Вы находитесь на странице: 1из 59

Faculty of Civil Engineering

B.E. Civil Engineering


(R 2013) Semester III
CE6311
SURVEY PRACTICAL I

Requirements for a batch of 30 students

Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

1.
Total Station
3

3
NIL

2.

Theodolites
6

6
NIL

3.
Dumpy level
6

6
NIL

4.
Plane table

6
NIL

5.
Pocket stereoscope
1

1
NIL

6.
Ranging rods

6 (set)

30 nos
NIL

7.
Leveling staf
6 (set)

10 nos
NIL

8.
Cross staf
6 (set)

10 nos
NIL

9.
Chains
6 (set)

10 nos
NIL

10.
Tapes
6 (set)

10 nos
NIL

11.
Arrows
6 (set)

10 nos

NIL

12.
Prismatic Compass
3

10
NIL

13.
Surveyor Compass
1

1
NIL

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester III
CE6312 COMPUTER AIDED BUILDING DRAWING

Requirements for a batch of 30 students


Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

Computer system of Pentium IV or


30

1.
equivalent

45
Nil

2.
AUTOCAD
10
10
Nil

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester IV
CE6411 STRENGTH OF MATERIALS LABORATORY

Requirements for a batch of 30 students


Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

1.
UTM of minimum 400 KN capacity
1
1
Nil

2.
Torsion testing machine for steel rods
1
1
Nil

3.
Izod impact testing machine
1
1
Nil

Hardness testing machine

Rockwell
1 each

4.
Vickers
(any 2)
1 each

Nil

Brinnel

5.
Beam deflection test apparatus
1
1
Nil

6.
Extensometer
1
1
Nil

7.

Compressometer
1
1

Nil

8.
Dial gauges
Few

3
Nil

9.
Le Chateliers apparatus
2
2
Nil

10.
Vicats apparatus
2
2
Nil

11.
Mortar cube moulds
10
10
Nil

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester IV
CE6412 HYDRAULIC ENGINEERING LABORATORY

Requirements for a batch of 30 students


Sl.

Quantity
Quantity
Deficiency

Description of Equipment
required
available
No.

(R - A)

(R)
(A)

Bernoullis theorem Verification


1
No.

1 No.
Nil
1.
Apparatus

Calculation of Metacentric height


1
No.

1 No.
Nil

2.
water tank Ship model with

accessories

Measurement of velocity
1
No.

1 No.
Nil

3.
Pitot tube assembly

Flow measurement

open channel flow

(i) Channel with provision for fixing

notches (rectangular, triangular &


1
Unit

4.
trapezoidal forms)

1 Unit
Nil

(ii) Flume assembly with provisions for

conducting experiments on
1
Unit

Hydraulic jumps, generation of

1 Unit
Nil

surges etc.

Flow measurement in pipes

(i)
Venturimeter,U tube manometer

fixtures like Valves, collecting tank


1
Unit
1 Unit
Nil

(ii)

Orifice meter, with all necessary

5.
fittings in pipe lines of diferent
1
Unit
1 Unit

Nil

diameters

(iii) Calibration of flow through orifice


1
Unit
1 Unit
Nil

tank with Provisions for fixing

orifices of diferent shapes,

collecting tank

(iv) Calibration of flow through mouth

pieceTank with provisions for


1
Unit

fixing mouth pieces Viz external

1 Unit
Nil

mouth pieces & internal mouth

piece Bordas mouth piece

Losses in Pipes

Major loss Friction loss

6.
Pipe lengths (min. 3m) of diferent
1 Unit

1 Unit
Nil

diameters with Valves and

pressure rapping & collecting tank

Minor Losses

Pipe line assembly with provisions

7.
for having Sudden contractions in
1 Unit

diameter, expansions Bends,


1 Unit
Nil

elbow fitting, etc.

Pumps

(i)
Centrifugal pump assembly
1 Unit

1 Unit
Nil

with accessories (single stage)

(ii)
Centrifugal pump assembly
1 Unit
1 Unit
Nil

8.
with accessories (multi stage)

(iii)
Reciprocating pump assembly
1 Unit
1 Unit
Nil

with accessories

(iv)
Deep well pump assembly set
1 Unit
1 Unit
Nil

with accessories

Turbine

(i)
Impulse turbine assembly with
1 Unit

1 Unit
Nil

fittings & accessories

9.
(ii)
Francis turbine assembly with
1 Unit
1 Unit
Nil

fittings & accessories

(iii)
Kaplan turbine assembly with
1 Unit
1 Unit
Nil

fittings & accessories

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester IV
CE6413
SURVEY PRACTICAL II

Requirements for a batch of 30 students

Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

1.
Total Station
3
3

Nil

2.

Theodolites
6
6

Nil

3.
Dumpy level
6
6

Nil

4.
Plane table

6
6

Nil

5.
Pocket stereoscope
1
1

Nil

6.
Ranging rods

6
6

Nil

7.
Levelling staf
6
6

Nil

8.
Cross staf
6

Nil

9.
Chains
6
6

Nil

10.
Tapes
6

Nil

11.
Arrows
6
6

Nil

12.
Hand held GPS
3
3

Nil

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester V
CE6511 SOIL MECHANICS LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

1.
Sieves
2

2.
Hydrometer
2

3.
Liquid and plastic limit apparatus
2

4.
Shinkage limit apparatus
3

5.
Proctor compaction apparatus
2

6.
UTM of minimum of 20KN capacity
1

7.
Direct shear apparatus
1

8.
Thermometer
2

9.
Field density measuring device
2

10.
Triaxial shear apparatus
1

11.
Three gang consolidation test device
1

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester VI
CE6611 ENVIRONMENTAL ENGINEERING LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

1.

Oxygen analyzer
1

2.
Spectrophotometer
1

3.
Ion selective electrode
1

4.
Sodium Potassium Analyzer Flame
1

Photometer

5.
Gas Chromatography
1

6.
Atomic absorption spectroscopy (Ni,
1

Zn, Pb)

7.

Nephlo - turbidity meter


1

8.
BOD Analyser
1

9.
COD Analyser
1

10.
Jar Test Apparatus
1

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester VI
CE6612 CONCRETE AND HIGHWAY ENGINEERING LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

1.
Concrete cube moulds
6

2.
Concrete cylinder moulds
3

3.
Concrete Prism moulds
3

4.
Sieves
1Set

5.
Concrete Mixer
1

6.
Slump cone
3

7.
Flow table
1

8.
Vibrator
1

9.
Trovels and planers
1Set

10.
UTM 400 kN capacity
1

11.
Vee Bee Consistometer
1

12.
Aggregate impact testing machine
1

13.
CBR Apparatus
1

14.
Blains Apparatus
1

15.
Los - Angeles abrasion testing machine
1

16.
Marshall Stability Apparatus
1

Faculty of Civil Engineering


B.E. Civil Engineering
(R 2013) Semester VII
CE6711 COMPUTER AIDED DESIGN AND DRAFTING LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.

(R - A)

(R)
(A)

1.
Models of Structures
1Each

2.
Computers Pentium IV
30

Analysis and Design Software -

3.
Minimum 5 use License
1

10

Вам также может понравиться