DETAILED
PROJECT REPORT
M
Y
FOR
W
A
Y
PERMANENT RESTORATION
S
E
R
V
I
C
E
S
KA
RA
N
NA
GA
R
9
4
1
9
0
6
4
1
7
2
TECHNICAL REPORT
TITLE:-
HISTORY:- The Raikoot Canal/Channel takes off from Khanchi Nallah at a distance of
1.50Kms upstream of Raikoot (Yousmarg). The channel caters to the
water supply demand of the population of entire Charsharief Town and its
adjoining areas.
Due to the recent incessant rains that crossed all the previsous
records of devastation, started in the upper catchments in the Pir-Panjal
Range on 02-09-2014, Khanchi Nallah, Romshi Nallah and Doodhganga
Nallah are the otherwise viable sources of various water supply schemes
got flooded with gushing discharge thus washed away and damaged
everything that came into its way. This resulted in damages and silting up
of Raikoot Canal.
Since large scale damages have been caused to the channel in shape
of development of breaches at a number of spots,, sliding of land on the
hill side and choking of the channel also took place at spots.
For the purpose this proposal has been conceived to to for full
fledged permanent restoration of the channel. It is proposed to lay bed
concrete and construction of lining walls on either side for the portion of
the channel for a length of 390mtrs out of total 900mtrs. Moreover,
crate protection works shall be constructed at the breach spots and a
bifurcation / escape together with provision of winch gates. Also foot
crossings of RCC slabs shall be laid across the channel at twelve spots.
Jr. Engineer
Executive Engineer
PHE Div. Chadoora
S.
No.
1.
Name of Work
Permanent Restoration of Damages to Raikoot Canal by way of
a)
b)
c)
2.
3.
4.
5.
April 2015
Period of Activity
May 2015
June 2015
15-31
1-15
16-26
1-15
16-30
16-26
10May - 30 June
Executive Engineer
PHE Div. Chadoora
July 2015