RTCC panel drawing

INDEX

Radiator drawing to be provided


Arching horns for HV bushing
Transportation dimension drawing
Spares list to be provided
HV & LV Bushing 1no & gasket
QAP to be provided
Drain value on conservator to be indicated
Xmer Lifting lug arrow in GA

INDEX
INDEX
INDEX
INDEX
INDEX
INDEX
GA
OLTC Side view

Radiator lifting lug to be indicated

OLTC Side view

10

29 no HV neutral c/b not required

M.Box side view

11
12
13

24 no. OLTC shall be on side, not on top


HV bushing no. to be corrected from item no 4
to 1
Provide HV Neutral on top with copper strip
brought down by U ring support

Elevation
Elevation
GA

14

Inspection cover on top to be marked item 8 no

15

Provide CAD drawing for verification of


clearances

16

Temp rise oil/wdg shall be corrected to altitude

R&D

17

Add altitude on Plate

R&D

18

Rating plate parameters shall be as per IS Std.

R&D

24

All wiring till M/B shall be through Metal flexible


conduit
Canopy top shall be provided with slope from
back to front
The setting details of OTI/WTI & others shall be
mounted in the M/B by using Plate
BSP size shall be mentioned/intimated
Terminal strips shall be 27 no.'s as per wiring
dgr
IP55 to be mentioned in list under point 1

25

Provide RTD for remote supervision

19
20
21
22
23

Plan view
GA

M/Box
M/Box
M/Box
M/Box
M/Box
M/Box
M/Box

26

28
29
30

Item no. 8,9&10 to mention in dwg


Canopy top shall be provided with slope from
back to front
LV side / HV side & Z details to be mentioned
HV Neutral C/B drawing not reqd
Provide OLTC in RRPL Template

31

Inspection cover,Radiators to be as per GA

32

pt.1 RAYCHEM RPG to be mentioned

GTP

33

IP55, Altitude, Seismic zone to be added

GTP

34
35
36

GTP
GTP
GTP

40
41

Pt. 18 b, 18d not applicable


Losses Max to be written
Noload current at 90,100&110% to be added
Tap changer shallnot be mounted on top of
tank
Pt 37 HV side(o) Creepage distance with
25mm/kv =825mm
Pt 37 LV side(o) Creepage distance with
25mm/kv =82.5mm
Pt. 38 oil type & grade to be indicated
Pt 40 thickness of tank to be indicated

42

Pt 43 4 no of radiators to be corrected

GTP

43

Pt 45 a Radiators shall provide sufficient


cooling

GTP

44

Altitude correction factor for Gradient & hotspot


calculation to be given

Cooling
calculation
sheet

45

Altitude correction factor for Current density to


be given

Current density
calculation
sheet

47

PACKING LIST Drawing To be submitted

27

37
38
39

LV C/B
LV C/B
Foundation
Neutral C/B
OLTC
Valve sch. Plate

GTP
GTP
GTP
GTP
GTP

RTCC Panel is not part of Specification/PO. Can be provided at extra


cost.
We confirm to provide
We confirm to provide
We confirm to provide
We confirm to provide
We confirm to provide
We confirm to provide
We confirm to provide
We confirm to provide in GA drawing
We confirm to provide in Radiator drawing
Specification calls for neutral CT which cann't be mounted in neutral
bushing turret due to size of the CT. Therefore as an alternative we
are providing resin cast CT in NEUtral Cable box, as this was laready
discussed and provided in 2900KVA transformers.

We confirm that CTR Make OLTC will be provided on tank side.


We confirm
Refer note 10
We confirm
CAD drawing will be provided after CAT 1 approval.

Temperature rise shall be 50/55 at specified altitude, however the


correction factor will be applied while testing at altitude less than
1000 mtr. will be done after altitude correction.
we confirm
we confirm
we confirm to provide metal cable tray & flexible metal conduit
we confirm to provide
Setting details of OTI/WTI shall be provided in drawing which will be
available in Marshalling box door pocket
Pls elaborate
Already Provided in Schematic drawing of marshalling box
We confirm
We shall replace dial type with RTD PT 100 based digital OTI/WTI . It
shall have 4-20mA output for remote indication

We confirm
We confirm
We confirm
Refer note 10
We confirm
We confirm
We confirm
Pls provide seismic zone
We confirm
Refer point 19 i(d) & ii(d) where tolerance is mentioned NIL
We confirm
Refer note 10
we confirm
we confirm
we confirm
already mentioned

we confirm

we confirm

we confirm

Not applicable

Ok. Not Required


Ok.
Ok.
Ok.
Ok.
Ok.
Ok.
Ok.
Ok.
Provide Radiator Drawing indicating two Lifting
Lugs

OK. We confirm two lifting lugs ( one at top &


one at bottom)

We require Neutral CT in side tank, & outside


Neutral Bushing, from bushing 2 No's Copper Flat
CT size is very big and not possible to
(50x6mm) brought upto bottom of Trfo with
accommodate in the transformer.
supporting insulators for erathing, we cannot
accept separate neutral box as suggested by you..
OLTC shall be in side of the transformer & on tank
OK. We agree to provide CTR make EO-16
it is not acceptable go with alternate make(OLG) of
OLTC.
OLTC if required.
ok
Refer note 10 above
ok
ok..Provide CAD Drawing in 1:1 ratio.

OK

Altitude correction factor should be considered &


The temp rise of top oil & winding will be 48
Indicate the Altitude & insulation level in Rating
and 53 degrees when measured at ground level.
plate, the design shall be made for the 1800mm
At an altitude of 1800M the rise will be 50 & 55
Altitude, the temperature rise is to be shown in
Deg C. The above is in line with correction
GTP for corrected for 1800mm Altitude, provide the
factor
tempr. rise calculations.
ok
ok
ok
ok
ok
BSP Size of capillary tube to be provide.
20% spares of Total to be provided

1/2" BSP
OK. We confirm

ok
Provide "Hybrid OTI, WTI & Remote Indicator". Ex.
OK. We confirm
Precimeasure Make, Model:1031H

ok
ok
ok
ok
ok
ok
Sesmic zone-V, Altitude: 1850m above MSL

We shall add the same in GTP. Altitude is 1800


m as per BFL Specification.

ok
ok
ok

Consider Altitude Correction Factor & Change


Creepage Distance Accordingly

creepage distance will increase by 8% i.e.


825*1.08=891mm

ok
ok
ok
Provide Raditors addequate for Cooiling as per
Design.
GA & "Valve Plate Schedule Plate" should have
same No's, provide the radiator calculations.

OK. Calculation will be given along with the


drawings.

ok

Since the Trfo to be Installed at AL.1850m above


MSL. Provide Altitude correction factor & change
the values accordingly.

To Submmit

Revised calculation for radiators will be send


with revised drawings. Altitude correction is not
applicable for current density.

Will be sent after manufacturing

Ok. Not Required


Ok.
Ok.
Ok.
Ok.
Ok.
Ok.
Ok.
Ok.
Ok.
We require Neutral CT in side tank, & outside
Neutral Bushing, from bushing 2 No's Copper Flat
(50x6mm) brought upto bottom of Trfo with
supporting insulators for erathing, we cannot
accept separate neutral box as suggested by you..
OLTC shall be mounted on side & adjoining to the
transformer.
Ok

Ok
OK
The temp rise of top oil & winding will be 48 and
53 degrees when measured at ground level. At an
altitude of 1800M the rise will be 50 & 55 Deg C.
The above is in line with correction factor
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Ok
Ok
Ok
Ok

Ok

Ok

Ok

Ok

Вам также может понравиться