIII(a)]toseekandobtainautonomousstatusasperUGCnormsand
procedures(referAnnexII).
Continuation of funding to any project institution beyond the second year of the Project will be
subjecttoitsobtainingAutonomousInstitutionstatus.

2.

Decentralization of financing framework: The States need to create an Enabling Financing


Frameworkthatdecentralizesareasonableshareoffinancialdiscretiontotheinstitutionsleadership,
incentivizestheinstitutiontoincreaseitsinternallygeneratedrevenue,andestablishfundstoallow
formidtermfinancialplanning.TheStateneedsto:
Adopt a Block Grant pattern: (as described in AnnexI) for fund release of, at least, the non
salary nonPlan component of grants to the funded (and aided as the case may be) project
institutions. The funds utilization is to be left to the decision of the project institution as it
deems fit during each financial year to achieve its mission, respecting regular Government
purchasingandaccountingguidelines.
AllowRetentionofIRG:Permitprojectinstitutionstoretainandutilizetherevenuegenerated,
including 100% of tuition and other fee and charges from students without adjusting the
revenueretainedintheirnonPlangrants.
AllowEstablishmentoffourfunds:Permitthefundedandaidedprojectinstitutionstoestablish
4 funds (as recommended in AnnexI), each in a separate Bank account, namely the Corpus
Fund, Faculty Development Fund, Equipment Replacement Fund and Maintenance Fund (for
maintenanceofbuildingsandequipment).TheStatesto:
Direct project institutions to build these funds with annual contribution into each fund
equal to at least 0.5% (total 2%) of annual recurring expenditure of the institution, and
directeachprojectinstitutiontoadditionallycontributefromsavingsintotheCorpusFund;
IssueguidelinesforpropermanagementoffourfundsafterclosureofthisProject.
Fillingup the faculty vacancies: The benchmark value for the faculty positions on regular full time
basis for institutions under subcomponent 1.1 and 1.2 are mentioned in Sections 4.3.1 and 4.3.2
respectively.TheStatesneedtoauthorizeeachprojectinstitutiontofillupallfacultyvacanciesona
regularbasis(overandabovethebenchmarkvalue).Tillsuchtimethatthesevacanciesarefilledup
onaregularbasis,theappointmentson11monthorlongercontractmaybepermittedbytheState.
Establishment of SPFU: Establish an SPFU, located in the Department of the State Government
responsibleforTechnicalEducation.TheHeadofSPFUshallbetheDirectorortheequivalentofficer
responsible for Technical Education in that Department and will be designated as the State Project
Advisor (SPA). The SPA will be assisted by a Project Coordinator who will be an academician. State
shouldbewillingtotakeadecisionnottotransfer/changetheSPFUofficialsforthedurationofthe
Project.
Constitution of BoG in each Project Institution: Establish a governance model that will hold each
governmentfundedandgovernmentaidedinstitutionaccountabletowardsgovernment,civilsociety,
andindustry.Inparticular,theStatesneedtoconstitute/ensureformationofaBoardofGovernorsin
eachprojectinstitutionassuggestedinSection5andensurethattheBoardofGovernorsmeetsat
least4timesinayear.
Reforms Implementation: Each State is to implement the Project according to the Project
Implementation Plan. This includes support and facilitation to implement both academic and non
academicreformsprescribedforimplementationbyallprojectinstitutions.(ReferAnnexI)
Conduct of Pedagogical Training: Each State has to ensure that each project institution imparts
pedagogical training to all its faculty members. The benefit of pedagogical training is also to be
extendedtofacultyofnonprojectinstitutionsoncostsharingbasis.

3.

4.

5.

6.

7.

Note: ReleaseofthefirstinstalmentofCentralProjectfundstoaStateforitsinstitutionswillbesubjecttoreceiptbytheNPIUof
thenecessarydocumentationinrespectofcompliancewiththeEligibilityCriteria14.

ThroughoutthePIP,thewordStateimpliesboththeStateGovernmentsandtheUnionTerritoryGovernments.

165

SELECTIONOFSTATES
PARTI

NameoftheState/UT:_______________________________________________________________

1.1

1.2

NameofSecretary/PrincipalSecretarydealingwithEngineeringEducation:______________________
______________________________

1.3

Location of Directorate of Technical Education (DTE)/Department of State Government responsible


forEngineeringEducation:____________________________________________________________

NameoftheDirectorofTechnicalEducation(DTE)/OfficerresponsibleintheDepartmentofState
GovernmentforEngineeringEducation:__________________________________________________

1.4FurnishthebaselinedatainTable27.

1.5

BrieflyexplainthekeypolicyobjectivesandchallengesforTechnicalEducationintheStateandhow
theparticipationintheProjectwillhelpinenhancingqualityofTechnicalEducationaswholeinthe
State?[Maximum2pages]

1.6

Summarize the main steps and challenges to implement increased academic autonomy in the
institutions participating in Subcomponent 1.1. [Eligibility Criteria 1] and establishing a Board of
Governors [Eligibility Criteria 5]. Has the State consulted with affiliating Universities regarding this
aspect?[Maximum1page]

1.7 Summarize the main steps and challenges to implement the enabling financing framework
[EligibilityCriteria2and3].HastheStateFinancingDepartmentbeenconsultedandhasitagreedto
thisframework?[Maximum1page]

1.8 BrieflyexplaintheStatePlanforsustainingthegainsfromtheProjectafteritsclosing.
[Maximumpage]

166

Table27
State/UTLevelAcademicDataforAcademicYear200910

Note:PleasegivetotalsfortherespectivetypeofinstitutionsintheState/UTandthegrosstotalfortheacademicyear20092010

TotalNo.ofStudents
Admitted

No.ofInstitutions

No.ofPrograms

TotalSanctionedSeats

TotalNo.ofStudents
Admitted

(10)

(11)

(12)

(13)

(14)

(15)

(16)

DoctoralDegree3

No.ofPrograms

No.ofPrograms

(6)

(7)

No.ofInstitutions

(5)

TotalNo.ofStudents
Admitted

(4)

TotalSanctionedSeats

(3)

No.ofInstitutions

(2)

TotalNo.ofStudents
Admitted

TotalSanctionedSeats

TotalSanctionedSeats

MastersDegree

(8)

(9)

(Xindicatesthattheinformationnotrequired)

ForDoctoralprograms,pleasegivethetotalnumberofPhDregistrantsduring20092010incolumns4,8,12and16.

167

GrossTotal(totalsintheState/UT
excludingthoseintheCentrally
FundedInstitutions/Universities
andDeemedUniversities)

(1)
BachelorsDegree

PrivateUnaidedInstitutions
includingUniversities/Deemed
Universities

State/UTGovernmentAided
Institutionsincluding
Universities/Deemed
Universities

No.ofPrograms

State/UTGovernmentFunded
InstitutionsincludingUniversities/
DeemedUniversities

No.ofInstitutions

LevelofProgram
inEngineering
Disciplines

PARTII

EssentialcommitmentsfromtheState:

S.
No.

Item

States
Commitment
(Yes/No)

DoestheStateagreeto:
share the project cost of the Government funded and aided institutions with
MHRDintheratioof25:75(10:90incaseofspecialcategoryStates)?

sponsorproposalsfromprivateunaidedinstitutionsandprovidegranttothose
selectedoncostsharingbasisasrecommendedinPIP?

conductthepedagogytrainingforfacultyofnonprojectinstitutions?

considerapplyingforInnovationFund?

implementtheProjectaccordingtotheProjectImplementationPlan?

ensure implementation of both academic and nonacademic reforms by all


projectinstitutions?
encourage the project institutions participating in subcomponent 1.1 to
obtainAutonomousInstitutionstatuswithintwoyears,andaccordinglyissue
orderstoprojectinstitutionstoseekandobtainAutonomousInstitutionstatus
asperUGCnormsandprocedures?

discontinue funding to any project institution beyond the second year of the
Project,iftheinstitutionfailsinobtainingtheAutonomousInstitutionstatusor
neglectsprojectImplementation?
adoptaBlockGrantpatternforfundreleaseofatleastthenonsalarynonPlan
componentofgrantstotheprojectinstitutions?

10

permit project institutions to retain and utilize the revenue generated,


including 100% of tuition and other fee and charges from students without
adjustingtherevenueretainedintheirnonPlangrants?

11

15

permit the project institutions to establish 4 funds each in a separate Bank


account, namely the Corpus Fund, Faculty Development Fund, Equipment
Replacement Fund and Maintenance Fund (for maintenance of buildings and
equipment)asrecommendedinPIP?
authorize each project institution to fill up the faculty vacancies (over and
abovethebenchmarkvalue)to100%on11monthperiodorlongercontracts
tillsuchtimethatthesevacanciesarefilledonregularbasis?
establishStateProjectFacilitationUnit(SPFU)locatedinStateDirectorateof
TechnicalEducation/thedepartmentresponsibleforTechnicalEducationwith
adequatestaffandmaintainthestaffingwithstability?
constitute Board of Governors at each project institution as suggested in
AnnexIIofPIPandensurethattheBoardofGovernorsmeetsatleast4times
in a year and ensure that the main proceedings of the meetings are made
availableontheinternet?
complywithFinancialManagementGuidelinesasdescribedinSection6?

16

followProcurementGuidelinesasdescribedinSection8 ofPIP?

17

complywiththeEquityActionPlanas describedinSection9 ofPIP?

18

comply with the Environment Management Framework as described in


Section10ofPIP?
comply with the Disclosure Management Framework as described in
Section11ofPIP?

12

13

14

19

168

AnnexIV(B).a(i)

TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)
(PHASEII)

FORMAT*FOR
INSTITUTIONALELIGIBILITYPROPOSAL
for
Subcomponent1.1:StrengtheningInstitutionstoimproveLearning
OutcomesandemployabilityofGraduates

*forselectionofInstitutionsin1stCycle.

169

1. INSTITUTIONALBASICINFORMATION
(Note:PleaseinsertthenameofapplicantinstitutionandtheSubcomponentnumberinthefooteroneach
pageoftheproposal.)

1.1

InstitutionalIdentity:

NameoftheInstitution

IstheInstitutionAICTEapproved?

:Yes/No

FurnishAICTEapprovalNo.

TypeofInstitution

:Govt.funded/Govt.aided/Privateunaided/Other

:_____________________________________________

StatusofInstitution

: Autonomous Institute as declared by University / Non


Autonomous/Deemed University/Constituent College/
UniversityTechnicalDepartmentorfacultyorUniversity
ConstituentCollege

NameofHeadoftheInstitution
(Fulltimeappointee)

:_____________________________________________

1.1

AcademicInformation:

EngineeringUGandPGprogrammesofferedinAcademicyear200910

S.
No

Titleof
programmes

Level(UG,
PG,PhD)

Duration
(Years)

Yearof
starting

AICTE
sanctioned
annualintake

Totalstudent
strength

AccreditationStatusofUGprogrammes:

TitleofUG
programmes
beingoffered

Whethereligiblefor
accreditationornot?

Whetheraccreditedas
on31stMarch.2010?

WhetherAppliedforason
31stMarch2010?

AccreditationStatusofPGprogrammes:

TitleofPG
programmes
beingoffered

Whethereligiblefor
accreditationornot?

Whetheraccreditedas
on31stMarch2010?

WhetherAppliedforason
31stMarch2010?

st

1.1 FacultyStatus(Regular/OnContractFacultyasonMarch31 ,2010):

Prof
AssoProf
AsstProf
Lec
Total

10

11

12

13

15=
14 (3+5+7+9+11+13)

TotalNumberofcontract
facultyinPosition

TotalVacancies

TotalNumberofregular
facultyinPosition

Other
Disciplines

BachelorDegree
Engineering
Disciplines

Other
Disciplines

MastersDegree
Engineering
Disciplines

DoctoralDegree
Other
Disciplines

FacultyRank

PresentStatus:NumberinPosition
byHighestQualification

Engineering
Disciplines

No.ofSanctionedRegular
Posts

16= 17=
(215)
(4+6+8+10
+12+14)

Prof=Professor,AssoProf=AssociateProfessor,AsstProf=AssistantProfessor,Lec=Lecturer,R=Regular,C=Contract

171

2. ELIGIBILITYPROPOSAL
2.1 EligibilityCriteria:

InstitutionstobeeligibleforparticipationintheprojectundertheSubcomponent1.1mustmeetthe
followingbenchmarks:
BenchmarksforInstitutionstoQualifyforSubcomponent1.1

S.No.
1

EligibilityParameters
Benchmarkvalues
Agreementtoimplementallacademicandnonacademicreformslistedbelow:
Yes

3
4

CurricularReforms
Exerciseofautonomies
Establishment of Corpus Fund, Faculty Development Fund, Equipment
ReplacementFundandMaintenanceFund
Generation,retentionandutilizationofrevenuegeneratedthroughavarietyof
activities
Fillingupallexistingteachingandstaffvacancies
DelegationofdecisionmakingpowerstoseniorInstitutionalfunctionarieswith
accountability
Improvedstudentperformanceevaluation
Performanceappraisaloffacultybystudents
FacultyincentivesforContinuingEducation(CE),consultancyandR&D
AccreditationofeligibleUGandPGprogrammes

AgeoftheInstitutionfromthestartofitsfirstacademicsession(inyears):
a)RegularStates
b)NewStateslagginginTechnicalEducationandSpecialCategoryStates
TotalnumberofUGandPGprogrammescurrentlyconducted
Faculty positions filled on fulltime basis as percentage of the total faculty
positionssanctionedinaccordancewiththeAICTEprescribedstudenttofaculty
ratiofor:
a) Govt.fundedandGovt.aidedinstitutions
b) Privateunaidedinstitutions
PresenceofBoardofGovernorswithaneminenteducationistorIndustrialistas
theChairperson

6
4
4

*
**
Yes***

Minimum40%regularfacultyofthesanctionedstrengthandaminimumoverallfacultystrengthof50%including
facultyonelevenmonthsorlongerdurationcontract.
These institutions will essentially have to have a minimum of 50% regular faculty as per the AICTE prescribed
facultystudentratio(forNITs&CFIsMHRDnormsasapplicable)withinoneyearofsigningofMoU,failingwhich
projectfundingwillbestopped.

** Faculty strength as per AICTE approved norms out of which at least 50% should be appointed on regular basis
(Please provide the faculty details i.e. name, qualification, department and date of appointment and status
(Regular/Contract).
***

KindlyprovidethefullBoGcompositionwithnamesanddesignations.
Government Funded, Government Aided, Private Unaided and University Constituent Institutions: The BoG
structurerequiredforfulfillingtheeligibilityparametersforparticipationintheprojectisasfollows:
1. TheChairperson
The Chairperson has to be an eminent educationist/ industrialist (should not be an employee of the
institution,aservingGovt.officialoranelectedpeoplesrepresentative)
2. TwotoFivememberstobenominatedbytheRegisteredSociety/Trust

(NotapplicableforGovt.andGovt.aidedinstitutions)
3. Twoeducationist/industrialists
4. OnenomineeoftheAICTE/UGC
5. OnenomineeoftheStateGovernment
6. OnenomineeoftheUniversitytowhichtheInstitutionisaffiliated
7. TwofacultymembersoftheInstitution
8. HeadoftheInstitution,Exofficio

UniversityFaculty/Department/UnitaryConstituentInstitution:TheManagingCommittee(BoG)structureforthe
applicant Faculty or Department or Unitary Constituent Institution (where no other engineering constituent
institution / department / faculty exists under the same university) to be as per the regulations of respective
Universityasmadewillbeconsideredeligible.
DeemedtobeUniversities: The DeemedtobeUniversities has to comply with the BoG structure as per UGC
Regulation2010.
NITs and CFIs: NITs and CFIs have to comply with the BoG structure as per the Act or the Memorandum of
Associationasapplicable.

172

2.2

ProvidesummaryofSWOTanalysis.[Maximum2pages]

2.3

State the general objectives of your proposal and elaborate the specific objectives and expected
results in terms of institutional strengthening and improvements in employability and learning
outcomesofgraduates.TheseobjectiveandresultsshouldbelinkedtotheSWOTanalysis.[maximum
2pages]

2.4

Provide an action plan to achieve the desired results and implement the institutional project.
[maximum2pages]

2.5

DescribethecapacityandstepsforImplementationofthefollowingkeyreforms:[maximum2pages]

a.

How will the institution obtain autonomous status in two years and what are the main
challenges?

b. How will the institution obtain accreditation for its programmes and what are the main
challenges?
c.

HowwilltheinstitutionplanutilizationofBlockGranteffectivelyandefficiently?

d. Howwilltheinstitutionbeabletoincreaseitsnontuitionrevenue?
2.6

Provideinformationrelatedtospecialacademicachievementsoftheinstitutionthatwilladdtothe
qualificationofinstitutiontojointheProject.[maximumpage]

(Enclosesupportingdocument:AICTEMandatoryDisclosurefor20092010)

173

AnnexIV(B).a(ii)

TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)

(PHASEII)

FORMAT*FOR
INSTITUTIONALDEVELOPMENTPROPOSAL
for
Subcomponent1.1:StrengtheningInstitutionstoimproveLearning
OutcomesandemployabilityofGraduates
(TobesubmittedafterobtainingtheclearancefortheEligibilityProposal)

*forselectionofInstitutionsin1stCycle.

175

1.

INSTITUTIONALBASICINFORMATION

(Note:PleaseinsertthenameofapplicantinstitutionandtheSubcomponentnumberinthefooteron
eachpageoftheproposal.)

1.1

InstitutionalIdentity:

NameoftheInstitution

: _____________________________________

IstheInstitutionAICTEapproved?

: Yes/No

FurnishAICTEapprovalNo.
TypeofInstitution

:
: Govt.funded/Govt.aided/Private
unaided/Autonomous/Other

StatusofInstitution

: AutonomousInstituteasdeclaredby
University/Nonautonomous/Deemed
University/Constituent Institution / University
Technical Department or faculty or University
ConstituentCollege

NameofHeadofInstitutionandProjectNodalOfficers

HeadandNodalOfficer
HeadoftheInstitution
(Fulltimeappointee)
TEQIPCoordinator

Name

Phone
Number

Mobile
Number

Fax
Number

Email
Address

ProjectNodalOfficersfor:
AcademicActivities
Civil Works including
Environment
Management
Procurement

Financialaspects

Equity Assurance Plan


Implementation

1.2 AcademicInformation:

EngineeringprogrammesofferedinAcademicyear200910:

S.
No

Titleofprogrammes

Level
(UG,PG,
PhD)

Duration
(Years)

Yearof
starting

AICTEsanctioned
annualIntake

Total
student
strength

AccreditationStatusofUGprogrammes:

TitleofUG
programmes
beingoffered

Whethereligiblefor
accreditationornot?

Whetheraccreditedas
st
on31 March2010?

WhetherAppliedforason
31stMarch2010?

AccreditationStatusofPGprogrammes:

TitleofPG
programmes
beingoffered

Whethereligiblefor
accreditationornot?

Whetheraccreditedas
st
on31 March2010?

WhetherAppliedforason
31stMarch2010?

177

1.3 FacultyStatus(Regular/OnContractFacultyasonMarch31st,2010):

10

11

12

13

15=
14 (3+5+7+9+11+13)

TotalNumberofcontract
facultyinPosition

TotalVacancies

Other
Disciplines

BachelorDegree
Engineering
Disciplines

Other
Disciplines

MastersDegree
Engineering
Disciplines

Other
Disciplines

DoctoralDegree

TotalNumberofregular
facultyinPosition

PresentStatus:NumberinPosition
byHighestQualification

Engineering
Disciplines

FacultyRank

No.ofSanctionedRegular
Posts

16= 17=
(215)
(4+6+8+10
+12+14)

Prof
AssoProf
AsstProf
Lec
Total

Prof=Professor,AssoProf=AssociateProfessor,AsstProf=AssistantProfessor,Lec=Lecturer,R=Regular,C=Contract

1.4

Baseline Data (all data given for the following parameters must be restricted to engineering
disciplines/fieldsonly)

S.
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

18
19
20
21

178

Parameters
Totalstrengthofstudentsinallprogrammesandallyearsofstudyintheyear200910
Totalwomenstudentsinall programmesandallyearsofstudyintheyear200910
TotalSCstudentsinallprogrammesandallyearsofstudyintheyear200910
TotalSTstudentsinallprogrammesandallyearsofstudyintheyear200910
TotalOBCstudentsinallprogrammesandallyearsofstudyintheyear200910
NumberoffullyfunctionalP4andabovelevelcomputersavailableforstudentsinthe
year200910
Total number of text books and reference books available in library for UG and PG
studentsintheyear200910
%ofUGstudentsplacedthroughcampusinterviewsintheyear200910
%ofPGstudentsplacedthroughcampusinterviewsintheyear200910
%ofhighqualityundergraduates(>75%marks)passedoutintheyear200910
%ofhighqualitypostgraduates(>75%marks)passedoutintheyear200910
NumberofresearchpublicationsinIndianrefereed journalsintheyear200910
NumberofresearchpublicationsinInternationalrefereedjournalsintheyear200910
Numberofpatentsobtainedintheyear200910
Numberofpatentsfiledintheyear200910
Numberofsponsoredresearchprojectscompletedintheyear200910
The transition rate of students in percentage from 1st year to 2nd year in the year
200910for:
(i) allstudents
(ii) SC
(iii) ST
(iv) OBC
IRGfromstudents'feeandotherchargesintheyear200910(Rs.Inlakh)
IRG from externally funded R&D projects, consultancies in the year 200910 (Rs. in
lakh)

TotalIRGintheyear200910(Rs.inlakh)
Totalannualrecurringexpenditureoftheapplicantentityintheyear200910(Rs.in
lakh)

2.

2.1

INSTITUTIONALDEVELOPMENTPROPOSAL(IDP)

GivetheExecutiveSummaryoftheIDP.

2.2

ProvidethedetailsofSWOTanalysis(seeAnnexVtoPIP)carriedout(intermsofmethodology
used, analysis and information and data as collected and inferences derived with respect to
strengths,weaknesses,opportunitiesandthreats).

BasedonSWOTanalysis,providethestrategicplandevelopedforinstitutionaldevelopment.

How the key activities proposed in the Institutional Development Proposal are linked with the
resultsofSWOTAnalysis.

2.3

State the specific objectives and expected results of your proposal in terms of, Institutional
strengtheningandimprovementsinemployabilityandlearningoutcomesofgraduates.Theseobjective
andresultsshouldbelinkedtotheSWOTanalysis.

2.4

Provideanactionplanfor:(max1pageeach)
a) Improvingemployabilityofgraduates
b) Increasedlearningoutcomesofthestudents
c) Obtainingautonomousinstitutionstatuswithin2years
d) Achievingthetargetsof50%oftheeligibleUGandPGprogrammesaccreditedwithintwoyears
ofjoiningtheProjectand80%accreditationobtainedandappliedforbytheendoftheProject
oftheeligibleUGandPGprogrammes
e)
Implementationofacademicandnonacademicreforms(detailsgiveninAnnexItoPIP)
f)
Improvinginteractionwithindustry
g)
Enhancementofresearchandconsultancyactivities

2.5 ProvideanactionplanfororganisingaFinishingSchoolandforimprovingtheacademicperformanceof
SC/ST/OBC/academically weak students through innovative methods, such as remedial and skill
development classes for increasing the transition rate and pass rate with the objective of improving
theiremployability.

2.6

ProvideanactionplanforstrengtheningofPGprogrammesandstartingofnewPGprogrammes.

2.7 Attach a summary of Training Needs Analysis carried out. Also, provide Faculty Development Planfor
the first 18 months for improving their teaching, subject area and research competence based on
TrainingNeedsAnalysis(TNA)(seeAnnexVItoPIP)inthefollowingareas.

Basicandadvancedpedagogy
Subject/domainknowledgeenhancement
Attendanceinactivitiessuchasworkshops,seminars
Improvementinfacultyqualifications
Improvingresearchcapabilities

2.8

Provideanactionplanfortrainingtechnicalandotherstaffinfunctionalareas.


2.9 DescribetherelevanceandcoherenceofInstitutionalDevelopmentProposalwithStates/National(in
caseofCFIs)Industrial/EconomicDevelopmentPlan.

2.10 Describebrieflytheparticipationofdepartments/facultyintheIDPpreparation.

2.11 DescribetheInstitutionalprojectimplementationarrangementswithparticipationoffacultyandstaff.

2.12 ProvideanInstitutionalprojectbudgetinTable29.

179


InstitutionalProjectBudgetforSubComponent1.1
[Note: For details of permissible and nonpermissible expenditures, please see Table18 (for Centrally
Funded,Governmentfundedandaidedinstitutions)andTable18(a)(forprivateunaidedinstitutions)]

Infrastructure improvements for teaching, training and


learningthrough:
(i)Modernizationandstrengtheningoflaboratories

(ii)EstablishmentofnewlaboratoriesforexistingUGand
PGprogrammesandfornewPGprogrammes
(iii)Modernizationofclassrooms*

(iv) UpdationofLearningResources

(v)

(vi) Establishment/Upgradation
of
Central
and
DepartmentalComputerCenters*
(vii) Modernization/improvements
of
supporting
departments*
(viii) Modernization and strengthening of libraries and
increasingaccesstoknowledgeresources
(ix) Refurbishment(MinorCivilWorks)*

Providing Teaching and Research Assistantships to increase


enrolment in existing and new PG programmes in
EngineeringdisciplinesandstartingnewPGprogrammes
Enhancement of R&D and institutional consultancy
activities*
FacultyandStaffDevelopment(includingfacultyqualification
upgradation,
pedagogical
training,
and
organising/participation of faculty in workshops, seminars
andconferences)forimprovedcompetencebasedonTNA
EnhancedInteractionwithIndustry

Institutionalmanagementcapacityenhancement

Implementationofinstitutionalacademicreforms

Academic support for weak students under the aegis of


FinishingSchool
Technicalassistanceforprocurementandacademicactivities

10

IncrementalOperatingCost

3
4

Procurementoffurniture

TOTAL

*Notapplicableforprivateunaidedinstitutions.

201415

201314

201213

180

201112

Activities

201011

S.
No

ProjectLife
Allocation

(Rs.inCrore)
Financialyear

2.13

ProvidethetargetsagainstthedeliverableslistedinTable30.

ProjectTargets forInstitutionsunderSubcomponent1.1

S.
No
1

2
3

Deliverables
Numberofstudentsregisteredfor
(a) MastersinEngineeringprogramme
(b) DoctoralprogrammeinEngineering
Revenue from externally funded R&D projects and
consultanciesintotalrevenue(Rs.inlakh)

7
8

Numberofpublicationsinrefereedjournals
a) National
b) International
IRGas%oftotalannualrecurringexpenditure
Number of coauthored publications in refereed
journals
(a) National
(b) International
Studentcredentials
(a) campusplacementrateof
UGstudents
PGstudents
(b) averagesalaryofplacementpackagefor(Rs.
inlakh)
UGstudents
PGstudents
NumberofcollaborativeprogrammeswithIndustry
Accreditationstatus(obtainedplusappliedfor)

Facultypositionfilled

10

Percentage of regular faculty having a Masters


Degree or a Doctorate Degree in Engineering
disciplines
st
nd
Transitratefrom1 to2 yearforthefollowing:
AllStudents
SCandSTStudents
OBCStudents
WomenStudents
Autonomystatus

4
5

11

12
13

EnrolmentoffacultywithonlyBachelorDegreefor
qualificationupgradation

Base
line

Targetstobeachieved
Attheendof2yearsofjoining
Byprojectclosing
theProject

Minimum50%ofUG+PG
For Govt. funded & aided
institutions : 70% (with at least
55% on regular appointment and
remaining on 11 months or
longercontracts)
For Private unaided institutions :
100% (with at least 60% on
regular
appointment
and
remaining on 11 months or
longercontracts)
Increasedby20%and10%
respectivelyoverbaseline

80%ofeligibleUG+PG
programmes
For Govt. funded & aided
institutions:80%(withatleast
60% on regular appointment
and remaining on 11 months
orlongercontracts)
For
Private
unaided
institutions : 100% (with at
least 70% on regular
appointmentandremainingon
11monthsorlongercontracts)
Increasedby40%and20%
respectivelyoverbaseline

Requiredtobeobtained

At least 50% of the faculty with


onlyBachelordegreeatbaseline
at the parent institution or 25%
atotherinstitution

14 Anyotheracademicdeliverables(maximum3)
(i)

(ii)

(iii)

Note:TheaccreditationtargetsforUndergraduateandPostgraduateprogrammeareforNBAaccreditationofprogrammes.

2.14 GiveanactionplanforensuringthattheprojectactivitieswouldbesustainedaftertheendoftheProject.

2.15

Provide a Procurement Plan for the first 18 months for Goods and Civil Works in Table31 and Consultant
ServicesinTable32withbudgetandtimeframe.
2.16 ProvideanyotherinformationrelatedtospecialacademicachievementsasgiveninEligibilityproposalofthe
institution.

These pertain to the entity participating in the Project which may either be the whole stand alone institution or the Faculty /
Department/constituentinstitutionofaUniversityorFaculty/DepartmentofaTechnicalDeemedUniversity.

181

ProcurementPlanforWorksandGoods*forSubcomponent1.1

Nameoftheinstitutionwithlocation:______________________________________________________________________________________________________________

Activities

(2)

(3)

(4)

Estimated
Cost
(Rs)

Method
of
Procurement

(5)

(6)

(7)

Preparation
ofBid
Document
(Date)

Contract
Award
(Date/
Value)

(13)

(14)

Bids
Opening
(Date)

(1)

SlNo.

Description
of
Works/
Goods

Receiptof
BanksNo
Objection
to
Bidding
Document
(Date)**

Invitation
(Date)

Package
No.

Design/Investigation
Estimate
Completion/
Sanctioned
Specification
(Dateand
Finalization
Value)
(Date)

DateofCompletion
ofContract

(10)

(11)

(12)

(8)

(9)

*GoodscoverEquipment,FurnitureandBooksandLearningResources
**ApplicableincaseofPriorReviewbytheWorldBank
Note:ForColumn6,stateICB/NCB/DirectContracting/Shoppingmethodasappropriate

182

ProcurementPlanforConsultantServicesforSubcomponent1.1
Nameoftheinstitutionwithlocation:_______________________________________________________________________________________________________________

(7)

(8)

SL
No

Activities

Descriptionof
Services

Advertisement
(Date)

No
Objection
fromthe
Bankfor
RFP
(Date)**
(9)

RFPFinal
Drafttobe
Forwarded
totheBank
(Date)**

Estimated
Cost
(Rs)

(1)

(2)

(3)

(4)

Methods
of
Selection
@

TOR
Finalization
(Date)

(5)

(6)

RFP
Issued
(Date)

Proposals
Received
(Date)

(10)

(11)

Evaluation
(Date)

No
Objection
bythe
Bank
(Date)**

Contract
Valueand
Dateof
Award

Contract
Completion
(Date)

(12)

(13)

(14)

(15)

@Statewhether(i)Singlefirmorindividual;or(ii)Competitiveprocedure.IfCompetitive,thenstatewhetherQuality&CostBasedSelection(QCBS)orQualityBasedSelection(QBS)procedure
RFP(RequestforProposal):SameasBidDocument#TechnicalandFinancial
**ApplicableincaseofPriorReviewbytheWorldBank

183

AnnexIV(B).a

TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)
PHASEII)

FORMAT*FOR
INSTITUTIONALDEVELOPMENTPROPOSAL
for
Subcomponent1.1:StrengtheningInstitutionstoimproveLearning
OutcomesandemployabilityofGraduates

*OnlyforselectionofGovernment/GovernmentAided/CentrallyFundedInstitutions(CFIs)in2ndCycleofselection
underSubcomponent1.1.

185

1. INSTITUTIONALBASICINFORMATION
(Note:PleaseinsertthenameofapplicantinstitutionandtheSubcomponentnumberinthefooteroneach
pageoftheproposal.)

1.1

InstitutionalIdentity

NameoftheInstitution
:_____________________________________________
IstheInstitutionAICTEapproved? : Yes/No

FurnishAICTEapprovalNo.
TypeofInstitution
StatusofInstitution

NameofHeadoftheInstitution
(Fulltimeappointee)

:
: Govt.funded/Govt.aided/CentrallyFundedIntuition
: Autonomous Institute as declared by University/Non
Autonomous/DeemedtobeUniversity/ConstituentCollegeof
Deemed to be University/ University Technical Department
orfaculty/UniversityConstituentCollege
:_____________________________________________

1.2

AcademicInformation:

EngineeringUGandPGprogrammesofferedinAcademicyear201112:

S.
No

Titleof
programmes

Level(UG,
PG,PhD)

Duration
(Years)

Yearof
starting

AICTEsanctioned
annualintake
(200809onwards)

Totalstudent
strength

AccreditationStatusofUGprogrammes:

TitleofUG
programmesbeing
offered

Whethereligiblefor
accreditationornot?

Whetheraccreditedason
st
31 July2012?

WhetherAppliedforason
st
31 July2012?

AccreditationStatusofPGprogrammes:

TitleofPG
programmesbeing
offered

Whethereligiblefor
accreditationornot?

Whetheraccreditedason
st
31 July2012?

th

WhetherAppliedforason30
st
31 July2012?

1.3 Status of Faculty Associated with Teaching Engineering Students (Regular & Contract) as on
31stJuly2012:

Prof
AssoProf
AsstProf
Lec
Total

10

11

12

13

15=
14 (3+5+7+9+1
1+13)

TotalNumberofcontractfacultyin
Position

TotalVacancies

EngineeringDisciplines

EngineeringDisciplines

SupportingDisciplines
(Physics,Chemistry,
MathsandHumanities)

BachelorDegree

SupportingDisciplines
(Physics,Chemistry,
MathsandHumanities)

MastersDegree

SupportingDisciplines
(Physics,Chemistry,
MathsandHumanities)

DoctoralDegree

TotalNumberofregularfacultyin
Position

PresentStatus:NumberinPosition
byHighestQualification

EngineeringDisciplines

FacultyRank

No.ofSanctionedRegularPosts

16=(215)

17=
(4+6+8+10+1
2+14)

Prof=Professor,AssoProf=AssociateProfessor,AsstProf=AssistantProfessor,Lec=Lecturer,R=Regular,C=Contract

[Kindlyprovideallthedetailsoffacultysuchasnames,qualification,department,designation,dateofappointment
andstatusofappointment(regular/contract].

187

2.ELIGIBILITYCRITERIA
2.1 EligibilityCriteria:

InstitutionstobeeligibleforparticipationintheprojectundertheSubcomponent1.1mustmeetthe
followingbenchmarks:
Table28
BenchmarksforInstitutionstoqualifyforSubcomponent1.1

S.No.
1

EligibilityParameters
Agreementtoimplementallacademicandnonacademicreformslistedbelow:

Benchmarkvalues
Yes

CurricularReforms
Exerciseofautonomies
EstablishmentofCorpusFund,FacultyDevelopmentFund,EquipmentReplacementFund
andMaintenanceFund
Generation,retentionandutilizationofrevenuegeneratedthroughavarietyofactivities
Fillingupallexistingteachingandstaffvacancies
Delegation of decision making powers to senior Institutional functionaries with
accountability
Improvedstudentperformanceevaluation
Performanceappraisaloffacultybystudents
FacultyincentivesforContinuingEducation(CE),consultancyandR&D
AccreditationofeligibleUGandPGprogrammes

3
4

AgeoftheInstitutionfromthestartofitsfirstacademicsession(inyears):
a)RegularStates
b)NewStateslagginginTechnicalEducationandSpecialCategoryStates
TotalnumberofUGandPGprogrammescurrentlyconducted
Faculty positions filled on fulltime basis as percentage of the total faculty positions
sanctionedinaccordancewiththeAICTEprescribedstudenttofacultyratiofor:
a) Govt.fundedandGovt.aidedinstitutions
b) Privateunaidedinstitutions
Presence of Board of Governors with an eminent educationist or Industrialist as the
Chairperson

6
4
4

*
**
Yes***

* Minimum 40% regular faculty of the sanctioned strength and a minimum overall faculty strength of 50%
includingfacultyonelevenmonthsorlongerdurationcontract.

These institutions will essentially have to have a minimum of 50% regular faculty as per the AICTE prescribed
facultystudentratio(forNITs&CFIsMHRDnormsasapplicable)withinoneyearofsigningofMoU,failingwhich
projectfundingwillbestopped.

** Faculty strength as per AICTE approved normsout of which atleast 50% should beappointedon regular basis
(Please provide the faculty details i.e name, qualification, department and date of appointment and status
(Regular/Contract).
*** KindlyprovidethefullBoGcompositionwithnamesanddesignations.
Government Funded, Government Aided, Private Unaided and University Constituent Institutions: The BoG structure
requiredforfulfillingtheeligibilityparametersforparticipationintheprojectisasfollows:

1.

TheChairperson

TheChairpersonhastobeaneminenteducationist/industrialist(shouldnotbeanemployeeoftheinstitution,aservingGovt.officialor
anelectedpeoplesrepresentative)

2.

TwotoFivememberstobenominatedbytheRegisteredSociety/Trust(NotapplicableforGovt.andGovt.aidedinstitutions)

3.

Twoeducationist/industrialists

4.
5.

OnenomineeoftheAICTE/UGC
OnenomineeoftheStateGovernment

6.

OnenomineeoftheUniversitytowhichtheInstitutionisaffiliated

7.

TwofacultymembersoftheInstitution

8.

HeadoftheInstitution,Exofficio

University Faculty/Department/Unitary Constituent Institution: The Managing Committee (BoG) structure for the applicant
Faculty or Department or Unitary Constituent Institution (where no other engineering constituent institution / department /
faculty exists under the same university) to be as per the regulations of respective University as made will be considered
eligible.
DeemedtobeUniversities:TheDeemedtobeUniversitieshastocomplywiththeBoGstructureasperUGCRegulation2010.
NITs and CFIs: NITs and CFIs have to comply with the BoG structure as per the Act or the Memorandum of Association as
applicable.

Note:Enclosesupportingdocument:AICTEMandatoryDisclosurefor20112012or20122013)

188

3.

Baseline Data (all data given for the following parameters must be restricted to engineering
disciplines/fieldsonly):

S.
No
1

Parameters

2010
11

2011
12

Totalstrengthofstudentsinallprogrammesandallyearsofstudy

Totalwomenstudentsinallprogrammesandallyearsofstudy

TotalSCstudentsinallprogrammesandallyearsofstudy

TotalSTstudentsinallprogrammesandallyearsofstudy

TotalOBCstudentsinallprogrammesandallyearsofstudy

NumberoffullyfunctionalP4andabovelevelcomputersavailableforstudents

7
8

TotalnumberoftextbooksandreferencebooksavailableinlibraryforUGandPG
students
%ofUGstudentsplacedthroughcampusinterviews

%ofPGstudentsplacedthroughcampusinterviews

10

%ofhighqualityundergraduates(>75%marks)passedout

11

%ofhighqualitypostgraduates(>75%marks)passedout

12

NumberofresearchpublicationsinIndianrefereedjournals

13

NumberofresearchpublicationsinInternationalrefereedjournals

14

Numberofpatentsobtained

15

Numberofpatentsfiled

16

Numberofsponsoredresearchprojectscompleted

17

18

Thetransitionrateofstudentsinpercentage from1st yearto2nd year for:


(i) allstudents
(ii) SC
(iii) ST
(iv) OBC
IRGfromstudents'feeandothercharges(Rs.Inlakh)

19

IRGfromexternallyfundedR&Dprojects,consultancies (Rs.inlakh)

20

TotalIRG(Rs.inlakh)

21

Totalannualrecurringexpenditureoftheapplicantentity (Rs.inlakh)

Note:

Academicyearforacademicdata :JulyJune
Financialyearforfinancialdata :AprilMarch

189

4. INSTITUTIONALDEVELOPMENTPROPOSAL(IDP)

4.1
4.2

4.3

4.4

GivetheExecutiveSummaryoftheIDP.

y ProvidethedetailsofSWOTanalysis(seeAnnexVtoPIP)carriedout(intermsofmethodology
used, analysis and information and data as collected and inferences derived with respect to
strengths,weaknesses,opportunitiesandthreats).
BasedonSWOTanalysis,providethestrategicplandevelopedforinstitutionaldevelopment.
How the key activities proposed in the Institutional Development Proposal are linked with the
resultsofSWOTAnalysis.
State the specific objectives and expected results of your proposal in terms of, Institutional
strengtheningandimprovementsinemployabilityandlearningoutcomesofgraduates.Theseobjective
andresultsshouldbelinkedtotheSWOTanalysis.

Provideanactionplanfor:(max1pageeach)

(a) Improvingemployabilityofgraduates
(b) Increasedlearningoutcomesofthestudents
(c) Obtainingautonomousinstitutionstatuswithin2years
(d) Achievingthetargetsof50%oftheeligibleUGandPGprogrammesaccreditedwithintwoyears
ofjoiningtheProjectand80%accreditationobtainedandappliedforbytheendoftheProjectof
theeligibleUGandPGprogrammes
(e) Implementationofacademicandnonacademicreforms(detailsgiveninAnnexItoPIP)
(f) Improvinginteractionwithindustry
(g) Enhancementofresearchandconsultancyactivities

4.5 ProvideanactionplanfororganisingaFinishingSchoolandforimprovingtheacademicperformanceof
SC/ST/OBC/academically weak students through innovative methods, such as remedial and skill
development classes for increasing the transition rate and pass rate with the objective of improving
theiremployability.

4.6 ProvideanactionplanforstrengtheningofPGprogrammesandstartingofnewPGprogrammes.

4.7 Attach a summary of Training Needs Analysis carried out. Also, provide Faculty Development Planfor
the first 18 months for improving their teaching, subject area and research competence based on
TrainingNeedsAnalysis(TNA)(seeAnnexVItoPIP)inthefollowingareas.

Basicandadvancedpedagogy
Subject/domainknowledgeenhancement
Attendanceinactivitiessuchasworkshops,seminars
Improvementinfacultyqualifications
Improvingresearchcapabilities

4.8 Provideanactionplanfortrainingtechnicalandotherstaffinfunctionalareas.

4.9 DescribetherelevanceandcoherenceofInstitutionalDevelopmentProposalwithStates/National(in
caseofCFIs)Industrial/EconomicDevelopmentPlan.

4.10 Describebrieflytheparticipationofdepartments/facultyintheIDPpreparation.

4.11 DescribetheInstitutionalprojectimplementationarrangementswithparticipationoffacultyandstaff.

4.12 ProvideanInstitutionalprojectbudgetinTable29.

190

Table29
InstitutionalProjectBudgetforSubcomponent1.1
[Note: For details of permissible and nonpermissible expenditures, please see Table18 (for Centrally
FundedGovernmentfundedandaidedinstitutions)

Improvement in teaching, training and learning facilities


through:

(i)

StartingnewPGprogrammes

(ii)Modernizationandstrengtheningoflaboratories
(iii)EstablishmentofnewlaboratoriesforexistingUGand
PGprogrammesandfornewPGprogrammes
(iv)Modernizationofclassrooms
(v)

UpdationofLearningResources

(vi)

Procurementoffurniture

(vii) Establishment/Upgradation

of
Central
and
DepartmentalComputerCenters
(viii) Modernization/improvements
of
supporting
departments
(ix) Modernization and strengthening of libraries and
increasingaccesstoknowledgeresources
(x) MinorCivilWorks

Providing Teaching and Research Assistantships to


increase enrolment in existing and new PG programmes
inEngineeringdisciplines
Enhancement of R&D and institutional consultancy
activities
Faculty and Staff Development (including faculty
qualification upgradation, pedagogical training, and
organising/participationoffacultyinworkshops,seminars
andconferences)forimprovedcompetence
EnhancedInteractionwithIndustry
InstitutionalManagementCapacityenhancement
Implementationofinstitutionalacademicreforms
Academicsupportforweakstudents
IncrementalOperatingCost

3
4

5
6
7
8
9

TOTAL

201415

Project
Life
Allocation

Activities

201314

S.
No

201213

(Rs.inCrore)
Financialyear

191


ProvidethetargetsagainstthedeliverableslistedinTable30.

4.13

Table30

ProjectTargets5forInstitutionsunderSubcomponent1.1

S.
No

Deliverables
2010
11

Baseline
2011
12

Numberofstudentsregisteredfor
a) MastersinEngineeringprogramme
b) DoctoralprogrammeinEngineering
Revenue from externally funded R&D
projectsandconsultanciesintotalrevenue
(Rs.inlakh)
Numberofpublicationsinrefereedjournals
a) National
b) International
IRG as % of total annual recurring
expenditure
Number of coauthored publications in
refereedjournals
a)National
b)International
Studentcredentials
a)campusplacementrateof
UGstudents
PGstudents
b) average salary of placement package
for(Rs.inlakh)
UGstudents
PGstudents
Number of collaborative programmes with
Industry
Accreditation status (obtained plus applied
for)
Facultypositionfilled

4
5

7
8
9

10

11

12
13

Targetstobeachieved
Attheendof2yearsofjoining
Byprojectclosing
theProject

Minimum50%ofUG+PG

80%ofeligibleUG+PG
programmes

For Govt. funded & aided


institutions : 70% (with at least
55% on regular appointment and
remainingon11monthsorlonger
contracts)
For Private unaided institutions :
100%(withatleast60%onregular
appointmentandremainingon11
monthsorlongercontracts)

For Govt. funded & aided


institutions : 80% (with at least
60% on regular appointment and
remainingon11monthsorlonger
contracts)
For Private unaided institutions
100%(withatleast70%onregular
appointmentandremainingon11
monthsorlongercontracts)

Percentage of regular faculty having a


Masters Degree or a Doctorate Degree in
Engineeringdisciplines
st
nd
Transit rate from 1 to 2 year for the
following:
AllStudents
SCandSTStudents
OBCStudents
WomenStudents
Autonomystatus

Increasedby20%and10%
respectivelyoverbaseline

Increasedby40%and20%
respectivelyoverbaseline

Requiredtobeobtained

Enrolment of faculty with only Bachelor


Degreeforqualificationupgradation

Atleast50% ofthefacultywith
only Bachelor degree at base
line at the parent institution or
25%atotherinstitution

14

Anyotheracademicdeliverables(maximum

3)
(i)

(ii)

(iii)

Note:
TheaccreditationtargetsforUndergraduateandPostgraduateprogrammeareforNBAaccreditationofprogrammes.

4.14

GiveanactionplanforensuringthattheprojectactivitieswouldbesustainedaftertheendoftheProject.

4.15 Provide a Procurement Plan for the first 18 months for Goods and Civil Works in Table31 and Consultant
ServicesinTable32withbudgetandtimeframe.
5

These pertain to the entity participating in the Project which may either be the whole stand alone institution or the Faculty /
Department/constituentinstitutionofaUniversityorFaculty/DepartmentofaTechnicalDeemedUniversity.

192

4.16 Provideanyotherinformationrelatedtospecificacademicachievementsoftheinstitution.

193

Table31
ProcurementPlanforWorksandGoods*forSubcomponent1.1

Nameoftheinstitutionwithlocation:_______________________________________________________________________________________________________________

Invitation
(Date)

Opening
(Date)

(10)

(11)

(12)

(13)

(14)

(1)

(2)

Activities

Method
of
Procurement

(3)

(4)

(5)

(6)

Estimate
Sanctioned
(Dateand
Value)

Preparation
ofBid
Document
(Date)

(8)

(9)

Bids

Sl
No.

Estimated
Cost
(Rs)

Receiptof
BanksNo
Objectionto
Bidding
Document
(Date)**

Contract
Award
(Date/
Value)

Package
No.

Description
of
Works/
Goods

Design/
Investigation
Completion/
Specification
Finalization
(Date)
(7)

Dateof
Completion
ofContract

*GoodscoverEquipment,FurnitureandBooksandLearningResources
**ApplicableincaseofPriorReviewbytheWorldBank.
Note:ForColumn6,stateICB/NCB/DirectContracting/Shoppingmethodasappropriate

195

Table32
ProcurementPlanforConsultantServicesforSubcomponent1.1
Nameoftheinstitutionwithlocation:_______________________________________________________________________________________________________________

Activities

Estimate
dCost
(Rs)

(1)

(2)

(3)

(4)

Methodsof
Selection@

TOR
Finalization
(Date)

(5)

(6)

Advertisement
(Date)

SL
No.

Descriptionof
Services

RFPFinal
Drafttobe
Forwardedto
theBank
(Date)**

No
Objection
fromthe
Bankfor
RFP
(Date)**

RFP
Issued
(Date)

Proposals
Received
(Date)

(7)

(8)

(9)

(10)

(11)

Evaluation
(Date)

No
Objection
bythe
Bank
(Date)**

Contract
Valueand
Dateof
Award

Contract
Completion
(Date)

(12)

(13)

(14)

(15)

@Statewhether(i)Singlefirmorindividual;or(ii)Competitiveprocedure.IfCompetitive,thenstatewhetherQuality&CostBasedSelection(QCBS)orQualityBasedSelection(QBS)procedure
RFP(RequestforProposal):SameasBidDocument#TechnicalandFinancial
**ApplicableincaseofPriorReviewbytheWorldBank

196

AnnexIV(B).b

TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)
(PHASEII)

FORMATFOR
INSTITUTIONALDEVELOPMENTPROPOSAL
for
Subcomponent1.2:ScalingupPostgraduateEducation
and
DemanddrivenResearch&DevelopmentandInnovation

197

1. INSTITUTIONALBASICINFORMATION

(Note:PleaseinsertthenameofapplicantinstitutionandtheSubcomponentnumberinthefooteron
eachpageoftheproposal.)

InstitutionalIdentity:

1.1

1.4.1 NameoftheInstitution

:___________________________________

1.4.2 IstheInstitutionAICTEapproved?

:Yes/No

1.4.3 FurnishAICTEapprovalNo.

1.4.4 TypeofInstitution

:Centrallyfunded/Govt.funded/Govt.aided/
Privateunaided/Autonomous/Others

StatusofInstitution

:AutonomousInstituteasdeclaredby
University/Nonautonomous/Deemed

University/Constituent
Institution/University
Technical Department or faculty or University
ConstituentCollege

1.4.5

NamesofHeadsofInstitutionandProjectNodalOfficers:

HeadsandNodalOfficers

Names

Head of the Institution


(Fulltimeappointee)
TEQIPCoordinator
ProjectNodalOfficersfor:
AcademicActivities
Civil Works including
Environment
Management
Procurement
FinancialAspects
Equity Assurance Plan
Implementation

Phone
Numbers

Mobile
Numbers

Fax
Numbers

Email
Addresses

AICTE
sanctioned
annual
intake

Total
student
strength

1.5 AcademicInformation:

1.5.1 EngineeringprogrammesofferedinAcademicyear200910:

S.
No

Titleof
programmes

Level
(UG,PG,PhD)

Duration
(Years)

Yearof
starting

AccreditationStatusofUGprogrammes:

TitleofUG
programmesbeing
offered

Whethereligiblefor
accreditationornot?

Whetheraccreditedas
st
on31 March2010?

WhetherAppliedfor
ason31stMarch2010?

AccreditationStatusofPGprogrammes:

TitleofPG
programmesbeing
offered

Whethereligiblefor
accreditationornot?

Whetheraccreditedas
st
on31 March2010?

WhetherAppliedfor
ason31stMarch2010?

199

FacultyStatus(Regular/OnContractFacultyasonMarch31st,2010):

1.6

Prof
AssoProf
AsstProf
Lec
Total

Engineering
Disciplines

Other
Disciplines

10

11

12

13

14

15=
(3+5+7+9+
11+13)

TotalVacancies

Other
Disciplines

TotalNumberofregularfaculty
inPosition

Engineering
Disciplines

Engineering
Disciplines

Other
Disciplines

No.ofSanctionedRegularPosts

Faculty
Rank

PresentStatus:NumberinPosition
byHighestQualification
Doctoral
Masters
Bachelor
Degree
Degree
Degree

TotalNumberofcontract
facultyinPosition

16=
17=
(215)
(4+6+8+10+12
+14)

Prof=Professor,AssoProf=AssociateProfessor,AsstProf=AssistantProfessor,Lec=Lecturer,R=Regular,C=Contract

1.7

Baseline Data(all data given for the following parameters must be restricted to engineering
disciplines/fieldsonly):

200

S.
No.
1

Totalstrengthofstudentsinallprogrammesandallyearsofstudyintheyear200910

Totalwomenstudentsinallprogrammesandallyearsofstudyintheyear200910

TotalSCstudentsinallprogrammesandallyearsofstudyintheyear 200910

TotalSTstudentsinallprogrammesandallyearsofstudyintheyear200910

TotalOBCstudentsinallprogrammesandallyearsofstudyintheyear200910

NumberoffullyfunctionalP4andabovelevelcomputersavailableforstudentsintheyear200910

7
8

TotalnumberoftextbooksandreferencebooksavailableinlibraryforUGandPGstudentsintheyear
200910
%ofUGstudentsplacedthroughcampusinterviewsintheyear200910

%ofPGstudentsplacedthroughcampusinterviewsintheyear200910

10

%ofhighqualityunderGraduates(>75%marks)intheyear200910

11

%ofhighqualitypostgraduates(>75%marks)intheyear200910

12

NumberofresearchpublicationsinIndianrefereedjournalsintheyear200910

13

NumberofresearchpublicationsinInternationalrefereedjournalsintheyear200910

14

Numberofpatentsobtainedintheyear200910

15

Numberofpatentsfiledintheyear200910

16

Numberofsponsoredresearchprojectscompletedintheyear200910

17

18
19
20
21
22

Thetransitionrateofstudentsinpercentagefrom1 yearto2 yearintheyear200910for:


(i) allstudents
(ii) SC
(iii) ST
(iv) OBC
IRGfromstudentsfeeandotherchargesintheyear200910 (Rs.inlakh)
IRGfromexternallyfundedR&Dprojects,Consultanciesintheyear200910(Rs.inlakh)
TotalIRGintheyear200910(Rs.inlakh)
Totalannualrecurringexpenditureoftheapplicantentityintheyear200910 (Rs.inlakh)
NumberofJointpublicationswithNationalauthorsintheyear200910

23

NumberofJointpublicationswithInternationalauthorsintheyear200910

24

NumberofR&Dproductscommercializedintheyear200910

25

NumberofjointMTechprogrammeswithinstitutionsundertakenintheyear200910

26

NumberofjointMTechprogrammeswithIndustryundertakenintheyear200910

27

NumberofjointPhDwithinstitutionsundertakenintheyear200910

28

NumberofjointPhDwithIndustryundertakenintheyear200910

29

Numberofjointconsultanciesundertakenwithinstitutionsintheyear200910

30

NumberofjointconsultanciesundertakenwithIndustryintheyear200910

Parameters

st

nd


1.5 InstitutionstobeeligibleforparticipationintheProjectundertheSubcomponent1.2mustfulfilthe
followingbenchmarks:
Table33
BenchmarksforInstitutionstoqualifyforSubcomponent1.2

S.No.

EligibilityParameters

Agreementtoimplementallacademicandnonacademicreformsgivenasbelow:

1.

Benchmark
values

Yes

CurricularReforms
Exerciseofautonomies
Establishment of Corpus Fund, Faculty Development Fund, Equipment Replacement Fund and
MaintenanceFund
Generation,retentionandutilizationofrevenuegeneratedthroughvarietyofactivities
Institutionstofillupallexistingteachingandstaffvacancies
Delegationofdecisionmakingpowerstoseniorfunctionarieswithaccountability
Improvedstudentperformanceevaluation
Performanceappraisaloffacultybystudents
FacultyincentiveforContinuingEducation(CE),consultancyandR&D
AccreditationofUGandPGprogrammes

2.
3.
4.

AutonomousInstitutionStatusbyUGC
Presence of Board of Governors with an eminent educationist or Industrialist as the
Chairperson
PercentageofeligibleUGprogrammesaccreditedplusappliedfor

5.

PercentageofeligiblePGprogrammesaccreditedplusappliedfor

6.

CumulativenumberofPhDsproducedinthelastthreeacademicyears(200708,200809
and200910)or
CumulativenumberofMTechproducedinthelastthreeacademicyears(200708,2008
09and200910)
Facultypositionsfilledonregularfulltimebasisaspercentageoftotalfacultypositions
sanctionedinaccordancewiththeAICTEprescribedstudenttofacultyratiofor:
a)Govt.fundedandGovt.aidedinstitutions
b)Privateunaidedinstitutions
PercentageofregularfacultywithPhDinEngineering
a.RegularStates:Minimum15%offacultywithPhDinEngineeringagainsttotalavailable
facultyforEngineeringdisciplinesonly.

7.

8.

Yes*
Yes**
60%
40%
5

50

***
****
15%

b. Special Category States: Minimum 15% of faculty in Engineering and Basic Sciences
withPhDagainstthetotalavailablefacultyforEngineeringdisciplinesandBasicSciences.

Institutions that have already applied for induction as Autonomous Institution status can also apply. However the selection of such
institutionsandconsequentsigningofMoUwillbesubjecttotheInstitutionhavingactuallyobtainedAutonomousInstitutionstatusby
UGC.

** Govt.Funded,Govt.Aided,Privateunaided,andUniversityConstituentcollegesthatareeitheralreadyautonomousorhaveapplied
forautonomousstatus:TheseInstitutionswillhavetohavetherelevantUGCprescribedBoGstructureforAutonomousInstitutions.
The Chairperson in all cases has to be an eminent educationist/industrialist (should not be an employee of the institution, a serving
Govt.officialoranelectedpeoplesrepresentative).
DeemedtobeUniversities:TocomplywiththeBoGstructureasperUGCRegulation2010.
University Faculty/Department/Unitary Constituent Institution: The Managing Committee (BoG) structure for the applicant Faculty or
DepartmentorUnitaryConstituentInstitution(wherenootherengineeringconstituentinstitution/department/facultyexistsunderthe
sameuniversity)tobeaspertheregulationsofrespectiveUniversityasmadewillbeconsideredeligible.
NITsandCFIs:TocomplywiththeBoGstructureaspertheActortheMemorandumofAssociationasapplicable.
*** Minimum55% regularfacultyofthesanctionedstrengthandaminimumoverallfacultystrengthof65%includingfacultyoneleven
monthsorlongerdurationcontract.

Theseinstitutionswillessentiallyhavetohaveaminimumof65%regularfacultyaspertheAICTEprescribedfacultystudentratio(for
NITs&CFIsMHRDnormsasapplicable)withinoneyearofsigningofMoU,failingwhichprojectfundingwillbestopped.

**** The Private unaided institutions should have faculty strength as per AICTE approved norms out of which at least 65% should be
appointedonregularbasis.

Note:

In respect of accreditation benchmarks for Undergraduate and Postgraduate programmes in Universities, Deemed
Universities, University Constitute Colleges/Faculties/Departments, NAAC accreditation is acceptable at the entry point.
However, all such project entities will have to essentially achieve the Undergraduate and Postgraduate programmes
targetsofNBAaccreditationasgiveninTable35forSubcomponent1.2.

201

2. INSTITUTIONALDEVELOPMENTPROPOSAL(IDP)

2.1

GivetheexecutivesummaryoftheIDP.

2.2

Provide the details (in terms of methodology used, analysis carried out of the data and
information collected and inferences derived with respect to strengths, weaknesses,
opportunitiesandthreats)ofSWOTanalysis(seeAnnexVofthePIP)carriedout.
BasedonSWOTanalysis,providethestrategicplandevelopedforinstitutionaldevelopment.
ShowhowtheresultsofSWOTanalysisarelinkedtothekeyactivitiesproposedintheproposal.

2.3

State the specific objectives and expected results of your proposal in terms of, Scalingup
Postgraduate Education and demanddriven Research & Development and Innovation. These
objectiveandresultsshouldbelinkedtotheSWOTanalysis.

2.4

Provide an action plan for scalingup enrollment into Masters and Doctoral programmes (include
measurestoattractqualifiedstudentsandmaintainhighqualitystandards).

2.5

ProvideanactionplanforimprovingcollaborationwithIndustry.

2.6

Provideanactionplanfor:
o quantitatively increasing and qualitatively improving research by their faculty individually,
jointlyandcollaboratively,

2.7

developingresearchinterestamongundergraduatestudents,and

collaboratingwithIndianandforeigninstitutionsinacademicandresearchareathroughMoUs.

AttachthesummaryofTrainingNeedsAnalysiscarriedout.Also,provideFacultyDevelopmentPlan
fromthefirst18monthstoachieveimprovedcompetencebasedonTrainingNeedsAnalysis(TNA)in
thefollowingareas.

o
o
o
o
o

Basicandadvancedpedagogytraining
Subject/domainknowledgeenhancement
Attendanceinactivitiessuchasworkshops,seminars,etc.
Improvementinfacultyqualifications.
Improvingresearchcapabilities

2.8

Provideanactionplanfortrainingtechnicalandotherstaffinfunctionalareas.

2.9

DescribetherelevanceandcoherenceofInstitutionalDevelopmentProposalwithStates/National(in
caseofCFIs)Industrial/EconomicDevelopmentPlan.

2.10

Describe briefly the participation of departments/faculty in the proposal preparation and


implementation.

2.11

Describetheinstitutionalprojectimplementationarrangements.

2.12

ProvideaninstitutionalprojectbudgetinTableNo.34.

202

Table34
InstitutionalProjectBudgetforSubcomponent1.2

[Note: For details of permissible and nonpermissible expenditures, please see Table19 (for
Centrallyfunded,Governmentfunded,GovernmentAidedandPrivateunaidedinstitutions)]

(Rs.InCrore)

Improvement in teaching, training and learning


facilitiesthrough:

(i)

(ii) Updationoflearningresources

(iii) Procurementoffurniture

(iv) Modernization and strengthening of libraries and


increasingaccesstoknowledgeresources

(v) CivilWorks

Providing Teaching and Research Assistantships for


significantly increasing enrolment in existing and new
Masters and Doctoral programmes in Engineering
disciplines
Enhancement of R&D and institutional consultancy
activities
Faculty and Staff development for improved
competencebasedonTNA
EnhancedinteractionwithIndustry

InstitutionalManagementCapacityenhancement

Implementationofinstitutionalreforms

Academicsupportforweakstudents

IncrementalOperatingCost

3
4

Establishment of new laboratories for new and


existingPGprogrammes,facultyresearch,etc.

TOTAL

201415

201314

201213

201112

Activities

201011

S.
No

ProjectLife
Allocation

Financialyear

203

2.13(a)ProvidethetargetsagainstthedeliverablesgiveninTable35.

Table35:ProjectTargets6forInstitutionsunderSubcomponent1.2

S.
No
1

Deliverables

Numberofstudentsregisteredfor
(a) MastersinEngineeringprogramme
(b) DoctoralProgrammeinEngineering

Revenue from externally funded R&D projects


andConsultanciesintotalrevenue(Rs.inlakh)
Numberof
(a) Researchpublicationsinrefereedjournals
Nationaljournals
Internationaljournals
(b) Citations
(c) Patentsobtained/filed
(d) Books
(e) No.ofR&Dprojectscommercialized
IRGas%oftotalrecurringexpenditure
Number of coauthored publications in
refereedjournals
(a) National
(b) International
Studentcredentials
(a) Campusplacementrateof
UGstudents
PGstudents
(b) Average salary of placement package for
(Rs.inlakh)
UGstudents
PGstudents
Number of collaborative programmes with
Industry
AccreditationStatus(obtainedplusappliedfor)

Facultypositionfilled

10

Percentage of regular faculty with PhD in


Engineeringdisciplines
Anyother(maximumthree)

4
5

11
(i)
(ii)
(iii)

Base
line

Targetstobeachieved
ByProjectclosing
Attheendof
2yearsofjoiningtheProject

At least2
At least 75% of eligible UG
programmesand 60%of eligiblePG
programmes
For Govt. funded & aided
institutions:
80% (with at least 70% on regular
appointment and remaining on 11
monthsorlongercontracts)

ForPrivateunaidedinstitutions:
100% (with at least 70% on regular
appointment and remaining on 11
monthsorlongercontracts)(*)
At least 20% of faculty in
engineeringdiscipline

At least 85% of eligible UG


programmesand70%ofeligible
PGprogrammes
For Govt. funded & aided
institutions:
90% (with at least 75% on
regular
appointment
and
remaining on 11 months or
longercontracts)
ForPrivateunaidedinstitutions:
100% (with at least 75% on
regular
appointment
and
remaining on 11 months or
longercontracts)(**)
At least 25% of faculty in
engineeringdiscipline

*within2yearsofProjectstart

**tobeachievedbyProjectclosure
Note:TheaccreditationtargetsforUndergraduateandPostgraduateprogrammeareforNBAaccreditationofprogrammes.

(b)DescribethePlanindetailforachievementoftheabovetargetsenumeratedinTable35.

2.14

GiveanactionplantoensurethattheprojectactivitieswouldbesustainedaftertheendoftheProject.

2.15

Provide Procurement Plan for the first 18 months for Goods and Civil Works in Table36 and Consultant
ServicesinTable37withbudgetandtimeframe.
2.16 Provideanyotherinformationrelatedtospecialacademicachievementsoftheinstitution.
2.17 Provide an action plan for organising a Finishing School and for improving the academic performance of
SC/ST/OBC/academicallyweakstudentsthroughinnovativemethods,suchasremedialandskilldevelopment
classesforincreasingthetransitionrateandpassratewiththeobjectiveofimprovingtheiremployability.
6

These pertain to the entity participating in the Project which may either be the whole stand alone institution or the Faculty /
Department/constituentinstitutionofaUniversityorFaculty/DepartmentofaTechnicalDeemedUniversity.

204

Table36
ProcurementPlanforWorksandGoods*forSubcomponent1.2
Nameoftheinstitutionwithlocation:_______________________________________________________________________________________________________________

(1)

(2)

Activities

Estimated
Cost
(Rs)

(3)

(4)

(5)

(6)

Design/
Investigation
Completion/
Specification
Finalization
(Date)

Bids

Estimate
Sanctioned
(Dateand
Value)

Preparation
ofBid
Document
(Date)

Receiptof
BanksNo
Objectionto
Bidding
Document
(Date)**

(7)

(8)

(9)

(10)

(11)

Contract
Award
(Date/
Value)

Dateof
Completion
ofContract

(12)

(13)

(14)

Opening
(Date)

Sl
No

Method
of
Procurement

Invitation
(Date)

Package
No.

Description
of
Works/
Goods

*GoodscoverEquipment,FurnitureandBooksandLearningResources
**ApplicableincaseofPriorReviewbytheWorldBank.
Note:ForColumn6,stateICB/NCB/DirectContracting/Shoppingmethodasappropriate

205


Table37
ProcurementPlanforConsultantServicesforSubcomponent1.2

Nameoftheinstitutionwithlocation:________________________________________________________________________________________________________________
RFPFinal
Drafttobe
Forwardedto
theBank
(Date)**

NoObjection
fromtheBank
forRFP
(Date)**

(7)

(8)

(9)

(11)

(12)

(13)

(14)

(15)

RFP
Issued(Date)

Contract
Completion
(Date)

Advertisement
(Date)

(6)

ContractValue
andDateof
Award

TOR
Finalization
(Date)

(5)

NoObjection
bytheBank
(Date)**

Methodsof
Selection@

(4)

Evaluation
(Date)

EstimatedCost
(Rs)

(3)

(1
)

Proposals
Received
(Date)

Descriptionof
Services

(2)

Sl.No.

Activities

(10)

@Statewhether(i)Singlefirmorindividual;or(ii)Competitiveprocedure.IfCompetitive,thenstatewhetherQuality&CostBasedSelection(QCBS)orQualityBasedSelection(QBS)procedure.
RFP(RequestforProposal):SameasBidDocument#TechnicalandFinancial
**ApplicableincaseofPriorReviewbytheWorldBank

206

AnnexIV(B).c

TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)

(PHASEII)

FORMATFOR
DEVELOPMENTPROPOSALFOR
Subcomponent1.2.1:EstablishingCentresofExcellence(CoE)
[ApplicableforInstitutions(CFIs,Govt.funded,Govt.aidedandPrivateunaided)
selectedundersubcomponent1.2]

NameoftheInstitution

:________________________________

NameoftheCentreofExcellencetobeestablished:________________________________

SpecificArea(s)ofexcellence

:________________________________

Note: InstitutionsdesirousforestablishingmorethanoneCentreofExcellenceshouldsubmittheseparate
proposalsaccordingly.

207

PROPOSALFORESTABLIHINGACENTREOFEXCELLENCE

1. InstitutionalIdentity:

1.1

NameoftheInstitution

_________________________________________

TypeofInstitution

CFI/Govt.funded/Govt.aided/Privateunaided/Other

AutonomousInstituteasdeclaredbyUniversity/
Nonautonomous/DeemedUniversity/ConstituentCollege
/University Technical Department or faculty or University
ConstituentCollege

1.2

1.3 StatusofInstitution

1.4

DoestheInstitutionhaveanyCoE?

: Yes/No

IfYes,writethenameofthe
Departmentandspecificareas
ofexcellence

__________________________________________
__________________________________________
__________________________________________

__________________________________________

_________________________________________

1.8

NameoftheCoEtobeestablished

1.9

SpecificAreaofexcellence

1.7 NamesofHeadsofInstitutionsandCoECoordinators:

HeadandCoordinator
HeadoftheInstitution(Full
timeappointee)
CoECoordinator

Name

Phone
Number

Mobile
Number

FaxNumber EmailAddress

EligibilityCriteria:

2.

InstitutionstobeeligibleundertheSubcomponent1.2.1mustfulfilthefollowingbenchmarks:

Table38
BenchmarksforInstitutionstoqualifyforSubcomponent:1.2.1

S.
No.
1

AutonomousInstitutionStatusbyUGC

PercentageofeligibleUGprogrammesintheinstitutionaccreditedorappliedfor

75%

PercentageofeligiblePGprogrammesintheinstitutionaccreditedorappliedfor

60%

PercentageofregularfacultywithPhDinEngineeringaspercentageoftotal
facultyavailableinEngineeringintheinstitution
Numberofsponsoredresearchprojectscompletedintheinstitutioninthelast
threeacademicyears(200910,201011,201112)
CumulativenumberofPhDsproducedinthelastthreeacademicyears(200910,
201011,201112)intheDepartmentsparticipatingforestablishingCoEs

20*

5
6
7

EligibilityParameters

Faculty positions filled on regular full time basis as percentage of total faculty
positionssanctionedinaccordancewiththeAICTEprescribedstudenttofaculty
ratiointheDepartmentsparticipatingforestablishingCoEs

Benchmark
values
Yes

07
12**
70%

Institutionshaving50%ofregularfacultywithPhDinEngineeringofthetotalregularfacultyinEngineering;
outofwhich75%intheproposedthemeareawillbegivenweightage.
** Institutionshavingproduced25Nos.ofPhDsinlastthreeacademicyearwillbegivenweightage.

Note1: The benchmarks prescribed for Subcomponent 1.2 are deemed to have been met by the applicant
Institutions.
Note2: Minimumnumberofparticipatingfacultyinthecentre4.
Note3: In respect of accreditation benchmarks for Undergraduate and Postgraduate programmes in
Universities, Deemed Universities, University Constituent Colleges/Faculties/Departments, NAAC
accreditationisacceptableattheentrypoint.However,allsuchprojectentitieswillhavetoessentially
achieve the Undergraduate and Postgraduate programme targets of NBA accreditation as given in
Table35ofPIPforSubcomponent1.2.

209

3. InstitutionalplanforestablishingCoE:
3.1

GiveanExecutiveSummaryoftheproposalforestablishingCoE.

3.2

Providethedetails(intermsofmethodologyused,analysiscarriedoutofthedataandinformation
collectedandinferencesderivedwithrespecttostrengths,weaknesses,opportunitiesandthreats)
ofSWOTanalysiscarriedout.

3.3

Provideproofofexistingexpertiseinthearea,proofoffocusedactivitytowardsthedesiredgoals
oftheCoE(publications,MastersandPhDthesis),andnamesofparticipatingfacultywithlevelof
engagement(intermsofpercentageoftimetobegiventotheCoEactivity).

Provide specific evidence to the potential economic and social impact that this particular CoE
proposalanditspartnerscanbring.

3.4

StatethespecificobjectivesoftheCenterofExcellence.

3.5

Giveadetailedadministrative/managementandimplementationstructuretobefollowedwiththe
hierarchyandthefundflowchart(reducedadministrativehurdlesinexecution,independenceof
action to participating faculty in the COE with respect to project related decisions, structure for
disbursementoffundstoparticipatingfacultyforequipmentpurchase/qualityenhancementetc.)

3.6

GivethedetailsonengagementofvariousdepartmentsintheinstitutionforCoEactivities.

3.7

ProvidetheCV,includingthepublicationlistof:(i)thetwomostimportantPrincipalInvestigators
fromtheinstitutionstoparticipateintheCoE;(ii)thethreemostimportantresearcherfromthe
private sector/knowledge user partners; and (iii) provide the CV of up to 5 other institutional
faculty/researchersthatwillparticipateintheCoE.

3.8

Giveanactionplanfortheproposedresearchareasandtheresultstobeachievedalongwitha
briefreviewofliterature.TheseobjectivesshouldbelinkedtotheSWOTanalysis.

3.9

Indicate the collaborative arrangements made/under discussion with industries and research
institutions / organizations within India and abroad. Attach letter of commitment from the
collaborating companies/institutions with the list of detailed commitments, including incash
contributionstotheCoEandtherupeevalueofeachmajorinkindsupport.

3.10 Giveanactionplanforcommunicationtopolicymakersandpotentialusersofresearchfindings
anduseofCoEfacilitiesforsolvingreallifeproblems.
3.11

Giveanactionplanfortechnologytransfer,commercializationofresearch,orotherwaysofusing
theR&Dresultsforeconomicandsocialbenefit.

3.12 Give an action plan for scalingup PhD & Masters enrolment in the thematic area, and describe
other plans for how this CoE will improve quality of education in the institutions, including UG
education.
3.13 GiveaprocurementplanforGoodsandConsultantServicesasperTables36and37.
3.14 ProvidebudgetforestablishingCentreofExcellenceinTable39.
3.15 ProvidetheincrementalinstitutionalprojecttargetsagainstthedeliverablesindicatedinTable40
inadditiontothetargetsunderSubcomponent1.2withplanforachievingthesame.
3.16 Give an action plan on how the institution will ensure that the CoE research activities would be
sustainedaftertheendoftheProject.

210

Table39
ProjectBudgetforSubcomponent1.2.1
Note:Fordetailsofpermissibleandnonpermissibleexpenditures,pleaseseeTable19(a)
S
No

Activities

Project
Life
Allocation

3
4

5
6

201213

201314

Improvement in research and development facilities


through*:

(i)

Establishmentofnewlaboratoriesfor applicablethematic
research
(ii) Establishment of knowledge resource center (Library) in
thethematicarea
(iii) Procurementoffurniture
(iv) MinorCivilWorks

Financialyear(Rs.Incrore)

Providing Teaching and Research Assistantships for


enrolment in Masters and Doctoral programmes in topics
linkedtoeconomicorsocietalneedsinthethematicareas
Collaboration with Industry for applicable research and
productdevelopment
National/International collaboration for Research and
DevelopmentactivitieswithacademicinstitutionsandR&D
organizations
Enhancing research competence of faculty and knowledge
sharinginthematicareas,bothwithinIndiaandabroad
IncrementalOperatingCost
TOTAL

201415

*NotapplicableforPrivateunaidedInstitutions.

211

Table40
IncrementalProjectTargetsforCentreofExcellence

Note:ThesetargetsarespecifictoCoEandarethusoverandabovethoseforSubcomponent1.2of
theProject.

S.
No.
1

6
7

Numberofpatentsfiled

NumberofexternalR&Dprojects

12

NumberofIndustryChairssecured
NumberofMoUswithacademia:
(a) National
(b) International
NumberofMoUswithindustry:
(a) National
(b) International
Number of products, research
commercialized

13

Anyother(maximumthree)

10

11

212

NumberofInternationalExchangeprogrammes

Targetstobeachieved
Attheendof
ByProject
2years
closing

Number of individual publications in peerreviewed


journals:
(a) National
(b) International
Number of coauthored publications in peerreviewed
journalswithnamesofauthors:
(a) National
(b) International
Number of exchange of research students with
collaboratinginstitutions:
(a) National
(b) International
Number of exchange of research faculty with
collaboratinginstitutions:
(a) National
(b) International
Numberofpatentsobtained

Baseline
(201011)

Deliverables

and

services

(i)

(ii)

(iii)

Table41
ProcurementPlanforWorksandGoods*forSubcomponent1.2.1

Nameoftheinstitutionwithlocation:__________________________________________________________________________________________

(1)

Activities

Description
of
Works/
Goods

(3)

Estimated
Cost
(Rs)

(2)

(4)

(5)

(6)

Preparatio
nofBid
Document
(Date)

Receiptof
BanksNo
Objection
to
Bidding
Document
(Date)**

Bids
Opening
(Date)

Sl
No

Design/
Investigation Estimate
Completion/ Sanctioned
Specification (Dateand
Finalization
Value)
(Date)

Invitation
(Date)

Package
No.

Method
of
Procureme
nt

Contract
Award
(Date/
Value)

(13)

(7)

(8)

(9)

(10)

(11)

(12)

*GoodscoverEquipment,FurnitureandBooksandLearningResources
**ApplicableincaseofPriorReviewbytheWorldBank.
Note: (i)ForColumn6,stateICB/NCB/DirectContracting/Shoppingmethodasappropriate.
(ii)ProcurementPlanforGoodsNotApplicableforprivateunaidedinstitutions
213

Dateof
Completion
ofContract

(14)

Table42
ProcurementPlanforConsultantServicesforSubcomponent1.2.1

Nameoftheinstitutionwithlocation:_______________________________________________________________________________
ContractValueand
DateofAward

NoObjectionby
theBank
(Date)**

Evaluation(Date)

Proposals
Received(Date)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(12)

(13)

(14)

@Statewhether(i)Singlefirmorindividual;or(ii)Competitiveprocedure.IfCompetitive,thenstatewhetherQuality&CostBasedSelection
(QCBS)orQualityBasedSelection(QBS)procedure.
RFP(RequestforProposal):SameasBidDocument#TechnicalandFinancial
**ApplicableincaseofPriorReviewbytheWorldBank
214

Contract
Completion
(Date)

TOR
Finalization
(Date)

RFP
Issued(Date)

Methodsof
Selection@

NoObjectionfrom
theBankforRFP
(Date)**

EstimatedCost
(Rs)

(1)

Advertisement
(Date)

Descriptionof
Services

(11)

Activities

(10)

Sl.No.

RFPFinalDraftto
beForwardedto
theBank(Date)**

(15)

AnnexV

GUIDELINESONSTRENGTHS,WEAKNESSES,OPPORTUNITIESANDTHREATS(SWOT)
ANALYSIS

1. Introduction:
SWOT,isananalysismethod,whichisusedinstrategicplanningfortheinstitutionsandconsistsofthe
initiallettersofconceptsofStrengths,Weaknesses,OpportunitiesandThreats.
Strategicplanning is aprocess in which futureaims are determined together with the stakeholders and
responsibilitiesandresourcesareallocatedinaccordancewiththesefutureaims.Itisaprocessbetween
thepointsaninstitutionstandspresentlyandthepointsittriestoreachinacertainperiodoftime.The
concept of strategic planning is closely related with the concept of foresight. In this regard, strategic
planning can be considered as the collection of systematic efforts of experts for the best choice of the
future.
Theaimofstrategicplanningistoproduceplannedfacilities,embodytheappointedpolicies,followthe
application efficiently and take the initiative and provide for effective participation. In the process of
strategicplanning,someofthefundamentalquestionsareneededtobeanswered.ThoseareWhereare
we?,Howcanwereachourdesiredgoal?AndHowcanweevaluateoursuccess?
InstitutionsareexpectedtomakeaStrategicPlantogainabetterperceptionofongoingquestforquality
educationandfulfillingitsmissionandrealizingitsvision.
2.

SalientPoints:

Asamediumofadministration,SWOTanalysisisusedinmakingaplan,definingaproblemand
alsoidentifyingasolutionforit,makingastrategyandgivingananalyticdecision.Itisatoolfor
auditinganinstitutionanditsenvironment.Itisafirststageofplanningwhichhelpstofocuson
keyissues.

TheroleofSWOTanalysisistotaketheinformationfromtheenvironmentalscanandseparateit
into internal and external issues. SWOT analysis determines if the information indicates
something that will assist the institution in accomplishing its objectives or if it indicates an
obstaclethatmustberemovedorminimizedtoachievedesiredresults.

SWOTanalysisisscalable,collaborative,integrateable,simpleandcostefficient.

3. StepstoconductaSWOTAnalysis:
i) TeamworkandStakeholderParticipation:
The first step involves setting up a team of the key stakeholders of the institution to carry out the
consultations/brainstorming. The team essentially has to be participatory and should encourage all
participants to be candid and constructive. Involving maximum students, faculty and staff in the
brainstorming will help to bring out information, determine the most important Strengths,
Weaknesses,OpportunitiesandThreats,andprioritizetheactions.
Thebrainstormingmaybecarriedoutinseparategroupsofstudents,usinganappropriatefacilitator
foreachgroup.Alternatively,theinternalStrengthsandWeaknessescouldbeidentifiedseparatelyby
eachgroupandbroughttogethertodiscusstheexternalOpportunitiesandThreats,andtheStrategic
Planning.Foraverylargeinstitution,theSWOTanalysismaybedonedepartmentwisetorevealthe
Strengths,Weaknesses,OpportunitiesandThreats.
ii) DataAnalysis:
Collectalltheparticipantsinaroomwithablackboard/flipcharts/computerprojection.Explainthe
objectiveandprocessoftheexercisetothem.Encourageacongenialatmosphereforafreeflowof
information,insistingonfocus,specificityandbrevity.Thefacilitatorshouldkeepthediscussiongoing
andarapporteurshouldbewritingthepointsontheboard/charts/computerforalltosee.
Collectively list all strengths that exist. Then list all weaknesses by avoiding modesty and over
estimation.Berealistic.
Listallopportunitiesthatexistforthefuture.Thenlistallthreatsthatexistinthefuture.
215

Data, which is gained through either formal or informal information, can be used in the process of
strategicplanning.Bythisway,withthehelpofSWOTanalysis,itiseasytodetermineaninstitutions
presentsituationandwhetherthatinstitutionfunctionsproperlyornot.

TheinstitutionneedstoreviewtheSWOTanalysisanddothestrategicplanningtomeettheobjectives,
addressingeachofthefourareas.

iii)

StrategicPlanning:

a) Strengths: The Strengths can be identified by thinking in terms of capabilities, recognition,


competitive advantages, resources, assets, people (experience, knowledge, their culture, values,
attitudes and behaviors), innovative aspects, marketing, quality of programmes, location,
accreditations,qualifications,certifications,andprocesses/systemsthroughthefollowing:

Resources and capabilities that can be used as a basis for developing a competitive
advantage.

Strengthsshouldberealisticandnotmodest.

Strengthsshouldanswer:

o
o
o
o
o
o

Advantagesoftheinstitution
Theactivitiestheinstitutioncanplantodobetter
Therelevantresourcesonwhichtheinstitutionhasaccessto
Visionofothersaboutinstitutionsstrengths
UniqueSellingPoints(USPs)
Financialreservesoftheinstitutionsalongwithreturnsfromfeesandothersources

Method to use each strength: The strengths would normally support the achievement of the
objective,maybeusefultoleverageotherbenefits.

b) Weaknesses: The Weaknesses can be identified by thinking in terms of disadvantages, gaps in


capabilities; lack of competitive strength, reputation, financial, timescales/deadlines, weak core
activities, distractions, morale, leadership, accreditations, continuity, robustness and
processes/systemsthroughthefollowing:

Internal forces that could serve as a barrier to maintain or achieve a competitive


advantage,alimitation,faultordefectoftheinstitution.

Weaknessesshouldbetruthfulsothattheymaybeovercomeasquicklyaspossible.

Weaknessesshouldanswer:
o
o
o
o
o
o
o

Thepossibilityofimprovements
Weakprocessesandsystemsandinadequatefacilities
Lackofcompetitivestrengths
LackofIndustry/networkpartners
Planpredictability
Financialsituation,cashflowandcashdrainoftheinstitution
Means to perform in a more effectively and efficient manner, changes in the
institutionstohelpthemfunctionmoreefficiently

Method to stop each Weakness: The institutions need to identify the Weaknesses and take
remedialmeasurestoovercomethem.

c) Opportunities: The Opportunities can be identified by thinking in terms of market developments,


competitorvulnerabilities,industrytrends,andgeographicalpartnershipsthroughthefollowing:

o
o
o
o
o

216

Thegoodopportunitiesfacingus
Theinterestingtrendsweareawareof
Technologydevelopmentandinnovation
Growingstudentdemand
Increasedattractionforqualifiedfuturefaculty

o
o
o
o
o
o
o

Researchinnicheareas
Geographicalexpansion
Employmentandindustrytrends
UniqueSellingPoints(USPs)
IndustryInstitutionpartnership
Innovations,productdevelopment,patent,businessdevelopment
Globalinfluences,opportunities

Method to exploit each opportunity: These are attractive external factors that can help the
institutiondevelopandimprove.Theyneedtobeprioritizedonthebasisoftheirbenefitstothe
institutionintheshort(12years),medium(45years)andlongterm(810years).

d) Threats:TheThreatscanbeidentifiedbythinkingintermsofexternalforcesthatcouldinhibitthe
maintenanceorattainmentofacompetitiveadvantageoranyunfavorablesituationintheexternal
or internal environment that is potentially damaging at the present and in future through the
following:

o
o
o
o
o
o
o
o
o
o
o

Obstaclesfacedbytheinstitutionsocial,politicalandmanagerial
Doingsofthecompetitors
Changeintherequiredspecificationsforservicesoftheinstitution
Threatsofchangingtechnology
Decliningsupplyofqualifiedfaculty
Lossofkeyfacultyandstaff
Decliningqualityofstudents
Difficultyofsustaininginternalcapabilities
Lackofnewideasandaccesstofastchangingtechnology
LackofindustryInstitutionpartnership
Financialstatusandsustainablefinancialbackingoftheinstitution

Methodtodefendagainstthreats:Theseareexternalfactorsbeyondtheinstitutionscontrol,but
theinstitutionmusthaveaPlantoaddresstheonesthathaveahighprobabilityofoccurringand
present a serious risk to the achievement of the objective. If there are sufficient Strengths and
Opportunitiesintheinstitution,alltherisksneednotbeaddressed.
4.

SWOTAnalysislimitations:
The classification of some factors as Strengths or Weaknesses, or as Opportunities or Threats is
somewhat arbitrary. For example, a particular institutions culture can be either Strength or a
Weakness. A technological change can be either a Threat or an Opportunity. Perhaps what is more
importantthanthesuperficialclassificationofthesefactorsistheinstitutionsawarenessofthemand
itsdevelopmentofastrategicplantousethemtoitsadvantage.

217

AnnexVI

GUIDELINESONTRAININGNEEDSANALYSIS(TNA)

1. Introduction:

Training Needs Analysis (TNA) is a series of activities to define the gap between the current and the
desiredindividualandorganizationalperformances.Itidentifiestheareaswherebothindividualsandan
organizationwouldbenefitfromtraininginordertobecomemoreeffectiveatachievingtheindividuals
ownobjectivesandtheobjectivesoftheOrganization.
TNAisasystematicprocessbasedonspecificinformationconvergingtechniques.Itproceeds in stages,
withthefindingsofonestagehelpingtoshapethenextone.Eachparticularstagerequiresitsownmixof
observationsandanalysis.Itisnotaonetimeevent.Organizationsneedtocarryitouteveryyearandthe
training/development plan resulting from it is to be implemented in the following year. TNA gives
performanceimprovement,introductionofnewsystem,taskortechnologyandorganizationalbenefits.

2. Scope:

AllclassIVstaff
Allsupportstaffandtechnicalstaff
Allfaculty(includingcontractualandadhoc)
AllHeadsoftheDepartmentsandDeans
Alladministrativestaff(includingfinancepersonnel)
Principal/Director

3. Suggestedtrainingdomains:

Table43
SuggestedTrainingDomainsforFacultyandVariousCategoriesofStaff

S.
Staff/Faculty
No
Category
1 ClassIVStaff
2 SupportStaff

SuggestedAreasofTraining/Development

Attitudinalandmindsetchange,personalitydevelopment,motivation
Attitudinalandmindsetchange,personalitydevelopment,communicationskills,
motivation,officemodernization,advancelearningintheirrelevantoccupational
areas,otherfeltneeds
TechnicalStaff
Attitudinalandmindsetchange,Personalitydevelopment,Communicationskills,
Motivation, Operation and Maintenance of modern laboratory and advanced
equipment, Advance learning in their relevant occupational areas, other felt
needs
Attitudinalandmindsetchange,Personalitydevelopment,Communicationskills,
Faculty
Motivation, Qualification upgradation, Effective teaching learning (pedagogy)
(including
contractual and processes,Advancedsubjectknowledge,AdvancedR&Dactivities,lab/workshop
development, Quality management, Standard conferences, consultancy, other
adhoc)
feltneeds
HoDsandDeans Attitudinalandmindsetchange,Personalitydevelopment,Communicationskills,
Motivation, Qualification upgradation, Effective teaching learning (pedagogy)
processes,Advancedsubjectknowledge,AdvancedR&Dactivities,Lab/workshop
development, Quality Management, Attachment to industry and premiere R&D
organizations, consultancy, Planning and Implementation, Budgeting Financial
Management, Management Capacity Development, Departmental / Institutional
Management,otherfeltneeds
Attitudinalandmindsetchange,Personalitydevelopment,Communicationskills,
Administrative
Staff (including Motivation, Institutional Development Management, Quality Management,
Management Information System, Planning and Implementation, Budgeting and
finance
Financial Management, Systems Automation, Management Capacity
personnel)
Development,HumanResourceManagement,otherfeltneeds
Principal/
InstitutionalDevelopmentandManagement,QualityManagement,Management
Director
Capacity Development, Planning and Implementation, Budgeting and Financial
Management,Extensionofservices,Exposuretopremiereinstitutions/Centresof
Excellence(NationalandInternational),Sustainabilitystrategy,otherfeltneeds

219

4. Procedure:

4.1

All staff, faculty, Heads of Department/Sections and Institutional Project Coordinator of the
institutionarerequiredtofilluparelevantTNAproformaasindicatedbelow:

Table44
ListofTNAproformaforfacultyandvariouscategoriesofstaff

S.No.

1
2
3
4
5
6
7
8
9

Staff/FacultyCategory

ClassIVStaff
SupportStaff
TechnicalStaff
Faculty(includingcontractualandadhoc)
HoDsandDeans
AdministrativeStaff(includingfinancepersonnel)
Principal/Director
ConsolidatedDepartmentalTraining/DevelopmentPlan
ConsolidatedInstitutionalTraining/DevelopmentPlan

ApplicableTNAProforma

ProformaI
ProformaII
ProformaIII
ProformaIV
ProformaV
ProformaVI
ProformaVII
ProformaVIII
ProformaIX

4.2

FollowinginformationmaybeusedbytheindividualsforexercisingTNA:
InstitutionsStrategicDevelopmentPlan
Institutions(recent)SWOTanalysis
PreviousyearsDevelopment/Trainingplans
Seniorsand/orPeersfeedback
Studentsfeedback
Feedbackonpreviouslyattendedtrainingprogrammes

Anyotherrelevantfeedback

4.3

Eachstaffmemberandfacultyshouldanalyzehis/hercurrentknowledgeandskills,andthedesired
knowledge and skills for effective performance of his/her current jobprofile as well as perceived
future/prospective job profile. To takeup the exercise of TNA, staff and faculty are suggested to
usetheinformation/feedbackasmentionedatSubhead4.2(incasesuchinformation/feedbackis
not available they should have discussions with their students/peers/seniors/HoD/Principal/
Director). While analyzing the training needs, a staff member should align his/her personal
developmentobjectiveswiththoseofthedepartment.
In cases of training in specialized subject areas and R&D skills, faculty are expected to have
communication with the organization(s) where such trainings are available in order to furnish
informationpertainingtotheduration,period(tentativedate)andtrainerorganization,intheTNA
proforma (this will essentially be helpful to HoD and Principal/Director in finalizing a Plan for
deputingstaffandfacultyinaphasedmanner).

AllstaffmembersandfacultywillneedtosubmitthedulyfilledinTNAproformaindicatingtraining
needsalongwiththeirdevelopmentobjectives,totheHoDwithinthreeweeks.

4.4

HoDsshouldreviewthedepartmentsindividualfilledinTNAproforma,makeanattempttoalign
the individual development aspirations with the departments objectives/ priorities, and
consolidate into a Departmental Training/Development Plan (ProformaVIII), including HoDs own
training/developmentneeds.
HoDs should submit within two weeks, the Departmental Training/Development Plan
(ProformaVIII)alongwithanUndertakingthatthesameisresultedfromanactualneedsanalysis

oftheDepartment,forPrincipals/Directorsapproval.

4.5

Principal/Director will review all Departments/Sections Training/Development Plans, make an


attempttoalignitwiththeinstitutionsobjectives/priorities,andconsolidateintoanInstitutional
Training/Development
Plan
(ProformaIX),
including
Principals/Directors
own
training/developmentneeds.

4.6

Principal/DirectorwillrecommendtheInstitutionalTraining/DevelopmentPlan(ProformaIX)along
with an Undertaking that the same is resulted from an actual Training Needs Analysis of the
institution,forBoGsapproval.

5. ConvergenceofTNA:
The exercise of TNA at various levels finally converges into an Institutional Training/Development Plan,
comprising a shortterm (up to three months) training/development plan and a longterm (above three
months)Training/DevelopmentPlan.

6. ProformaforTNA:

VariousproformaareavailableonNPIUwebsite(www.npiu.nic.in).

220

AnnexVII
GUIDELINESFORINTERNATIONALTRAVEL

1.

Introduction:
TheseGuidelinesareframedtoensurethatallinternationaltravelrelatedtotheProjectareundertaken
asperthesetprocedureasoutlinedhereunder.
Only the Faculty, Heads of the Departments, Heads and PhD students of the project institutions, State
officialshandlingtheProject,DirectorsofTechnicalEducation,SPFUofficials,vicechancellorsofaffiliating
universitiesandMHRD/NPIUofficialsareeligibleforinternationaltravelundertheProject.Thepurposeof
internationaltravelcanbe:
a)

PresentationofPapersinInternationalseminars,conferences,etc.

b)

Invitationtochairasession

c)

AninvitationtodeliverakeynoteaddressinInternationalseminars,conferences,etc.

d)

Studyandnetworkingtour.

e)

Enhancingsubjectknowledgeandresearchcompetence.

f)

Collaborationwiththeorganization.

TheobjectiveoftheInternationalTravelSupportSchemeistoenableparticipantstoimprovethequality
ofeducationatProjectInstitutions(inthecaseofacademictravel)ortheadministrativeeffectivenessof
ProjectInstitutions(inthecaseofHeadsofinstitutions,orstate/nationalofficials).Participantstherefore
willneedtoshownotonlywhattheyexpecttolearnorgainfromtheinternationalexperiencebutalso
how that experience will be shared with their institution and result in concrete activities at the
institutionallevel.
2.

InstitutionsEligibility:
ForthefacultyofaProjectInstitutiontobeeligiblefortheInternationalTravel,itismandatorythatthe
institutionmustatleastmeet8outof10AssessmentIndicatorsasgivenbelow:
I.
Autonomyobtainedorappliedfor
II.
BoGcompositionaspertheprescribedstructureandavailabilityofBoGminutesonthe
website
III.
AtleastoneMentoringcompletedandthereportsubmitted
IV.
AtleastonePerformaAuditing/DataAuditingcompletedandthereportsubmitted
V.
50%oftheeligibleprogrammesshouldhavebeenaccreditedorappliedforaccreditation
VI.
GovernanceSelfReviewsubmitted
VII.
Expenditureofatleast60%againstthetotalfundsreceived
VIII.
100%Commitmentagainstthetotalfundsreceived
IX.
StatutoryAuditcompleted(201314)
X.
Completedatleast70%dataentryinMIS

3.

Procedure:
The Concerned Project Institution should prepare international travel plan for Director/ Faculty of the
concernedinstitution,andobtaintheapprovaloftheBoG.

ApplicantsforundertakingInternationalTravelarerequiredtosubmitacompleteproposalalongwiththe
enclosurestotheSPFU,throughtheDirectoroftheProjectInstitution.Theachievementsintheacademic
excellenceinthelinesoftheacademicgrid,withspecificcontributionoftheconcernedfacultydesirousof
availingInternationalTravelfacilityundertheProjectbeclearlymentionedintheproposal.
221


DetailedProcedureforapprovingtheInternationalTravel:

ApplicationsfromtheInstitutionsmeeting8outof10AssessmentIndicators(asgivenatpt.No.2)
onlyshallbeeligibleforInternationalTravel.Anundertakinginthisregardshouldbesubmittedto
theSPFU.

A) IncaseofStateGovernmentaided/fundedandprivateunaidedinstitutions:

The Project Institutions shall constitute an internal scrutiny committee; consisting of senior
faculty members. The internal scrutiny committee shall scrutinize the received proposal
(formatenclosedasAnnexa)andsubmitthereporttotheDirector,alongwiththeproposals.

The Director shall forward the proposal to the BoG with his remarks on the findings of the
internalscrutinycommittee.

The BoG will accord in principle approval for the proposal on the basis of scrutiny report
andtherecommendationoftheDirectoroftheInstitute.

The Institute will send the proposal with remarks of the BoG to the SPFU for further
processing.

SPFU will ensure the eligibility of the institution w.r.t the performance assessment and
scrutinizethereceivedproposalasperthechecklist(Annexb)andsubmittheproposalwith
itsobservationtotheScreeningCommittee
(A Screening Committee be constituted by the State Steering Committee (SSC) consisting of
senioracademicians)

ThescreeningcommitteeshallevaluatetheproposalasperthecriteriasuggestedinAnnexIII
and advice the State Project Advisor (SPA), at SPFU. If deemed necessary, the Screening
Committeemayseekopinionfromexternalthemeexpertsbeforearrivingataconclusion.

OnthebasisofadvicereceivedfromtheScreeningCommittee;theSPA,SPFUshallsubmita
consolidatedreporttotheNPIU.

Further, NPIU shall forward the States consolidated reports to the MHRD for the approval.
ThedecisionoftheMHRDwillbecommunicatedtotheSPFUbytheNPIU.SPFUshallfurther
communicateittotheconcernedinstitutions.

B) IncaseofCentrallyFundedInstitutions(CFIs):

222

The CFIs TEQIP Unit will ensure the eligibility of the institution w.r.t the performance
assessment.
TheProjectInstitutionmeetingtheeligibilityshallconstituteaninternalscrutinycommittee;
consisting of senior faculty members. The internal scrutiny committee shall scrutinize the
received proposal (format enclosed as AnnexI) and submit the report to the Institutional
TEQIPUnit,alongwiththeproposals.
The CFIs TEQIP Unit will scrutinize the received proposal as per the checklist (AnnexII) and
submit the proposal with its observation and the remarks of internal scrutiny committee to
theScreeningCommittee.
(A Screening Committee be constituted by the BoG of the institution consisting of senior
externalexperts)
ThescreeningcommitteeshallevaluatetheproposalasperthecriteriasuggestedinAnnexc
andadvicetheDirectoroftheinstitution.Ifdeemednecessary,theScreeningCommitteemay
seekopinionfromexternalthemeexpertsbeforearrivingataconclusion.
TheDirectorshallforwardtheproposaltotheBoGwithhisremarksalongwiththeremarksof
theScreeningcommittee.
The BoG will accord approval for the proposal on the basis of report of the screening
committeeandtherecommendationoftheDirectoroftheInstitute.
The Institute will send the proposal with remarks of the BoG to the NPIU for further
processing.
NPIUshallforwardtheproposaltotheMHRDfortheapproval.ThedecisionoftheMHRDwill
becommunicatedtotheconcernedCFIbyNPIU.

4.

Importantpointstobenoted:
Theeventshouldbeofaninternationalcharacter.
The applicant should not have availed financial assistance from any other source for the same
event.
AnyinternationaltourundertakenwithoutCompetentAuthoritysapprovalwillnotbeconsidereda
partoftheProjectand,therefore,expenditureincurredwillnotbeeligibleforreimbursement.
HeadsofInstitutionswillavoidtravelduringtheendofthefinancialyear.
Theperiodoftourswillbelimitedtosevenworkingdays.
All austerity measures like discount on training fee, accommodation etc. should be availed. The
travelwillbeundertakenonlyundertheavailablecheapestrestrictedeconomyclassairfare.
Theofficialsvisitingabroadarerequiredtoprepareadetailedreportoftheirvisit,clearlyspecifying
thegainsandanactionplanforimplementingthefeasibleactivities.
Theexperiencewillalsobesharedwithfellowfacultyoftheinstitution.

223

Annexa

PROPOSALFOR
INTERNATIONAL TRAVEL
UNDER TEQIP-II

NameoftheInstitution

: __________________________________________________

ProjectSubComponent

: __________________________________________________

CategoryoftheInstitution
(CFI/Govt.funded/Govt.
Aided/PrivateUnaided)

224

__________________________________________________

1.
Nameoftheapplicant
Designation
Department

:
:
:

AcademicProfile:

2.

Class/Institution
UG

PG
PhD.
PostDoctoral
Anyother

Year

Subject

3.

ExperienceDetails:
Experience
i)Teaching

Details

Duration

NameofEmployer

ii)Research*
iii)Industry
iv)Anyother
*Detailsofresearchprojectmaybeprovidedseparately,ifany

4.

Publicationsoftheapplicantduringlastfiveyears:
S.No.
Particulars
Year
i)

ReferredJournals

ii)

Books

iii)

Proceedings

iv)

PopularArticles

v)

Patents

Nos.

Impactfactor

5.

Contributionoftheapplicantinenhancingacademicexcellenceintheinstitution:
S.No.

Year

ContributionoftheApplicant(duringlastthreeyears)
ProjectActivities

Institutiondevelopmentactivities

20102011

20112012
20122013
20132014
20142015

6.

NameoftheInternationalEvent
Venue&Date

:
:

225

7.

Purposeoftheevent(putatickmarkagainsttheappropriateplace):
Items

a) Paperpresentation
b)ChairingaSession
c)KeynoteSpeaker
d)Study&networktour
e)Enhancementofsubjectknowledgeand
researchcompetence
f)Collaborationwiththeorganization

:
:
:
:
:

Remarks

8.

Providewriteuponthefollowing(1pageoneach):
(i) FocusonInternationalvisitonimprovingthequalityofteachingandresearch(ortheinstitutionaleffectiveness)ofa
Institution.Objectivesofthevisitbeclearlymentioned.
(ii)

BenefittotheapplicantfromtheInternationalvisitandexpectedoutcomefromthisvisittotheinstitution.

(iii)

VisitlinkagetotheInstitutionalDevelopmentProposalobjectivesandtothecurrenttrainingneedsassessment.

(iv)

Planoftheapplicantforsharingthegainedinformationwithfellowfacultymembers.

(v)

Alternativearrangementplannedbytheapplicantabouttheappropriatecontinuanceoftheteachingandresearch
dutiesduringthetravelperiod.

9.

TravelPlan(fromtheplaceofworkingtotheconference&back):
S.N.

DateandTime

Departure

DateandTime

Arrival

Mode

10.

DetailsofExpenditure:
Items
a)
b)
c)
d)

Totalairfarebyshortestroutebyeconomyclass
VisaFee
Amountofregistrationfee
Accommodationandotherlogisticarrangement

:
:
:
:
:

Remarks

11. DetailsofInternationaleventsattendedduringlastfiveyears(InChronologicalorder):

Nameofevent
Date
Venue

DetailsofSponsors

12. Anyotherinformationwhichyoumayliketofurnishinsupportofyourapplication.

Place:

(Signatureoftheapplicant)

Date

Encl.:Attachthefollowingenclosures:

Invitationlettersfromtheinstitutions/organizationtobevisited

Dailyscheduleofactivitiestobeundertaken

Availabilityofbudgetprovisionswithbreakupoffeecharges,accommodation,otherlogisticarrangementsand
travelexpenses

Internationaltravelplanforfacultyoftheconcernedinstitution(dulyapprovedbyBoG)

Forallprojectinstitutions,NOCfromBoGforundertakingInternationaltravel

Anyotherdeemednecessary

226

Annexb

CHECKLISTFORSPFU/CFIs
ChecklistfortheproposalsunderTEQIPIIinvolvingInternationalTravelinrespectof
Dr./Prof/Mr.

__________________________________from

____________________________________________.

Nameoftheparticipantsundertakingthe
tour with Designation and Contact
Number
(AbriefBioDatatobeenclosed)

PurposeoftheVisit

PlaceofvisitwithContactDetailsofthe
instituteproposedtobevisited
(whether Consent Letter has been
obtainedandattached)

Durationofvisit
(whetherDailyScheduleenclosed)

Date of his/her last foreign visit with


duration, name of the institute visited,
funding/sponsoring Agency and the
purposeofsuchvisit

(i) Relevance of the visit/training to the


ProjectObjectives

(ii) Clear Objective and Outcome of the


Visit

Amount of expenditure involved in the


presentproposal
(whetherbreakupattached)

227

Whether approval of Head of the


institute and BOG have been obtained
andproofthereofattached

Whether an undertaking has been


obtainedandenclosedonsubmissionof
reportinduecourseonthetrainingtobe
undertakenandexperiencetobegained
toimprovetheteachinglearningprocess
intheinstitute

SignatureofTEQIPcoordinator

228


Annexc

SelectionCriteria:ThefollowingcriteriawillbeusedbytheScreeningCommittee:

S.
No.
1

Particulars

EvaluationCriteria

Is the international visit


focused on improving the
qualityofteachingorresearch
(or
the
institutional
effectiveness) of a Project
institution?
Willtheapplicantbenefitfrom
theinternationalvisit?

Alltheevidencethatthiscriterionhasbeenmetisstrongand
clear
Someoftheevidencethatthiscriterionhasbeenmetiseither
weakorunclearorboth.
Noevidencethatthiscriterionhasbeenmet

Alltheevidencethatthiscriterionhasbeenmetisstrongand
clear
Some of the evidence that this criterion has been met is
eitherweakorunclearorboth.

Noevidencethatthiscriterionhasbeenmet

Alltheevidencethatthiscriterionhasbeenmetisstrongand
clear

Someoftheevidencethatthiscriterionhasbeenmetiseither
weakorunclearorboth.

Noevidencethatthiscriterionhasbeenmet
Alltheevidencethatthiscriterionhasbeenmetisstrongand
clear

0
2

Someoftheevidencethatthiscriterionhasbeenmetiseither
weakorunclearorboth.

Noevidencethatthiscriterionhasbeenmet

Alltheevidencethatthiscriterionhasbeenmetisstrongand
clear
Someoftheevidencethatthiscriterionhasbeenmetiseither
weakorunclearorboth.

Noevidencethatthiscriterionhasbeenmet

Is the visit linked to the


Institutional
Development
Proposalobjectivesandtothe
current
training
needs
assessment?
Is the action plan for how the
applicant will share the
information gained likely to
have an impact on others
beyondtheapplicant?

Has the institution ensured


that teaching and research
duties will be appropriately
continued during the travel
period?

Points

1
0

Note:Applicantswillhavetogetaleastonepointineachcategoryandgetatotalofatleast7pointsin
orderfortheapplicationtobeapproved.

229

AnnexVIII

LISTOFCENTRALLYFUNDEDINSTITUTIONSANDSTATEINSTITUTIONSTHATPARTICIPATEDIN
TECHNICALEDUCATIONQUALITYIMPROVEMENTPROGRAMME(TEQIP)PHASEI

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

CENTRALLYFUNDEDINSTITUTIONS(18)
MotilalNehruNationalInstituteofTechnology,Allahabad
MaulanaAzadNationalInstituteofTechnology,Bhopal
NationalInstituteofTechnology,Calicut
NationalInstituteofTechnology,Durgapur
NationalInstituteofTechnology,Hamirpur
MalviyaNationalInstituteofTechnology,Jaipur
DrBRAmbedkarNationalInstituteofTechnology,Jalandhar
NationalInstituteofTechnology,Jamshedpur
NationalInstituteofTechnology,Kurukshetra
VisvesvarayaNationalInstituteofTechnology,Nagpur
NationalInstituteofFoundryandForgeTechnology,Ranchi
NationalInstituteofTechnology,Rourkela
NationalInstituteofTechnology,Silchar
NationalInstituteofTechnology,Srinagar
SardarVallabhBhaiNationalInstituteofTechnology,Surat
NationalInstituteofTechnology,Karnataka,Surathkal
NationalInstituteofTechnology,Tiruchirapalli
NationalInstituteofTechnology,Warangal
STATEINSTITUTIONS(109)

19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

ANDHRAPRADESH(12)
AUCollegeofEngineering,Vishakhapatnam
BapatlaEngineeringCollege,Bapatla
GovtInstituteofElectronics,Secunderabad
JNTUCollegeofEngineering,Kukatpally,Hyderabad
JNTUCollegeofEngineering,Anantpur
JNTUCollegeofEngineering,Kakinada
JNTUInstituteofScienceandTechnology,Hyderabad
OsmaniaUniversityCollegeofTechnology,Hyderabad
RajivGandhiMemorialCollegeofEngineeringandTechnology,Nandyal
SreenidhiInstituteofScienceandTechnology,Ghatkesar
SVUCollegeofEngineering,Tirupati
UniversityCollegeofEngineering,OsmaniaUniversity,Hyderabad
GUJARAT(6)
DDInstituteofTechnology,Nadiad
DrS&SSGhandhyCollegeofEngineeringandTechnology,Surat
GovernmentEngineeringCollege,GandhiNagar
GovernmentEngineeringCollege,Modasa
GovtPolytechnic,Ahmedabad
LDCollegeofEngineering,Ahmedabad
HARYANA(5)
DeenBandhuChottuRamUniversityofScienceandTechnology,Murthal
GovernmentPolytechnic,Nilokheri
GuruJambheshwarUniversity,Hisar
KurukshetraUniversity,Kurukshetra
YMCAInstituteofEngineering,Faridabad

231

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87

232

HIMACHALPRADESH(3)
GovernmentPolytechnicforWomen,Kandaghat
GovernmentPolytechnic,Hamirpur
GovernmentPolytechnic,Sundernagar
JHARKHAND(4)
BirlaInstituteofTechnology,Mesra
BIT,Sindri
GovernmentPolytechnic,Dumka
GovernmentPolytechnic,Ranchi
KARNATAKA(14)
BasaveswaraCollegeofEngineering,VidyanagarBagalkot
BMSCollegeofEngineering,Bangalore
DrAmbedkarInstituteofTechnology,Bangalore
MalanadCollegeofEngineering,Hassan
MSRamaiahInstituteofTechnology,Bangalore
TheNationalInstituteofEngineering,Mysore
NMAMInstituteofTechnology,NITTE,Udupi
PoojyaDoddappaCollegeofEngineering,Gulbarga
ShriDharmasthalaManjunatheshwaraCollegeofEngineering,Dharwad
ShriJayachamarajendraCollegeofEngineering,Mysore
SiddagangaInstituteofTechnology,Tumkur
SriSiddharthaInstituteofTechnology,Tumkur
UniversityBDTCollegeofEngineering,Davangere
UniversityofVishweshwaraiahCollegeofEngineering,Bangalore
KERALA(5)
CollegeofEngineering,Chengannur
CollegeofEngineering,Trivandrum
LBSCollegeofEngineering,Kasaragod
ModelEngineeringCollege,Kochi
SreeChitraThirunalCollegeofEngineering,Trivandrum
MADHYAPRADESH(7)
JabalpurEngineeringCollege,Jabalpur
KalaniketanPolytechnic,Jabalpur
RajivGandhiProudhyogikiVishwavidyalaya,Bhopal
RewaEngineeringCollege,Rewa
SardarVallabhBhaiPolytechnicCollege,Bhopal
ShriGSInstituteofTechnologyandScience,Indore
UjjainEngineeringCollege,Ujjain
MAHARASHTRA(17)
CollegeofEngineering,Pune
DKTESocietysTextileandEngg.Institute,Ichalkaranji
DrBabasahebAmbedkarTechnologicalUniversity,Lonere
GHRaisoniCollegeofEngineering,Nagpur
GovernmentCollegeofEngineering,Aurangabad
GovernmentPolytechnic,Mumbai
GovernmentPolytechnic,Nagpur
GovernmentPolytechnic,Pune
GovtCollegeofEngineering,Amravati
KESRajarambapuInstituteofTechnology,Sakharale,Islampur,Distt.Sangli
MumbaiUniversityInstituteofChemicalTechnology,Mumbai
ShriGuruGobindSinghjiInstituteofEngineeringandTechnology,Vishnupuri,Nanded
ShriSantGajananMaharajCollegeofEngineering,Shegaon

88
89
90
91

VeermataJijabaiTechnologicalInstitute,Matunga,Mumbai
VishwakarmaInstituteofTechnology,Pune
WalchandCollegeofEngineering,Sangli
YeshwantraoChavanCollegeofEngineering,Nagpur
TAMILNADU(11)
92
ACCollegeofTechnology,Chennai
93
AlagappaChettiarCollegeofEngineeringandTechnology,Karaikudi
94
CentralPolytechnicCollege,Tharamani,Chennai
95
CollegeofEngineering,Guindy,Chennai
96
DDGovtPolytechnicCollegeforWomen,Tharamani,Chennai
97
GovernmentCollegeofEngineering,Salem
98
GovernmentCollegeofEngineering,Tirunelveli
99
GovernmentCollegeofTechnology,Coimbatore
100
MadrasInstituteofTechnology,Chennai
101
TamilNaduPolytechnicCollege,Madurai
102
ThanthaiPeriyarGovtInstituteofTechnology,Vellore
UTTARPRADESH(10)
103
BundelkhandInstituteofEngineeringandTechnology,Jhansi
104
DrAmbedkarInstituteofTechnologyforHandicapped,Kanpur
105
HarcourtButlerTechnologicalInstitute,Kanpur
106
InstituteofEngineeringandTechnology,Lucknow
107
IntegralUniversity,Lucknow
108
KamlaNehruInstituteofTechnology,Sultanpur
109
MadanMohanMalviyaEngineeringCollege,Gorakhpur
110
ShriRamMurthiSmarakCollegeofEngineeringandTechnology,Bareilly
111
UnitedCollegeofEngineeringandResearch,Allahabad
112
UttarPradeshTextileTechnologyInstitute,Kanpur
UTTARAKHAND(4)
113
DehradunInstituteofTechnology,Dehradun
114
GovernmentPolytechnic,Dehradun
115
GovindBallabhPantEngineeringCollege,Paurigarhwal
116
GovindBallabhPantUniversityofAgricultureandTechnology,Pantnagar
WESTBENGAL(11)
117
AsansolEngineeringCollege,Asansol
118
BengalEngineeringandScienceUniversity,Howrah
119
GovernmentCollegeofEngineeringandCeramicTechnology,Kolkata
120
GovernmentCollegeofEngineeringandTextileTechnology,Serampore
121
HaldiaInstituteofTechnology,Haldia
122
InstituteofEngineeringandManagement,Kolkata
123
JadavpurUniversity,Jadavpur
124
JalpaiguriGovtEngineeringCollege,Jalpaiguri
125
KalyaniGovernmentEngineeringCollege,Kalyani
126
NetajiSubhashEngineeringCollege,Kolkata
127
UniversityCollegeofTechnology,CalcuttaUniversity,Kolkata
Legend:LeadInstitutionsareshowninbold.

233

AnnexIX

GUIDELINESONINDUSTRYINSTITUTIONINTERACTIONCELL(IIIC)

1.

Objective:
To explore and identify common avenues of interaction with Industry as per the requirements of the
institution.

2.

Scope:
All the institutions covered under the Project will form IndustryInstitutionInteraction Cell (IIIC) to
establishpurposefulinteractionbetweenIndustryandinstitution.
FortheCelltofunctionsmoothlyandtomeetitsobjectiveseffectively,IIICmusthavesomecorestaff.
ThecorestaffshouldincludeaCoordinator(notlessthananAssistantProfessor)fromtheinstitutionwho
will be assisted by a Project Assistant and an Office Assistant. The Cell should meet at least twice per
semester.TheproposedcompositionoftheCellisasfollowing:

3.

a) Director/Principaloftheinstitution

Chairman

b) HODandonefacultyfromeachdepartment

Member

c) TwoMembersfromIndustry/Entrepreneursoftheregion

Member

d) TrainingandPlacementOfficer

Member

e) CoordinatoroftheCell

Convener

Strategy:
IIICwillberesponsiblefordesigningtheroadmapforinteractionwithIndustryrecognisingtheinherent
strengthsaswellastheweaknessesoftheinstitution.TheGovernmentorganizationsintheregionalso
canparticipateintheIndustryInstitutionInteractionCell.

4.

SuggestedActivitiesunderIIIC:
a)

To identify and facilitate Guest Lectures, Interactive workshops,conferences, seminars, Brain


Storming Sessions, Technical Discussions etc. with Members of the Industry, outside Experts,
eminentpersonalitiesatregularinterval.

b)

ToconductIndustrialTraining,OrientationCourses,IndustrialVisitsetcforfacultyandstudents
atregularintervals.

c)

Tofacilitatejointresearchwork,consultancyinvolvingfacultyandstudents.

d)

Toconductindustrialexhibitionstohighlightresearchfacilitiesandexpertiseavailablewiththe
institution.

e)

TofacilitateprofessionalsfromIndustrytoworkasvisitingfacultyininstitutionsandshortor
long periods deployment of faculty from institutions to Industry for gaining industrial
experienceand/orworkonprojectsinIndustry.

f)

ToseekandassociateExpertsfromIndustryinCurriculumDevelopmentandreview.

g)

ToidentifyContinuingEducationopportunities,shorttermprogrammesandtrainingneedsof
theIndustry,whichtheinstitutioncanprovide.

h)

To promote revenue generating activities for the institution like Lab Testing, Calibration,
consultancyandR&Detc.

i)

Toassessperiodicallythescientificandtechnologicalscenario/happeningsinIndiaandabroad
inordertotranslateitintoactionfortakingupfutureR&Dwork.

235


5.

Deliverables:
IIICwillberesponsibleforthefollowingdeliverables:

236

IncreaseincollaborationwithIndustry

Increasedrateofcampusplacementofstudents

Increaseinindustrialtrainingforstudentsarrangedbyinstitution

Absorptionofstudentsbysameindustriesprovidingindustrialtraining

IncreaseinIRGbycollaboratingwithIndustry

IncreaseinutilizationofinstitutionalresourcesbyIndustry

Increaseinsolvingthereallifeproblemsoftheregion

AnnexX

SCHEMESFORPROPOSALEVALUATION

Table45
(A)SchemeforEvaluationofStateProposals

S.
EvaluationParameters
No
1 EvidencethattheDirectorateofTechnicalEducation(DTE)locatedwithintheStatestructureis
in a manner that facilitates ongoing coordination with State policy related to other
dimensionsofHigherEducation
2 Evidence that the States participation in the Project is linked to its policy objectives for
TechnicalEducation
3 Understanding that potential contributions of project reflect an understanding of the
objectivesandsuggestedactivitiesofSubcomponents1.1,1.2,1.2.1and1.3
4 Understanding of the underlying rationale for granting institutions increased autonomy as
requiredinEligibilityCriterion1
5 Commitment to meeting the requirement of Criterion 1 before signing MoU with MHRD to
seekandobtainautonomousstatusandagreetocontinuousfunding
6

Marks
10
10
10
10
10

Demonstration of intent to establish a governance model that will assure accountability


towardsGovernment,CivilSociety,andIndustry
Demonstration that the structure of the Board of Governors reflects the requirements set
forthinSection5
Evidence that the State has identified, understood and discussed with key stakeholders the
mainstepsandchallengesforimplementationoftherequiredreforms
Evidence of full understanding and commitment of the rationale for granting institutions
increasedFinancingandAdministrativeAutonomy
EvidencethattheStatehasaplantosustainthegainsoftheProjectafterithasbeenclosed

7
8
9
10

10
10
10
10
10
100

TotalMarks

Table46
(B)SchemeforEvaluationofInstitutionalEligibilityProposal(IEP)underSubcomponent1.1
S
No
A

EvaluationParameters

Marks

InstitutionalInformation
1

Clarityandadequacyofinstitutionalbasicinformation

10

QualityofSWOTAnalysis

Appropriateness of the procedure adopted for the conduct of SWOT analysis and
adequacyofparticipationofstakeholders

10

Clarityintheidentificationofstrengths,weaknesses,opportunitiesandthreats

10

Clarityinidentificationofobjectivesandfeasibilityoftheactionplantoimplementtheinstitutional
project
1 Clarityintheidentificationofgeneraldevelopmentobjectives,relatedspecificobjectives,
10
theirexpectedresults,andcoherencewithSWOTanalysis
2 Havethekeyactivitiesbeenidentifiedclearlyandadequatelyforeachspecificobjective
10
3

Aretheschedulesforactivitiesrealistic

10

Implementationofreforms
1 InstitutionscapabilitytomeetthekeychallengesforobtainingAutonomousInstitution
10
statusandexercisingofthegrantedautonomy
2 Institutions capability to meet the key challenges for obtaining accreditation of
10
programmes
3 Qualityoftheactionplantoutilizetheblockgranteffectivelyandefficiently
10
4

Qualityoftheplantoincreasetheinstitution'snontuitionrevenue

10

TotalMarks

100

237

Table47
(C)SchemeforEvaluationofInstitutionalDevelopmentProposal(IDP)underSubcomponent1.1
S.
No.
I

EvaluationParameters
InstitutionalPreparednessandImplementationFeasibility
A
Clarityofinstitutionalbasicinformationincludingbaselinedata
B

QualityofSWOTanalysis
1
Appropriateness for the procedure adopted for the conduct of SWOT analysis and
adequacyofparticipationofstakeholders
2
Clarityintheidentificationofstrengths,weaknesses,opportunitiesandthreats
Overallimplementationfeasibilityofinstitutionalproject
1
Clarity in the identification of general development objectives, related specific
objectives,theirexpectedresults,anditscoherencewithSWOTanalysis
2
Have the key activities been identified clearly and adequately for each specific
objective
3
AdequacyoftheInstitutionalProjectImplementationarrangements

CoherenceofproposalwithStates/regionaldevelopmentplan
Subtotal(I)
ClarityandQualityoftheActionPlansfor:
E
Implementationofreforms
1
Quality and adequacy of proposed actions for obtaining autonomous institutional
statusandforexercisingofthegrantedautonomy
2
Quality and adequacy of proposed actions for obtaining accreditation of UG & PG
programmes
3
Qualityandadequacyofactionplantoimplementalltheacademicandnon
academicreforms

II

5
5
5
5
5
35

5
5
5
10

Identification of weak students and for improvement in their learning outcomes through
finishingschool

Improvingemployabilityofgraduates

StrengtheningofexistingPGprogrammesandstartingnewPGprogrammes

Facultydevelopmentincludingpedagogicaltrainingto:
1
Developfaculty/technicalstaffinsubjectdomain
2
Improvepedagogicalskillsoffacultyforbetterstudentlearning

5
5

*lessthan40%=0,4149=1,5059=2,6069=4,70andabove=5marks
**lessthan50%=0,5059%=1,6069%=2,7079%=3,80%andabove=5marks

238

Improvinglearningoutcomesofstudentsintermsofhigherpassratesandhigheracademic
achievements

Enhancedinteractionwithindustry
Subtotal(II)
FacultyQualification&Status
L
Qualityoffaculty(facultywithPhD&Mastersdegreeaspercentageoftotalfaculty)
M Statusoffaculty(facultyonregularappointmentaspercentageoftotalfaculty)
Subtotal(III)
TOTAL(I+II+III)

III

Marks

5
55

5*
5**
10
100

Table48
(D)SchemeforEvaluationofInstitutionalDevelopmentProposal(IDP)underSubcomponent1.2
S.
No
I

EvaluationParameters
InstitutionalPreparednessandImplementationFeasibility
A Clarityofinstitutionalbasicinformationincludingbaselinedata
B

II

Overallproposalimplementationfeasibility
1 Clarity in the identification of general development objectives, related specific
objectives,theirexpectedresults,anditscoherencewithSWOTanalysis
2 Have the key activities been identified clearly and adequately for each specific
objective
3 AdequacyoftheInstitutionalProjectImplementationarrangements
QualityofSWOTanalysis
1 Appropriateness for the procedure adopted for the conduct of SWOT analysis and
adequacyofparticipationofstakeholders
2 Clarityintheidentificationofstrengths,weaknesses,opportunitiesandthreats

Marks

5
5
5
5
5
5

D CoherenceofproposalwithStates/regionaldevelopmentplan

Reasonabilityofproposedbudget
Subtotal(I)
ClarityandQualityoftheActionPlansfor:
F Scalingupresearchandinnovation
1 Quality of action plan for quantitatively increasing and qualitatively improving
researchactivities
2 QualityofactionplantotransfertechnologyandforcommercializationofR&D(the
innovationagenda)

5
40

G ScalingupPhDenrolmentthroughexistingandnewprogrammes

10

H ScalingupenrolmentintoMastersprogrammesinexistingandnewprogrammes

10

ResearchcollaborativeactivitieswithInstitutionatNationalandInternationallevel
1 IdentificationofoptionstoimproveandincreaseresearchcollaborationsatNational
andInternationallevels
2 Clarity in identification of expected quality enhancement in Masters and doctoral
programmesandfacultyresearch

PotentialimpactanddepthofproposedIndustrycollaboration

Facultydevelopmentincludingpedagogicaltrainingto:
1 Developfaculty/technicalstaffinsubjectdomain
2 Improvepedagogicalskillsoffacultyforbetterstudentlearning
Identificationofweakstudentsandforimprovementintheirlearningoutcomesthrough
finishingschool
Subtotal(II)
TOTAL(I+II)

5
5

5
5
5
5
5
5
60
100

239

Table49
(E)SchemeforEvaluationofInstitutionalDevelopmentProposal(IDP)underSubcomponent1.2.1
S.
No
I

II

EvaluationParameters

Marks

ImplementationFeasibility
A Overallproposalimplementationfeasibility
1 AppropriatenessofchoiceofthethematicandspecificareasofCoEwithrespectto
strengthsandopportunitiesidentifiedinSWOTanalysis
2 AppropriatenessofthespecificobjectivesidentifiedforCoE

B Institutionalpreparedness
1 AdequacyofinvolvementofvariousdepartmentsforCoEactivities
2 FacultyQualificationandPhDsproduced:
50%ofregularfacultywithPhDinEngineeringofthetotalregularfacultyin
Engineering;outofwhich75%intheproposedthemearea
25numberofPhDs(Cumulative)producedinthelastthreeacademicyears(2009
10,201011,201112)intheDepartmentsparticipatingforestablishingCoEs
3 QualityoffacultyintermsofcredentialsandachievementstobeassociatedwithCoE
4 Adequacyandqualityofcollaborativearrangementsandclarityofresponsibilitiesas
giveninMoUswithIndustries/researchinstitutions/organizationswithinIndiaand
abroad

C Reasonabilityofproposedbudget
Subtotal(I)
ClarityandQualityofActionPlansfor:
D establishmentofCoEintermsofphysicalarrangementsandworkingarrangements

conductingresearchandobtainingresultsintheidentifiedthematicareas

F communicationofresearchfindingstopolicymakersandpotentialusers

G commercializationofresearchresults

H scalingupPhDandMastersenrolmentinthematicareas

I insuringsustenanceofCoEaftertheendoftheproject

240

5
5
10
10

5
50
10

10
5
5
10
10
Subtotal(II)

TOTAL(I+II)

50
100