So..hopefully..
UCG is the
answer.....
resource
161.34 billion tons
Very High ( > 7,100 kcal/kg )
kcal/kg )
High ( 6,100 7,100 kcal/kg )
reserve
32.38 billion tons
Medium ( 5,100 6,100
Low ( < 5,100 kcal/kg )
Total Underground Coal Resources (deeper than 100 m) in South Sumatera 20.658
B Tons
Utilization of UCG
Electricity
Oil & Gas
Mineral & Coal
coal
Generator
thickness
No.
type of well (m)
Inj. Wells Prod. Wells Total
2
14
56
181
237
3
4
109
137
246
4-5
6
52
184
236
Vertical
holes
6-7
11
86
237
323
11
12.4
42
132
174
mean
63
178
241
14
370
161
531
2
inclined and
4-5
6
271
91
362
horizontal
6-7
11
345
134
479
holes
mean
332
130
462
2
14
108
57
165
inclined
6-7
11
55
281
336
hole
mean
70
217
287
Road Map
a.Preparation of
land for pilot
Confirmation
of drilling
(PTBA)
a.Selection of location
for pilot plant
b.Design of model for
artificial combustion
c.Preparation of
baseline for
hydrogeology&
geomechanics
plant
b.Model of
geological
condition
c.Model of
artificial
combustion
d.Model of
environmental
condition
e.Preparation of
equipment for
pilot plant
Assessment of policy
paper for
paper for regulation
regulation
Discussion of policy
paper to Ditjen
Minerba
a.Model of geological
& hydrological
condition
b.Test of combustion
& cementing model
c.Preparation of
control and
monitoring system
d.Continuation of
environmental
model
e.Preparation of
supporting
equipment for pilot
plant
Draft of
regulation
(Ditjen Minerba)
Revision of
draft of
regulation
a.Preparation of
drilling for pilot
plant
b.Test of combustion
at the real depth
c.Implementation of
combustion process
d.Determination of
environmental
condition
e.Model of 3D for
subsurface
Output : Innovation
of technology
a.Modul of
gasification
b.PreFS+environme
ntal analysis
Socialization &
Revision of
implementation
regulation
of regulation
(Ditjen Minerba)
Revision of draft
of regulation
a.Operation of
pilot plant
b.PreFS+environmental
analysis
Completion
of regulation
Output : Regulation
CEMENTING
Cementing Process
Parameter proses
penyemenan
1. Pumpability (viscosity)
2. Setting time
3. Bonding strength
4. Thermal expansion
5. Compressive strength
6. Low cost
poisson's
ratio)
XRD