Вы находитесь на странице: 1из 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Overview

A material master is required for a material.


A material needs to have additional department views created.
A new material is to be used in a production process.
A material needs to be extended to another plant.
Requirement for Valuation of material in the Material Master.
A need to define a Production Resource / Tool as a Material.

Business Process Description Overview


Material masters are created when a material required is not defined in the material master. Control of
master data depends largely on how each company sets up its Organizational levels - centralized or
decentralized. Some material data is valid for all organizational levels while other data is valid only at
certain levels. (i.e.: client, plant, sales org., etc.). All functional areas of the system use the same material
master data. The material master data is defined in individual screens (departmental views) that can be
added as needed. Thus a material can be created with only basic data and other departments can add other
information later as it becomes available.
The views possible for material are controlled by the material type selected.
For a material to be used in the system it needs to be created for each plant. Multiple views of a material
are possible but at a minimum, the material needs to have a description and a base unit of measure assigned
on the basic data view. Additional department views (i.e. Accounting, Sales, Purchasing, MRP) can be
added at a later time by extending the material. As additional plants are added, a material will need to be
extended to the plants before it can be used there.
A Production Resource / Tool can be defined as a material if purchasing and inventory functions are to
be carried out for that PRT. The information required to be input is dependent upon which department
views are being created. Thus, material master information is typically entered at different times by
numerous system users. Note that to add a view, the Create Material transaction is used rather than
the Change Material transaction.
Input - Required Fields
Material

Field Value / Comments


Required as using external numbers.

Industry Sector

Enter T Telecom Industry

Material Type

Press F4 to call the list of choices. Select ZADM for Material


Type Admin Material
Enter the inventory unit of measure (Example PC, EA)

Base Unit of Measure


Other information
Output - Results
New material created

Depending upon the views to be created, additional information will


be required
Comments
Material Created and available for other activities

____________________________________________________________________________________________
Page 1 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

New view added to a material


Material extended to a new plant

1.1.1 MM-MM01-Material-Create-ZADM
1.2

View Added
Material extended

BPP Table of Contents


Since a material can have from 1 to more than 30 views depending upon the material type and views
desired, a user should select the relevant sections of this document and ignore the views that are not desired.
The procedural steps included in this document are as follows:

Basic Data
Purchasing
Purchase Order Text
MRP
Forecasting
Plant data/storage
Quality mgt.
Accounting
Costing
Plant stock
Storage location stock

Extending a material to add a departmental view


Extending a material to another plant

Tips and Tricks

If no other view exists, you must enter the base (standard / inventory) Unit of measure and a
material description.

Using a reference material (similar characteristics etc.) saves a lot of effort as all the views will be
copied over and can be changed or overwritten.

Note: When creating the MRP Views (or any view for that matter), the Industry Sector and
Material type will be automatically copied from an existing view, so long as at least one view
exists.

The material data can be entered with or without an MRP profile. An MRP profile contains typical
MRP data for a particular procedure. The values can be fixed (cannot be changed) of default
values (can be overridden). The MRP profile simplifies data entry in the master record. For

____________________________________________________________________________________________
Page 2 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

example if an MRP controller looks after similar material at several plants, a profile will be defined
in the system and assigned to new materials as they are created.
To set user defaults for views and organizational levels follow these steps:
Views:

Menus: Defaults >> Views


Select those views to be checked on by default when generating a new material.
Select View selection only on request when the select view pop-up is to be by-passed
unless selected.

Organizational levels:
Menus: Defaults >> organizational levels
Enter those organizational levels to be defaulted when generating a new material.
Select Org. levels/profiles only on request when the select view pop-up is to be bypassed unless selected.
To extend a material to a different plant requires selecting the new plant on the organizational level screen.
Note that all views of a material are not extended unless they were selected on the initial screen. In
addition, each plant may have a different system configuration requiring additional inputs on each of the
departmental screens. Material changes made in one plant do not change that material in other plants.
To determine which views of a material need to be added or to see which plants a material has been
extended to, use transaction MM50 (Logistics>Material Management>Material Master>Other>Extend
Material View(s)).

Procedure Steps
1.1.

Access transaction by:

____________________________________________________________________________________________
Page 3 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Via Menus

Via Transaction Code

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

(a) Logistics>Material Management>Material


master>Material>Create (General) > Immediate
(b) Logistics > Production > Master Data > Prod. resources/tools
> Prod. resources/tools > Material > Create (General)
(c) Logistics>Production>Master Data>Material
Master>Material > Create(General)
(d) Logistics> Logistics Execution> Master Data > Material >
Material > Create>Immediately
(e) Logistics>Central function >Engineering> Material
>Material>Create (General) > Immediately
(f) Accounting>Project Systems > Basic Data > Master Data
>Material>Create
(g) Logistics>Environmental Health & Safety> Dangerous Goods
Management> Environment> Material
master>Material>Create (General) > Immediately
(h) Logistics>Customer Service > Technical Objects> Material
>Create (General) > Immediately
(i) Logistics>Plant Maintenance> Technical
Objects>Material>Create (General) > Immediately
(j) Logistics>Sales & Distribution> Master data >Products >Bill
of Materials> Environment> Material Master >Material >
Create (General)
(k) Logistics>Material Management>Material
master>Material>Create (General) > Immediately
MM01

____________________________________________________________________________________________
Page 4 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

1.2.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

On screen Create Material: Initial Screen, enter information in the fields as specified in the
below table:

Field Name
Material

Description
Key identifying material

R/O/C
N/A

Industry
Sector
Material
Type
Copy From
Material:

Specifies branch of industry


R
to which material is assigned
Group to which material is
R
assigned.
Similar material from which the O
system obtains selected values.

User Action and Values


Leave Blank, as this is internal
no assignment. System will
assign a new no for the material
Type T (Telecom Industry) or
select from pull down menu
Type ZADM or select from the
Pull Down Menu
Leave blank, unless new
material is based on an
existing material

Comments

R = Required, O = Optional, C = Conditional


Press Enter.
1.3.

On pop up screen Select View(s), check the appropriate boxes

Click on Basic Data 1, and any other views needed.


____________________________________________________________________________________________
Page 5 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Note: The material type controls which views are displayed. Therefore, specific material types will
not contain certain views.
Press Enter.
1.4.

On pop up screen Organizational Levels, enter information in the fields as specified in the
below table:

____________________________________________________________________________________________
Page 6 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Field Name
Organizati
onal Levels
Plant

Description
Section Header

R/O/C

Plant identification key

Storage
Location

Storage Location
Identification key

Profiles
MRP
Profile

Section Header
MRP Parameters

Forecast
prof.

Forecast profile

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values

Comments

Enter Plant where material will


be active or select from pull
down menu
Enter Storage Location where
material will reside or select
from pull down menu
Key that you can use to store
MRP parameters that are
independent of the material
master record.
Key that allows you to store
forecast parameters
independently of a material
master record.

Enter.

____________________________________________________________________________________________
Page 7 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

1.5.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

On screen Create Material ######## (Material Type), Basic Data 1 tab, enter information
in the fields as specified in the below table:

Field Name

Description

R/O/C

User Action and Values

Comments

____________________________________________________________________________________________
Page 8 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Material
Base Unit
of Measure
Material
Group
Old
Material
Number
X Plant
Matl Status

Generic
Req.
Number

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Material Description
R
Units of measure in which
R
stocks of the material are
managed
Key allowing grouping of
R
same or similar materials
Legacy system material number, or,
O
previous SAP material master number

Enter in material description


Enter UOM or select from pull
down list

Indicates whether the material


may be used within different
departments

Enter if appropriate

Generic Requirement Number

Enter if Appropriate

Enter Material Group


Enter if appropriate
As of now this
field will not
be used.
However
depending on
requirement,
this can be
used after
implementation

____________________________________________________________________________________________
Page 9 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

1.6.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

On screen Create Material ######## (Material Type), Basic Data 2 tab, enter information
in the fields as specified in the below table:

____________________________________________________________________________________________
Page 10 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Field Name
Ind. Std
Desc.
Document

1.7.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Description
Description
Of
The
Material in accordance
with
the
appropriate
industry standard.
Number of the drawing that
exists for this object.

R/O/C
O

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values

Comments

Part Number to be maintained


O

Drawing Number to be
maintained.

On the tab Purchasing enter information in the fields as specified in the below table:

____________________________________________________________________________________________
Page 11 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Field Name
Base Unit

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Description
Inventory UOM

R/O/C
R

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values


Defaults in from Basic Data 1

Comments
Not to be

____________________________________________________________________________________________
Page 12 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

of Measure

1.1.1 MM-MM01-Material-Create-ZADM
1.2

screen.

Order Unit

UOM for ordering

Purchasing
Group
Material
Group

Group Responsible for purchasing


R this
Material
Group code of like materials
R

Plant
sp.matl
status

Plant specific material status.


Determines availability of
Material for purchase or
production
Batch
Identifies the material as
Managemen managed by batch
t

Enter only if different from


base UOM and required by
Vendor

changed or
used here
If defined here,
ordering unit
will be
common for all
POs and
hence
recommended
to be used at
PO level and
not in
purchasing
view

Enter or select from pull down list


Defaults in from Basic Data 1 screen.
Not to be
changed or
used here
Blank indicates available
As of now this
field will not
be used.

Check if appropriate

Purchasing
Values
Purchasing
Value Key
Other Data
GR
Processing
time

Section Heading
Identifies follow up intervals
and delivery tolerances
Section Heading
Number of days required to
inspect and place in storage

Select appropriate key from


pull down list

Enter number of days if


relevant

Source List

Mandates entry of supplier


before PO issues

Check box if appropriate

It will be
maintained
only for those
materials for
which shelf life
needs to be
maintained.

This will be
same for
material type.
However it can
be different for
individual
material as
well.
It will be
maintained for
Proprietary

____________________________________________________________________________________________
Page 13 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Mfr. Part
number

Manufacturer part number

Enter number if appropriate

Mfr.

Manufacturer identifier

Use pull down menu

Items
This field will
be used to
capture
manufacturer's
part no. for
proprietary
items only
This field will
be used in case
of item is
proprietary.

Enter

1.8.

On tab Purchase order text enter appropriate text in the desired languages and press enter.
OPTIONAL

____________________________________________________________________________________________
Page 14 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

1.9.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

On tab MRP1, enter information in the fields as specified in the below table:

____________________________________________________________________________________________
Page 15 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Field Name
Description
General Data Section Heading

R/O/C

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values

Comments

____________________________________________________________________________________________
Page 16 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Base Unit of
Measure

Inventory Unit of measure

MRP
Procedure
MRP Type

Section Heading

Reorder point
MRP
Controller
Lot Size
Data
Lot Size
Maximum
stock level
Rounding
value

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Enter the inventory unit of


measure for this product

Defaults if
Basic Data 1
view exists

Identifies the type of


MRP /MPS to be performed

Mainly, no planning (ND) and


manual reorder point planning
(VB) will be used

After the
generation of
sufficient data
in the SAP, later
on automatic
reorder point
planning (VM)
may be
considered.

Reorder point
Code for the person
responsible for MRP/MPS
for this material
Section Heading

O
O

Enter value
Press F4 for list. Select desired
code from the list

Identifies the type of Lot


Sizing that will occur.
Maximum stock level
allowed
Rounding value for
purchase order quantity.
Value to a multiple of which
the system rounds up the
procurement quantity.

O
O

"Replenish to maximum stock HB" will be used.


Enter value

Enter value

Enter.

1.10.

On tab MRP2, enter information in the fields as specified in the below table:

____________________________________________________________________________________________
Page 17 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Field Name

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Description

R/O
/C

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values

Comments

Scheduling
____________________________________________________________________________________________
Page 18 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Plnd Delivery
Time

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Number of days required to


obtain material obtained
externally

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Enter number of days if needed

Enter.
On tab MRP3, enter information in the fields as specified in the below table:

Field Name
Availability

Description
Identifies whether total

R/O/C
R

User Action and Values


Enter 01 (period) or 02

Comments
Preference

____________________________________________________________________________________________
Page 19 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Check

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

requirements by period are


to be used or individual
Requirements
Total lead time for finished
product, including
production and procurement
along the longest path
Indicator for cross project
material

Tot. Repl.
Lead Time
Cross project

1.1.1 MM-MM01-Material-Create-ZADM
1.2

(individual).
NOTE: This is the only
required field on this screen
Enter time in days

Use pull down menu

depends upon
company

Enter.
1.11.

On tab Forecasting, enter information in the fields as specified in the below table:

Not Applicable
Field Name
General
data
Forecast
model

Description
Section header

R/O/C

Indicator that defines on


which forecast model the
system bases its calculation of
future requirements of the
material.

User Action and Values

Comments

Use pull down to change


default value

Enter.

1.12.

On tab Plant data/stor. 1 enter information in the fields as specified in the below table:

____________________________________________________________________________________________
Page 20 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Field Name
Description
General Data Section Heading
Base Unit of
Inventory UOM

R/O/C
R

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values


Enter UOM or select from pull

Comments
Defaults from

____________________________________________________________________________________________
Page 21 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Measure
Unit of Issue
Storage bin
Ph. Inv.
Indicator for
cycle
counting

Shelf Life
Data
Min. Rem.
Shelf Life
Total Shelf
Life
Period
Indicator for
shell life
Old Material
Number

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Unit in which material is


issued
Storage bin
Indicates that the given
material is subject to the
cycle counting method of
inventory. The indicator also
defines at which time
intervals a physical
inventory is to be carried
out for the material
Section Heading

O
O
O

down list
Enter Unit of Issue or select
from pull down list
Enter value is appropriate
Select from pull down menu

Number of days material


needs to be kept for the
system to accept
Number of days material
will keep in total
The period indicator
specifies the unit of
measurement for a period of
time
Plant Specific Old material
number

Enter number of days.

Enter number of days

Enter number of days

Enter Old Material Number

Basic Data

Enter.

On tab Plant data/stor.2, enter information in the fields as specified in the below table:

____________________________________________________________________________________________
Page 22 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Field Name

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Description

R/O/C

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values

Comments

____________________________________________________________________________________________
Page 23 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

General plant
parameters
Neg. stocks in
plant
Log.
Handling
group
Serial No.
profile
Dist. Prof
Profit center
Stock
determin.
Group

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Section header
Negative stocks allowed in
plant
Logistics handling group for
workload calculation

Check box as appropriate

Use pull down menu

Serial number profile

Use pull down menu

Distribution profile of
material in plant
Profit center
The stock determination
group combined with the
Stock Determination Rule at
plant level create a key for
the stock determination
strategy.

Use pull down menu

R
O

Use pull down menu


Use pull down menu

Enter.

____________________________________________________________________________________________
Page 24 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

1.13.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

On tab Quality management, enter information in the fields as specified in the below table:

____________________________________________________________________________________________
Page 25 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Field Name
General data
Base Unit of
measure
Procurement
data
Inspection type

QM control
key

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Description
Section header
Base unit of measure

R/O/C
R

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values

Comments

defaults from Basic data View

Section header
The inspection type defines
how an inspection is
performed. Several inspection
types can be assigned to an
inspection lot origin.
Control Key for Quality
Management in Procurement

Use pull down menu

Enter.

1.14.

On tab Accounting 1, enter information in the fields as specified in the below table:

____________________________________________________________________________________________
Page 26 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Field Name
Description
General Data Section Heading
Base Unit of
Inventory UOM
Measure
Valuation
Indicates whether stocks are

R/O/C
R

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values


Enter UOM or select from pull
down list

Comments
Defaults from
Basic Data.

____________________________________________________________________________________________
Page 27 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Category
Current
Valuation
Valuation
Class
Prom. stk val.
Class

Price Control
Mov. Avg.
Price

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

valuated together or
separately
Section Heading
Defines which group of G/L
accounts material is
assigned
Valuation Class for Project
Stock. Default value for the
valuation class for valuated
project stocks of the
material.
Defines whether material is
valuated with standard or
moving average price
Moving average price of the
material

Select from pull down menu to


change default value

Use pull down menu

V Moving Average Price

Enter price

Defaults in
from the
material type.

Enter.

1.15.

On tab Costing 1 and tab Costing 2, Only views will be maintained, no field will be
populated as of now.
Not Applicable

1.16.

On tab Plant stock , information is displayed regarding the stocks of this material in this
plant: Automatic
Not Applicable
1.17.

On tab Stor. location stock, information is displayed regarding the stocks of this material in
this storage location: Automatic
Not Applicable
Save to create the material using the save button
1.18.

or use the Ctrl S key combination.

To extend a material to add an additional department view:

Access transaction by:


Via Menus

(l) Logistics>Material Management>Material

____________________________________________________________________________________________
Page 28 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Via Transaction Code

1.19.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

master>Material>Create (General) > Immediately


(m) Logistics > Production > Master Data > Prod. resources/tools
> Prod. resources/tools > Material > Create (General)
(n) Logistics>Production>Master Data>Material
Master>Material > Create(General)
MM01

On screen Create Material: Initial Screen, enter information in the fields as specified in the
below table:

Field Name
Material
Industry
Sector

Description
Key identifying material
Specifies branch of industry
to which material is assigned

R/O/C
R
O

Material
Type

Group to which material is


assigned.

Copy From
Material:

Similar material from which the O


system

User Action and Values


Enter material number
Leave blank. System will
default in the value stored for
this material
Leave blank. System will
default in the value stored for
this material
Leave blank.

Comments

____________________________________________________________________________________________
Page 29 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

obtains selected values


R = Required, O = Optional, C = Conditional
Press Enter.
1.20.

On pop up screen Select View(s), check the appropriate boxes for the screen(s) to be added.

Enter.

1.21.

On pop up screen Organizational Levels, enter information in the fields as specified in the
below table:

Note that the fields displayed will depend upon the views selected.
____________________________________________________________________________________________
Page 30 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Field Name
Organizati
onal Levels
Plant

Description
Section Header

R/O/C

Plant identification key

Storage
Location

Storage Location
Identification key

Profiles
MRP
Profile

Section Header
MRP Parameters

Forecast
prof.

Forecast profile

1.1.1 MM-MM01-Material-Create-ZADM
1.2

User Action and Values

Comments

Enter Plant where material will


be active or select from pull
down menu
Enter Storage Location where
material will reside or select
from pull down menu
Key that you can use to store
MRP parameters that are
independent of the
Key that allows you to store
forecast parameters
independently of a material
master record.

Enter.
Follow the procedural steps outlined above for the screens selected (See table of contents for this
document on page 2).

____________________________________________________________________________________________
Page 31 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

1.22.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

To extend a material to another plant:

Access transaction by:


Via Menus

Via Transaction Code


1.23.

(o) Logistics>Material Management>Material


master>Material>Create (General) > Immediately
(p) Logistics > Production > Master Data > Prod. resources/tools
> Prod. resources/tools > Material > Create (General)
(q) Logistics>Production>Master Data>Material
Master>Material > Create(General)
MM01

On screen Create Material: Initial Screen, enter information in the fields as specified in the
below table:

Field Name
Material
Industry
Sector

Description
Key identifying material
Specifies branch of industry
to which material is assigned

R/O/C
R
O

Material
Type

Group to which material is


assigned.

User Action and Values


Enter material number
Leave blank. System will
default in the value stored for
this material
Leave blank. System will
default in the value stored for
this material

Comments

____________________________________________________________________________________________
Page 32 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

Copy From
Material:

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

Similar material from which the O


system
obtains selected values
R = Required, O = Optional, C = Conditional

1.1.1 MM-MM01-Material-Create-ZADM
1.2

Leave blank.

Press Enter.
1.24.

On pop up screen Select View(s), check at least one box other than the basic data views.

Enter.

____________________________________________________________________________________________
Page 33 of 34

BUSINESS PROCESS PROCEDURE

Release:
Last Edited on:

1.25.

Title:
Organization /Area

Create Material Master for Material Type Admin (ZADM)


Materials Management

ECC 6.0
12 November 2015

File Name:
Version:

1.1.1 MM-MM01-Material-Create-ZADM
1.2

On pop up screen Organizational Levels, enter the plant number and other information in
the fields as specified in the below table:

Note that the fields displayed depends upon the screens selected.

Field Name
Organizati
onal Levels
Plant

Description
Section Header

R/O/C

Plant identification key

Storage
Location

Storage Location
Identification key

Profiles
MRP
Profile

Section Header
MRP Parameters

Forecast
prof.

Forecast profile

User Action and Values

Comments

Enter Plant where material will


be active or select from pull
down menu
Enter Storage Location where
material will reside or select
from pull down menu
Key that you can use to store
MRP parameters that are
independent of the
Key that allows you to store
forecast parameters
independently of a material
master record.

Enter.
Follow the procedural steps outlined above for the screens selected (See table of contents for this
document on page 2).

____________________________________________________________________________________________
Page 34 of 34

Вам также может понравиться