CONSTRUCTION OF 3 NEW SCHOOLS AROUND DOHA AND VILLAGES (PACKAGE 3- STAGE 9)


C 2014 / 147
BA 13/14 C 080 G
ASHGHAL- PUPLIC WORK AUTHORITY
CEG INTERNATIONAL
ALHUDA ENGINEERING WORKS
TIE IN CONNECTION REPORTS
LOCATION

PIN NO.

ROADS

DRAINAGE SYSTEM

QTEL/OOREDOO

KAHRAMAA(ELECTRICITY)

KAHRAMAA(WATER)

UMM ALSANEEM 1

As per instruction, to provide the As-built


We are requesting for new road layout as Drawings after completion of the external
per approved design under letter ref
works. We have to provide the Holding
56381986 AHEW/RD/15/0001 dated 01 June
Tank as per DC-2 Drawing Approval. Take
2015and awaiting for reply.
note that there are no existing Drainage
Service Manhole in the Project.

As per instruciton from Ooredoo, we have


to follow and proceed as per the approved
As per coordination with KAHRAMAA
DC-2 Site Plan Drawings with the stamp
stated that there is a conflict between
and sign from Ooredoo. Inspections will
existing HV cable on the area.
be carried out only as per the Ooredoo
stamp drawings.

To wrie a letter officially to Kahramaa


Water Network Planning Department
address to Engr. Mohd Thani Al Maadead,
to get the infrastructure drawing for the
water networks of the project.

UMM ALSANEEM 2

As per instruction, to provide the As-built


We are requesting for new road layout as Drawings after completion of the external
per approved design under letter ref
works. We have to provide the Holding
56371287
AHEW/RD/15/0001 dated 01 June
Tank as per DC-2 Drawing Approval. Take
2015and awaiting for reply.
note that there are no existing Drainage
Service Manhole in the Project.

As per instruciton from Ooredoo, we have


to follow and proceed as per the approved
As per coordination with KAHRAMAA
DC-2 Site Plan Drawings with the stamp
stated that there is a conflict between
and sign from Ooredoo. Inspections will
existing HV cable on the area.
be carried out only as per the Ooredoo
stamp drawings.

To wrie a letter officially to Kahramaa


Water Network Planning Department
address to Engr. Mohd Thani Al Maadead,
to get the infrastructure drawing for the
water networks of the project.

UMM ALSANEEM 3

As per instruction, to provide the As-built


We are requesting for new road layout as Drawings after completion of the external
per approved design under letter ref
works. We have to provide the Holding
56381951
AHEW/RD/15/0001 dated 01 June
Tank as per DC-2 Drawing Approval. Take
2015and awaiting for reply.
note that there are no existing Drainage
Service Manhole in the Project.

As per instruciton from Ooredoo, we have


to follow and proceed as per the approved
As per coordination with KAHRAMAA
DC-2 Site Plan Drawings with the stamp
stated that there is a conflict between
and sign from Ooredoo. Inspections will
existing HV cable on the area.
be carried out only as per the Ooredoo
stamp drawings.

To wrie a letter officially to Kahramaa


Water Network Planning Department
address to Engr. Mohd Thani Al Maadead,
to get the infrastructure drawing for the
water networks of the project.

PROJECT TITLE
CONTRACT NO.
PROJECT ID
CLIENT
CONSULTANT
MAIN CONTRACTOR

S/N

SCHOOL REF

PREPARATORY BOYS

SECONDARY BOYS

PREPARATORY GIRLS

CONSTRUCTION OF 3 NEW SCHOOLS AROUND DOHA AND VILLAGES (PACKAGE 3- STAGE 9)


C 2014 / 147
BA 13/14 C 080 G
ASHGHAL- PUPLIC WORK AUTHORITY
CEG INTERNATIONAL
ALHUDA ENGINEERING WORKS
TIE IN CONNECTION REPORTS
LOCATION

PIN NO.

ROADS

DRAINAGE SYSTEM

QTEL/OOREDOO

KAHRAMAA(ELECTRICITY)

KAHRAMAA(WATER)

UMM ALSANEEM 1

Ashghal Drainage Department Officer


asked to change the Tie-in Connection for
MH44/1/3/1B66/3 which is not matching
We are requesting for new road layout as
with DC-2 Drawings. We submitted
We had already coordinated with
per approved design under letter ref
approved Tie-in Connection
QTEL/OOREDOO and still awaiting a
56381986
AHEW/RD/15/0001 dated 01 June
Shopdrawings, DC-2 as well as Drawings response.
2015and awaiting for reply.
from Roads & Drainage Networks Design
Department. See Letter Ref AHEW/P137/PWA/15/54 dated 17 June 2015.

We had already coordinated with


KAHRAMAA (ELECTRICITY) and still
awaiting a response.

We had already coordinated with


KAHRAMAA (WATER) and still awaiting a
response.

UMM ALSANEEM 2

As per instruction, DC-2 Drawing shall be


followed for Tie-in Connection. We
We are requesting for new road layout as
submitted approved Tie-in Connection
We had already coordinated with
per approved design under letter ref
Shopdrawings, DC-2 as well as Drawings QTEL/OOREDOO and still awaiting a
56371287
AHEW/RD/15/0001 dated 01 June
from Roads & Drainage Networks Design response.
2015and awaiting for reply.
Department. See Letter Ref AHEW/P137/PWA/15/54 dated 17 June 2015.

We had already coordinated with


KAHRAMAA (ELECTRICITY) and still
awaiting a response.

We had already coordinated with


KAHRAMAA (WATER) and still awaiting a
response.

UMM ALSANEEM 3

As per instruction, DC-2 Drawing shall be


followed for Tie-in Connection. We
We are requesting for new road layout as
submitted approved Tie-in Connection
We had already coordinated with
per approved design under letter ref
Shopdrawings, DC-2 as well as Drawings QTEL/OOREDOO and still awaiting a
56381951 AHEW/RD/15/0001 dated 01 June
from Roads & Drainage Networks Design response.
2015and awaiting for reply.
Department. See Letter Ref AHEW/P137/PWA/15/54 dated 17 June 2015.

We had already coordinated with


KAHRAMAA (ELECTRICITY) and still
awaiting a response.

We had already coordinated with


KAHRAMAA (WATER) and still awaiting a
response.