Company :
Date :
Job Site :
Job Date :
Work Process :
LKC
16/03/2015
Port Klang to Lower Piah Power Station
2015
Transportation of Transformer- main body
Hazard Identification
No.
Work Activity
Hazard
Conducted by :
Designation :
Approved by:
Designation :
Revision :
Vigines
Mechanical Engineer
SC Low
Executive Director
1
Risk Analysis
Risk Control
Cause / Effect
Likelihood
Severity
Risk
Counter Measures
2A
Manageable
Mobilize of
tools,vehicle,equipment
& materials to site
Road accident
Parking the
tools,vehicle,equipment
& materials at the site
1D
Acceptable
1E
Acceptable
The project had been awarded by client, and no work witout permission
from the client
1C
Acceptable
Illegal item
equipment brought to
work area
Signalman / Supervisor is
available to guide the rigger &
only he will give the instruction.
To stop work if heavy rain
Page 1
2C
Acceptable
3B
Manageable
Hazard Identification
No.
10
Work Activity
Hazard
Risk Analysis
Risk Control
Cause / Effect
Likelihood
Severity
Risk
Counter Measures
The shackle/turnbuckles/wire
rope and other equipment are
checked periodically as part of
maintenance program. Check
equipment prior to delivery to
the job site and check again
before use.Ensure correct
shackle/wire rope is used at the
correct location
2C
Acceptable
Property damage
3C
Manageable
Transportation inland
(Inside the plant)
During Transportation
3B
Manageable
2B
Manageable
Barricade tape & warning signboard on the job site to warn other
personnel not to enter the critical area
3B
Manageable
3B
Manageable
On site security
Other personnel
enter the job site
Rushing hours /
Delays
Jackdown cargo