Instructions and Guidance for preparing the Work Plan and Budget

Background
According to RCW 36.78.121, Counties shall annually submit their maintenance plans to the County Road Adminstration Board.
WAC 136-11 provides guidance and information regarding compliance with the Maintenance Management Standard of Good Practice.
The specific requirement for preparation of the Work Program (Plan) and Budget is that it is based upon the road features to be
maintained, the types and amount of maintenance work planned and the costs for the labor, equipment and materials needed
to complete the work.
Preparation of the Work Plan and Budget
In this Excel spreadsheet file, worksheets have been developed to guide preparation of a work plan and budget.
The sample shown in the worksheet follows the typical maintenance management format for a work program and budget.
Note that counties may also use the ouptut of a Maintenance Management System instead of the spreadsheet.
counties use the WinCAMS Maintenance Management module. Preparing a Work Program and Budget from the reports
function of this module satisfies the requirement for a work plan and budget under the standard of good practice.
Counties also have the option of preparing a narrative form of work plan and budget. However, this narrative must include
the inventory of road features maintained, the type and amount of work planned and the costs for labor, equipment and materials,
as required under WAC 136-11, the standard of good practice for maintenance management.

For preparation of the Work Plan and Budget using the spreadsheet provided in this file, select the Interactive Work Plan & Budget
worksheet. Samples of typical maintenance activities are shown on this sheet. (1) Use the activity codes and names that your county
uses on timecards and budget documents. (2) Fill in the quantity of inventory that the work activity is performed on. (3) Fill in
the planned effort level--this identifies how much work (in work units) is planned for each unit of inventory.
From he inventory and effort level, the annual work quantity is calculated. (4) Enter the average daily production and crew size
in the identified columns. (5) Enter the costs per crewday for labor, equipment and materials. A total cost (budget) is calculated.
The spreadsheet also provides a calculation for the percentage of the budget for each activity. See the sample spreadsheet
for guidance on the preparation of the work plan and budget.
A spreadsheet has also be developed that includes a column for the percent of planned work. By entering percentages in this
column, you can see the effects on the budget for planning to do more or less than the planned amount of work.

ation Board.
of Good Practice.
atures to be
als needed

adsheet. A number of

t and materials,

Plan & Budget


es that your county
n. (3) Fill in

nd crew size
) is calculated.

ages in this

Work Plan and Budget Calculations and Descriptions

Column:

Calculations

Description

Annual Work Qty

=CXEXG

Inventory x Effort Level = Annual Work Quantity

Person Days

=(H/I)XJ

(Annual Work Quantity / Average Daily Production) x Crew Size

Labor Budget

=(H/I)XL

Crew Days x Labor Cost Per Day = Labor budget

Equipment

=(H/I)XN

Crew Days x Equip Cost Per Day = Equipment budget

Materials

=(H/I)XP

Crew Days x Material Cost Per Day = Materials budget

Total Cost

=M+O+Q

Labor + Equip. + Materials = Total Cost

WORK PROGRAM AND BUDGET REPORT


COUNTY ROAD ADMINISTRATION BOARD
Maintenance Management Program
Planned for 2010
C

ACTIVITY
CODE

2311
2313
2321
2322
2323
2324
2331
2332
2390
2411
2412
2421
2422
2490
2511
2512
2590
2641
2642
2643
2660
2670
2690
2712
2713
2721
2722
2731
2751
2761
2790
2910

NAME

GRADING
RE-GRAVELING
POTHOLE REPAIR
CRACK SEALING
BLADE PATCHING
SEAL COATING (BST)
SHOULDER BLADING
SHOULDER REPAIR
OTHER ROAD MAINT
DITCHING W/GRADER
DITCHING W/DITCHER
CULVERT CLEANING
CULVERT REP/REPL
OTHER DRAINAGE MTCE
BRIDGE/STRUCT MTCE
BRIDGE/STRUCT REPAIR
OTHER BRG/STR MAINT
SIGN MAINTENANCE
GUARDRAIL REPAIR
TRAFFIC MARKINGS
SNOW & ICE CONTROL
STREET CLEANING
OTHER TRAFFIC MAINT
BRUSH CONTROL-MECH
BRUSH CONTROL-MANUAL
CHEM VEG CONTRL-MECH
CHEM VEG CONTRL-MAN
LANDSCAPE MAINT
LITTER CONTROL
SLOPE REPAIR
OTHER ROADSIDE MAINT
MAINTENANCE ADMIN

PLANNED
INVENTORY
QTY

UNIT

miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
each
each
miles
each
each
each
each
feet
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
1 year

EFFORT LEVEL
QTY
UNIT
pass mi
cu yd
ton
gal
ton
road mi
shld mi
cu yd
hours
ditch mi
ditch ft
culverts
lin ft
hours
hours
hours
hours
hours
lin ft
ft
hours
hours
hours
shldr mi
hours
shldr mi
hours
hours
hours
hours
hours
hours

ANNUAL
WORK

AVG
DAILY

QTY

PROD

=(CXE)

CREW

PERSON

Labor
cost per

SIZE

DAYS

crewday

=(H/I)XJ

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

TOTALS:

#DIV/0!

LABOR
=(H/I)XL

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

N
O
(COST DISTRIBUTION)
Equip
cost per

Material
cost per

crewday

crewday

EQUIP

=(H/I)XN

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Interactive Work Program and Budget that can be modified by changing inventory quantities, planned effort level. percent of desired,
average daily production and daily costs for labor, equipment and materials

MATERIAL/
OTHER
=(H/I)XP

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

TOTAL

Percent

COST

of Total

= M+O+Q

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

4/6

WORK PROGRAM AND BUDGET REPORT


COUNTY ROAD ADMINISTRATION BOARD
Maintenance Management Program
Planned for 2010
C

ACTIVITY
CODE

2311
2313
2321
2322
2323
2324
2331
2332
2390
2411
2412
2421
2422
2490
2511
2512
2590
2641
2642
2643
2660
2670
2690
2712
2713
2721
2722
2731
2751
2761
2790
2910

NAME

GRADING
RE-GRAVELING
POTHOLE REPAIR
CRACK SEALING
BLADE PATCHING
SEAL COATING (BST)
SHOULDER BLADING
SHOULDER REPAIR
OTHER ROAD MAINT
DITCHING W/GRADER
DITCHING W/DITCHER
CULVERT CLEANING
CULVERT REP/REPL
OTHER DRAINAGE MTCE
BRIDGE/STRUCT MTCE
BRIDGE/STRUCT REPAIR
OTHER BRG/STR MAINT
SIGN MAINTENANCE
GUARDRAIL REPAIR
TRAFFIC MARKINGS
SNOW & ICE CONTROL
STREET CLEANING
OTHER TRAFFIC MAINT
BRUSH CONTROL-MECH
BRUSH CONTROL-MANUAL
CHEM VEG CONTRL-MECH
CHEM VEG CONTRL-MAN
LANDSCAPE MAINT
LITTER CONTROL
SLOPE REPAIR
OTHER ROADSIDE MAINT
MAINTENANCE ADMIN

PLANNED
INVENTORY
QTY
1131
1131
648
648
648
648
1296
1296
1779
1296
1296
2669
2669
1779
124
124
124
45000
3240
1944
1779
1779
1779
1296
1296
1296
1296
1296
1296
1296
1296
1

UNIT

miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
each
each
miles
each
each
each
each
feet
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
year

EFFORT LEVEL
QTY
UNIT
8
5
1
5
1
0.2
0.4
0.5
1
0.1
10
1
0.2
1
0.5
0.3
0.25
0.02
0.5
1560
2.2
1.3
0
0.1
1
0.1
0
1
1
0.7
0
5600

pass mi
cu yd
ton
gal
ton
road mi
shld mi
cu yd
hours
ditch mi
ditch ft
culverts
lin ft
hours
hours
hours
hours
hours
lin ft
ft
hours
hours
hours
shldr mi
hours
shldr mi
hours
hours
hours
hours
hours
hours

ANNUAL
WORK

AVG
DAILY

QTY

PROD

CREW

PERSON

Labor
cost per

SIZE

DAYS

crewday

=(CXE)

LABOR

=(H/I)XJ

9,048
5,655
648
3,240
648
130
518
648
1,779
130
12,960
2,669
534
1,779
62
37
31
900
1,620
3,032,640
3,914
2,313
130
1,296
130
1,296
1,296
907
5,600

12
150
2
24
75
3
6
8
16
3
500
20
40
16
24
24
24
24
60
10000
8
32
16
3
48
12
16
32
16
32
32
8
TOTALS:

1
6
2
3
10
21
4
4
2
4
6
2
6
2
3
3
3
2
2
2
1
4
2
3
4
2
2
4
2
4
4
1

754
226
648
405
86
907
346
324
222
173
156
267
80
222
8
5
4
75
54
607
489
289
0
130
108
22
0
162
162
113
0
700
7,743

N
O
(COST DISTRIBUTION)
Equip
cost per

Material
cost per

crewday

crewday

EQUIP

=(H/I)XL

230
1274
458
687
1682
3993
826
816
358
816
1274
408
1174
408
587
587
587
458
458
458
229
766

173,420
48,030
148,392
92,745
14,532
172,498
71,366
66,096
39,805
35,251
33,022
54,448
15,667
45,365
1,516
910
758
17,175
12,366
138,895
112,033
55,360
0
25,358
31,698
4,406
0
29,808
29,808
23,134
0
173,600

587
1174
408
736
368
816
248
$

1,667,462

MATERIAL/
OTHER

=(H/I)XN

224
1032
64
144
1624
3040
536
480
32
496
880
32
680
200
256
256
256
200
100
100
100
57

168,896
38,906
20,736
19,440
14,031
131,328
46,310
38,880
3,558
21,427
22,810
4,270
9,075
22,238
661
397
331
7,500
2,700
30,326
48,923
4,119
0
5,400
1,431
3,596
0
648
1,296
1,559
0
0

125
53
333
16
16
55
0
$

=(H/I)XP

0
1800
80
218
5370
8700
0
96
0
0
0
0
480
0
50
100
100
100
200
800
100
200

670,793

Interactive Work Program and Budget that can be modified by changing inventory quantities, planned effort level. percent of desired,
average daily production and daily costs for labor, equipment and materials

80
40
0
0
$

907,580

TOTAL

Percent

COST

of Total

= M+O+Q

0
67,860
25,920
29,430
46,397
375,840
0
7,776
0
0
0
0
6,406
0
129
155
129
3,750
5,400
242,611
48,923
14,454
0
0
0
25,920
0
3,240
3,240
0
0
0

0
0
2400

342,316
154,796
195,048
141,615
74,961
679,666
117,677
112,752
43,363
56,678
55,832
58,718
31,147
67,602
2,307
1,462
1,218
28,425
20,466
411,833
209,878
73,934
0
30,758
33,129
33,923
0
33,696
34,344
24,693
0
173,600
$

3,245,835

10.5%
4.8%
6.0%
4.4%
2.3%
20.9%
3.6%
3.5%
1.3%
1.7%
1.7%
1.8%
1.0%
2.1%
0.1%
0.0%
0.0%
0.9%
0.6%
12.7%
6.5%
2.3%
0.0%
0.9%
1.0%
1.0%
0.0%
1.0%
1.1%
0.8%
0.0%
5.3%
100%

5/6

WORK PROGRAM AND BUDGET REPORT


COUNTY ROAD ADMINISTRATION BOARD
Maintenance Management Program
Planned for 2010
C

ACTIVITY
CODE

NAME

GRADING
RE-GRAVELING
POTHOLE REPAIR
CRACK SEALING
BLADE PATCHING
SEAL COATING (BST)
SHOULDER BLADING
SHOULDER REPAIR
OTHER ROAD MAINT
DITCHING W/GRADER
DITCHING W/DITCHER
CULVERT CLEANING
CULVERT REP/REPL
OTHER DRAINAGE MTCE
BRIDGE/STRUCT MTCE
BRIDGE/STRUCT REPAIR
OTHER BRG/STR MAINT
SIGN MAINTENANCE
GUARDRAIL REPAIR
TRAFFIC MARKINGS
SNOW & ICE CONTROL
STREET CLEANING
OTHER TRAFFIC MAINT
BRUSH CONTROL-MECH
BRUSH CONTROL-MANUAL
CHEM VEG CONTRL-MECH
CHEM VEG CONTRL-MAN
LANDSCAPE MAINT
LITTER CONTROL
SLOPE REPAIR
OTHER ROADSIDE MAINT
MAINTENANCE ADMIN

PLANNED
INVENTORY
QTY

2311
2313
2321
2322
2323
2324
2331
2332
2390
2411
2412
2421
2422
2490
2511
2512
2590
2641
2642
2643
2660
2670
2690
2712
2713
2721
2722
2731
2751
2761
2790
2910

1131
1131
648
648
648
648
1296
1296
1779
1296
1296
2669
2669
1779
124
124
124
45000
3240
1944
1779
1779
1779
1296
1296
1296
1296
1296
1296
1296
1296
1

EFFORT LEVEL
UNIT

miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
each
each
miles
each
each
each
each
feet
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
miles
year

QTY

PERCENT

ANNUAL
WORK

AVG
DAILY

OF PLAN

QTY

PROD

UNIT
8
5
1
5
1
0.2
0.4
0.5
1
0.1
10
1
0.2
1
0.5
0.3
0.25
0.02
0.5
1560
2.2
1.3
0
0.1
1
0.1
0
1
1
0.7
0
5600

pass mi
cu yd
ton
gal
ton
road mi
shld mi
cu yd
hours
ditch mi
ditch ft
culverts
lin ft
hours
hours
hours
hours
hours
lin ft
ft
hours
hours
hours
shldr mi
hours
shldr mi
hours
hours
hours
hours
hours
hours

CREW

PERSON

Labor
cost per

SIZE

DAYS

crewday

= ( C X E )XG

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

LABOR

=(H/I)XJ

9,048
5,655
648
3,240
648
130
518
648
1,779
130
12,960
2,669
534
1,779
62
37
31
900
1,620
3,032,640
3,914
2,313
130
1,296
130
1,296
1,296
907
5,600

12
150
2
24
75
3
6
8
16
3
500
20
40
16
24
24
24
24
60
10000
8
32
16
3
48
12
16
32
16
32
32
8
TOTALS:

1
6
2
3
10
21
4
4
2
4
6
2
6
2
3
3
3
2
2
2
1
4
2
3
4
2
2
4
2
4
4
1

754
226
648
405
86
907
346
324
222
173
156
267
80
222
8
5
4
75
54
607
489
289
0
130
108
22
0
162
162
113
0
700
7,743

N
O
(COST DISTRIBUTION)
Equip
cost per

Material
cost per

crewday

crewday

EQUIP

=(H/I)XL

230
1274
458
687
1682
3993
826
816
358
816
1274
408
1174
408
587
587
587
458
458
458
229
766

173,420
48,030
148,392
92,745
14,532
172,498
71,366
66,096
39,805
35,251
33,022
54,448
15,667
45,365
1,516
910
758
17,175
12,366
138,895
112,033
55,360
0
25,358
31,698
4,406
0
29,808
29,808
23,134
0
173,600

587
1174
408
736
368
816
248
$

1,667,462

MATERIAL/
OTHER

=(H/I)XN

224
1032
64
144
1624
3040
536
480
32
496
880
32
680
200
256
256
256
200
100
100
100
57

168,896
38,906
20,736
19,440
14,031
131,328
46,310
38,880
3,558
21,427
22,810
4,270
9,075
22,238
661
397
331
7,500
2,700
30,326
48,923
4,119
0
5,400
1,431
3,596
0
648
1,296
1,559
0
0

125
53
333
16
16
55
0
$

670,793

Interactive Work Program and Budget that can be modified by changing inventory quantities, planned effort level. percent of desired,
average daily production and daily costs for labor, equipment and materials

=(H/I)XP

0
1800
80
218
5370
8700
0
96
0
0
0
0
480
0
50
100
100
100
200
800
100
200

80
40
0
0
$

907,580

TOTAL

Percent

COST

of Total

= M+O+Q

0
67,860
25,920
29,430
46,397
375,840
0
7,776
0
0
0
0
6,406
0
129
155
129
3,750
5,400
242,611
48,923
14,454
0
0
0
25,920
0
3,240
3,240
0
0
0

0
0
2400

342,316
154,796
195,048
141,615
74,961
679,666
117,677
112,752
43,363
56,678
55,832
58,718
31,147
67,602
2,307
1,462
1,218
28,425
20,466
411,833
209,878
73,934
0
30,758
33,129
33,923
0
33,696
34,344
24,693
0
173,600
$

3,245,835

10.5%
4.8%
6.0%
4.4%
2.3%
20.9%
3.6%
3.5%
1.3%
1.7%
1.7%
1.8%
1.0%
2.1%
0.1%
0.0%
0.0%
0.9%
0.6%
12.7%
6.5%
2.3%
0.0%
0.9%
1.0%
1.0%
0.0%
1.0%
1.1%
0.8%
0.0%
5.3%
100%

6/6

Вам также может понравиться