Вы находитесь на странице: 1из 11

APPENDIX-I

QUANTITIES OF MATERIALS
FOR COMPLETED ITEMS OF WORK
Notes :1.
For items of works, which are not listed in this Appendix, actual quantities
should be worked out as per mode of measurements specified in schedule
of rates.
S.No.

Item

Unit

Material

Moorum
sand
Moorum
Boulder
Moorum
Metal
Cement
Sand
Cement
Sand
Cement
Sand
Cement

1
2
3

Hard moorum filling


Rammed sand filling
Rammed moorum & boulder

Cum
cum
cum

cum

Rammed moorum and metal (or


shingle or gravel)
Cement mortar 1:2

Cement mortar 1:3

cum

Cement mortar 1:4

cum

Cement mortar 1:5

cum

9
10
11

Cement mortar 1:6


Cement mortar 1:8
(a) Plum cement concrete 1:2:4
with 25% plums

(b) Plum cement concrete 1:3:6


with 25% plums.

(c) Plum cement concrete 1:4:8


with 25% plums.

cum

cum
cum
cum

cum

cum

Quantities Remarks
of
Materials
1.00 cum
1.00 cum
0.40 cum
1.00 cum
0.33 cum
1.00 cum
0.50 cum
1.00 cum
0.33 cum
1.00 cum
0.25 cum
1.00 cum
0.20 cum

Sand

1.00 cum

Cement

0.16 cum

Sand

1.00 cum

Cement

0.12 cum

Sand

1.00 cum

Plum

0.21 cum

Metal

0.64 cum

Cement

0.16 cum

Sand

0.32 cum

Plum

0.22 cum

Metal

0.68 cum

Cement

0.11 cum

Sand

0.34 cum

Plum

0.23 cum

Metal

0.69 cum

S.No.

Item

Unit

Material

Cement
12

13

Cement concrete 1:1:2

Cement concrete 1:1.5:3

cum

cum

Quantities Remarks
of
Materials
0.09 cum

Sand

0.35 cum

Metal

0.77 cum

Cement

0.40 cum

Sand

0.38 cum

Metal

0.82 cum

Cement

0.283
cum

Sand

0.41 cum
14

15

Cement concrete 1:2:4

Cement concrete 1:3:6

cum

cum

Metal

0.85 cum

Cement

0.22 cum

Sand

0.43 cum

Metal

0.90 cum

Cement

0.154
cum

Sand

0.45 cum
16

17

18

19

Cement concrete 1:4:8

Cement concrete 1:5:8

Cement concrete 1:5:10

Cement Concrete 1:6:12

cum

cum

cum

cum

Metal

0.92 cum

Cement

0.12 cum

Sand

0.46 cum

Metal

0.85 cum

Cement

0.11 cum

Sand

0.53 cum

Metal

0.94 cum

Cement

0.09 cum

Sand

0.47 cum

Metal

0.94 cum

Cement

0.08 cum

Sand

0.47 cum

20

Brick bat filling

cum

Brick bats

1.00 cum

21

Metal filling

cum

Metal

1.00 cum

22

Plain

cum

Masonry

1.00 cum

Ashlar

masonry/Ashlar

S.No.

Item

Unit

rough tooled masonry/Ashlar


rock (quarried) faced masonry.
23

Squared rubble masonry (first


sort)/Squared rubble masonry
(second sort)/Hammer dressed
coursed rubble masonry/Face
stone masonry.

Material

Quantities Remarks
of
Materials

Stone
cum

Mortar

0.12 cum

Rubble

0.84 cum

Masonry
Stone (Bond
Stone)

0.16 cum

Mortar
0.35 cum
24

Dry random rubble masonry

cum

Rubble

1.00 cum

25

Un-coursed or Random Rubble


masonry

cum

Rubble

0.84 cum

Masonry

0.16 cum

Stone
26
27

28

29
30
31
32

Fixing fine dressed cut stone


lintels in mortar.

cum

Fixing fine dressed cut stone


copings,
cornices,
string
courses and plinth coursed in
mortar.

cum

Stone brick masonry with solid


stone masonry blocks pre-cast
in C.C. 1:4:8.

cum

Sub dried brick masonry


Burnt brick masonry
Honey comb brick masonry

Mortar

0.42 cum

Mortar

0.03 cum

Cut Stone

1.00 cum

Cut Stone

1.00 cum

Mortar

0.12 cum

Pre-cast

0.90 cum

Blocks
cum
cum
cum

Flag stone flooring over 20 mm Sq. m


thick bedding of CM 1:6
including pointing in CM 1:3

Mortar

0.12 cum

Bricks

1.00 cum

Mortar

0.25 cum

Bricks

1.00 cum

Mortar

0.21 cum

Brick

0.72 cum

Mortar

0.05 cum

Flagstone

1.10 sq.
m.

CM 1:6
CM 1:3

0.0224
cum
0.0026

S.No.

33

Item

Grouted stone pitching

Unit

Material

cum

Pitching

Quantities Remarks
of
Materials
cum
1.00cum

Stone
Mortar

0.20 cum

34

Dry stone pitching

cum

Pitching
Stone

1.00 cum

35

Dry Boulder pitching

cum

Boulder

1.00 cum

36

75 mm thick improved terrace sq. m.


C.C.
flooring in cement concrete with
Cement (for
neat cement floating coat.
finishing and
slurry)

0.075
cum

40 mm thick improved terrace sq. m.


C.C.
flooring in cement concrete with
Cement (for
neat cement floating coat.
finishing and
slurry)

0.04 cum

37

38

39

40

15 mm thick lime plaster on sq. m.


brick masonry with neeru finish.

20 mm thick lime plaster on sq. m.


brick masonry with neeru finish.

L.M.
White wash
lime
L.M.
White wash
lime

0.003
cum
0.003
cum
0.025
cum
0.003
cum
0.025
cum
0.003
cum

Cement plaster on stone work (a) 20 mm thick

sq. m.

C.M.

0.025
cum

(b) 25 mm thick

sq. m.

C.M.

0.028
cum

41

6 mm thick cement plaster to sq. m.


ceiling

C.M.

0.0072
cum

42

Cement plaster on brick work (a) 10 mm thick

sq. m.

C.M.

0.012
cum

(b) 15 mm thick

sq. m.

C.M.

0.018

S.No.

Item

Unit

Material

sq. m.

C.M.

0.022
cum

(a) 15 mm thick

sq. m.

C.M.

0.02 cum

(b) 20 mm thick

sq. m.

C.M.

0.022
cum

(c) 20 mm thick
43

Quantities Remarks
of
Materials
cum

Rough cast cement plaster -

44

Cement for floating coat of neat sq. m.


cement over plaster.

Cement

2.2 kg

45

Pebble dash plaster as per item sq. m.


1124

C.M.

0.023
cum

46

47

6 to 12 mm
pebbles or
crushed
stone

0.01 cum

Pointing on brick work(a) Flush pointing

sq. m.

Mortar

0.003
cum

(b) Ruled pointing

sq. m.

Mortar

0.003
cum

(c) Raised and cut pointing

sq. m.

Mortar

0.0046
cum

(a) Flush pointing

sq. m.

Mortar

0.0023
cum

(b) Ruled pointing

sq. m.

Mortar

0.0023
cum

(c) Raised and cut pointing

Sq. m.

Mortar

0.0038
cum

Pointing on stone work -

48

Cement pointing to flag stone sq. m.


flooring

C.M.

0.0026
cum

49

Mangalore tile roofing

sq. m.

Tiles

15 Nos

50

A.C. Sheets roofing

sq. m.

AC sheets

1.07 sq.
m.

51

White washing with lime -

S.No.

Item

Unit

(a) One coat

sq. m.

Material

Quantities Remarks
of
Materials
Quick lime
0.1 kg.
Indigo

0.3 gm

Gum

2 gm

Sodium

0.3 gm

Chloride
(b) two coats

sq. m.

Quick lime

0.2 kg.

Indigo

0.6 gm

Gum

4 gm

Sodium

0.4 gm

Chloride
(c) three coats

sq. m.

Quick lime

0.3 kg.

Indigo

0.9 gm

Gum

6 gm

Sodium

0.9 gm

Chloride
52

Cement wash with port land sq. m.


cement slurry

53

White washing
whiting (i) One coat

(ii) Two coats

(iii) Three coats

with

Cement

0.107 kg

Chalk

0.1 kg

Indigo

0.3 gm

Gum

2 gm

Copper
sulphate

0.2 gm

Chalk

0.2 kg

Indigo

0.6 gm

Gum

4 gm

Copper
Sulphate

0.4 gm

Chalk

0.3 kg

Indigo

0.9 gm

chalk
sq. m.

sq. m.

sq. m.

S.No.

Item

Unit

Material

Gum

54

(b) Two coat including priming sq. m.


coat of whiting

(c) Two coat excluding priming sq. m.


coat

56

57

Copper
sulphate

0.6 gm

Dry

0.06 kg

Distempering with dry distemper


(a) One coat excluding priming sq. m.
coat

55

Quantities Remarks
of
Materials
6 gm

distemper
Dry

0.10 kg

Distemper
Whiting
chalk

0.1 kg

Glue

4.0 gm

Dry

0.10 kg

distemper

Distempering with oil bound


washable distemper (a) One coat excluding priming sq. m.
coat.

Oil bound
distemper

0.10 kg

(b) Two coat including priming sq. m.


coat.

Oil bound
distemper
Primer

0.081
Litre

(b) Two coat excluding priming sq. m.


coat.

Oil bound
distemper
Primer

0.15 Litre

Snowcem or Durocem (a) one Coat

sq. m. Snowcem or
Durocem.

0.18 kg

(b) Two Coats

sq. m. Snowcem or
Durocem

0.3 kg

Priming coat with ready mixed (a) Wood primer, pink (for hard sq. m.
& softwood)

Primer

0.075
litre

(b) Aluminium priming water sq. m.


resistant (for resinous wood and

Primer

0.075
litre

S.No.

Item

Unit

Material

Quantities Remarks
of
Materials

plywood)
(c) Zinc chrome priming or red sq. m.
led priming (for steel surface)
`58

59

60

61

62

Priming

0.054
litre

(a) Ready mixed paint (for sq. m.


wooden surfaces)

Paint

0.125
litre

(b) Ready mixed paint (for G.S. sq. m.


sheets)

Paint

0.08 litre

(c) Aluminium paint

sq. m.

Paint

0.08 litre

(d) Enamel paint

sq. m.

Pain

0.10 litre

(a) Ready mixed paint (for sq. m.


wooden surfaces).

Paint

0.075
litre

(b) Ready mixed paint( for G.S. sq. m.


sheets)

Paint

0.046 itre

(c) Aluminium paint

sq. m.

Paint

0.046 itre

(d) Enamel paint

sq. m.

Paint

0.061
litre

(a) Two or more coats on new sq. m.


surfaces

Paint

0.057
litre

(b) One or more coats on sq. m.


previously painted surfaces

Paint

0.095
litre

(a) Two or more coats on new sq. m.


surfaces

Paint

0.116
litre

(b) One or more coats on sq. m.


previously painted surfaces.

Paint

0.07 litre

Painting two or more coats


(excluding priming coat) one
new surface with -

Painting one or more coats on


previously painted surfaces with

Painting with ready mixed anticorrosive


bituminous
black
paint-

Painting with synthetic enamel


paint-

Wall painting with plastic


emulsion
paint
(excluding

S.No.

Item

Unit

Material

Quantities Remarks
of
Materials

priming coat)(a) Two or more coats on new sq. m.


surfaces

Paint

0.121
litre

(b) One or more coats on sq. m.


previously painted surfaces

Paint

0.073
litre

63

Painting one or more coats with sq. m.


black Japan Paint.

Paint

0.07 litre

64

Varnishing one or more coats


with -

65

Painting with oil type wood


preservatives -

66

67

(a) Two or more coats on new sq. m.


Wood
surfaces
preservative

0.10 litre

(b) One or more coats on sq. m.


Wood
previously painted surfaces
preservative

0.081
litre

Oiling with linseed oil(a) Two or more coats on new Sq. m.


surfaces

Linseed oil

0.116
litre

(b) One or more coats on sq. m.


previously painted surface.

Linseed oil

0.07 litre

Seepage drains 60x60 cm(a) Filled with graded boulders


or quarried stone.

Boulder

0.36 cum

(b) Filled in layers with boulders


(or Quarried stone) shingle and
sand.

Boulder
Shingle

0.09 cum

Sand

0.112
cum
0.158
cum

68

Seepage drains 75 x 75 cm (a) Filled with graded boulders


or quarried stone.

Boulder

0.563
cum

(b) Filled in layers with boulder


or quarried stone) shingle and
sand.

Boulder
Shingle

0.14 cum

Sand

0.174
cum
0.246

S.No.

Item

69

Filter blanket

70

Rock
toe
embankment

71

45 cm thick stone pitching

in

earthen

Unit

Material

Quantities Remarks
of
Materials
cum

cum

Graded
metal or
shingle or
sand.

1.00 cum

cum

Quarried
stone or
boulder.

1.00 cum

sq. m.

Stone

0.45 cum

Chips

0.03 cum

72

30 cm thick stone pitching

sq. m.

Stone chips

0.30 cum
0.021
cum

73

90 cm thick stone pitching

sq m

stone chips

0.9 cum
0.06 cum

74

Fixing in position 1 mm thick


and 355 mm wide annealed
copper strips for contraction
joints.

Copper
Sheet

3.5 kg

M.S. Bars

0.74 kg

sq m

Mortar

0.05 cum

cum

Rubble
Metal

0.65 cum
0.35 cum

(a) 80 mm dia

Each
joint

Mortar

0.001
cum

(b) 100 mm dia

Mortar

0.0013
cum

(c) 150 mm dia

"

Mortar

0.0016
cum

(d)250 mm dia

"

Mortar

0.0023
cum

(e) 300 mm dia

"

Mortar

0.0033
cum

(f) 350 mm dia

"

Mortar

0.0037

75

40 mm thick
contraction joints

plaster

for

76

Providing dumped rip rap

77

Fixing in position NP2 or NP3


hume pipes in CM 1:3-

S.No.

78

Item

Unit

Material

Quantities Remarks
of
Materials
cum

(g) 400 mm dia

"

Mortar

0.004
cum

(h) 450 mm dia

"

Mortar

0.007
cum

(i) 500 mm dia

"

Mortar

0.008
cum

(j) 600 mm dia

"

Mortar

0.009
cum

(k) 700 mm dia

"

Mortar

0.011
cum

(l) 750 mm dia

"

Mortar

0.011
cum

(m) 800 mm dia

"

Mortar

0.012
cum

(n) 900 mm dia

"

Mortar

0.013
cum

(o) 1000 mm dia

"

Mortar

0.015
cum

(p) 1100 mm dia

"

Mortar

0.016
cum

(q) 1200 mm dia

"

Mortar

0.018
cum

Portland cement

cum

Port land
cement

28.80
bags

Вам также может понравиться