ITEM

DESCRIPTION

ELECTRICAL ENGINEERING INSTALLATIONS


Complete installation as detailed in the drawings and to the
complete satisfaction and approval of the Engineer and DEWA
Authority and under the following sections.
SWITCH GEAR:

A
B
C
D
E
F
G
H
I

Distribution and sub-main distribution boards including breakers,


terminations, isolators, supports, accessories, complete
MDB -1 (1600 A 4P ACB 50 KA WITH OUT INTERLOCKING FORM -4)
MDB -2 (1600 A 4P ACB 50 KA WITH OUT INTERLOCKING FORM -4)
CAPACITOR BANK ( 250 KVAR WITH OUT HARMONIC FILTER )
SMDB - GF - (500 A TP MCCB )
SMDB - FF (800 A TP MCCB )
SMDB -TF (400 A TP MCCB )
SMDB -SF (800 A TP MCCB )
C CHANNEL SUPPORTS FOR LV PANNELS & CAPACITOR BANKS
T &C of above

A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U

Distribution Boards
DB GL 125 A TP
DB GP - 100 A TP
DB AC- G1 - 160 A TP
DB AC-G2- 160 A TP
DB FL - 125 A TP
DB FP - 160 A TP
DB AC- F1 - 160 A TP
DB AC - F2 - 160 A TP
DB AC-F3- 160 A TP
DB AC-F4- 160 A TP
DB SL - 125 A TP
DB SP - 160 A TP
DB AC- S1 - 160 A TP
DB AC - S2 - 160 A TP
DB AC-S3- 160 A TP
DB AC-S4- 160 A TP
DB GL-100 A TP
DB GP - 100 A TP
DB AC - G1 - 160 A TP
DB AC -G2 160 A TP
T & C of Above

A
B
C
D
E
F
G

Isolators along with terminations, supports, complete


FIRE PUMP ( 250A TP ISOLATOR)
BOOSTER PUMP ( 40A TP ISOLATOR)
WATER PUMP ( 40A TP ISOLATOR )
FAHU- ( 63A TP ISOLATOR )
LIFT -1,2 ( 40A TP ISOLATOR )
SPLIT UNITS ( 32 AMP SP ISOLATOR)
ISOLTAORS FOR ROOF EXTRACT FANS ( 20 AMP TP)
Total for the Page
Cables, wires, conduits, supports, terminators and ceiling rose
(wherever applicable) in final sub-circuits with switches & sockets

A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
N
O

Light fitting Point


Light fitting Point W/P
Ceiling Fans Points
Exhaust Fans Point only
13 A Single Sockets
13 A Double Sockets
15 A Single Sockets
45 A Single Sockets for Ground Kitchen Cooker
Water Heater Points
SPLIT UNIT
One Gang One Way Switch (Include)
Two Gang One Way Switch (Include)
Three Gang One Way Switch (Include)
One Gang Two Way Switch (Include)
Switch Panel (Wherever Applicable)
Timer Switch + Contractor for Corridor, Parking and Stair lights
Press Switch For Staircase (Wherever Applicable)

A
B
C
D
E
F
G
H
I

Cables including trunking, trays, conduits, terminations, supports,


accessories, complete between MDBSs', SMDBs', MCCs', panels and
DBs' (OMAN CABLE , NATIONAL,EL-SEWEDY ,RIYAD,)
4C 300 mm2 XLPE/SWA/PVC Cu + 1C 150mm2 ECC
4C 185mm2 XLPE/SWA/PVC Cu + 1C 95mm2 ECC
4C 70mm2 XLPE/SWA/PVC Cu + 1C 35mm2 ECC
4C 50mm2 XLPE/SWA/PVC Cu + 1C 25mm2 ECC
4C 35mm2 XLPE/SWA/PVC Cu + 1C 25mm2 ECC
4C 16mm2 XLPE/SWA/PVC Cu + 1C 16mm2 ECC
150 MM GI TRUNCKING (FOR ELECTRICAL DB'S WIRING )
600 mm X 50 mm X 1.2 mm HD CABLE TRAYS
T&C of cables

Earthing system
A
B
C
D

Earthing system including all cables, earth rods, accessories, as per


specification
EARTHING CABLE 1 C X 150 MM FOR MDBS
EARTHING PIT WITH ROD AND ACCESORRIES, COVER ETC.
ALLOW EARTHING FOR CABLE TRAYS

EXCLUDED ITEMS
Electrical Manhole with heavy duty cover

Standby Generator including ATS & Cables

Intercom System

Lightning Protection System

Telephone Manhole with heavy duty cover


Total for the Page

A
B
C
D
E
F
G
H
I

A
B
C
D

A
B
C
D
E
F

Telephone Installation
Main distribution frame (AS PER ETISALAT/DU REQUIREMENT)
12U Telephone cabinet
RJ-45 Outlet (Tel/Data)with cat-cabling, termination and testing
Optical Fiber Cable from GF Main Telephone Room to Each ONT
Cat-6 Wire from each junction box to each point in RM.
Equipment and accessories including trays, terminations, supports, fittings,
complete
LADDER TYPE CABLE TRAY AS PER ETISALAT DESIGN
EARTHING BAR IN TELEPHONE ROOM
40 AMP TP ISOLATOR
PC Sum Items ( specify type and quantity with unit rates )
Electrical lights
Ceiling Fans
Electrical lights WP

Generally for the complete Electrical Engineering Installations


Drawings, manuals, approvals and instruction books
Testing and commissioning
Labels, special tools, complete
Coordination and liaison with DEWA and ETISALAT
Final connections from service authorities (coordination)
Testing/checking of existing installation

G
H
I
J

Removal of non usable installed items and equipment


Allow for all items required by the drawings and local regulations, for a
complete and operational system. (Please specify)
Allow for repair of damaged items: conduits, wires, etc.
Allow for any other contingencies (to be specified)

Total for this Page

SUMMARY

Brought Forward from Page 1


Brought Forward from Page 2
Brought Forward this Page

Total for Electrical Works

UNIT

QTY.

No
No
No
No
No
No
No
LS
LS

1
1
2
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
LS

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

RATE
DH.

AMOUNT
DH.

No
No
No
No
No
No
No

1
4
2
3
2
466
30
AED

No
No
No
No
No
No
No
No
No
No
No
No
No
No
LS
LS
LS

M
M
M
M
M
M
M
M

1,934
258
423
30
852
24
8
5
46
466
545
##
1
1
1

650
400
190
85
55
475
1,575
220

M
LS
LS

85
5
1

No

Exclude

LS

Exclude

LS

Exclude

LS

Exclude

No

Exclude

AED

No
No
No
LS
LS
LS

1
8
26
1
1
1

M
LS
No

15
1
1

No
No
No

1,934
423
258

LS
LS
LS
LS
LS
LS

1
1
1
1
1
1

LS
LS

1
1

LS
LS

1
1

AED

AED

AED

AED

AED

Вам также может понравиться