WATERWALL

Sr. no
1
2
3
4
5
6
7
8
9

BSL

Activity

210 mw

Cooling down of boiler


Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

CHD

KPKD

KRD

NSK

PRS

PRL

210 mw

210 mw

210 mw

210 mw

250 mw

250 mw

14
4
4
2
*
2
2
2
2

14:00
4:00
*
2:00
*
2:00
0:30
0:30
1:30

13

1
2
*

1:30
2:00
*

0.7
1
0

4
1

4
1.8

4:00

4
3
3
2
2
49

3:00
*
*
*
35.5

14
3.6
2.7
0
0.3
1.6
0.1
0.5

0.5
0.5
31.3

BSL500 mw

CHD500 mw

KPKD500 mw

14
4
*
2
*
1
0.3
0.3
1.3

14
4
*
2
*
2
1
0.3
2

14
4
*
2
*
2
0.30
0.30
1.30

16
6
*
2
*
3
0.30
0.30
1.30

2
2
*

2
2
*

2
2
*

3
3
*

4
2
3
3
1
34

4
4
*
0.3
1
37

4
3
*

4
3
*

4
4
*

36.3

35.3

43.3

10
1
2
1
1
1
1
2

PLATTEN WATERWALL
Sr. no
1
2
3
4
5
6
7
8
9

Activity
Cooling down of boiler
Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

BSL

CHD

KPKD

KRD

NSK

PRS

PRL

BSL-

CHD-

KPKD-

210 mw

210 mw

210 mw

210 mw

210 mw

250 mw

250 mw

500 mw

500 mw

500 mw

BSL500 mw

CHD-

KPKD500 mw

14
4
4
2
*
*
2
3
3

2.75
0
0
2.5
0.25
0.5

14
4.5

2
*
*

1.2
1
0

4
3
3
2
2
48

4
1.8

4
2
3
3
2
38

0.5
0.5
33.5

12
2
2
2

1
1
2

PLATTEN SUPERHEATER
Sr. no
1
2
3
4
5
6
7
8
9

BSL

Activity

210 mw

Cooling down of boiler


Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

CHD

KPKD

210 mw

210 mw

20
8
4
2
*
*
2
3
3

16:00
*
6:00
2:00
*
*
0:40
1:00
1:00

1
*
3

1:30
1:00
*

KRD

NSK

PRS

PRL

210 mw

210 mw

250 mw

250 mw

18
7.3
2.75

12
3
3
2

0
0
2.4

500 mw

16
4
*
2
2
*
1
0.3
1

16
4
8
3
*
*
2
1
2

16
*
6
2
*
*
1
0.3
1

16
5
6
2
*
*
1
0.3
1.3

0.25
0.6

1
1
2

1.2

1
*
*

2
2
*

1:30
2
*

1.3
2
*

4
4
*
*
*
35.3

4
3
2

4
*
3

4
*
3

0.5
51.8

4
2
3
3
1
39

49

37

42.3

KPKD

KRD

NSK

PRS

BSL500 mw

CHD-

KPKD500 mw

20

16

16

16
*
4
2
2
*
1
0.3
1.3

16
*
8
3
*
*
1
1
1

16
*
6
2
*
*
1
0.3
1

16
*
6
2
*
*
1
0.3
1.3

1.3
*
*

2
2
*

1:30
2
*

1.3
2
*

4
2
3
3

4
*
3
*
*
35.3

4
*
3

4
*
3

4
*
4

41

37

38.3

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

4
3
3
*
*
56

Activity

BSL

CHD

24
*
8
2
*
*
2
3
3

16:00
*
6:00
3:00
*
*
0:30
0:30
0:40

0.6

1
1
2

1
*
3

1:30
1:00
*

0.5

0.5
12
4

4:00

1.8

*
4:00
*
*
37.1

0.5

REHEATER
Sr. no
1
2
3
4
5
6
7
8
9

210 mw

Cooling down of boiler


Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

210 mw

4:00

4
*
4
*
*
54

*
4:00
*
*
37.1

210 mw

210 mw

210 mw

2.7
2.7

4
2

0
0
1.3
0.3

0.3
12

250 mw

PRL

250 mw

500 mw

4
1

1.8

27

43.2

0.5
0.5

40

SUPERHEATER & WATERWALL SCREEN TUBES


Sr. no
1
2
3
4
5
6
7
8
9

Activity
Cooling down of boiler
Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

BSL

CHD

KPKD

KRD

NSK

PRS

PRL

BSL-

CHD-

KPKD-

210 mw

210 mw

210 mw

210 mw

210 mw

250 mw

250 mw

500 mw

500 mw

500 mw

KPKD500 mw

20
*
2
2
*
*
2
2
2

17

0.5

1
*
*

0.5
0.5

4
*
2
*
*
37

4
1

1.8

28

45.3

18
2.5
2.5
0

14
2
1

0
1.5
0.5

1
1
2

16
*
4
2
2
*
1
3
1.3

1.3
*
*

4
2
3
3
35

4
*
3
*
*
35

12
4

0.5
0.5

LTSH
Sr. no
1
2
3
4
5
6
7
8
9

Activity
Cooling down of boiler
Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

BSL

CHD

KPKD

KRD

NSK

PRS

PRL

210 mw

210 mw

210 mw

210 mw

210 mw

250 mw

250 mw

17

BSL500 mw

CHD-

16
*
2
2
2
*
4
2
14

16
*
8
2
2
*
4:30
2:30
15

16
*
6
1
2
*
4:30
2:30
15

16
*
5.3
1
4
*
4.3
2.2
15

3
*
*

3:30
*
*

3:30
*
*

3.3
*
*

4
*
2
*
*
51

4:00
*
2

4
*
1

4
*
1

49.2

4
1
3
3
1
42

59.3

55.3

57

20
*
*
2
12
*
6
6
20

16
*
2
2
2
*
3.2
2
3

2
3
*

2
1
*

4
*
*
*
*
75

4
*
3
*
*
40.2

4
1

1.8

25.5

1.5

16
2.1
2.7
7.2
0
1.1
0.5
0.4
0.4
0

12
1
2
10
1
1
1
1

12

500 mw

0.5
0.5

PENTHOUSE
Sr. no
1
2
3
4
5
6
7
8
9

Activity
Cooling down of boiler
Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

BSL
210 mw

CHD

KPKD

KRD

NSK

PRS

PRL

BSL-

CHD-

KPKD-

210 mw

210 mw

210 mw

210 mw

250 mw

250 mw

500 mw

500 mw

500 mw

30
*
*
2
*
*
4
4
4

36:00
*
2:00
2:00
*
2:00
0:40
1:00

2.7
0
0
1.6
0.5
0.4

36

2
*
4

2:00
*
*

0.5
0.5
12
4
1.8

4:00

4
*
*
1
1
56

36
*
2
2
*
*
2
0.3
1

36
*
2
2
*
*
2
1
1

36
*
2
2
*
*
2
0.3
1

36
*
1.3
2
*
*
2
0.3
1

2
*
*

2
*
*

2
*
*

2
*
*

4
*
2
*
*
51.3

4
*
2

4
*
2

4
*
2

0.5
0.5
64.6

3
3
2
69

52

51.3

51

3.6

*
3:00
3:00
3:00
58.4

48
1
2
1
1
1
2

ECONOMISER
Sr. no
1
2
3
4
5
6
7
8
9

Activity
Cooling down of boiler
Erection of sky climber
Erection of scaffolding
Inspection of BTL
Lifting of coil assy + Restoration
Cutting of fins
Cutting of tubes
V prep of tuble
Welding of tubes

10
11
12

Radiography of welding joints


Fin welding of tubes /connector welding
Stress relieving of welding joints

13

Hydraulic Test of boiler Air test of RH and inspection

14
15
16
17

Removal of sky climber and box up


Removal of scaffolding and box up
Skin casing / Cutting Removal of insulation
Skin casing welding & reinsulation
Minimum Time Required

BSL
210 mw

CHD

KPKD

KRD

NSK

PRS

PRL

210 mw

210 mw

210 mw

210 mw

250 mw

250 mw

20
*
8
2
10
*
6
6
4

12:00
*
2:00
2:00
3:00
*
2:20
1:20
4:00

2
3
*

2:00
1:00
*

4
*
3
*
*
68

4:00
*
3:00
*
*
36.4

17

1.5

16
1.8
2.7
5.4
0
1.1
0.5
0.4

12
2
2
10
2
1
1
1

BSL500 mw

CHD-

12
*
2
2
2
*
2
1.3
8

14
*
*
2
3
*
2.30
1.30
10

12
*
*
1
2
*
3.2
1.2
9

14
*
*
1
8
*
3.3
1.3
9
2.3
*
*

500 mw

KPKD500 mw

0.4
0
0

3
*
*

2.3
*
*

2.2
*
*

4
1

4
1.8

4
*
1

4
*
1

0.5
0.5
35.1

4
*
2
*
*
38.3

4
*
2

25.5

4
2
3
2
1
46

41.30

35

44.3