As of January 2016
LNG PROJECT
Permits List1
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
Bureau of
Immigration
(BI)
1. Provisional Work
Permit
REQUIREMENTS
WHEN
REQUIRED
RESPONSI
BLE PARTY
Preconstruction/
Construction
Owner/Sup
ply
Co./Contrac
tor
1 Note that this a preliminary list. We will fine-tune the list as we get to know more about the details of the works and the operation of the Project.
APPROXIMA
TE LEAD
TIME
2-3 weeks
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
REQUIREMENTS
WHEN
REQUIRED
RESPONSI
BLE PARTY
APPROXIMA
TE LEAD
TIME
Preconstruction/
Construction
Owner/Sup
ply
Co./Contrac
tor
6-8 weeks
(SEC)
Certificate
of
Registration
ii. Articles of Incorporation
iii. General Information Sheet
g. Photocopy
of
Employment
Contract specifying the exact
compensation to be earned by
the applicant
h. BI Clearance Certificate
2. Pre-Arranged
Employment Visa
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
REQUIREMENTS
comprehensive description of
the nature an scope of the
applicants
position
in
the
company.
f. For
corporations
and
partnerships:
i. Machine-validated
SEC
Certificate of Registration
ii. Articles of Incorporation
iii. GIS
g. Photocopy of petitioners latest
ITR with the corresponding proof
of payment (official receipt, bank
tellers validation slip, BIR eFPS
payment details print out or
other similar evidence)
h. Applicants proof of TIN
i. Photocopy of AEP issued by the
DOLE
j. Original or certified true copy by
the DOLE or by the publisher of
the newspaper clipping showing
the publication of the application
for AEP
k. Special Temporary Permit for an
applicant practicing a regulated
profession under the Professional
Regulation Commission (PRC), if
applicable
WHEN
REQUIRED
RESPONSI
BLE PARTY
APPROXIMA
TE LEAD
TIME
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
REQUIREMENTS
WHEN
REQUIRED
RESPONSI
BLE PARTY
a. Duly-accomplished
visa Preapplication
construction/
b. Valid passport, validity must Construction
extend 6 months beyond the
length of proposed stay in the
Philippines
c. One 2x2 size photograph taken
within the last 6 months. The
applicants signature must be
Owner/Supp
ly
Co./Contract
or
l. BI Clearance Certificate
m. For each dependent:
n. Duly accomplished CGAF (BI
Form 2014-00-002 Rev 0)
o. Photocopy of passport bio-page
and latest admission with a valid
authorization stay
p. Birth Certificate/Family Register
or its equivalent, evidencing the
relationship with the petitioner
(All foreign documents must be
original and authenticated by
the Philippine Foreign Service
Post (FSP) which has jurisdiction
over the place of issuance or by
the DFA if said document is
issued by the local embassy in
the Philippines)
q. BI Clearance Certificate
3. Ordinary Visa
APPROXIMA
TE LEAD
TIME
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
REQUIREMENTS
WHEN
REQUIRED
RESPONSI
BLE PARTY
APPROXIMA
TE LEAD
TIME
Owner/Supp
ly
Co./Contract
or
1 week from
visa
implementati
on
Owner
1 month
Civil Aviation
4. Alien Certificate of
Registration
Identity Card
5. Height Clearance
Pre-
Discussion Draft
As of January 2016
AGENCY/PARTY
Authority of the
Philippines
(CAAP)
Department of
Labor and
Employment
(DOLE)
NATURE OF PERMIT
REQUIREMENTS
WHEN
REQUIRED
structure/s
b. Certification of Geodetic Engineer
c. Filing fee
construction/
Construction
6. Certificate of
Accreditation for
Practitioner in
Occupational
Safety and Health
Preconstruction
RESPONSI
BLE PARTY
Owner
APPROXIMA
TE LEAD
TIME
30 days
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
REQUIREMENTS
WHEN
REQUIRED
RESPONSI
BLE PARTY
APPROXIMA
TE LEAD
TIME
Preconstruction/
Construction
8. Alien Employment
Pre-
Owner
Owner/Sup
2-3
weeks
1 week
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
REQUIREMENTS
Permit
b.
c.
d.
e.
f.
g.
h.
i.
j.
9. Registration of the
WHEN
REQUIRED
RESPONSI
BLE PARTY
construction/
Construction
ply
Co./Contrac
tor
Pre-
Contractor
APPROXIMA
TE LEAD
TIME
2-3 weeks
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
Contractor (as
independent
contractor)
Department of
Public Works and
Highways
(DPWH)
REQUIREMENTS
WHEN
REQUIRED
RESPONSI
BLE PARTY
APPROXIMA
TE LEAD
TIME
Contractor
1 month
Preconstruction
Contractor
5 days
Preconstruction
Contractor
Minimum 6
working
days.
construction
Preconstruction
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
13.Permit to Cross, if
any part of the
Project will
interfere with the
flow of a navigable
or floatable
waterway or a
confirmation that
the waterway that
will be affected by
any part of the
Project is nonnavigable or nonfloatable
Home
Development
Mutual Fund
(HDMF/Pagibig)
14.Registration as
employer
REQUIREMENTS
vehicle
duly
signed
by
the
owner/operator
6. Two copies of plans and
computations for shoring and/or
reinforcement of the bridge
7. Xerox copy of the expired permit
To be determined. No answer at the
DPWH trunkline and Legal Services
so we need to inquire in person.
WHEN
REQUIRED
RESPONSI
BLE PARTY
APPROXIMA
TE LEAD
TIME
Preconstruction
Contractor
5 days
Preconstruction
Owner/Sup
ply
Co./Contrac
tor
Minimum
of 1 day
Discussion Draft
As of January 2016
AGENCY/PARTY
NATURE OF PERMIT
REQUIREMENTS
WHEN
REQUIRED
RESPONSI
BLE PARTY
APPROXIMA
TE LEAD
TIME
Preconstruction
Owner/Sup
ply
Co./Contrac
tor
Minimum of
1 day
Preconstruction/
Construction
Owner/Sup
ply
Co./Contrac
tor
5 days
Land
Transportation
Office (LTO)
16.Registration of
vehicles