Академический Документы
Профессиональный Документы
Культура Документы
1 Introduction
2 Benefits & Advantages
3 Study Field
4 Operating Principle
5 Historical Cases
6 Configurations
7 Candidates Selection
8 Economic Evaluation
9 Conclusions
04/09/2014
10 AOS
2
04/09/2014
10 AOS
3
RTU
04/09/2014
10 AOS
4
Parameter
Distributed
Production/Injection
Temperature Sensing
Logging Tools (PLT/ILT)
(DTS)
Radioactive Tracer
Survey (RTS)
Permanent Monitoring
Yes
Not
Measure System
Cost
Risk to Staff
Environmental Risk
Accuracy
Risk to Well
Time of Intervention in Well
Leak Detection in Pipe
Works in Sanded Well
Data Acquisition Time
Works both in producer &
Injector Wells
Space Required Surface
High* (Permanent)
Medium (Temporal)
Low
Low
High
Low
6 Hrs (Temporal)
5 Days* (Permanent)
Allows Detection
Yes
Not
Low
Medium
Low
Low
Medium
3 Days
Medium
Low
High
Medium
Low
2 Days
Real Time
Allows Detection
Yes
Is required that
tool is removed
Yes
Minimum
Yes
Wide
* = This value is taken into account only once (assembly) during the lifetime of the fiber. References:
1= SPE 153809, 2= McKinley Book, 3= SPE 15064, 4= SPE 71676, 5= SPE 154442, 6= IPTC 12343
04/09/2014
10 AOS
5
04/09/2014
10 AOS
6
LOWER
MAGDALE
NA
BASIN
Bonanza
Nutria
Proviancia
EASTERN LLANOS
Llanito
Tisquirama-San Roque
Galn
Casabe Sur
Peas Blancas
WATERFLOODING
WATER FLOODING PILOT
.
04/09/2014
Source : ECP
10 AOS
8
Location
Column Stratigraphic
STRATIGRAPHIC
UNIT
BO
B1
MUGROSA
SAND B
B2
B3
C
C1
SAND C
C2
C3
C3A
C4
C4C
C4B
SAND-C4
C4A
C5
C6
LA PAZ
CG
CG-B
UPPER SAND-CG
CG-A
CG1
CG1A
CG2
CG3
CG4
LOWER SAND-CG
CG5
CG6
CG7
CG8
FORMATION RESERVOIR
Source : ECP
04/09/2014
10 AOS
9
25000
10
Axis 1
Oil Prod Rate (Prod Day s) ( bbl/d ) SRI
Axis 2
Oil Cumulativ e Production ( Mbbl ) SRI
20000
10
15000
10
10000
10
5000
10
10
1943
49
55
61
67
73
79
85
91
97
03
09
DATE
Source : ECP
04/09/2014
10 AOS
10
Directional
Coupler
OPTICAL FIBER
Si, Ge-F
Laser
= Raman Backscattering
DTS
Unit
Optical
Receiver
Display Unit
Dintance
04/09/2014
10 AOS
11
JOUL-THOMPSOM:
T P= f(S,K)
Temperature-Oil Profile
Temperature-Gas Profile
04/09/2014
10 AOS
12
NORUEGA
ALASKA
CANADA
RUSIA
GREENLAND
DENMARK
UCRANIA
U.K
USA
AZERBAIJAN
EGIPTO
VENEZUELA
CHINA
ARABIA
INDIA
A. EMIRATES
MEXICO
COLOMBIA
BRAZIL
MALASIA
OMN
SUDAN
BOLIVIA
ANGOLA
04/09/2014
JAPAN
INDONESIA
10 AOS
14
DTS
Parameter
Cost
Optical Loss
Configuration
Single Ended Double Ended
Double Ended
Single Ended
LEVEL 1
Configuration
Parameter
Permanent
Temporal
Skin Detecing
injection Front Optimizing
Permanent
Temporal
LEVEL 2
monitoring of SLA
Rervoir Management
04/09/2014
10 AOS
15
Yes
No
START
START
MECHANICAL STATE
MECHANICAL STATE
Q INJ> 3000 BWPD
MULTI-LAYER COMPLETION
HIGH VIBRATION
TYAC< 248 F
IMPLEMENT A
DIFFERENT
MONITORING
SYSTEM
CANDIDATE
WELL
END
04/09/2014
TYAC< 248 F
IMPLEMENT A
DIFFERENT
MONITORING
SYSTEM
CANDIDATE
WELL
END
10 AOS
16
0 Months
21 Months
US$ 244,494
Revenue from Oil Production YR-72, YR-74, YR-87 , YR-99.
21 Months
0 Months
04/09/2014
10 AOS
17
0 Months
21 Months
-U$ 260,410
Revenue from Oil Prduction YR-74 Well
0 Months
21 Months
04/09/2014
10 AOS
18
04/09/2014
10 AOS
19
04/09/2014
10 AOS
20
04/09/2014
10 AOS
21