SCHEDULING RESOURCES

AND COSTS

The Resource Problem


 Resources

and Priorities

Project network times are not a schedule until


resources have been assigned.
o The implicit assumption is that resources will be available in
the required amounts when needed.
o Adding new projects requires making realistic judgments of
resource availability and project durations.

Types of Project Constraints


 Technical

Constraints related to the networked sequence in


which project activities must occur

 Resource

or Logic Constraints
Constraints

The absence, shortage, or unique interrelationship


and interaction characteristics of resources that
require a particular sequencing of project activities

Constraint Examples

Kinds of Resource Constraints


 People
 Materials
 Equipment
 Working

Capital

Resource Allocation Problem

A shortcoming of most scheduling procedures


is that they do not address the issues of
resource utilization and availability.

Scheduling procedures tend to focus on time


rather than physical resources.

Classification of a Scheduling Problem




Classification of Problem

Using a priority matrix will help determine if the project is time


or resource constrained

Time-Constrained Project: A project that must be


completed by an imposed date

Time is fixed, resources are flexible: if additional resources are


required to ensure project meets schedule, they may be
obtainable

Or a
 Resource-Constrained Project: A project in which the
level of resources available cannot be exceeded

Resources are fixed, time is flexible: inadequate resources will


simply delay the project.

Resource Allocation Methods




Limiting Assumptions

Splitting activities is not allowedonce an activity is start, it is


carried to completion.
Level of resource used for an activity cannot be changed.
Activities with the most slack pose the least risk.
Reduction of flexibility does not increase risk.
The nature of an activity (easy, complex) doesnt increase risk.

(Aside) From practical observation, the way many PMs


handle resource allocation is to assign people to
activities after the network has been MSProject-ized, and
then filter for person and put in additional links.

While easy to do, this is not theoretically correct and leads to


over-restrictive scheduling or inability to react to personnel
changes.

Time-Constrained Projects


Are projects that must be completed by an imposed date

Require the use of leveling techniques that focus on


balancing or smoothing resource demands by using
(positive) slack (i.e. delaying noncritical activities) to
manage resource utilization over the duration of the project

Peak resource demands are reduced.

Resources over the life of the project are reduced.

Fluctuation in resource demand is minimized.

Resource Loading

Resource loading describes the amounts of individual resources an


existing schedule requires during specific time periods.

The loads (requirements) of each resource type are listed as a


function of time period.

Resource loading gives a general understanding of the demands a


project or set of projects will make on a firms resources.

The project manager must be aware of the flows of usage for each
input resource throughout the life of the project.

It is the project managers responsibility to ensure that the required


resources, in the required amounts, are available when and where
they are needed.

Resource Leveling (Smoothing)

Resource leveling aims to minimize the periodby-period variations in resource loading by


shifting tasks within their slack allowances.
The purpose is to create a smoother distribution
of resource usage.
Resource leveling, referred to as resource
smoothing, has two objectives:
To determine the resource requirements so that they
will be available at the right time,
To allow each activity to be scheduled with the
smoothest possible transition across usage levels.

Resource Leveling (Smoothing)

Resource management is a multivariate,


combinatorial problem, i.e. multiple solutions with
many variables, the mathematically optimal
solution may be difficult or infeasible.

More common approach to analyzing resource


leveling problems is to apply some resource
leveling heuristics.

Resource Leveling Heuristics

Prioritizing resource allocation include applying


resources to activities:
with the smallest amount of slack
with the smallest duration
that start earliest
with the most successor tasks
requiring the most resources

Resource Leveling Steps

Create a project activity network diagram


Create a table showing the resources required
for each activity, durations, and the total float
available
Develop a time-phased resource loading table
Identify any resource conflicts and begin to
smooth the loading table using one or more
heuristics

Resource Loading Chart

Another way to create a visual diagram of


resource management problem is to use
resource-loading charts.
Resource conflicts can be seen in the resourceloading charts.
They are used to display the amount of
resources required as a function of time on a
graph.
Each activitys resource requirements are
represented as a block (resource requirement
over time).

Resource Loading Chart


Resource limit is set at 8 hourly units per day.
Display the amount of resources required as a function of
time.
4 B 5
Res = 2

0 A 4
Res = 6

5 D 9
Res = 7
1. Start with a
network diagram
4 C 7
Res = 2

9 E 11
Res = 3

11 F 12
Res = 6

Resource Loading Chart


Activity

A
B
C
D
E
F

Resource

6
2
2
7
3
6

Duration

4
1
3
4
2
1

ES

Slack

LF

0
4
4
5
9
11

0
0
4
0
0
0

4
5
11
9
11
12

2. Produce a table that shows the


duration, early start, late finish,
slack, and resource(s) required for
each activity.

Resource Loading Chart

Botanical Garden Example


Given the following project network, we would like to:
minimize total resources (rented backhoes) used
smooth capacity requirements (avoid large fluctuations)

Pre and Post Smoothing

Resource Allocation Methods


 Resource

Demand Leveling Techniques for TimeConstrained Projects

Advantages
o Peak resource demands are reduced.
o Resources over the life of the project are reduced.
o Fluctuation in resource demand is minimized.

Disadvantages
o Loss of flexibility that occurs from reducing slack
o Increases in the criticality of all activities

Resource-Constrained Projects

Are projects that involve resources that are limited in quantity or


by their availability
Scheduling of activities through use of heuristics (rules-of-thumb),
according to the following priorities.
o

Note- Heuristics do not guarantee optimal solutions, but they help


in finding a decent solution quickly

Start from beginning of project time and, when resources used


exceed the resources available, retain activities first by:
1. Minimum slack
2. Smallest (least) duration
3. Lowest activity identification number

and push the others out further in time


An unarticulated rule: in later periods, do not move activities
that have already started
Additional caveat: when considering activities not to delay,
consider the resources each activity uses.

Example: Resource Constrained Project




Assume we only have 3 people available to do the


following project, and we cannot afford to hire more.

Example of Resource-Constrained
Scheduling

Prior to Resource Balancing


ES
ESresource
resourceload
loadchart
chart (with
(withslack
slackin
ingray)
gray)

Start Shifting Activities Later to Satisfy


Resource Availability
Resource
-constrained schedule
6
Resource-constrained
schedulethrough
throughperiod
period556

We Now Consider the Resources


Available
Delay
Delayactivity
activity22by
by11period,
period,making
making2-to-3
2-to-3period
periodresourceresource-feasible
feasible
(still
(stillnot
notfeasible
feasiblefor
for3-to-4
3-to-4and
andbeyond.)
beyond.)

1
1

1
1

Resource Load Now Feasible


Final
Finalresource-constrained
resource-constrainedschedule
schedule
Still
Stillneed
needto
tore-compute
re-computeslack,
slack,given
givennew
newproject
projectend
enddate
date

Example in MS-Project
Go to tools: level resources
1. For resource-constrained leveling, use the default settings
2. For time-constrained, pick Level within Slack and ignore
the working messages that may be produced

Will produce a schedule with less fluctuation, but may still exceed
level limits

(Another) Computer Demonstration of


Resource-Constrained Scheduling


EMR Project

The development of a handheld electronic medical reference


guide to be used by emergency medical technicians and
paramedics

Problem

There are only eight design engineers who can be assigned to


the project due to a shortage of design engineers and
commitments to other projects.

This is the illustration from the book,


which has 2 grievous errorsCan anyone spot them?

EMR
Project:
Network
View of
Schedule
before
Resources
Leveled

EMR Project Prior to Leveling Resources

Time Constrained: Leveling Within Slack





We reduce the need for some overtime


but still have a large peak at the end, so this is
probably not acceptable

Leveling by Allowing the Project


Duration to Expand
If we take MS Projects leveling defaults
 Project duration will now be 57 working days instead of 45 working days.




Assuming a 1/2/08 start and no special holidays, we go from ending on 3/4 to 3/20

Resource usage between 5 to 8 engineers


Can insert leveling delay column in schedule view to see the shifts

Even manually make them without relying on MS algorithms.

The Impacts of ResourceConstrained Scheduling








Reduces delay but reduces flexibility


Increases sensitivity of the network
Increases scheduling complexity
Can break the sequence of events
May cause parallel activities to become sequential and
change the critical path

Splitting/Multi-tasking


A scheduling technique use to get a better project


schedule and/or increase resource utilization

Involves interrupting work on an activity to employ the resource on


another activity, then returning the resource to finish the
interrupted work

Is feasible when startup and shutdown costs are low (must include
them)

Although easy to put in with project software, both experts


would argue this is not a good approach.

Assigning Project Work




Factors to Consider:

Dont always pick the same people for the toughest


assignments.
Choose people with an eye to fostering their development
through participation on the project.
Pick people with compatible work habits and personalities but
who are not identical- can complement each other.
Mix team-up veterans with new hires to share experience and
socialize newcomers into the organization.
Select people who may need to learn work together on later
stages of the project or other projects.

Multiproject Resource Schedules


 Multiproject
Overall

Scheduling Problems

project slippage

o Delay on one project creates delays for other projects.


Inefficient

resource application

o The peaks and valleys of resource demands create


scheduling problems and delays for projects.
Resource

bottlenecks

o Shortages of critical resources required for multiple


projects cause delays and schedule extensions.

Multiproject Resource Schedules




Managing Multiproject Scheduling

Create project offices or departments to oversee the scheduling


of resources across projects.

Use a project priority queuing system: first come, first served for
resources.
o Prioritize based on perceived need- Internal projects more
likely to get slipped than client-facing ones.

Centralize project management: treat all projects as a part of a


mega-project.

Outsource projects to reduce the number of projects handled


internally.

Some Final Thoughts on Resources




We may not have a pure time-constrained or resource


constrained problem. A hybrid approach may be most
appropriate.

It may make sense to show management both extremes in order


to triangulate to the best solution

We have not explored revisiting activity dependencies,


outsourcing tasks, doubling effort to do a task twice as
fast (or halving effort to do twice as slow)

View Resources in MS Project





In Resource Graph can see the overage


Set resource availability via view: resource sheet

Defaults to increments of 50% but you can manually type in


different amount