Академический Документы
Профессиональный Документы
Культура Документы
SYSTEM
Triumph
Why do it ?
Triumph
Triumph
Schedule
Training of key personnel (Theory)
- Week 46
- Week 46
- Week 46
- Week 46
Follow up
- TBC
Decision on expansion
Triumph
Clipboard
Roving QC Daily Sheet
Roving QC Daily
Sheet
Tape measure
Triumph
Pencil
Green cone
Sewing
Specification
Red cone
AD page or
Technical
Specification
for the
operation
Triumph
Operation
standard
7
Triumph
ROVING QC NAME:DATE :
DAY:
QC SUPERVISOR:
Entered by QC
Clerk
LINE:
Operation
Style
Operator
No
Qty
inspected
Result
X or
Defect qty/code
rejected
Follow up
Remarks
Defect code:
RM = Raw Material faults / holes; SC = Stains/Contamination; MD = Molding faults; PG = Seam/stitch pucker or gather;
SB = Seam breakdown (non inclusion/cracking etc); SP = Seam position incorrect (twisting/stretched);
SD = Stitch density/tension; PT = Poor trimming/thread ends; ND = Needle damage; GB = Incorrect garment balance;
SE = Insecure or misaligned seams/edges; M = Measurement
Triumph
Line:
Date
Time
01
Style:
02
03
04
Operator No.:
05
06
07
08
Operator:
09
10
11
12
13
14
15
Morning
Remarks:
Roving QC:
Line Ldr/Supvsr:
Sen. Line Ldr/PM:
Afternoon
Remarks:
Roving QC:
Line Ldr/Supvsr:
Sen. Line Ldr/PM:
Night
Remarks:
Roving QC:
Line Ldr/Supvsr:
Sen. Line Ldr/PM:
Remarks:
Defect code:
Triumph
If Green and no rejections, no signature needed; If green & some rejection QC signs: If Red, QC & Line Leader/Supervisor sign; If Red again immediately, Senior Line Leader/Production
Manager signs
RM = Raw Material faults / holes; SC = Stains/Contamination; MD = Molding faults; PG = Seam/stitch pucker or gather;
SB = Seam breakdown (non inclusion/cracking etc); SP = Seam position incorrect (twisting/stretched);
SD = Stitch density/tension; PT = Poor trimming/thread ends; ND = Needle damage; GB = Incorrect garment balance;
SE = Insecure or misaligned seams/edges; M = Measurement
10
Triumph
11
Production line
Roving QC
Triumph
12
At the start of each day, refer to the QC Supervisor to the operations in need of special attention
Randomly select & check 7 samples from the finished bundle of 40 units
How many
faults
No fault
1st time
In <ODS>, colour
the appropriate cell
in Green
Line Leader
determines how to
handle & request
Operator to check the
whole bundle & repair
Move on to next
Operator
Triumph
13
Revised 22/02/2007
CQA TIOL HKG
Triumph
14
Pencil
Highlighters Green, Red
Measuring tape
Reports:
Frequency:
Related Parties:
Method:
1. At the start of each day, the Roving QC refers to the QC Supervisor to determine those
operations which are in the Highest 3 or in need of close attention for some other reasons.
2. The Roving QC visits operators at random to eliminate any chance of them cheating the
system.
3. On the <OPERATOR DAILY SHEET>, the Roving QC enters Roving QC name, Month,
Line, Style, Operator No. and Operator. On the <ROVING QC DAILY SHEET>, the
Roving QC enters Date, Day, Line, and QC Supervisor.
4. Roving QC randomly selects the latest 7 finished samples from the bundle of 40 still at the
workstation, checks the work against the visual standard and specific requirements for:
4.1
Correct trim being used
4.2
Workmanship
4.3
General appearance
4.4
Measurement where the operation is elastication or there is a specified
measurement controlled by the operator
4.5
According to the number of faults, QC follows Step 5, 6 or 7
5. If no fault is found:
5.1
Roving QC returns the inspected garments to the Operator
5.2
Roving QC fills in the appropriate space on the <OPERATOR DAILY SHEET> with
Green highlighter
5.3
Roving QC fills in each column on the <ROVING QC DAILY SHEET>:
Operation abbreviation or code, Style, Operator No, Quantity Inspected,
Result
5.4
QC raises Green cone at the work station and moves on to the next Operator
Triumph
15
1. If less than 3 minor faults are found: (a minor fault can be defined as a fault which will
not result in customer rejection or return, but one that is not within the specification or
tolerances required)
1.1
Roving QC returns the defective pieces to the Operator for repair
1.2
Roving QC fills in the appropriate space on the <OPERATOR DAILY SHEET> with
Green highlighter and enters the relevant Defect code and quantity as for example:
2/PT and sign it off
1.3
Roving QC fills in each column on the <ROVING QC DAILY SHEET>:
Operation abbreviation or code, Style, Operator No, Quantity Inspected
Result , Defect qty/code, Remarks bundle number(if necessary)
1.4
Roving QC raises Green cone at the work station and moves on to the next
Operator
2. If 1 or more major faults / 3 or more minor faults are found: (a major fault can be
defined as a fault that will definitely result in rejection by the customer and likely return)
2.1
Roving QC instantly informs the Line Leader/Supervisor to come to the operation
and returns the defective pieces to the Line Leader/Supervisor
2.2
Line Leader/Supervisor shall determine how to handle the defects and request the
Operator to check the rest of the bundle and rectify any further faults before
permitting the bundle to continue down the line
2.3
Roving QC colours the <OPERATOR DAILY SHEET> Red, and enters the relevant
Quantity and Defect code, for example: 3/SD and sign it off
2.4
Line Leader/Supervisor signs off on the <OPERATOR DAILY SHEET>
2.5
Roving QC fills in each column on the <ROVING QC DAILY SHEET>:
Operation abbreviation or code, Style, Operator No, Quantity Inspected
Result , Defect qty/code, Remarks bundle number(if necessary)
2.6
Roving QC raises Red cone at the work station and moves on to the next Operator
2.7
Once the Operator has finished checking and repairing, the Line Leader/Supervisor
shall call the Roving QC back to the operator
2.8
Roving QC proceeds from Step 4 for the checked and repaired bundle
2.9
If no fault is found, proceed from Step 5;
If less than 3 minor faults are found, then proceed from Step 6;
If 1 or more major faults / 3 or more minor faults are found, then proceed as follows:2.10 Roving QC requests the Line Leader/Supervisor to stop the Operator and informs
the Senior Line Leader / Production Manager
2.11 Line Leader/Supervisor, Senior Line Leader / Production Manager solve the problem
together
2.12 Roving QC colours the <OPERATOR DAILY SHEET> Red, and enters the relevant
quantity and Defect code, for example: 4/SD
2.13 Senior Line Leader / Production Manager signs off on the <OPERATOR DAILY
SHEET>
2.14 Roving QC fills the Defect code and quantity in Follow up on the <ROVING QC
DAILY SHEET>
2.15 Roving QC keeps Red cone at the work station and moves on to the next Operator
2.16 Roving QC must ensure to check the Operator again after 2 consecutive Red
2.17 Once the operator has a Red, she must only be allowed to continue working
if a Red is immediately followed by a Green.
3. The Roving QC should particularly note the following points:
3.1
NEVER get involved with the Operator in trying to find out why the Operator is
wrong. That is the responsibility of Line Leader/Supervisor
3.2
NEVER wait at the operation whilst the problem is being resolved
3.3
NEVER try to suggest solutions to the Operator if anything goes wrong afterwards
you may be blamed
3.4
If you have any views about the cause or solution of a particular problem, the Line
Leader/Supervisor & QC Supervisor should be consulted and the matter left with
them.
Revised 22/02/2007 CQA TIOL HKG
Triumph
Page 1 of 2
16
DAILY:
1. At 16.00 or 2 HOURS before the end of the shift, the QC Supervisor collects the
<ROVING QC DAILY SHEET> from all Roving QCs & submits them to QC Clerk.
2. In the computer file Roving QC Analysis, QC Clerk chooses the sheet Daily Chk
Sumry of the corresponding day.
3. QC Clerk enters the Week commencing & Unit.
4. On the <ROVING QC DAILY SHEET>, the QC Clerk ignores the entries with no fault.
For those entries with faults found , QC Clerk transfers the data to the Daily Chk
Sumry, including:
4.1
Line, Style, Operator No
4.2
Total handled(Exceptions) and the number of different defects
The QC Clerk initials the box on the <Roving QC Daily Sheet> to indicate she has
completed the entries for that sheet.
5. At 17:30 or 30 minutes before the end of the shift, the QC Clerk issues the Roving
QC Analysis with completed Daily Chk Sumry to Factory Managers, QA Manager,
Production Managers, QC Senior Supervisor, etc. through E-mail.
WEEKLY:
At 08:30 on Monday,
1. The QC Supervisor collects the <ROVING QC DAILY SHEET> which includes the
data of the previous Saturday entered after 16:00 on Friday from all Roving QCs
& submits to QC Clerk. Per the above steps, QC Clerk completes the Daily Chk
Sumry of the previous Saturday.
2. The QC Clerk chooses the sheet Analysis only of the computer file Roving QC
Analysis.
3. The QC Clerk filters the column Operator No & selects operators in the order of their
number.
4. The QC Clerk copies from row A to row G for each operator.
5. The QC Clerk pastes into Wkly Chk Sumry by using Paste Special Values only.
6. In Wkly Chk Sumry, QC Clerk selects from Toolbar, Data-Sort-% Reject-Descending.
Triumph
7. The QC Clerk issues the Roving QC Analysis with completed Wkly Chk Sumry to
General Manager, Factory Managers, QA Manager, Production Managers, QC
Senior Supervisor, etc. through E-mail.
17
Triumph
18
Triumph
19
QSF
Triumph
Week Commencing
Line
Style
Operator No
Total Checked
(Exceptions)
Total Rejected
(Exceptions)
% Reject (Exceptions)
Day
A
A
C
C
D
D
A
A
A
B
B
A
A
A
B
B
B
B
C
C
B
B
C
C
B
B
C
D
C
D
A
A
A
B
B
A
B
B
C
B
B
A
C
A
C
C
C
C
C
C
D
D
A
A
D
1234
1234
3456
3456
4567
4567
1234
1234
1234
2345
2345
1234
1234
1234
2345
2345
2345
2345
3456
3456
2345
2345
3456
3456
2345
2345
3456
4567
3456
4567
1234
1234
1234
2345
2345
1234
2345
2345
3456
2345
2345
1234
3456
1234
3456
3456
3456
3456
3456
3456
4567
4567
1234
1234
4567
AS
AS
BB
BB
CC
CC
DD
DD
IO
DV
DV
SS
ER
ER
GF
GF
GG
GG
GH
GH
HH
HH
HK
HK
HU
HU
II
II
II
II
IK
IK
IO
IO
IO
IO
IO
IO
MM
JJ
JJ
JK
JK
JK
KJ
KJ
LK
LK
MM
MM
MY
MY
OL
OL
PL
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
8
2
3
2
1
1
6
1
3
9
1
1
1
1
9
1
7
1
5
3
1
2
1
1
1
2
7
1
1
1
9
2
3
1
8
1
2
2
1
5
2
4
2
1
9
1
2
1
1
1
1
1
3
1
1
57.14%
14.29%
21.43%
14.29%
7.14%
7.14%
42.86%
7.14%
21.43%
64.29%
7.14%
7.14%
7.14%
7.14%
64.29%
7.14%
50.00%
7.14%
35.71%
21.43%
7.14%
14.29%
7.14%
7.14%
7.14%
14.29%
50.00%
7.14%
7.14%
7.14%
64.29%
14.29%
21.43%
7.14%
57.14%
7.14%
14.29%
14.29%
7.14%
35.71%
14.29%
28.57%
14.29%
7.14%
64.29%
7.14%
14.29%
7.14%
7.14%
7.14%
7.14%
7.14%
21.43%
7.14%
7.14%
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
MON
TUE
MON
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
MON
TUE
TUE
MON
TUE
MON
MON
MON
TUE
TUE
TUE
MON
MON
TUE
MON
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
TUE
MON
20
Defect Codes
Triumph
RM
SC
MD
Molding Faults
PG
SB
SP
SD
PT
ND
GB
SE
Measurement
21
MAJOR
SC
MINOR
MD
Molding Faults
MAJOR
PG
MAJOR
SB
MAJOR
SP
MAJOR
SD
MAJOR
PT
MINOR
ND
MAJOR
GB
MAJOR
SE
MAJOR
Measurement
MAJOR
MO
Missing Operation
MAJOR
CT
Careless Trimming
MAJOR
Triumph
22
23
Thank you..
Any Questions ?
Triumph
24