Академический Документы
Профессиональный Документы
Культура Документы
Date
Design By
SRV
PROJECT
EGP-01
17.08.14
Chk'd By
UDHYA
Rev
P1
App. By
Hs
Square
2
gs
18
180
kN/m
kN/m
Overburden pressure
kN/m
Density of soil
m
3
= 2 - 0.4
1.6
= 180 + 1.6 x 18
208.80
kN/m
253.80
kN/m
Size of Column ( a x b)
0.23
0.3 m
Size of pedestal
0.23
0.3 m
428
kN
10
Not Consider
Not Consider
0.00
%
kN
0.00
kN
470.80
kN
p 428
FGL
1.75
1.75
p 0
kN
0.4
0.15
kN
d
0.343
0.000
P
471
0.40
P
0
0
0.15
a
X
b
B =
B =
1.75 m
0.15
0.00 m
2m
Y
L=
Y
1.75
m
Square Footing
L=
0.00 m
Rectangular
Job No
Date
Design By
SRV
PROJECT
EGP-01
17.08.14
Chk'd By
UDHYA
Rev
P1
App. By
2.62
1.62
m
1.62 m
1.75
1.75 m
LxB
3.063
0.767
0.77 x b
= 0.77 x B x B
2.62
= BxB
3.41
0.00
m
m
0.00
OK
2
2
0.00
0.00 m
0.00
0.00 m
LxB
SBC Check
= 470.8 / 3.06
SBC Check
153.73
kN/m
= 208.8 >153.73
OK
1.5
230.60
IS456:2000
M20
Factored Consider
Net upward pressure (qu)
Ref Table-18
kN/m
N/mm
20
Fe415
50
10
415
N/mm
mm
Cl.26.4.2.2
mm
10
mm
(1750 - 0.23 )/ 2
Vu1
Area x force
760
mm
1750
mm
Job No
Date
Design By
SRV
PROJECT
EGP-01
17.08.14
Chk'd By
UDHYA
Rev
P1
App. By
Pt
0.15
tc
0.28
N/mm
tc
VC1/ bxd
Vc1
N/mm
0.28 x1.75 x d
Vu1
Here, Vu1<VC1
1750 x (760 - d ) x 0.231 < 0.28 x1.75 x d
d
343.23
mm
398.23
mm
1.75 m
327.43
B =
d
a
343.23
Y
L=
1.75
For Shear(Vu1), take section along the length in the XX-direction at a distance ' d '
from the column space
Max Shear is
Vu1
Area x force
725
mm
Length of section
1750
mm
Pt
0.15
tc
0.28
N/mm
tc
VC1/ bxd
Vc1
N/mm
0.28 x1.75 x d
Vu1
(1750 - 0.3 )/ 2
Here, Vu1<VC1
1750 x (725 - d ) x 0.231 < 0.28 x1.75 x d
d
327.43
mm
382.43
mm
Job No
Date
Design By
SRV
PROJECT
EGP-01
17.08.14
Chk'd By
UDHYA
Rev
P1
App. By
Final Depth
The effective depth from oneway shear
Req overall depth of fdn
= 343.23 +50 + 5
= 400 -10 - 5
343.23
mm
398.23
mm
400
mm
OK
345
mm
OK
2.66
604.51
kN
Critical perimeter
Critical shear (V)
Critical shear
tp
tp
tc
tc
= 604.51 / 2.66
Max shear strength ( clause 31.6.3.1, IS456:2000)
Here, tp < tc
V/( 2a+2b+4d) * d
2
0.23
N/mm
1.12
N/mm
N/mm OK
Mx
106.06
kNm
My
116.54
kNm
Mu / Bd
0.56
2
2
N/mm
Pt req
Pt req
0.160
Job No
Date
Design By
SRV
PROJECT
EGP-01
17.08.14
Chk'd By
UDHYA
Rev
P1
App. By
Minimum reinforcement
Ast min
Ast min
0.12 % BD
2
840
0.14
mm
%
Pt
0.160
Ast req
Nos
13.00
mm
Sp
126.00
mm
Ast pro
1021.02
967.87886 mm2
No.of.bras
mm
1021.02 > 967.88
OK
R
% of steel
Mu / Bd
0.51
2
2
N/mm
Pt req
Pt req
0.145
Minimum reinforcement
Ast min
Ast min
0.12 % BD
2
840
Pt (min)
0.14
mm
%
Pt
0.150
Ast req
905.63
mm
Nos
13.00
mm
Sp
126.15
mm
Ast pro
1021.02
No.of.bras
mm
1021.02 > 905.63
OK
Job No
Date
Design By
SRV
PROJECT
EGP-01
17.08.14
Chk'd By
UDHYA
Rev
P1
App. By
1.9 Result
Footing Size
Dir
Dia
X-Dir
10
126.00
115.00
Y-Dir
10
126.15
125.00
One Way
Two Way
OK
OK
2.0 Diagram
0.343
0.343 m
0.4
0.15
1.75
50 mm (min) Cover
Section A-A
10 mm@ 115 mm c/c
A
1.75
X Dir
Y Dir
L
1.75
Plan