Вы находитесь на странице: 1из 9

Start up analysis during the Month of May.

- 2015 TPS Pa
Unit No- 3
Date & Time of Last tripping
Turbine casing temp. at start up ( OC)
Type of Start up
Boiler light up
PRDS charging
FO change over
Fire killing for blow down
Header blow down completion
Boiler relight up
Vacuum pulling
Rolling
Synchrinisation
Oil consumption (LDO/FO) up to
synchronization
Oil support with drawn at
Oil consumption (LDO/FO) till oil
withdrawn
Unit stabilisation.
Remarks/Problems faced during start
up

Date & Time


02/05/2015

12.04 hrs

HPT- 477/402
IPT- 445/391
Hot
02/05/2015 12.45 hrs.
PRDS I/S
16.25
N/A
N/A
N/A
Vacuum I/S
16.30
17.10 hrs.
13/03=16 KL.

13/17=30 KL.

of May.- 2015 TPS Parli-V


Time taken
from BLU

Bench Mark

Hot
Light up to
synchronisation
= 2 hrs.

4.45 hrs.
15 KL.

20 KL.

Start up analysis during the Month of May.- 2015 TPS Parli-V


Unit No- 5

Date & Time

Time taken
from BLU

Date & Time of Last tripping


03/05/2015 20.51 hrs
Turbine casing temp. at start up HPT- 65/63
( OC)
IPT- 56/55
Type of Start up
Cold
Boiler light up
PRDS charging
FO change over
Fire killing for blow down
Header blow down completion
Boiler relight up
Vacuum pulling
Rolling

14/05/2015 19.00 hrs.


14.00 hrs.
23.50 hrs.
20.45 hrs.
21.05 hrs.
21.05 hrs.
22.15 hrs.
15/05/2015 01.30 hrs.
06.50 hrs.

Synchrinisation
Oil consumption (LDO/FO) up to
synchronization
Oil support with drawn at
Oil consumption (LDO/FO) till oil
withdrawn
Unit stabilisation.

11.50 hrs.

22/40=62 KL.
12.15
22/69=91 KL.

* Patina formation on new slipring( Slipring replaced by


new one) due to sparking problem . and turbine rolled ou
at 1.30 hrs. and 3000 RPM speed achived at 3.30 hrs.
Turbine hand tripped due to LPT differential expantion
Remarks/Problems faced during
very high problem. Turbine again rolled out at 06.15 hrs
start up
and set synchronised at 06.50 hrs.
*Patina formation done at 1000 RPM & 3000 RPM speed

2015 TPS Parli-V


Bench Mark

Cold

Light up to
synchronisation
= 9 hrs.
45 KL.

65 KL.

ng( Slipring replaced by


em . and turbine rolled out
ed achived at 3.30 hrs.
T differential expantion
ain rolled out at 06.15 hrs.
hrs.

0 RPM & 3000 RPM speed

Start up analysis during the Month of May.- 2015 TPS Pa


Unit No- 5
Date & Time of Last tripping
Turbine casing temp. at start up ( OC)
Type of Start up
Boiler light up
PRDS charging (Self)
FO change over
Fire killing for blow down
Header blow down completion
Boiler relight up
Vacuum pulling
Rolling
Synchrinisation
Oil consumption (LDO/FO) up to
synchronization
Oil support with drawn at
Oil consumption (LDO/FO) till oil
withdrawn
Unit stabilisation.
Remarks/Problems faced during start
up

Date & Time


06/05/2015

20.25 hrs

HPTIPTWarm
09/05/2015 01.30 hrs.
4.35 hrs.
6.00 hrs.
4.05 hrs.
4.25 hrs.
4.30 hrs.
4.45 hrs.
7.00 hrs.
17.10 hrs.
20/10=30 KL.

20/20=40 KL.

of May.- 2015 TPS Parli-V


Time taken
from BLU

Bench Mark

Warm
Light up to
synchronisation
= 7 hrs.

4.45 hrs.
35 KL.

50 KL.

Start up analysis during the Month of May.- 2015


TPS Parli-V
Unit No- 3

Date & Time

Date & Time of Last


tripping
Turbine casing temp.
at start up ( OC)
Type of Start up

19/05/2015
18.12 hrs
HPTIPTWarm

PRDS charging
15.30 hrs.
FO change over
20.25 hrs.
Fire killing for blow
19.20
down
Header blow down
19.25
completion
Boiler relight up
19.40
Vacuum pulling
18.10
Rolling
22.52
Synchrinisation
22/05/2015 00.04 hrs
15/15=30 KL

Bench Mark

Warm
Light up to
synchronisation
= 7 hrs.

21/05/2015
17.00 hrs.

Boiler light up

Oil consumption
(LDO/FO) up to
synchronization
Oil support with
drawn at

Time taken
from BLU

4.45 hrs.
35 KL.

22/05/2015 8.25 hrs.

Oil consumption
(LDO/FO) till oil
withdrawn
Unit stabilisation.
Remarks/Problems
faced during start up

15/45=60 KL

50 KL.

Start up analysis during the Month of May.- 2015 TPS Parli-V


Unit No- 5

Date & Time

Time taken
from BLU

Date & Time of Last


23/05/2015
tripping
20.34 hrs
HPT-164/110
Turbine casing temp. at
start up ( OC)
IPT-110/94
Type of Start up
Warm
Boiler light up
PRDS charging
FO change over
Fire killing for blow
down
Header blow down
completion
Boiler relight up
Vacuum pulling
Rolling
Synchrinisation
Oil consumption
(LDO/FO) up to
synchronization
Oil support with drawn
at
Oil consumption
(LDO/FO) till oil
withdrawn
Unit stabilisation.
Remarks/Problems
faced during start up

Bench Mark

Warm
Light up to
synchronisation
= 7 hrs.

28/05/2015
08.25 hrs.
6.45 hrs.
13.25 Hrs
11.40 hrs.
12.00 hrs.
12.05 hrs.
12.30 hrs.
14.05 hrs.
28/05/2015
15.00 hrs
22/8=30 KL

4.45 hrs.

35 KL.

18.20 hrs.
22/20=42 KL
18.20 hrs.

50 KL.

15 TPS Parli-V

Вам также может понравиться