SAUDI ARAMCO ID/PID - REV 1 - 5/18/05(Standards Cutoff - August 2004)

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


PORTABLE FIRE PROTECTION EQUIPMENT INSTALLATION

SATIP-B-019-01

PROJECT TITLE:

ITEM
NO.

PROJECT PHASE &


ACTIVITY CODE

1.0

DOCUMENT REVIEW

APPROVED DATE

WBS/BI/JO/NO.

QUALITY
PROCEDURE

QUALITY
RECORD

2.1

Material Verification & Inspection


a) Portable Fire Extinguishers
b) Mobile Foam Apparatus
c) Carbon Dioxide Extinguishing Systems
d) Halon 1301 Fire Extinguishing Systems
e) Dry Chemical Fire Extinguishing
Systems
f) Fire Hose Including Connections and
Nozzles

SAIC-B-2011

2.2

Storage, Handling & Preservation

3.1

TASK / ACTIVITY

INSPECTION RESPONSIBILITY
ASSIGNMENTS
SAUDI
ARAMCO

SAIC-B-2011

W1

W2

SAIC-B-2012

SAIC-B-2012

Portable Extinguishers

SAIC-B-2013

SAIC-B-2013

W1

3.2

Foam Generating Equipment

SAIC-B-2014

SAIC-B-2014

W1

3.3

Special Fixed Extinguishing equipment

SAIC-B-2015

SAIC-B-2015

W1

3.4

Structural Welding for supports

3.5

Access and Platforms

3.6

Painting works and Safety color coding

4.0

REMARKS

NONE

1.1

3.0

MECHANICAL

25-May-05
CONTRACTOR/SUBCONTRACTOR

CNTRCTR

2.0

DISCIPLINE:

MATERIAL RECEIVING

S. Aramco will inspect the first batch of delivery for each


type of equipment.

INSTALLATION

Refer to SATIP-M-001-04

SAIC-B-2016

SAIC-B-2016

W1

Refer to SATIP-H-100-01

PRE-COMMISSIONING

4.1

Re-instatement/Final Inspection of
Portable Fire Protection System

4.2

Mech Completion Punch listing


(Partial or Final MCC)

SAIC-B-2017

SAIC-B-2017
SATR-A-2011
Form SA-6133

Page 1 of 2

W1

W1

H1

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05(Standards Cutoff - August 2004)


SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


PORTABLE FIRE PROTECTION EQUIPMENT INSTALLATION

SATIP-B-019-01

PROJECT TITLE:

ITEM
NO.

APPROVED DATE

WBS/BI/JO/NO.

PROJECT PHASE &


ACTIVITY CODE

QUALITY
PROCEDURE

TASK / ACTIVITY

QUALITY
RECORD

DISCIPLINE:

25-May-05

MECHANICAL

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

REMARKS

SAUDI
ARAMCO

GENERAL NOTES
1

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of
Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is
not present.

Hold:

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

LEGEND
W1

100% Witness Inspection/Test

H2

Sample Hold Point for QC Inspection or Test

RH2 100% Review and Approval of Documents

W2

Sample Witness Inspection/Test

R1

100% Review of Documents

RH1 Sample Review and Approval of Documents

H1

100% Hold Point for QC Inspection or Test

R2

sample Review of Documents