Вы находитесь на странице: 1из 4

Heavy Vehicle Forecast for Pavement Design

Overview
This tool calculates future heavy vehicle volumes for pavement design.
Un-shaded cells indicate where data entry is required.
Yellow shaded cells indicate where results are calculated.
General Information

For both levels of analysis, enter the Analyst Name, Project description, highway #, milepost, base year, and forecast year.
Tab Information
Scoping Level
To get the Highway Report Data, go to:
http://highway.odot.state.or.us/cf/highwayreports/traffic_parms.cfm

Copy in the volumes from the Highway Report, class 4 to class 13, into the un-shaded cells (B2 through K2) at the top of th
Copy the AADT volume and the AADT 20-Yr volume (if available).
If no 20-year volume shown please contact TPAU at 503-986-4111 for assistance.
Project Level
Identify the TCM Count ID Number if possible
Identify the Count Duration and Count Year. The Count Duration is a drop-down box where the duration can be selected.

Enter in the calculated project base year AADT and future year AADT (see APM Chapter 5 for AADT calculation procedure
Select from the following in Cell A26:
* Cumulative Analysis
* Future Volume Table
* Post-Processed Travel Demand Model Volume
Enter in the truck classification volumes, class 4 to class 13, from the count in to cells E32 through E42 (unshaded cells).
Results
Scoping Level
The calculator shows the resulting future heavy vehicle volumes.
Project Level

The calculator shows the count volume factored to a full 24 hrs, the base year truck volumes, and the future forecast truck

For additional Project or Scoping Segments, you can copy tabs

se year, and forecast year.

hrough K2) at the top of the Scoping Level Analysis t

uration can be selected.

ADT calculation procedures).

gh E42 (unshaded cells).

d the future forecast truck volumes.

Heavy Vehicle Forecast for Pavement Design Spreadsheet:


Scoping Level Analysis
Name
Description
Scoping
Additional Identification
Project
Information State Hwy # / Route
M.P. Range
Forecast Year
State Hwy #
Hwy Name
Beginning M.P.
Effective Date
Highway Report Data
AADT Volume
AADT 20-yr Volume
#DIV/0!

20-yr Growth Rate (per yr.)

0
Class

Description

# Axles

4
5
6
7
8
9
10
11
12
13

buses
2ax
3ax
4ax
4ax trl
5ax trl
6ax trl
5ax dbl trl
6ax dbl trl
7ax dbl trl

2
2
3
4
4
5
6
5
6
7+

Total

# Trailers

1
1
1
2
2
2+

22
123
2
0
111
132
29
10
9
33

0
Forecasted
Volume
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

471

#DIV/0!

Count Volume

Heavy Vehicle Forecast for Pavement Design Spreadsheet:


Project Level Analysis
Name
Description
Additional Identification
Project

Count

Hwy #
M.P.
Base Year
Forecast Year
TCM # (If available)
Duration
Factor
Year

#N/A

Base Year / Future Year


Base Year AADT
Future
Volume Table
Future Year AADT
#DIV/0!

0-yr Growth Rate (per yr.)

Class

Description

# Axles

4
5
6
7
8
9
10
11
12
13
13

buses
2ax
3ax
4ax
4ax trl
5ax trl
6ax trl
5ax dbl trl
6ax dbl trl
7ax dbl trl
triples

2
2
3
4
4
5
6
5
6
7
7+

Total

# Trailers

0
0
Count Volume

1
1
1
2
2
2
2+
0

24 hr Count
Volume

Base Year
Volume

Forecasted
Volume

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#N/A

#DIV/0!

#DIV/0!

Вам также может понравиться