Академический Документы
Профессиональный Документы
Культура Документы
IDEA NO
326
365
NA
394
2011
NA
NA
402
2012-13
CIRA
CIRA
CIRA
NA
CIRA
2010
DESCRIPTION
To replace Old passing KV's in LPG trains for preventing failures / unplanned shutdowns
To provide a control valve upstream of FT-61-308A and FT-61-308B for proper controlling of VR residue
flow to RSD5 line
Process alternate Conversion Feed Stock (VRU slop wax, HGO) during VGO shortage period
To recycle Isostripper nC4 to DIB feed surge drum for recovering iC4 instead of burning as Boiler Fuel G
2011
2012-13
NAME
Tannuos Diab-Area-7
STATUS
ACCEPTED
ACCEPTED
PIP/OPL/PE
ACCEPTED
Mohammed Abdussalam
ACCEPTED
PIP / OPL
PIP / OPL
ACCEPTED
ACCEPTED
Essa Al-Rashidi
ACCEPTED
K.S. Sabapathi
K.S. Sabapathi
ACCEPTED
ACCEPTED
K.S. Sabapathi
ACCEPTED
PIP/OPL/PE
K.S. Sabapathi
ACCEPTED
ACCEPTED
IDEA NO
326
328
339
340
344
356
357
361
362
365
368
370
372/73/74
375
379 & 380
381
383
385
392
394
395
402
409
411
413
423
424
426
20
428
431
435
438
CIRA#199
CIRA#202
CIRA#213
CIRA#221
CIRA#225
CIRA#234
CIRA#334
NEW IDEA AREA-7
CIRA#323
CIRA#370
2010
DESCRIPTION
To replace Old passing KV's in LPG trains for preventing failures / unplanned shutdowns
To flush Whole ADIP system with hot DM Water from HSR unit during GRTA/MRTA
To extend the Unit -47 bird screen air inlet spool to avoid frequent choking
To Provide a circulation line at inlet vent line in C-002-A/B,C-002 L/Oil Coolers S/By to provide continuo
To provide closed bucket with funnel for filling bearing and other oils at pumps and compressors to av
To Provide a tie-valve between RMP-FUP LP steam line to tankage area
To provide suitable modification to all bath room fittings and service points for minimizing water consu
To Provide a guided wave reader LT instead of Float Wired type LT on Caustic Tank TK-84-001
To Provide a Second Block Valve on the 3 inch D-slop lines of V-58-001 & V-58-013
To provide a control valve upstream of FT-61-308A and FT-61-308B for proper controlling of VR residue
To Provide an individual isolation valve on both sides of cooler (C/W and Gas side of E-58-010 A/B) fo
To Provide magnetic type level gauge on LPHS (V-41/42/81/82-023) & Fractionator (V-41/42/8
To improve the Heater/pre heat exchanger performance of NHT & CCR plat former by implementing th
"Polar blast cleaning of convection tubes", "Ceramic coating on the Radiant coils" and providing pre-fil
feed line.
To Provide new flow indicator with low flow alarm on P-46-021 discharge line to alert the control room
To Provide flow indicator reading for raw kerosene & LGO product flow ex CDU's in 43GD01 & 44GD01
To Provide temperature indicator and high temperature alarm at the bottom of V-46-017 to alert contr
To Replace Instrument Air low low pressure switch with new transmitter
To Provide steam tracing with insulation on 41/81-PCV-077A .
To increase the frequency of checking HVGO sample for distillation to thrice a week (Same as VGO) fo
To recycle Isostripper nC4 to DIB feed surge drum for recovering iC4 instead of burning as Boiler Fuel G
To Provide back flushing facility C-44-002-T-E-002
2011
To Change the PCV-1140 set point to delta P across HP fuel gas and PCV-1140 and control differential
To Provide a tie-in connection between P-46-004 A&B suction lines to resolve acid accumulation proble
To interconnet low pressure hot pressure hot seperators (V-023) of 41/81 & 42/82 ARD's for avoiding s
To alert the operating personnel and to minimise upset, providing a level switch low (LSL) will help to t
To provide connection between v-81-022 drain and hot slop line
To provide FT/PT (low / high) alarm on P-87-503/504 A/B common discharge line
To provide a minimum flow of circulation for P-61-002 A/B
2012-13
To upsize the gas trap (#MT-58-7601-Provided in the Fuel Gas KOD V-58-016) or replace with better m
To provide gas oil connection from Unit 44 feed to downstream of U-41/42 flush oil battery limit block valv
To avoid of diesel water contamination to change set point of conductivity analyzer from 154 ms/sec
To provide new drain line with isolation valve on downstream of P-58-001 A/B e-001 (lube oil coole
To provide PG511 & PG512 reading in CCR LCP display
To provide a pressure transmitter on V-41/42-014
Relocation of Hand switch HS-1001 for preventing mal-operation
To provide new line from charge pump balance line to flush oil surge drum V-41-011
To Provide isolation valve on vacuum dryer barometric line in KD/GOD units
To provide isolation valve on P-110 PRT seal flush cooler CCCW return line.
To provide a modification during outage of TK661
To provide a trend and FQ for the newly installed flare flow meters FI-0403/04 in DCS
to provide the running status of fin fans (LPG trains drier regeneration system) in DCS
To provide DCS control at Central Control Room for pressure control at V-41-011 & V-41-012
To provide block valve on the caped vent on the top pump around inlet line to E-84-110
NAME
EMP.NO:
Tannuos Diab-Area-7
PERCY N PATEL-Area-3
11643
P.ARUMUGAM,AREA-4
116566
ABDUL WADOOD KHAN,AREA-3
6611
NAWAF AL-HARBI,AREA-3
10554
Rashed Ismail-Operation Area-2
3023
Ornis Al-Hatem-Operation Area-5
37
Mazhar Khan-Operation Area-4
6558
Faiz Rasool-Operation Area-3
13787
Dhafer Al-Hajrri-Operation Area-8
13629
Mraikhan Al-Mutairi-Operation Area-3 2254
Fayez Al-Mutairi
14927
STATUS
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
12377/1462A
ACCEPTED
16488
Area-3
14622
10554
6085
5942
14307
14450
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
Essa Al-Rashidi
Hemanth Kumar
Process Engineering-MAA
Bader Khalid-Area-3
Talal Al Harbi
Operation Area-03
Nawaf Al-Harbi
Operation Area-03
Rashed Al-Ajmi
Operations Area-4
Mr.Dafer Al-Hajeri Area-08
13985
ACCEPTED
18371
ACCEPTED
1883
ACCEPTED
14675
ACCEPTED
10554
ACCEPTED
14622
ACCEPTED
13269
ACCEPTED
13308
ACCEPTED
11430
ACCEPTED
13747
ACCEPTED
Mr.Ahmed Bousheri
(Operations Area-3)
Mr.Khalid Faud
(Operations Area-3)
Mr.Qamar Shabbir
(Operations Area-5)
Mr.Talal Al-Harbi
14675
(Operations Area-3)
Mr. Percy Patel (Operations Area-3) 11643
Mr.Mohd Sanwar Mozid (Operations Area-3)3259
Mr.T.R.Chandran (Operations Area-3) 14113
Mr. Ibrahim Al-Enzi
14993
(Operations Area-3)
Mr.Fawzy Hijazi
3528
(Operations Area-3)
Mr.A/Majeed Khan Ellahi
6128
(Operations Area-4)
Mr.Sulyman Al-Otaibi
13327
Khaled Al-Salem
15638
(Operations Area-7)
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
ACCEPTED
18182
ACCEPTED
Altaf Malik
(Operations Area-3)
6085
ACCEPTED
6254
ACCEPTED
Fayez Al-Mutairi
(Operations Area-3)
14927
ACCEPTED
17848
ACCEPTED