ACTIVITY - BASED EHS RISK ASSESSMENT FORM

COMPANY :
PROCESS :

MACTECH ENGINEERING & TRADING PTE LTD


Installation works for 2 numbers of FCU

LOCATION :
Last Review:
Next Review:

S/N

WORK
ACTIVITY

Delivery of
Materials

Unloading of
Materials

2No's FCU with


chilled water
pipe
a) Preparation
of installation
materials at
ground level

b) 2No's FCU
with chilled
water pipe
3

CONDUCTED BY/ Sathish


PARTICIPANT: Ashok,Anoop, Haurn,Rama ganesh
DATE :
11thJanuary 2014

Balestier Point
11th January 2014
10th January 2015

APPROVED BY :
DATE :

1) HAZARD IDENTIFICATION
HAZARD
LIKELY ACCIDENT
TYPES
/ PERSON AT RISK

JAMES LEOW (DIRECTOR)


11th January 2014

2) RISK EVALUATION
EXISTING RISK CONTROL
S
(IF ANY)

Person(s) hit by delivery


Injury/Death to person(s) Check property constructed
Van collision with site
and or damage to site access , traffic warning signs
facility
faility

3) RISK CONTROL
ADDITIONAL RISK
S
L
R PERSON-IN-CHARGE /
CONTROL MEASURE
FOLLOW UP

15

Ensure site access for


no obstruction

15

Driver /Site supervisor

Coordination of work
by Supervisor

10

Site supervisor

Site supervisor

Toppling of materials
from sides of vehicle

Injury to person (s)

Unloading zone cordoned off, lorry


stationed off, lorry stationed on
even ground, materials only taken
off lorry from rear

10

Contact with
sharp/protruding parts or
splinters

Injury to person (s)

Use of proper PPE-protective


gloves

Improper manual lifting

Back injury

Briefing on correct methods for


lifting

Workers told not to lift


more than 20kg of
work

Site supervisor

Apply permit to work.


User to Isolate the
12
panel before start
working with detectors

12

Site supervisor

Supervision by safety
supervisor during
15 erection, briefing on
safe work procedures
during toolbox meeting

15

Site supervisor

Trip and fall

Fall from height

Injury

Arrange materials on even ground,


provide unblocked walking paths &
cordon off installation area

Injury

Installation only to be done by


trained worker following the safe
work procedure . To stand on safe
working platforms / Ladder during
the process

Trip & Falls


Eye hit by flying object
2No's FCU with
during drilling for
chilled water installation of wall-plug tiepipe
backs
Electrocution/Electric
Shock during drilling
process for installation of
wall-plug tie-backs

Working on
electrical control
panel for power
cables
connection

Eletrocution

Injury

Good housekeeping

Site supervisor

Site supervisor

Eye Injury

Wearing of protective googles

Hand tools to be
contained in tools bag
& slung to facilitate
concentration at drilling

Injury/Death

Use of defect-free portable


electrical tools in good working
condition.

15

Briefing during toolbox


meeting and safety
precautions against
electrocution

15

Site supervisor

15

Tool box meeting

15

Site supervisor

A) Worker is to comply with lockout & tag-out procedure and


padlock key is to be kept by worker
Worker may be
B) Worker is to confirm absence of
electrocuted if electrical electrical supply at DB or isolator
supply is not turned off using voltmeter
during work
C) Electrical isolator must be
turned off by worker prior to the
replacement work
D) Worker is to wear safety boots

Loosening/tight
4 ening of bolts
and nuts at
equipment,
bracket
supports, etc

Housekeeping

Slippage of hand tools

A) Worker is to use correct tools,


which have been provided to suit
various sizes of bolts & nuts
B) Worker is to wear glove &
check on good condition & proper
Cut or injuries on hands, fit of PPE at all times & prior usage
fingers or any parts of C) If tightness of bolt/nut is beyond
the body that come in normal condition, worker is to use
contact with machine or power-tools to perform this task
surrounding fixture
D) Worker is to ensure that he is at
*Steady* position before carrying
out work to prevent lost of balance
E) Worker is to ensure correct
bolts & nuts size used equipment
are firmly secured

Tool box meeting

Site supervisor

Fire

A) All materials, tools & equipment


shall be removed from site at the
Flammable materials eg.
end of each day
(WD 40) and debris left
B) Supervisor to ensure all
on site causing fire
flammable materials to be
removed from site daily

15

Tool box meeting

15

Site supervisor

Site supervisor

Tripping over materials

Trips and falls

Store materials & tools in proper


holding area