SAUDI ARAMCO ID/PID - REV 1 - 05/18/05 (Standards Cutoff - August 2004)

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


CENTRIFUGAL PUMP

APPROVED DATE

SATIP-G-005-01

PROJECT TITLE:

ITEM
NO.

1.0

PROJECT PHASE
& ACTIVITY CODE

25-May-05

DISCIPLINE:

MECHANICAL-Rotating Equipment

CONTRACTOR/SUBCONTRACTOR

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

SAUDI
ARAMCO

REMARKS

DOCUMENT REVIEW
Review of Material & Equipt Storage,
Handling and Preservation Procedure-

SAIC-G-2001 SAIC-G-2001

RH1

RH1

2.1

Equipment Verification and Visual


Inspection of Centrifugal Pumps

SAIC-G-2002 SAIC-G-2002

H1

W1

2.2

Equipment Handling, Storage and


Preservation

SAIC-G-2003 SAIC-G-2003

W1

2.3

Verification, Visual inspection and


storage/Preservation of Electrical and
instrumentation components

See Remarks See Remarks

Refer to the respective SATIPs for Electrical &


Instrumentation (SATIP-P-113-01/02/03
P-116-06 , P-515-01, J-100-01, J-200-01,
J-300-01, J-400-01, J-902-03)

3.1

Concrete Foundation Installation

See Remarks See Remarks

See SATIP-Q-001-02

3.2

Verification of Equipment Support


Structure or Foundation (Pre-Installation)

SAIC-M-2006 SAIC-M-2006

H1

W1

3.3

Mounting Plate ( Base plate and


Soleplate) Installation and Leveling

SAIC-G-2021

SAIC-G-2021
SATR-G-2005

H1

W1

3.4

Grouting of Machinery Support

See Remarks See Remarks

3.5

Inspection of Auxiliary Piping Installation

SAIC-G-2004 SAIC-G-2004

3.6

Relief Valve Installation

See Remarks See Remarks

1.1

2.0

3.0

Per Schedule Q, attach III, Para.

MATERIAL RECEIVING

INSTALLATION

Page 1 of 3

See SATIP-Q-010-01 or Q-011-01whichever is applicable


HI

W1
Refer to SATIP-J-600-01

SAUDI ARAMCO ID/PID - REV 1 - 05/18/05 (Standards Cutoff - August 2004)


SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


CENTRIFUGAL PUMP

APPROVED DATE

SATIP-G-005-01

PROJECT TITLE:

ITEM
NO.

25-May-05

DISCIPLINE:

MECHANICAL-Rotating Equipment

CONTRACTOR/SUBCONTRACTOR

PROJECT PHASE
& ACTIVITY CODE

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

REMARKS

SAUDI
ARAMCO

See SATIP-W-011-01

3.7

Welding

See Remarks See Remarks

3.8

Pump Suction and Discharge Piping


Connection

SAIC-G-2005 SAIC-G-2005

H1

W1

3.9

Flange Joint, gasket verification and bolt


tightening

SAIC-L-2014

SAIC-L-2014
SATR-L-2001

H1

W2

3.10

Electric Motor (Driver) Installation

See Remarks See Remarks

Refer to the applicable SATIP: SATIP-P-113-06,


P-113-01, P-113-02, P-113-03, P-116-06

3.11

Skid Mounted Aux. Electrical System


installation

See Remarks See Remarks

Refer to SATIP-P-515-01

3.12

Skid Mounted Aux. Instrumentation


Systems installation

See Remarks See Remarks

Refer to SATIP-J-902-03

4.1

Final Pump/Driver Alignment

SAIC-G-2022

4.2

Instrumentation and Electrical PreCommissioning prior MCC

See Remarks See Remarks

4.0

4.3
4.3

See Note 3 of the General Notes for S.Aramco's


Responsibility and minimum of 10% thereafter.

PRE-COMMISSIONING

Final Inspection/walkthrough (by


Contractor)
Final Inspection for mechanical
completion acceptance

SAIC-G-2007

SAIC-G-2022
SATR-G-2004

SAIC-G-2007
SATR-A-2011
Form SA-6133

H1

W1
Refer to the respective SATIPs for Electrical &
Instrumentation noted above.

H1

S
H1

GENERAL NOTES
1

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
levels of Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
representative is not present.

Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
attendance.

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Page 2 of 3

SAUDI ARAMCO ID/PID - REV 1 - 05/18/05 (Standards Cutoff - August 2004)


SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


CENTRIFUGAL PUMP

APPROVED DATE

SATIP-G-005-01

PROJECT TITLE:

ITEM
NO.

PROJECT PHASE
& ACTIVITY CODE

25-May-05

DISCIPLINE:

MECHANICAL-Rotating Equipment

CONTRACTOR/SUBCONTRACTOR

QUALITY
PROCEDURE

TASK / ACTIVITY

QUALITY
RECORD

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

REMARKS

SAUDI
ARAMCO

LEGEND
W1

100% Witness Inspection/Test

H2

Sample Hold Point for QC Inspection or Test

RH2 100% Review and Approval of Documents

W2

Sample Witness Inspection/Test

R1

100% Review of Documents

RH1 Sample Review and Approval of Documents

H1

100% Hold Point for QC Inspection or Test

R2

sample Review of Documents

Page 3 of 3