Академический Документы
Профессиональный Документы
Культура Документы
ItemDesc.
1-1
1-2
Page 1 of 14
Unit
Qty
Unit Price
ID
Item Cost
ID
ML
1,100
18,000
19,800,000
KmL
0.5
30,000,000
15,000,000
Unit
Qty
Unit Price
ID
Item Cost
ID
Cu.M
800
15,000
12,000,000
Sq. M
3,500
17,000
59,500,000
No.
ItemDesc.
Sub-base:
Sub Total 1
2
106,300,000
Bridge Structure
2-1
2-2
Page 2 of 14
Cu.m.
1,430
5,000
7,150,000
No.
ItemDesc.
Unit
Qty
Unit Price
ID
Item Cost
ID
M.L
760
700,000
532,000,000
Cu.m.
90
130,000
11,700,000
Cu.m.
600
300,000
180,000,000
Cu.m
455
330,000
150,150,000
Cu.m
32
450,000
14,400,000
Cu.m
50
360,000
18,000,000
Cu.m
100
300,000
30,000,000
Cu.m
185
280,000
51,800,000
Page 3 of 14
ItemDesc.
Unit
Qty
Unit Price
ID
Item Cost
ID
Cu.m
270
275,000
74,250,000
Cu.m
330
800,000
264,000,000
M.L
85
50,000
4,250,000
No.
75
500,000
37,500,000
M.L
150
120,000
18,000,000
M.L
42
750,000
31,500,000
2-6
M.L
22
1,000,000
22,000,000
2-7
M.L
150
85,000
12,750,000
No.
2-3
2-4
2-5
Page 4 of 14
No.
ItemDesc.
Unit
Qty
Unit Price
ID
Item Cost
ID
2-8
ML
42
20,000
840,000
Sub Total 2
###
3-1
Cu.M
540.0
5,000
2,700,000
3-2
Cu.M
35.0
130,000
4,550,000
3-3
Cu.M
260.0
280,000
72,800,000
Cu.M
280.0
350,000
98,000,000
Cu.M
143.0
15,000
2,145,000
3-4
3-5
Sub Total 3
4-1
4-2
4-3
4-4
180,195,000
ML
250.0
225,000
56,250,000
ML
26.0
280,000
7,280,000
ML
32.0
350,000
11,200,000
ML
68.0
500,000
34,000,000
No.
4-5
ItemDesc.
Double pipe culvert 100 cm inside diameter (Type
-b3-)
Unit
Qty
Unit Price
ID
Item Cost
ID
ML
0.0
580,000
Sub Total 4
108,730,000
5-1
LS
1.0
25,000,000
25,000,000
5-2
Cu.m
18,330
3,500
64,155,000
5-3
Cu.m
222,150
6,000
###
5-4
525
9,000
4,725,000
5-5
57,100
500
28,550,000
Sub Total 5
6
Sq.M
###
No.
6-1
6-2
6-3
ItemDesc.
Sub-base Type -A-: Supply material and construct
(20 cm ) thickness after compaction sub-base type
(A) by Batch plant to the required sizes and grades
with proper moisture content, it must lay with digital
or sensor paver machine , it must compact up to
95% of MDD ,matrilas and other requirements must
comply with section R6 of (SSRB) and related
drawings .
Base Course Construction : Supply crushed
limestone or crushed gravel to construct ,each layer
(10cm thickness after compaction)by Batch plant to
the required sizes and grades. It must give a
minimum CBR value of 80% , and lay by digital or
sensor paver machine with compacting up to 98%
MDD. All requirments of this item shall be according
to section R7 of (SSRB) and related drawings.
Unit
Qty
Unit Price
ID
Item Cost
ID
Cu.m
11,900
20,000
238,000,000
Cu.m
3,840
25,000
96,000,000
31,460
1,000
31,460,000
29,500
25,000
737,500,000
29,500
1,000
29,500,000
Page 7 of 14
Unit
Qty
Unit Price
ID
Item Cost
ID
Sq.M
28,220
16,000
451,520,000
Sq.M
28,220
1,000
28,220,000
Sq.M
27,500
10,000
275,000,000
Cu.m
7,520
20,000
150,400,000
ML
210
80,000
16,800,000
No.
6-9
ItemDesc.
Sub Total 6
7
###
Page 8 of 14
No.
ItemDesc.
Unit
Qty
Unit Price
ID
Item Cost
ID
7-1
ML
5,780.0
80,000
462,400,000
7-2
No.
25
180,000
4,500,000
No.
10
180,000
1,800,000
No.
10
180,000
1,800,000
No.
75
100,000
7,500,000
No.
22
30,000
660,000
No.
180,000
720,000
Unit
Qty
Unit Price
ID
Item Cost
ID
ML
9,540.0
5,500
52,470,000
ML
1,090.0
4,000
4,360,000
No.
44.0
30,000
1,320,000
No.
7-3
ItemDesc.
Binder (Resin and oil) ------- 20+-2 % by mass of
mixture.
Solid Glass Beads ------- 20 minimum % by mass of
mixture.
Aggregates together with pigment Extender and
glass beads------- 80+-2 % by mass of mixture.
Sub Total 7
8
8-1
537,530,000
Interchange Lighting
Civil Work
Excavation note: Excavation must be kept away from the
existing trees,and great care must be taken not to damage
any existing cables,sewer or water pipes whether indicated
or not if any cable or pipe is damaged due to excavation it
is the contractor responsibility to make whatever
amendment is required to reinstate and re-fix the damaged
cable or pipe immediately without any delay and on his
expense whatever the cost, incase of failure to do so
G.D.o.E will do the required without prior warning to the
contractor and will deduct the cost from the contractors
payment.
m3
375.0
8,000
3,000,000
M.L.
5,900.0
20,000
118,000,000
Page 10 of 14
No.
ItemDesc.
Unit
Qty
Unit Price
ID
Item Cost
ID
No.
13.0
90,000
1,170,000
No.
1.0
400,000
400,000
No.
6.0
25,000
150,000
8-1-6
No.
10.0
45,000
450,000
8-1-7
ml
625.0
750
468,750
m3
103.0
25,000
2,575,000
No.
4,275.0
900
3,847,500
m3
15.0
250,000
3,750,000
m3
220.0
8,000
1,760,000
ml
125.0
15,000
1,875,000
ml
2,000.0
30,000
60,000,000
8-2
Unit
Qty
Unit Price
ID
Item Cost
ID
set
2.0
400,000
800,000
set
2.0
400,000
800,000
each
1.0
1,350,000
1,350,000
each
1.0
40,000,000
40,000,000
No.
ItemDesc.
8-2-6
Box
1.0
40,000
40,000
8-2-7
ml
2,000.0
2,000
4,000,000
each
2.0
300,000
600,000
No.
4.0
4,000,000
16,000,000
Page 12 of 14
Unit
Qty
Unit Price
ID
Item Cost
ID
No.
23.0
1,150,000
26,450,000
No.
151.0
900,000
135,900,000
No.
46.0
300,000
13,800,000
No.
151.0
250,000
37,750,000
No.
3.0
950,000
2,850,000
No.
15.0
760,000
11,400,000
No.
6.0
300,000
1,800,000
No.
30.0
250,000
7,500,000
No.
197.0
8,000
1,576,000
No.
182.0
40,000
7,280,000
M.L.
5,300.0
11,000
58,300,000
No.
8-210
8-211
8-212
8-213
ItemDesc.
12 m height with double arms(3m) , galvanized iron
pole, pipe shape 4mm thickness, 240mm at the
bottom and 60mm at the top, the price also includes
terminal block connections, excavation in any kind
of soil, pre - cast concrete
basement( 70x70x120cm) 28 Mpa. concrete mix on
10 cm crushed stone, pole erection, backfilling and
all requirements to implement the works entirely.
9 m height with single arm (1m) , galvanized iron
pole , pipe shape 4mm thickness, 190mm at the
bottom and 60mm at the top, the price also includes
terminal block connections, excavation in any kind
of soil, pre - cast concrete
basement( 70x70x100cm) 28 Mpa. concrete mix on
10 cm crushed stone, pole erection, backfilling and
all requirements to implement the works entirely.
Lighting fixture( Philips mark ), water proof,
equipped with aluminum reflector and HPSV 400
watt lamp, ballast and power factor correction
capacitor, completely enclosed type with clear glass
cover.
Lighting fixture( Philips mark ), water proof,
equipped with aluminum reflector and HPSV 250
watt lamp, ballast and power factor correction
capacitor, completely enclosed type with clear glass
cover.
Page 13 of 14
Unit
Qty
Unit Price
ID
Item Cost
ID
M.L.
650.0
15,000
9,750,000
M.L.
550.0
5,000
2,750,000
M.L.
3,000.0
2,500
7,500,000
No.
ItemDesc.
Sub Total 8
Grand Total
585,642,250
###
Page 14 of 14