(URS)
1.0
2.0
3.0
Purpose of equipment
To fill the vials with liquid &do the partial or full stoppering and
capping(for oncological products) OEL - 5
4.0
Room Height
PREPARED BY
User Department
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department
PREPARED BY
User Department
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department
25.0 Supply chute for stoppers and caps are with aseptic
version and electro polished down to < 0.5Ra
26.0
Stoppering and capping zone should be separated
by polycarbonate enclosure with adjustable mouse hole
& DP Monitoring.
27.0
Fillings pumps, stoppering, capping are driven by
servo motors.
28.0
Exhaust requires from the crimping operation.
29.0
The sorting device for Filling, Stoppers, and Seals
is accessible by a glove port.
30.0
Positioning of Microbiological plate (petri dish) &
Air sampling heads.
31.0
Solution shall be transferred through closed
system (SART system) from sterile filtration isolator to
filling M/c.
32.0
Dosing of filling pumps shall be 1ml to 25ml.
33.0
Vial diameter ranges from 16-55mm, height 32 to
100mm.
34.0
Max. Accumulation sensor for the control of one
upstream sterilizing tunnel.
35.0
Supplier should provide two set of change parts,
one for 10ml tubular vial ,another to be determined.
36.0
Isolator requirements:
36.1 Isolator leak tightness classification should be
Class 3 as per ISO 10648-2
36.2 Chamber leak test can be performed by pressure
decay method and leak rate should meet ISO
10648-2, class 3.
36.3 Isolator should be able to perform leak test before
and after of each process.
36.4 Working area should be grade A with UDAF
Membrane to get unidirectional airflow
Vendor to specify what are the systems available
with description to get laminar air flow
36.5 OEL validation to be done at site.
36.6 Surrounding environment will be Grade B.
36.7 Isolator should have VHP Provision.
36.8 Isokinetic probes required for online particle
monitoring.
36.9 Provision to connect the SART system to transfer
solution from mobile filtration isolator to dosing
system.
36.10 Temp, RH & DP Monitoring system inside the
isolator.
36.11 Catch pot for used accessories collection.
PREPARED BY
User Department
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department
Effective Date:13/08/2014
Page No.: 4 of 8
Chamber
36.18 Zero leak dampers with actuators to facilitate VHP
sanitization and to perform leak testing
Description of Component
Contact parts
Non contact parts
Hose pipes
Buffer tank
Vent filter
Hinges for polycarbonate
panes
Bio seal flange
Gassing stations (needles)
Bowl
Chute
Gloves
Glove ports
Manifold
MOC / Surface
finish
SS316L 0.5 Ra
SS316 1 Ra
Silicone
SS316L 0.5 Ra
PTFE
SS316
SS316L
SS316L
SS316L
Hypalon Clear
POM
SS316L
Component(s) / Feature(s)
PREPARED BY
User Department
SS304
Features
Required
(Yes / No)
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department
7.1
Yes
7.2
Yes
7.3
7.4
Yes
Yes
Effective Date:13/08/2014
Page No.: 5 of 8
The indications on HMI as follows
1. Batch code
2. Date
3. Starting time
4. Set parameters
5. Actual weights
6. Machine speed
7. Out put
In case of power failure, operational
status (parameters) changes like
No bottle/no fill/no stoppering
Machine Over load
Gassing fluid indication
Stoppers and seals level in chutes
Seals and stoppers level in bowl
No vials in conveyor
Utilities flow
Serial fault stop
When doors open
Required
Safety Feature(s)
Emergency Stop
Power Failure / Recovery
Electrical Protection (Flame Proof / Non
Flame Proof)
Required
(Yes / No)
Yes
Yes
Yes
8.5
8.6
Earthing
Noise level
Yes
Less
8.7
Interlocks
Yes
Applicable
Applicable
NA
8.4
PREPARED BY
User Department
380volts,50hz,3phase
System to provide for operators
view, acknowledge and take
corrective action in the event of
system alarms
Applicable
Below 90db in the operating area
Machine should stop while guards
open
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department
Emergency switch
Protection Class
Effective Date:13/08/2014
Page No.: 6 of 8
Yes
Yes
9.0 Documentation:
Sr.
No.
9.1
9.2
9.3
9.4
9.5
9.6
9.6.1
9.6.2
9.6.3
9.6.4
Title
Material of construction Certificate
(MOC) of Contact Parts / Non contact
parts
Calibration Certificates traceable to
NIST standard
Performance Test Certificates
Qualification Documents (DQ/IQ&OQ
document )
Operation and Maintenance Manual
Drawings
GA Drawing
P& ID Drawings
Electrical
Ladder Diagram
Required
(Yes / No)
Yes
Applicable
Yes
Applicable
Yes
Applicable
Yes
Yes
Yes
Yes
Yes
Yes
Authorized
Authorized
Authorized
Required
3 D Animation for entire process flow(as
built)
Yes
Yes
Required
Yes
Yes
Equipment specifications
Required
10.0 Others
10.1
10.2
10.3
Training
Inspection at Vendors end
Technical support
PREPARED BY
User Department
Yes
Yes
Yes
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department
10.4
11.0
Others
Effective Date:13/08/2014
Page No.: 7 of 8
---
Conclusion by vendor:
The User requirement specification has been discussed and agreed upon. We hereby declare that we will
supply the equipment / system as per above laid down specification.
Name of the Vendor
PREPARED BY
User Department
Signature / Date
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department
PREPARED BY
User Department
REVIEWED BY
Head of The Department
Head Engineering / Projects
APPROVED BY
User Department