100% renewable electricity

A 2050 vision and roadmap for Europe and North Africa

March 2010

PwC
Agenda

1 Introduction

2 The 2010 / 2050 Transition and Roadmap

3 Conclusions and next steps

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 2
1 Introduction

What is the context and opportunity?

• Ageing infrastructure Change in the makeup Need to stay within a


• Security of supply and structure of the 2oC temperature
• Climate change power sector increase

An opportunity to achieve
100% renewable electricity
for Europe and North Africa
Roadmap ? Good EU-wide policy
cohesion and alignment

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 3
1 Introduction

2010 / 2050: Today’s starting point, tomorrow’s vision

2010 2050
• Demand challenges • Regional power system
• Power grid / power mix • Decarbonised electricity generation
• Imports / security of supply • Unified European power market united
• Emerging EU energy policy with NA
• Power market structure • Most suitable sites / technologies
• REN electricity costs • Affordable electricity / no energy
poverty
• Fossil fuel subsidies
• Development of a “Green” market

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 4
1 Introduction

A simplified market model

Government
Enabling
Policy Areas

Investment & Market Infrastructure


Finance Structure

h
& Planning

Supply Generation Grid


Delivery
R&D Chains Capacity Demand
Capacity
Areas

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 5
1 Introduction

Breaking down this down into manageable steps

100% 2050

Long term
milestones and
% REN generation in power sector

vision
2040
75%

50% 2030

Medium term milestones, linking


into existing EU 2020 targets

25%
2020
2015
End- 2012 Short term
Current 2010 milestones
state

2010 2020 2030 2040 2050

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 6
1 Introduction

A roadmap to 2050

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 7
2 The 2010 / 2050 Transition and Roadmap

Key Findings
Enabling Area 1 – Government Policy
• REN Directive (esp. Art 9, electricity imports)
• Setting of binding regional 2030, 2040 and 2050
targets
• Long term policy, support schemes / incentives
General • Development of further technical guidelines

• Permission processes and public concern


• Other EU Directives – grid regulation
• Sharing best practice / lessons learned
• Building of institutional capacity across NA
Grid
100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 8
2 The 2010 / 2050 Transition and Roadmap

Key Findings
Enabling Area 2 – Market Structure
• Regionalisation / unification of EU power markets
• Real time pricing and support schemes
(dispatchability)
• Grid connection for REN electricity
General • Increasing cooperation with North Africa

• Harmonisation of grid regulation


• Increasing coord’n between TSO’s and Nat’l Grids
• Managing electricity supply and demand
• Supply chain constraints
Grid • New entrant network connection
100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 9
2 The 2010 / 2050 Transition and Roadmap

Key Findings
Enabling Area 3 – Finance & Investment
• Accessing all sources of financing
• Information sharing, standardisation of tools
• Development of bespoke products e.g.
insurance
General • R&D and demonstration plant investments

• Technology cost reductions


• Project proposal development
• HVAC and HVDC supply chain
• Energy efficiency
Grid
100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 10
2 The 2010 / 2050 Transition and Roadmap

Key Findings
Enabling Area 4 – Infrastructure & Planning
• Long term planning for regional grid expansion
• Mandate to introduce new technologies, support
R&D
• Commercial scale demo projects (generation)

General • Natural and strategic decommissioning of FF plants

• Development of 3-5 regional Super Grids


• Demonstration projects (transmission)
• Reinforcing HVAC lines, new DC links to North
Africa
Grid • North African grid development

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 11
2 The 2010 / 2050 Transition and Roadmap

Key Findings
Other – Opportunities and Consequences
• Security of supply
• Costs
• Environmental concerns
• Sustainable development
General • Climate change

• Governance and regulation


• Engagement with the public
• Other North African opportunities
• Cost reduction
Grid
100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 12
3 Conclusions and next steps

What is the context and opportunity?

• Ageing infrastructure Change in the makeup Need to stay within a


• Security of supply and structure of the 2oC temperature
• Climate change power sector increase

An opportunity to
achieve 100%
renewable electricity
for Europe and
? Good EU-wide policy
cohesion and alignment
North Africa
Roadmap

100% renewable electricity: A 2050 vision and roadmap for Europe and North Africa March 2010
PricewaterhouseCoopers LLP Slide 13
Thank you

The report can be downloaded from: www.pwc.com and www.SuperSmartGrid.net

Gus Schellekens
PricewaterhouseCoopers
Sustainability and Climate Change
gus.schellekens@uk.pwc.com
+44 7711 828 845

This presentation has been prepared for general guidance on matters of interest only, and does not constitute
professional advice. You should not act upon the information contained in this presentation without obtaining
specific professional advice. No representation or warranty (express or implied) is given as to the accuracy or
completeness of the information contained in this publication, and, to the extent permitted by law,
PricewaterhouseCoopers LLP, its members, employees and agents do not accept or assume any liability,
responsibility or duty of care for any consequences of you or anyone else acting, or refraining to act, in reliance on
the information contained in this publication or for any decision based on it.

© 2010 PricewaterhouseCoopers LLP. All rights reserved. 'PricewaterhouseCoopers' refers to


PricewaterhouseCoopers LLP (a limited liability partnership in the United Kingdom) or, as the context requires, the
PricewaterhouseCoopers global network or other member firms of the network, each of which is a separate and
independent legal entity. Design: 1000150_strategy design
PwC