AND COSTS
and Priorities
Resource
or Logic Constraints
Constraints
Constraint Examples
Capital
Classification of Problem
Or a
Resource-Constrained Project: A project in which the
level of resources available cannot be exceeded
Limiting Assumptions
Time-Constrained Projects
Resource Loading
The project manager must be aware of the flows of usage for each
input resource throughout the life of the project.
0 A 4
Res = 6
5 D 9
Res = 7
1. Start with a
network diagram
4 C 7
Res = 2
9 E 11
Res = 3
11 F 12
Res = 6
A
B
C
D
E
F
Resource
6
2
2
7
3
6
Duration
4
1
3
4
2
1
ES
Slack
LF
0
4
4
5
9
11
0
0
4
0
0
0
4
5
11
9
11
12
Advantages
o Peak resource demands are reduced.
o Resources over the life of the project are reduced.
o Fluctuation in resource demand is minimized.
Disadvantages
o Loss of flexibility that occurs from reducing slack
o Increases in the criticality of all activities
Resource-Constrained Projects
Example of Resource-Constrained
Scheduling
1
1
1
1
Example in MS-Project
Go to tools: level resources
1. For resource-constrained leveling, use the default settings
2. For time-constrained, pick Level within Slack and ignore
the working messages that may be produced
Will produce a schedule with less fluctuation, but may still exceed
level limits
EMR Project
Problem
EMR
Project:
Network
View of
Schedule
before
Resources
Leveled
Assuming a 1/2/08 start and no special holidays, we go from ending on 3/4 to 3/20
Splitting/Multi-tasking
Is feasible when startup and shutdown costs are low (must include
them)
Factors to Consider:
Scheduling Problems
project slippage
resource application
bottlenecks
Use a project priority queuing system: first come, first served for
resources.
o Prioritize based on perceived need- Internal projects more
likely to get slipped than client-facing ones.