PENELITIAN DAN PENGEMBANGAN

TEKNOLOGI GASIFIKASI BATUBARA


BAWAH TANAH (UNDERGROUND
COAL GASIFICATION)

Estimate domestic oil production

Estimate of the gas balance


Production
declines ....
Consumption
rises ....
Export declines
CBM production
declines ....
Import rises ....

So..hopefully..
UCG is the
answer.....

Coal Resource & Reserve

resource
161.34 billion tons
Very High ( > 7,100 kcal/kg )
kcal/kg )
High ( 6,100 7,100 kcal/kg )

reserve
32.38 billion tons
Medium ( 5,100 6,100
Low ( < 5,100 kcal/kg )

(Agency of Geology, 2013)

South Sumatera Underground Potencies


Kota Tengah 0,945 BTon
Musirawas 0,097 BTon

Nibung 0,862 BTon

Bayat 0,008 BTon


Lubuk Mahang 1,240
BTon
Sungai Lilin 0,009
BTon
Babat 2,437 BTon

B. Toman 0,192 BTon


M. Lakitan 0,266 BTon
S. Pinang 2,062 BTon

Sekayu 4.792 BTons


Sigoyang Benuang 2,645 BTon

Benakat Minyak 0,782 BTon


Tj Lubuk 0,168 BTon
Banjarsari 0,071 BTon

Pagerdewa 0,067 BTon

Arahan 1.545 BTon


Air Serelo 0,008 BTon

Kungkilan 0,348 BTon

Bunian 0,024 BTon

Total Underground Coal Resources (deeper than 100 m) in South Sumatera 20.658

B Tons

Utilization of UCG
Electricity
Oil & Gas
Mineral & Coal

YEROSTIGAZ COMMERCIAL PLANT

CHINCHILLA DEMONSTRATION PLANT

Gasification system and wells life time

Duration of operation (days)

coal
Generator
thickness
No.
type of well (m)
Inj. Wells Prod. Wells Total
2
14
56
181
237
3
4
109
137
246
4-5
6
52
184
236
Vertical
holes
6-7
11
86
237
323
11
12.4
42
132
174
mean
63
178
241
14
370
161
531
2
inclined and
4-5
6
271
91
362
horizontal
6-7
11
345
134
479
holes
mean
332
130
462
2
14
108
57
165
inclined
6-7
11
55
281
336
hole
mean
70
217
287

LANDSCPE AFTER UCG

Road Map
a.Preparation of
land for pilot

Confirmation
of drilling
(PTBA)

a.Selection of location
for pilot plant
b.Design of model for
artificial combustion
c.Preparation of
baseline for
hydrogeology&
geomechanics

plant

b.Model of

geological
condition

c.Model of

artificial
combustion

d.Model of
environmental
condition
e.Preparation of
equipment for
pilot plant

Signing of MoU with


Study on
Linc Energy & PT.
regulation
Astaka Dodol
Study on policy

Assessment of policy
paper for
paper for regulation
regulation
Discussion of policy
paper to Ditjen
Minerba

a.Model of geological
& hydrological
condition
b.Test of combustion
& cementing model
c.Preparation of
control and
monitoring system
d.Continuation of
environmental
model
e.Preparation of
supporting
equipment for pilot
plant

Draft of
regulation
(Ditjen Minerba)
Revision of
draft of
regulation

a.Preparation of
drilling for pilot
plant
b.Test of combustion
at the real depth
c.Implementation of
combustion process
d.Determination of
environmental
condition
e.Model of 3D for
subsurface

Output : Innovation
of technology
a.Modul of
gasification
b.PreFS+environme
ntal analysis

Socialization &
Revision of
implementation
regulation
of regulation
(Ditjen Minerba)
Revision of draft
of regulation

a.Operation of
pilot plant
b.PreFS+environmental
analysis

Completion
of regulation

Output : Regulation

UCG WELL DESIGN

CEMENTING
Cementing Process
Parameter proses
penyemenan
1. Pumpability (viscosity)
2. Setting time
3. Bonding strength
4. Thermal expansion
5. Compressive strength
6. Low cost

KLASIFIKASI SEMEN PEMBORAN (OIL WELL CEMENT)

ALTERNATIF JUDUL PENELITIAN


1. pengaruh penambahan kapur pada characteriatic cement
portland dan semen tahan api
2. Characteristic campuran semen portland dan semen tahan
api.
3. pengaruh penambahan gypsum pada campuran semen
portland dan semen tahan api.
4. pengaruh penambahan filler (grog) pada charavtrristic
cement
5. pengaruh penambahan filler (grog) pada charavtrristic
cement
6. Pengaruh penambahan kaolin wool pada characteristic
cement
7. Pengaruh penambahan glass fiber pada characteristic
cement
8. Pengaruh penambahan KCL, NaCl, CaCl
9. Pengaruh penambahan fly ash

ANALISIS DAN PENGUJIAN

Analisa bahan: XRD, XRF, kimia


Analisa benda uji hasil penelitian:
sifat fisik (kadar air, berat isi, berat jenis, daya
serap air, kekerasan,slake durability)
Setting time, pumpability
sifat mekanik (kuat tekan, kuat tarik, triaxial, kuat
geser residu, point load, ultrasonic/ dynamic

poisson's
ratio)

XRD