STATUS OF HYDROELECTRICITY IN NEPAL: POTENTIAL AND CHALLENGES
1.
INTRODUCTION
II.
II.
III.
IV.
2.
HISTORY
The mechanical power of falling water is an age old tool. It was used
by the Greeks to turn water wheels for grinding wheat into flour, more
than 2,000 years ago. During the Middle Ages, large wooden
waterwheels were developed with a maximum power output of about
50 hp. Modern large-scale water-power owes its development to the
British civil engineer John Smeaton, who first built large water wheels
out of cast iron. The earliest hydroelectric plant was constructed in
1880 in Cragside, Northumberland, England. The early hydroelectric
plants were direct current stations built to power arc and incandescent
lighting during the period from about 1880 to 1895. The years 1895
through 1915 saw rapid changes occur in hydroelectric design and a
wide variety of plant styles built. Hydroelectric plant design became
fairly well standardized after World War I with most development in
the 1920's and 1930's being related to thermal plants and
transmission and distribution.
The history of electricity development of Nepal has crossed 100 years
since the start of construction of Pharping Hydroelectric Plant (500
KW) in 1911. Today, Nepal has an electric power of total installed
capacity 689 MW (in 2009) in Integrated Nepal Power System (INPS).
Out of total electric power, about 91 % is contributed from
hydroelectric plants and rest of 9 % is supported from diesel plants.
The existing largest hydroelectric plant in the country is Kaligandaki-A
(144 MW). The generated electric power has been transmitted through
132 KV single and double circuit transmission line of 1562.9km, 66 KV
single circuit, double circuit of 354.72km (
includes single core
underground transmission Teku-k3). The country has a total sub
station capacity of 1415.10 MVA to date.
In 1966, i.e. 44 years ago, Dr. Hari Man Shrestha assessed the total
hydropower potential in Nepal as 83,500 MW. He did so during the
research work for his Ph.D. Thesis (1966) from Moscow Power
Institute, USSR on Cadastre of potential water power resources of
less studied high mountainous regions, with special reference to
Nepal. Dr. Shrestha is known as the pioneer Hydropower Engineer of
Nepal. Since then, no further study has, so far, been done in this field.
And, that finding seems to have been accepted as full and final to
date. Much water has flown down river Bagmati during these four
decades, and the world has seen sea changes in the fields of science
and technology. Moreover, the revolutionary changes in the fields of
computer and information technology has helped find new dimensions
in research and study approaches and many findings of the past have
been proved wrong in recent years. But, in Nepal, not much initiative
has been taken to carry out further investigations and research works
to justify the findings of Dr. Shrestha.
3.
BACKGROUND
OBJECTIVES
5.
METHODOLGY
1.
2.
1.
DATA ANALYSIS
6.
7.
472,994 kw
4,536 kw
477,530 kw
158,315 kw
635,845 kw
53,410 kw
100 kw
689,355 kw
Hydropower stations
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Middle marsyangdi
Kaligandaki A
Maryangdi
Kulekhani 1
Kulekhani 2
Trisuli
Gandak
Modi khola
Devighat
Sunkoshi
Puwakhola
Total
Power
output
70,000 kw
144,000 kw
69,000 kw
60,000 kw
32,000 kw
24,000 kw
15,000 kw
14,800 kw
14,100 kw
10,050 kw
6,200 kw
459,159 kw
Hydropower stations
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Chatara
Panauti
Tatopani/myagdi (1&2)
Seti(pokhara)
Phewa(pokhara)
Tinau (butwal)
Sundarijal
Pharping***
Jomsom**
Baglung
Khandbari**
Power
output
3,200 kw
2,400 kw
2,000 kw
1,500 kw
1,000 kw
1,024 kw
640 kw
500 kw
240 kw
200 kw
250 kw
12.
13.
14.
15.
16.
Phidim**
Surnaiyagadh(baitadi)
Doti
Ramechhap
Terathum**
total
Total power output
240 kw
200 kw
200 kw
150 kw
100 kw
13,844 kw
472,994kw
Note:-
Hydropower stations
Dhankuta***
Jhapra(surkhet)***
Gorkhe(illam)***
Jumla**
Dhading***
Syangja***
Helambu
Darchula 1&2**
Chame**
Taplejung**
Manang**
Chaurjhari(rukum)**
Syarpudaha(rukum)**
Bhojpur**
Bajura
Bajhang**
Arughat gorkha
Okhaldhunga**
Rupalgadh(dadeldhura)
Achham
Dolpa
Kalikot
Heldung(humla)
Total
Power output
240 kw
345 kw
64 kw
200 kw
32 kw
80 kw
50 kw
300 kw
45 kw
125 kw
80 kw
150 kw
200 kw
250 kw
200 kw
200 kw
150 kw
125 kw
100 kw
400 kw
200 kw
500 kw
500 kw
4,536 kw
Power stations
Duhabi multifuel
Hetauda
Total
Power output
39,000 kw
14,410 kw
53,410 kw
Power stations
Simikot
Gamgadhi
Total
Power output
50 kw
50 kw
100 kw
Power projects
Upper tamakoshi
Chamelia
Kulekhani III (storage)
Gamgadh
Total
Power output
456,000 kw
30,000 kw
14,000 kw
400 kw
500,400 kw
Power projects
Upper trisuli-3A
Upper trisuli-3B
Power output
60,000 kw
37,000 kw
3.
4.
5.
6.
7.
8.
Budhi gandaki
Rahughat
Upper seti(storage)
Seti trisuli(storage)
Upper modi A
Naisyagu gad(storage)
Total
600,000 kw
27,000 kw
128,000 kw
128,000 kw
42,000 kw
400,000 kw
1,422,000 kw
IPP
Projects
Connected
to INPS
S.N.
Name of Company
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Name of
Project
Khimti khola
Bhotekoshi
Khola
Chilime
Capacity
(KW)
60,000
36,000
20,000
Jhimruk Khola
Indrawati - II
12,000
7,500
Andhi Khola
Khudi Khola
Piluwa Khola
5,100
3,450
3,000
Sunkoshi
Khola
Thoppal Khola
2,500
Chaku Khola
1,500
Pati Khola
Pheme Khola
996
995
1,650
14.
15.
16.
17.
18.
19.
Baramchi
Khola
Sati-II
980
Sisne Khola
750
Rairang Khola
500
Sali Nadi
232
Syange Khola
183
Total=
979
1,58,315
Under Construction:
1. Sunkoshi Hydro Power Co. Pvt. Ltd
2. Himal Dolkha Hydro Power
Company Ltd
3. Gandako Hydro Power Co. (P) Ltd.
4. Ridi Hydro Power Development Co.
(P) Ltd.
5. Centre for Power Dev. And
Services (p) Ltd.
6. Baneshor Hydro Power Pvt. Ltd.
Total=
Lower Indrawati
Khola
Mai Khola
4,500
Mardi Khola
Ridi Khola
3,100
2,400
991
Lower Piluwa
990
16,436
4,455
PPA
Concluded
S.N.
Name of Company
Name of
Project
Madi-I Khola
Lower Madi-I
Capacity
(KW)
10,000
9,900
1.
2.
Sipring Khola
9,658
Ankhu-I
6,930
Daram Khola
5,000
Dapcha-Roshi
Mailung Khola
5,000
5,000
8.
Phawa Khola
4,950
9.
10.
Siuri Khola
Lower Nyadi
4,950
4,500
Bhagawati Hydropower
Dev. Co. Pvt. Ltd.
East Nepal Development
Endeavour (P) Ltd.
Barun Hydro Power
Development Co. (P) Ltd.
Nikhil Jalshakti (P) Ltd.
Laughing Buddhapower
Nepal (P) Ltd.
Nama Buddha Hydropower
(P) Ltd.
Bojini Company Private
Limited
Garjang Upatyaka
Hydropower (P) Ltd.
Joshi Hydropower
Development Company P.
Ltd.
Bijayapur-I
4,500
Upper Mai
Khola
Hewa Khola
3,100
Bhairab Kunda
Lower Chaku
1,850
1,765
Tinau Kunda
990
Jiri Khola
990
Chake Khola
990
Upper Puwa-I
985
3.
4.
5.
6.
7.
Nepal(Pvt.) Ltd.
11.
12.
13.
14.
15.
16.
17.
18.
19.
2,400
20.
21.
22.
23.
24.
25.
Charanawati
980
Tadi Khola
970
Ladku Khola
700
Golmagad
580
Narayani
Shankar
Belkhu
500
320
87,508
Total=
1.
Upper Modi
Khola
14,000
Project
West Seti
Arun III
Kali Gandaki II
Lower Arun
Upper Arun
Karnali Chisapani
Upper Karnali
Pancheswor
Thulo dhunga
Capacity(MW)
750
402
660
308
335
10800
300
6480
25
Type
Storage
PROR
Storage
PROR
PROR
Storage
PROR
Storage
ROR
10
Tamor/Mewa
100
ROR
11
Dudh Koshi
300
Storage
12
Budhi Ganga
20
13
14
Likhu 4
Kabeli A
51
30
15
16
17
Upper Marshyangdi A
Andhikhola(Storage)
Khimti II
121
180
27
18
19
218
86
ROR
Storage
Storage
60
Storage
20
ROR
PROR
ROR
Storage
Storage
Source: www.ippan.org.np/HPinNepal.html
Transmission lines
Length(km)
Type of
Ckts
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Anarmani-Duhabi
Kusha-Katiya(india)
Duhabi-Hetauda
Hetauda-KL2P/S
Bharatpur-Marsyangdi P/S
Marsyangdi P/S- sulchatar
Sulchatar-KL2 P/S
Sulchatar-New bhaktapur
New Bhaktapur- Lamosangu
Lamosangu-Khimti P/S
Hetauda-Gandak P/S
Bharatpur-pokhara
Bardghat-butwal
Butwal-KGA P/S
KGA P/S-lekhanath
Pokhara-modikhola P/S
Butwal-tanakpur
Pathlaiyah-new parwanipur
Marsyangdi-M.marsyangdi
Total
85
19
282
8
25
84
34
26.9
48
46
154
97
43
58
48
37
407
17
44
1562.9
Single
single
Double
Single
Single
Single
Single
Single
Double
Single
Single
Single
Double
Double
Single
Single
Single
Double
Single
Transmission line
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Length(km)
43.56
29
30
33
2.3
36
72
4.1
4
3.5
6.9
2.8
12
Type of
Ckts
Single
Double
Single
Single
Single
Double
Double
Single
Double
Singlecore
Single
Single
Single
14.
15.
16.
61
4.56
10
354.72
Single
Single
Single
72
75
147
Double
Single
28.5
129
157.5
Double
Single
Under construction
220kv transmission lines
1.
2.
Hetauda-Bharatpur
Khimti-Dhalkewar
Total
Thankot-Chapagaon
Chameliya-Attaria
Total
Transmission lines
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Length(km)
85
Type of
Ckt
Double
40
44
Double
Double
90
18
208
283
Double
Single
D/C
tower
Double
D/C
tower
Double
45
Double
73
44
11.
12.
220KV Trisuli-thankot
132KV kohalpur-attariya second
circuit
Total
54
200
Double
D/C
tower
1,214
400KV Dhalkewar-Muzzaffarpur
cross border line
45
double
Transmission lines
1.
2.
3.
Lengths(km) Type of
Ckts
22
Double
25
Double
12
59
Double
Substations
1.
2.
3.
4.
132/11 KV
132/33 KV
66/33 KV
66/11 KV
Total
Lengths(km) Type of
Ckts
186.00
MVA
470.50
MVA
248.40
MVA
485.20
MVA
1415.10
Under contruction
1.
132/11 matatirtha
22.5
MVA
132/33 KV syangja
132/33 KV anbukhaireni
132/33 KV damak
132/11 KV chapali
132/33 KV matatirtha
132/33 KV kusum
132 KV hapure
132 KV hetauda
132 KV pathlaiyah
New butwal switching centre
New bharatpur switching station
Total
15
15
30
30
32
30
30
30
22.5
30
30
294.5
MVA
MVA
MVA
MVA
MVA
MVA
MVA
MVA
MVA
MVA
MVA
MVA
Energy Charge:
Up to 20 Units
21-250 Units
Over 250 Units
2.
TEMPLES
Energy
Charge
3.
STREET
LIGHTS
A
4.
5.
TEMPORARY
SUPPLY
Energy
Charge
COMMUNITY
WHOLESALE
CONSUMER
Minimum
Exempt
Charge (NRs.) (KWh)
80.00
299.00
644.00
1394.00
3244.00
With
Energy
Meter
Without
Energy
Meter
20
50
100
200
400
Energy
Charge
6.
INDUSTRAL
7.
8.
COMMERCIAL
A.
Low
Voltage
(400/230
volt)
B
Medium
Voltage
(11 KV)
C
Medium
Voltage
(66 KV
and
above)
NONCOMMERCIAL
45.00
5.45
90.00
6.60
190.00
5.90
190.00
5.80
175.00
4.60
225.00
7.70
216.00
7.60
216.00
7.40
Low
Voltage
(400/230
Volt)
Medium
Voltage
(11 KV)
Medium
Voltage
(33 KV)
9.
IRRIGATION
A
B
C
10. WATER SUPPLY
A
160.00
8.25
180.00
7.90
180.00
7.80
B
C
11. TRANSPORTATION
A
Medium Voltage ( 11 KV)
B
Medium Voltage ( 33 KV)
3.60
47.00
47.00
3.50
3.45
140.00
4.30
150.00
150.00
4.15
4.00
180.00
180.00
4.30
4.25
High
Voltage
Consumer
Category
Monthly
Demand
Supply Level
Charge
(Rs./KVA)
Energy
Charge
(Rs./unit)
Peak
Time
18:0023:00
OffPeak
23:006:00
Normal
6:0018:00
(66 KV
and
Above)
1
Industrial
Medium
Voltage
(33 KV)
1
Industrial
2
Commercial
3
Noncommercial
4
Irrigation
5
Water Supply
6
Transportation
7
Street Light
C Medium
Voltage
(11 KV)
1
Industrial
2
Commercial
3
Noncommercial
4
Irrigation
5
Water Supply
6
Transportation
7
Street Light
175.00
5.20
3.15
4.55
190.00
216.00
180.00
6.55
8.50
8.50
4.00
5.15
5.35
5.75
7.35
7.75
47.00
150.00
180.00
52.00
3.85
4.55
4.70
5.70
2.35
2.75
2.95
1.90
3.40
3.95
4.15
2.85
190.00
216.00
180.00
6.70
8.65
9.00
4.10
5.25
5.45
5.85
7.55
7.85
47.00
150.00
180.00
52.00
3.95
4.60
4.80
6.00
2.40
2.80
3.00
2.00
3.45
4.10
4.25
3.00
Note:
Targets by 2017
Targets by 2027
4,000 MW of hydropower is developed to meet the projected
domestic demand at base case scenario, excluding export,
75% of the households are to be supplied with INPS electricity,
20% by isolated (micro and small) hydro systems and 5% by
alternate energy,
Per capita electricity consumption of over 400 KWh will be
achieved, and
Nepal exporting substantial amounts of electricity to earn
national revenue.
Objectives
To generate electricity at low cost by utilizing the water
resources available in the country,
To link electrification with the economic activities,
to render support to the development of rural economy by
extending rural electrification, and
to develop hydro power as an exportable commodity.
No nationalization of Projects
Exchange facility (to repatriate)
Government land on lease.
Water rights.
Government may be a partner in storage project
Transfer of project
Export of electricity
Licensing procedures
The Electricity Act of 1992 has set following time limits for the
issuance of licenses:
Survey license issued within 30 days.
Period of such license up to 5 years.
Project license issued within 120 days.
Period of such license up to 35 years.
Public consultation before issuance of project license.
Application
process
generation/transmission/distribution
for
Survey License
Operation License
Supporting
documents
required
to
generation/transmission/distribution license
obtain
or
Other Requirements
Certificate of registration,
Memorandum of article,
Memorandum of association,
Industrial registration certificate,
PAN (permanent account number), and
Details of technical capability.
Marketing electricity
15. CONCLUSION
The latest scenario of hydel generation with established projects,
undergoing projects and feasible projects are clearly shown in this
report. The theme of status of hydel in Nepal is believed to be depicted
by those data. Moreover, policy and legal framework requirement for
private sectors participation in hydel development has been explained
herein. Also challenges in hydel development in Nepal have been
listed. Furthermore, brief introduction and history of hydel is
16. BIBLIOGRAPHY
1.
2.
3.
International
Energy
http://www.ieahydro.org/faq.htm
Agency
(IEA).
4.
5.
6.
http://www.electricityforum.com/hydroelectricity.html
7.
8.
9.
10.
Alternative
Energy
http://www.aepc.gov.np/
11.
Wikipedia, http://en.wikipedia.org/wiki/Hydroelectricity
12.
http://tech.nepalko.info/2010/03/nepals-total-hydropowerpotential-update-requirement/
13.
Association,
Promotion
Nepal(IPPAN),
Centre(AEPC),