Вы находитесь на странице: 1из 15

Angola Block 15/06 West HUB Development Project

Inspection and Test Plan (ITP) for ENI Angola 1506


Mpungi HFL
EX-CO

02

01.06.15

EX-CO

01

14.04.15

EX-CO

00

05.03.15

Validity
Status

Rev.
number

Date

Revision Index

Final Issue
Issued For
Approval
Issued For
Approval
Description

Company logo and business name

Oceaneering

Oceaneering

U Ezeanyika

J Attree

Oceaneering

Oceaneering

U Ezeanyika

J Attree

Oceaneering

Oceaneering

U Ezeanyika

J Attree

Prepared
by

Checked
by

Approved
by

Contractor
Approval

Project name

Company
Approval

Company Document ID

Angola Block 15/06 West


HUB Development

361201CUQBMC132
Job N.

Contractor logo and business name

Contractor Document ID
ALD-41300-01-401
Contract N.
Vendor Document ID

Vendor logo and business name


Oceaneering
Facility Name
Angola Block 15/06 West HUB Development

Location
Offshore

Document Title

Order N.
Scale
n.a.

Sheet of Sheets
1 / 15

Supersedes N.

Inspection and Test Plan (ITP) for ENI Angola 1506 Mpungi HFL

Software: Microsoft Word 97-2003


01

Superseded by N.
Plant Area

Plant Unit

File No. FP_361201CUQBMC132_EXCO00_15.doc

This document is property of Eni S.p.A. Exploration & Production Division.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

Company Document Identification


361201CUQBMC132

Revision Index
Validity
Status

Rev.

EX-CO

02

REVISION HISTORY

Rev.

Date

EX-CO-00
EX-CO-01
EX-CO-02

05.03.15
14.04.15
01.06.15

Nr. of
sheets
13
15
15

Description
Issued for Approval
Issued for Approval
Final Issue

This document is property of Eni S.p.A. Exploration & Production Division.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

Sheet of
Sheets
2 / 15

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

INSPECTION AND TEST PLAN (ITP) FOR


MANUFACTURING OF MPUNGI HFLs
QP-0599592

5/27/2015

H. SOUZA

A. OLIVAREZ

F. ZAPATA

A. OLIVAREZ

H. SOUZA

Updated per GE comment


sheet ALD-41300-03-401 from
26/05/2015

Pages 2, 3, 4 and 5 as well sections 4.1, 4.2,


4.3, 4.4, 5.2, 6.1, 6.2 and 7.1

4/08/2015

H. SOUZA

A. OLIVAREZ

F. ZAPATA

A. OLIVAREZ

H. SOUZA

Updated per Customer email


comments amended in the GE
comment sheet

Pages 3, 4 and 5 as well sections 1.4, 1.6,


1.7, 4.2, 4.3, 4.4, 5.2, 6.1, 7.1 and 9.1

4/02/2015

H. SOUZA

A. OLIVAREZ

F. ZAPATA

A. OLIVAREZ

H. SOUZA

Updated per Customer


Comments Sheet from
31/03/2015

Pages 4 and 5 as well sections 1.4, 1.6, 4.2,


4.4, 5.2 and 10 (moved to the end)

3/27/2015

H. SOUZA

R. PEREZ

F. ZAPATA

A. OLIVAREZ

H. SOUZA

Updated per Customer


Comment Sheet from
18/03/2015

All

1/23/2015

H. SOUZA

R. PEREZ

F. ZAPATA

A. OLIVAREZ

M. SMITH

INCORPORATED CUSTOMER
COMMENTS

All

07/01/2014

R. PEREZ

N/A

N/A

N/A

N/A

INTERNAL REVIEW

--

REV

DATE
(mm/dd/yyyy)

PREPARED

CHECKED

PM

QA

REMARKS

SECTION(S)
AFFECTED

ENG

APPROVED

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

TITLE
DOCUMENT No.

QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

OWNER

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 1 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ENI
NUMBER

ALD-41300-03-401

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

FOREWORD
1

All QMS and non-project specific procedures will be available for review upon request, at any Oceaneering site. Oceaneering
reserves the right to revise these documents without prior notice. All other project specific procedures can only be implemented
upon revision, after prior approval by GE and ENI, as laid out in section 1 of this ITP. Oceaneering will record all quality related
incidents through its non-conformance and concession procedure. All such non-conformities, request for deviation to technical
specifications and technical queries arising from the works shall be processed in accordance with section 9 of GE project
supplier Quality Requirements document ALD-20100-00-419.

Verification documents will be endorsed by the Oceaneering Quality Department.

Oceaneering defined inspection code definitions:

Approval required (Documents are submitted to client for approval and required customer endorsement)

Review (These records shall be made available to client or their representative upon request)

Monitor Activity (Activities that will process as scheduled, without advance notification)

=
Witness Point (Client notification is required prior to the start of the operation, but if not in attendance, work may
proceed). 5 working days notice.

=
Hold point (Client notification is required prior to the start of the operation. The process may not proceed without
the presence of the notified party. A HOLD point cannot be waived unless confirmed in writing by the client). 5 working
days notice.

To make it easier to manage all Witness and Hold points during the assembly and testing of HFLs, a formal NOI for each
Witness & Hold point with minimum notice needs to be issued for the first HFL. For the assembly of subsequent HFL
INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

TITLE
DOCUMENT No.

QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

OWNER

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 2 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

Notification can be managed locally between Oceaneering, GE and ENI QC inspectors. Notification for witness and Hold points
may be issued at minimum the day before start-up of the activity but for routine inspection at least an hour, prior to start of the
same activity.

ITP ACTIVITY INDEX


Operation / Inspection Activity Heading
1. Project Engineering
2. Supplier Pre-Production Activities
3. Receiving Inspection
4. Welding Pressure Containing
5. Assembly
6. Factory Acceptance Testing
7. Final Inspection
8. Packing & Storage
9. Manufacturing Record Book
10. Shipping

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

TITLE
DOCUMENT No.

QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

OWNER

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 3 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

LIST OF REFERENCED DOCUMENTS

Doc

ENI Document No.

ALD-41300-03-401 (OII QP-0599592)

361201CUQBMC132

ALD-41300-10-060 (OII 0444887)

361201DUDGMD102

D-0598777
QP-0632742
D-0632808
D-0444859
Q-038
ALD-41300-00-018
AS016475
PR001262
D-0612480

N/A
N/A
N/A
N/A
N/A
361201DUMIGE009
361201DUDAGD086
361201DUPTGD089
361201DUMIGD092
361201CUQSMD084
361201CUQSMD085
N/A

N/A
WPS OII-MT-8-014
D-0352868

N/A

D-0413145

N/A

ALD-41300-10-200 (OII D-0627433)

361201DUPTMD089

D-0637313

N/A

GE VGS2.19.14

N/A

D-0598450
D-0637213
D-0636994
D-0636995

Inspection and Test Plan (ITP) for ENI Angola 1506


Mpungi HFL
Flying Lead Hydraulic Thermoplastic General
Arrangement Drawing
Master Document Register
Quality Plan for Mpungi
Project Execution Plan for Mpungi
Scope of Supply
Assembly Check List Procedure
HFL, Operating and Handling Procedure
GA - Male (16 way) Fixed Test & Flushing Stabplate
MQC Plate Factory Acceptance Test Procedure
Hydraulic Stabplate Operating / Handling Procedure
ASME Section IX - Welder Performance Qualification
(WPQ)
ASME - Welding Procedure Specification (WPS)
Management of Customer Owned and Customer
Customer-Furnished Items
Originating and Maintaining Weld Traceability for
Tubing
FAT - Factory Acceptance Test
PMI - Positive Material Identification Procedure SDSA

361201DUQSMD091
N/A
N/A
N/A

Positive Material Identification (PMI) philosophy and


practice
Weld Matrix
Visual Examination Procedure GE SBT
Penetrant Procedure GE SBT
Computerized Radiography Procedure GE SBT

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

TITLE
DOCUMENT No.

QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

Description

APPROVED BY: Abiodun Aromasodu

OWNER

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 4 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

GE VGS2.19.4

N/A

D-0636992
GE VGS 2.19.3
GE VGS 3.5.12
ALD-20100-00-419 (OII D-0612944)
GE S127090 and S127091 (D0208894).

N/A
N/A
N/A
N/A
N/A

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs

TITLE
DOCUMENT No.

QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

Specification for Welding and Non Destructive


Examination of GE Oil and Gas Controls Equipment
ASME Radiographic Examination Procedure GE SBT
Vendor Supply and Packaging Specification
Small Bore Tubing Welding Requirements
GE Supplier Quality Requirements
Supplier Document Requirements List Supplier
Template.

APPROVED BY: Abiodun Aromasodu

OWNER

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 5 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE
NUMBER

GE

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

DOC

ACCEPTANCE CRITERIA

SAMPLE
SIZE %

OII

GE

ENI

PROJECT ENGINEERING / PRE-PRODUCTION ACTIVITIES


Project Specifics: N/A

1.1

Contract Review

Project Execution Plan


D-0632808

Document is approved

Contract /
PO

N/A

N/A

Document(s) Released in PLM

Weld
Matrix,
MDL

N/A

N/A

Document(S) Released In PLM

Procurement
SPEC

N/A

N/A

Document(s) Released in PLM

WPS

N/A

Document(s) Released in PLM

FAT

N/A

Project Specifics: N/A


1.2

Design Activities

Scope of Supply
0444859

Project Specifics: N/A


1.3

Procurement
Specifications

D-0612944
(GE ALD-20100-00-419)

Project Specifics: N/A

1.4

Weld procedures

D-0598450, WPS OII-MT-8014


(GE VGS2.19.14, VGS 3.5.12,
VGS2.19.4)
Project Specifics: N/A

1.5

Test Procedures

TITLE
DOCUMENT No.

D-0627433
(GE ALD-41300-10-200)

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 6 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

SAMPLE
SIZE %

OII

GE

ENI

NDE

N/A

Document(s) Released in PLM

ITP

N/A

Standard GE PPM Agenda (Minutes of Meeting)

PPM - MoM
Signature

N/A

ACCEPTANCE CRITERIA

DOC

Document(s) Released in PLM

Project Specifics: N/A

1.6

NDE Procedures

D-0636995, D-0637213, D0636994, D-0636992


(GE VGS2.19.14, VGS2.19.4)
Project Specifics: N/A

1.7

Inspection & Test Plan

QP-0599592
(GE ALD-41300-03-401)
Project Specifics: Pre-Production Meeting

1.8

Pre-Production Meeting

TITLE
DOCUMENT No.

N/A

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 7 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE
NUMBER

GE

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

DOC

ACCEPTANCE CRITERIA

SAMPLE
SIZE %

OII

GE

ENI

100%

SUPPLIER PRE-PRODUCTION ACTIVITIES


Project Specifics: N/A
1) Supplier to submit ITP for approval and incorporation of comments
prior to start of manufacturing.

2.1

Supplier Inspection and


Test Plan

Supplier Procedure /
OII PO / WI-33

2) Supplier to implement adequate trigger mechanisms to enable a


progressive documentation review, prior to production start, thus
allowing culmination of MRB.
3) Approved ITP to be used as a basis of validation for process and
product integrity.

Supplier
ITP

4) If no ITP is required then, the OII Inspection and Test Plan shall be
considered during manufacturing.
3

RECEIVING INSPECTION
Project Specifics: N/A

3.1

Receiving

3.2

Receiving
Customer Furnished
Parts

WI-21
(Parts Card, PO, Print)

Verify all documentation as per WI-21. Supplier Quality Documentation


meets the requirements of D-0364632 as identified on the Parts Card
and/or PO.

CoC, MTR,
MDB, Test
Reports, etc

100%

N/A

Parts will be inspected per WI-21 for Visual Damage, Identification,


and/or Parts Card / Print instructions.

Delivery
Receipt

100%

N/A

Perform PMI on Weld filler wire, verify to MTR / PO.

PMI Report

1 / Batch

Project Specifics: N/A


D-0352868
Project Specifics: N/A

3.3

PMI

D-0637313
(GE VGS2.19.14)

TITLE
DOCUMENT No.

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 8 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE
NUMBER

GE

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

SAMPLE
SIZE %

OII

GE

ENI

PMI Report

100%

Weld map /
Trace log

100%

R/A

R/A

DOC

ACCEPTANCE CRITERIA

WELDING (Pressure Containing)


Project Specifics: N/A

4.1

PMI

Per OII Print


D-0250511
(GE VGS2.19.14)

Perform PMI on all pressure containing components such as Couplers,


Tubing, Fitting, Adapters, etc. prior to welding.
Identify the successfully PMIs parts with PMI / AV.

Project Specifics: N/A


Welding shall be performed with WPS approved by OII and GE.

4.2

Pressure Containing
Welding

Weld per Weld Matrix


D-0598450
(GE VGS 3.5.12)

Welder Qualifications and Register


NDE Personnel Qualifications and Register
Weld Consumable
Weld Check parameter

NOTE: The four check points above will be verified onsite by GE and
ENI site QC, prior to start of welding.
D-0413145

Weld Data Collection for pressure containing welds shall be completed


per procedure.

F-0367715
(WDCF)

100%

M/R

M/R

Perform PMI on all Welds, Tubing, Fitting and Adapters for information
only. Indentify the successfully PMIs welds with PMI / AV on either
side of the weld.

PMI Report

100%

Project Specifics: N/A


4.3

PMI

Per OII Print


D-0637313
(GE VGS2.19.14)
Project Specifics: N/A

4.4

NDE

TITLE
DOCUMENT No.

Inspect per OII Print


D-0637213 VT,
D-0636994 PT,
(GE VGS2.19.4)

All welded joint visual and surface NDE shall meet the requirements as
described in ASME B31.3, severe cyclic conditions.
VISUAL EXAM: 100% of welds
PENETRANT TEST: 100% of welds

NDE
Report(s)

100%

Inspect per OII Print


D-0636992 RT or
D-0636995 CRT
(GE VGS2.19.4)

All welded joint radiography shall meet the requirements as described in


ASME B31.3, severe cyclic service conditions.
RADIOGRAPHIC EXAMINATION: 100% of welds
COMPUTERIZED RADIOGRAPHIC EXAMINATION : 100% of welds

NDE
Report(s)

100%

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 9 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE
NUMBER

GE

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

5
5.1

DOC

ACCEPTANCE CRITERIA

SAMPLE
SIZE %

OII

GE

ENI

ASSEMBLY
Traceability / Set- out

Project Specifics: N/A


OII Assembly Procedure

Record required information in ROA.

ROA

100%

Assemble per OII procedure

PID

100%

Check NCR/ CR/ TQ register to ensure the close out of all opened item.
Should be any open NCR/ CR/ TQ which will not be hindering the FAT
activates then the same shall be included in the punch list register and
shall be settled and closed during FAT. Ensure that all the punch list
items have been closed.

F- 0468258

100%

N/A

N/A

Perform Factory Acceptance Test(s) per the approved to OII Engineering


Testing Procedure. Notify customer of anticipated testing schedule
Acceptance criteria:
Shall meet all test procedure acceptance criteria
Shall show no visible leakage under test pressure (as applicable)
Note: A chart recorder shall be used on all pressure tests. Charts
shall identify the measuring device (including its calibration date) and
shall be signed and dated by all representatives in attendance.

FAT
Record

100%

NDE
Report(s)

100%

Project Specifics: N/A

5.2

Assemble

GA Drawing
OII D-0444887
OII Assembly Procedure
(Q-038)
(GE ALD-41300-10-060)

FACTORY ACCEPTANCE TESTING


Project Specifics: N/A
TRR
(Test Readiness
Review)

GA Drawing
OII D-0444887
(GE ALD-41300-10-060
Project Specifics: N/A

6.1
FAT
(Factory Acceptance
Test)

6.2

Post-FAT NDE

TITLE
DOCUMENT No.

OII D-0627433
(GE ALD-41300-10-200)

Inspect per OII Print


D-0636994 PT,
(GE VGS2.19.4)

All welded joint visual and surface NDE shall meet the requirements as
described in ASME B31.3, severe cyclic conditions.
PENETRANT TEST: 100% of welds

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 10 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

DOC

ACCEPTANCE CRITERIA

SAMPLE
SIZE %

OII

GE

ENI

100%

FINAL INSPECTION
Project Specifics:
GA Drawing
OII D-0444887

7.1

Final Acceptance
Verification

Project Management and Quality Assurance are to complete FAV


Process. Part(s) meet Drawing(s) / Specifications /
Data book approved

(GE ALD-41300-10-060
WI-1 (OII)
GE SICD (Source Inspection
Completion Dossier) and
MCCR (Mechanical
Completion Check Record)

GE SICD and Project MCCR signed off by OII, GE QA inspector and ENI
inspector

Q-002

GE SICD
and MCCR

PACKAGING & STORAGE


Project Specifics:

GE (VGS 2.19.3) Vendor


Supply and Packaging
Specification

Oceaneering shall package completed HFLs in the original crate


received in. Oceaneering shall maintain the crate, such repair any
damage regardless of cause. Crate shall be marked with Oceaneering &
Company PN and SN.
Marking will be required for parts that have protection to critical surfaces,
such as caps on the couplers. Mark with text REMOVE PRIOR TO
INSTALLATION.

N/A

100%

BOM

Customer PO

Customer
PO

100%

D-0630838 (OII)
8.1

Packaging, Marking, &


Storage

TITLE
DOCUMENT No.

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 11 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ALD-41300-03-401

ENI
NUMBER

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

SAMPLE
SIZE %

OII

GE

ENI

MDB

100%

H/A

W/A

Customer
PO

100%

DOC

ACCEPTANCE CRITERIA

MANUFACTURING RECORD BOOK


Project Specifics: Review Manufacturing Book

9.1

Review Manufacturing
Book

Agreed Upon GE SDRL


D-0598777 Content

1) MRB per D-0208894 & GE S127090 and S127091 SDRL Supplier


Template.
2) Documentation from Customer Furnished Part will be integrated in to
the MDB, but the content will NOT be reviewed or validated by
Oceaneering.
3) Agreed Upon MRB index per Supplier Document Requirement List
(SDRL).

10

10.1

SHIPPING
All Equipment Ordered
for This Project

TITLE
DOCUMENT No.

Project Specifics: N/A


BOM

Customer PO

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 12 OF 13

JOB No.

152766 Houston /
162423 Angola

CLIENT

GE

GE
NUMBER

ENI
NUMBER

ALD-41300-03-401

361201CUQBMC132

PROJECT

Mpungi HFLs

This confidential document and the copyright therein are the property of Oceaneering International Services Limited and may not be used, copied or disclosed to any third party without the prior
written authorization of Oceaneering International Services Limited.

OPER
REF

OPERATION /
INSPECTION
ACTIVITY

INSPECTION CODES
STANDARDS /
SPECIFICATIONS

DOC

ACCEPTANCE CRITERIA

SAMPLE
SIZE %

OII

GE

ENI

LIST OF PART NUMBERS


GE Part Number
ALD-41300-30
ALD-41300-32
ALD-41300-35
ALD-41300-36
ALD-41300-38
ALD-41300-39
ALD-41300-40
ALD-41300-41
ALD-41300-42
ALD-41300-43
ALD-41300-44
ALD-41300-45
ALD-41300-46
ALD-41300-47
ALD-41300-48

TITLE
DOCUMENT No.

INSPECTION & TEST PLAN FOR ENI ANGOLA 1506 MPUNGI HFLs
QP-0599592

REV

Security
Level:
CONFIDENTIAL
STATE: RELEASED
REVIEWED BY: UGOCHUKWU EZEANYIKA REVIEWED
REVISION PENDING: NO

APPROVED BY: Abiodun Aromasodu

ON: 2015/06/01 09:00:34


APPROVED ON: 2015/06/01 10:30:18

OWNER

QUALITY

VIEWED: 2015/06/01 10:34:19


DOCUMENT:
ALD-41300-03-401 | NC

PO

2100000094
PAGE 13 OF 13

Вам также может понравиться