Per Piece
LabourPlumber
Electrician
Technician
Helper
Day
Day
Day
Day
Amount
19500
19500
0.67
0.67
0.67
1
220
220
285
194
147.4
147.4
190.95
194
Total
Add 15 % contractor profit
Say
20179.75
3026.963
23206.71
23207
Auto level sensing solonoid valve for putting inside the machine to control the
waterflow and to stop wastage of water
Material
Particulars
Solonoid
auto level valve as per
specifications above
LabourPlumber
Electrician
Technician
Helper
Unit
Per Piece
Day
Day
Day
Day
Quantity
1
Rate
1500
Amount
1500
0.67
0.67
0.67
1
220
220
285
194
147.4
147.4
190.95
194
Total
Add 15 % contractor profit
Say
2179.75
326.9625
2506.713
2507
Abstract of Cost
Name of Work : Boundary wall along Jhuggi to stop encroatchment
Civil Works
S.No.
1
Name of Item
Unit
cum
Rate
Quantity
103.40
500.00
Amount Remarks
51700.000 DSR-2007
Item
No.2.8.1
cum
162.65
350.00
56927.500 DSR-2007
cum
3359.60
50.00
kg
42.70
4000.00
cum
1913.10
791.00
cum
361.50
350.00
cum
3579.10
12.00
sqm
180.40
125.00
kg
51.20
2531.00
Item
No.2.9.1
10
11
sqm
8.45
4550.00
51.30
112.50
Total
Total of DSR Items
Add CI @ 37 %
DSR Items Including CI
Total of MR Items
Total of DSR Items including CI & MR items
Add Contigencies @5%
Grand Total
Say
2282281.000
2282281.000
844443.970
3126724.970
0.000
3126724.970
156336.249
3283061.219
3283061.000