First you have to start with

Objective of the project and what are client expectations

Your involvement and responsibility of your job and limitations of job, Project
architecture and team structure.

Client Introduction:

Main objective of this project is we are providing a system with all the information
regarding Transactions of entire banks all over the country. We will get the daily transaction
data from all branches at the end of the day. We have to validate the transactions and
implement the business logic based on the

transactions type or transaction code. We have

to load all historical data into DWH and once finished historical data. We have to load Delta
Loads.
Also explain about:

Target Staging Area.

Mappings.

Source to staging mappings.

Staging to warehousing.

Each transaction contains Transaction code. Based on the transaction code we can
identify whether that transaction belongs to withdraw, deposit, loan, payment based on that
code business logic will be change. We validate and calculate the measure and load to
database.

In Informatica mapping, we first lookup all the transaction codes with code master
table to identify the transaction type to implement the correct logic and filter the unnecessary
transactions. Because in BANK there are lot of transactions will be there but we have to
consider only required transactions for the project. The transaction code exists in the code
master table are only transactions we have to consider and other transactions load into one
table called Wrap table and invalid records( transaction code missing, null, spaces) to Error
table. For each dimension table we are creating surrogate key and load into DWH tables.

SCD2 Mapping:

We are implementing SCD2 mapping for customer dimension to keep history of the customers.
We are using SCD2 Date method.

ArchitectureofProject:
SCD2 Mapping:
We are implementing SCD2 mapping for customer dimension to keep history of the customers.
We are using SCD2 Date method.
Architecture of Project:

100% in onsite,Business Analyst, project manager.

Gather the useful information for the DSS and indentifying the subject areas, identify
the schema objects and all.

Design:

ETL Lead, BA and Data Architect

80% onsite .( Schema design in Erwin and implement in database and preparing the
technical design document for ETL.

20% offshore: HLD & UTP

High Level Design Document, Based on the Technical specs. Developers has to create
the HLD, it will have the Informatica flow chart. What are the transformations required for
that mapping. HLD will cover only 75% of requirement.
UTP:
Development:
ETL Team and offshore BA
100% offshore
Based on the HLD. U have to create the mappings. After that code review and code standard
review will be done by another team member. Based on the review comments we have to
update the mapping. Unit testing based on the UTP. We have to fill the UTP and enter the
expected values and name it as UTR (Unit Test Results). 2 times code review and 2 times unit
testing will be conducted in this phase. Migrating to testing repository. Integration test plan
has to prepare by the senior people.
Testing Team, Business Analyst and Client.
80% offshore
based on the integration test plan testing the application and gives the bugs list to the
developer. Developers will fix the bugs in the development repository and again migrated to

testing repository. Again testing starts till the bugs free code.
20% Onsite
UAT - User Accept Testing. Client will do the UAT. This is last phase of the ETL

project.

Production:
50% offshore 50% onsite
Work will be distributed between offshore and onsite based on the run time of the Loading.
Mapping bugs needs to fix by Development team. Development team will support for warranty
period based on agreement days.
In ETL projects Three Repositories. For each repository access permissions and location will be
different.
Development:
E1
Testing:
E2
Production:
E3
In ETL projects Three Repositories. For each repository access permissions and location will be
different.
Development:
E1
Testing:
E2
Production:
E3
Dimensions:
Mapping explanation:

Analysis

Requirement Gathering

Design

Development

Testing

Production Analysis and Requirement Gathering:


Output:

Analysis Doc, Subject Area

Output:

Technical Design Docs, HLD,UTP

HLD:

Unit Test Plan. Write the test cases based on the requirement.

Output:

Bugs free code, UTR, Integration Test Plan

Testing:
Output:

ITR, UAT, Deployment Doc and User Guide

Note: E1, E2, E3 are Repository names. Nothing else.


Employee
Customer
Agent
Transaction
Date

http://informaticakareem.blogspot.in/2012/08/informatica-project.html
https://www.scribd.com/doc/48634480/informatica-project