BOOK IV

PART 5 Forms and Schedules


SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet

_______________________
(Bidders Name)

7.2.3 STEAM TURBINE AND AUXILIARY EQUIPMENT


1. TURBINE
(1) Type
(2) Manufacturer
(3) Speed

(4)
(5)
(6)
(7)

Number of extraction
Length of last stage blade
Annulus area of last blade
Bearing
Type
Number
(8) Thrust bearing type
(9) Material:
Turbine rotor
Casing
Blade
Casing bolt
Steam chest

____________________________________
____________________________________
______________________________________
______________________________________
______________________________________
______________________________

(
r
p ______________________________________
m ______________________________________
) ______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
__________________

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment

Bidders Data Sheet


(Bidders Name)

(10) Performance data

Output

50% rating

75% rating

(MW)

Gross turbine-generator heat rate


Main steam pressure
Main steam temperature
Main steam flow

(kcal/KWH)

Rating

*
(*)

(*)

Turbine
Capability

Maximum
Output

(*) *

(kg/cm2g)
(oC)
(kg/H)

Exhaust steam pressure


Exhaust steam flow
Make up water

(mmHg abs)
(kg/H)
(%)

Feedwater temperature at HP final heater outlet


(oC)
Generator power factor

Note : (*)

Revision 1

Shows " Weighted mean" guarantee.

Sch 7.2.3 - 2

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment

Bidders Data Sheet


(Bidders Name)

Flow (kg/H)

(11) Extraction steam conditions at turbine


connections (at Rating)

Pressure
(kg/cm2g)

Temperature (oC)

Extraction number
No. 1 (to HP No. 5 heater)
No. 2 (to HP No. 4 heater)
No. 3 (to deaerator heater)
No. 4 (to LP No. 2 heater)
No. 5 (to LP No. 1 heater)
(12)
(rpm)
(13)

Critical speed (Composition and each rotor)

Dimension
Rotor length
Width
Turbine bearing span
Height of top above operating floor

(14)

(mm)
(mm)
(mm)
(mm)

Weight (approx.)
Rotor
Upper casing
Lower casing
Assembled weigh

Revision 1

_________________________________________________________

(kg)
(kg)
(kg)
(kg)

_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________

Sch 7.2.3 - 3

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)

2.

SPEED, LOAD CONTROL AND


PROTECTION
SYSTEM
_______________________________________________
(1) EHC system type

_______________________________________________
_______________________________________________

(2) Control valve


_______________________________________________
Type
Yes

No

Yes

No

Number
Material
_______________________________________________
(3) Load limiter
_______________________________________________
(4) Full-arc admission
_______________________________________________
(5) Main stop valve
_______________________________________________

Number

_______________________________________________

Size
(mm)
Material of body and stem
(6) Emergency governor type
(7) Emergency trip device
Thrust failure protection device

Yes

No

Yes

No

Yes

No

Vacuum trip device


Low bearing oil pressure trip device

_______________________________________________
Yes

(8) Vacuum breaker


Type and size

No
X

(9) Initial pressure regulator

_______________________________________________

(10) Atmospheric relief diagram

_______________________________________________

dia. x thickness
(mm)
(11) Turbine exhaust spray water flow
(kg/H)

3. LUBRICATING AND HYDRAULIC OIL


SYSTEM

Revision 1

_______________________________________________

Sch 7.2.3 - 4

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)
(1) Brand of using oil
(2) Oil capacity of system
(3) Bearing oil pressure
(m3/H)

_______________________________________________
(m 3)

________________________________________________
______________________________________________
_______________________________________________

(4) Full-arc admission


(kg/cm 2g)

_______________________________________________

(5) Main stop valve

_______________________________________________

(kg/cm 2g)
(6) Main oil tank

_______________________________________________

Capacity

_______________________________________________

(m3)

Yes

No

Yes

No

Material
(7) Main oil pump
Type

_______________________________________________

Capacity
Discharge and suction pressure

_______________________________________________

(kg/cm 2g)

_______________________________________________

(8) Relay dump valve

_______________________________________________

Type

_______________________________________________

Valve size

_______________________________________________

(mm)

_______________________________________________
_______________________________________________

(9) Oil cooler


Type
Cooling surface area
(m2)
Cooling water inlet design temp.
(C)
Oil outlet temperature

Revision 1

Sch 7.2.3 - 5

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)
(C)
Cooling water flow
(m3/H)
Oil flow
(m3/H)
Tube size (outside diameter x thickness)

(mm)
(10) Auxiliary oil pump
Type

_______________________________________________

Capacity

________________________________________________

(m3/H)

________________________________________________

Discharge pressure

________________________________________________

(kg/cm 2g)

____________________________________________

Weight (assembly)

(kg)

_______________________________________________
________________________________________________

approx.
(11) Barring gear oil pump (if required)

________________________________________________
_____________________________________________

Type
Number

________________________________________________

Capacity
(m3/H)
Discharge pressure
(kg/cm 2g)

________________________________________________
________________________________________________
____________________________________________

(12) Emergency oil pump


Type
Number
Capacity
(m3/H)

_______________________________________________
________________________________________________
________________________________________________
_____________________________________________

Discharge pressure
(kg/cm 2g)

Revision 1

______________________________________________

Sch 7.2.3 - 6

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)
(13) Jacking oil pump (if required)

______________________________________________
______________________________________________

Type
Capacity
(m3/H)
Discharge pressure
(kg/cm 2g)
Motor
4. TURBINE EQUIPMENT

Type
Turning speed
(rpm)
Motor

5. GLAND STEAM SEAL SYSTEM


(1) Gland steam seal regulator
Type

_______________________________________________

Size

_______________________________________________

Regulating pressure
(kg/cm 2g)

_______________________________________________

(2) Gland steam exhaust blower


_______________________________________________
Type
_______________________________________________
Number

_______________________________________________

Capacity
(m3/H)
Exhaust pressure
abs.)

_______________________________________________
(mmHg
_______________________________________________

(3) Gland Steam Condenser

_______________________________________________

Type

Revision 1

Sch 7.2.3 - 7

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)
_______________________________________________
Cooling surface area
(m2)

_______________________________________________

Cooling water flow


(m3/H)

_______________________________________________
_______________________________________________

Tube size and thickness


(mm)
Heat transfer coefficient
(kcal/H/m 2/C)

_______________________________________________
_______________________________________________

Friction loss through tubes


(kg/cm 3)
Design pressure

______________________________________________

Tube side
(kg/cm 2g)

______________________________________________

Shell side
(kg/cm 2g)
Design temperature
Tube side
(C)
Shell side
(C)

6. BOILER FEED PUMPING EQUIPMENT


(1) Boiler feed pump
Type

__________________________

Manufacturer

__________________________

Number

__________________________

Capacity

(ton/H)

Total head

(kg/cm 2g)

__________________________

Discharge head

(kg/cm 2g)

__________________________

Shut off pressure

(kg/cm 2g)

__________________________

(C)

__________________________

(ton/H)

__________________________

Feed water temperature


Minimal flow

Revision 1

__________________________

Sch 7.2.3 - 8

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)

Pump efficiency

(%)

Shaft horse power

(kW)

Motor

__________________________
__________________________
__________________________

NPSH required

(m)

__________________________

NPSH available

(m)

__________________________

Speed
Noise (at a complete set)

(rpm) __________________________
dB (A)

__________________________

Number of stage

__________________________

Type of bearing

__________________________

Type of coupling

__________________________

Connection size:
Suction

(mm)

__________________________

Discharge

(mm)

__________________________

Material:
Casing

__________________________

Shaft

__________________________

Impeller

__________________________

Minimum flow orifice

__________________________

Warm-up orifice

__________________________

(2) Lubricating oil system


Auxiliary oil pump:

__________________________

Type
Capacity
Discharge pressure

__________________________
(m3/H)
(kg/cm2g)

__________________________
__________________________

Oil cooler:
Type
Cooling water flow

Revision 1

__________________________
(m3/H)

Sch 7.2.3 - 9

__________________________

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)
Oil reservoir:
Type

__________________________

Capacity

(m3)

__________________________

(3) Discharge valve


Type

__________________________

Size

__________________________

Rating and material

__________________________

Motor

__________________________

(4) Speed increasing gear (if required)


Type

__________________________

Manufacturer

__________________________

Revolution (rpm) Pump/Motor

__________________________

Material:

__________________________

Drive gear

__________________________

Driven gear

__________________________

Direct driven L.O pump capacity:

__________________________

Type
Capacity
Discharge pressure

__________________________
(m3/H)
(kg/cm 3g)

__________________________
__________________________

(5) Booster pump (if required)


Type

__________________________

Manufacturer
Capacity

__________________________
(ton/H)

__________________________

NPSH required

(m)

__________________________

Total pressure

(kg/cm 2g)

__________________________

Motor

__________________________

(6) Suction strainer

Revision 1

Sch 7.2.3 - 10

PLTU Kalimantan Selatan (2 X 65 MW)

BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.3 Steam Turbine and Auxiliary Equipment
Bidders Data Sheet
(Bidders Name)
Type

__________________________

Strainer mesh

__________________________

Material:
Casing and cover

__________________________

Strainer

__________________________

(7) Recirculation control valves


Type

__________________________

Flow capacity

(m3/H)

__________________________

Fluid pressure

(kg/cm 2g)

__________________________

(8) Orifice
Type

__________________________

Flow
Inlet/outlet pressure

(m3/H)

__________________________

(kg/cm 2g)

______________/___________

(9) Power consumption at 100% rating


Boiler feed pump
Boster pump (if required)

Revision 1

(kwh)
(kwh)

Sch 7.2.3 - 11

__________________________
_________________________

PLTU Kalimantan Selatan (2 X 65 MW)