Engineering Strategies and Practice

Date of Report / Tutorial:

April 1st, 2013 Tut0103_______________________________

Report Prepared by* Kasra Modares___________________________________________


Project #24

Client: Heather Ervin_____________________________________

Project Title: Tarragon Theatre Lobby Improvement Plan___________________________


Project Manager: Hoi Kwong Lo______________________________________________
Team Leader: Madhushan Perera______________________________________________
Team Members:
Adam De Biasi (999512273), Christine Nassif (999851334), Enyu Zhou (999087018),
Kasra Modares (999507083), Madhushan Perera (999717025), Yida Wang (999485926)__
_________________________________________________________________________
* This report may be written by one team member (as delegated by the team), but all members of
the team take full responsibility for the accuracy of the final version.
Activities since the last report, i.e. progress to date:
1
2

3
4
5

Specific Task
Prepare status report
Complete first draft of
FDS sections 2.7
(Social Impact) & 2.8
(Economics)
Complete first draft of
FDS section 2.1
(Regulations)
Complete first draft of
FDS sections 2.2
(Testing)
Complete first draft of
FDS sections 2.4
(Implementation
Requirements) & 3.0
(Project Plan)
Complete first draft of
FDS sections 2.4 (Life
Cycle) & 2.5 (Human
Factors)
Third Client Meeting
(Discussed the CDS)

Person Assigned
Kasra Modares
Kasra Modares

Date Due
1/4/2013
1/4/2013

Date Completed
31/3/2013
31/3/2013

Adam De Biasi

1/4/2013

31/3/2013

Enyu Zhou

1/4/2013

31/3/2013

Yida Wang

1/4/2013

31/3/2013

Christine Nassif

1/4/2013

31/3/2013

All six group


members

29/3/2013

27/3/2013

Engineering Strategies and Practice


8

Revised the CDS

7 Minute Presentation
(Gave a summary of
PR and CDS, and
talked about the main
lesson learned while
working on the project)

All six group


members
All six group
members

29/3/2013

25/3/2013

18/3/2013

18/3/2013

10

Problems Encountered:
We could not start working on the Final Design Specifications until we had met with the client,
as the client might not have agreed with our proposed design, which is what really happened in
the client meeting and the client decided to pick two of our alternative designs and asked us to
combine them._____________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
Lessons Learned & Strategies to address Problems:
We learned that a process type solution like ours might not have many obvious social and
external costs, and that we have to do more research and discuss the matter with our instructors
so as to come up with proper social impacts for our design._________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
Team Decisions____________________________________________________________
We assigned specific sections of the FDS to each group member, and decided a due date for the
first draft._________________________________________________________________
2

Engineering Strategies and Practice


_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
ADDITIONAL COMMENTS (items to discuss during tutorial: documents, client meetings, upcoming due dates and activities, etc.):
_________________________________________________________________________
We need to go over the completed first draft of the FDS and begin to revise it. We must also
clarify a few topics such as the external and social costs of our design with the TA.______
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
ATTACH GANTT CHART (one week past, two weeks forward only)

Engineering Strategies and Practice


ATTACHED COMPLETE IN TUTORIAL SECTION FROM PREVIOUS
REPORTCOMPLETE IN TUTORIAL
This page is to be completed in tutorial and approved by your Project Manager before leaving
tutorial.
PM Initials: _____________________
Plans for the next work period (1-2 weeks)
1
2
3
4
5
6
7
8
9
10

Task
Prepare Status Report

Person Assigned

Date Due

Comment