Вы находитесь на странице: 1из 5

CURRICULUM VITAE

IRWAN
Address:
bung_irone69@yahoo.co.id
Jl.Pembangunan Blk no 163 Garut,Jabar. irone.safetybpp@gmail.com
Phone Number : +62 813 7723
3899
Date & place of birth

P.Nibung,Medan,North Sumatera,17 May 1969


Objective
To obtain a position with a major corporation. To contribute toward the
companys aim through simultanious proffesion ability development.
Notes
Fluent in English, excellent skills in MS -Office, Windows Power print and
also Internet.
Education
Senior High School.West Sumatera. 1988 / 1989
Taken Course Included
Name of Training/Course

Provider

Year
Remark
Obtained

Certificate Of Engine Room Watch keeping

STKIP Jakarta

2002

Certified

Certificate Of Competency Engine Officcer Class V

STKIP Jakarta

2002

Medical First Aid

STKIP Jakarta

2002

Certified
Certified

Advanced Fire Fighting

STKIP Jakarta

2002

Certified

Survival Craft and Rescue Boats

STKIP Jakarta

2002

Certified

Rigging Coursed Of PT. Chiyoda International


Indonesia

PT.Chiyoda Indonesia

2004

Certified

Safe Crane Operation Coursed Of PT.Chiyoda


International Indonesia

PT.Chiyoda Indonesia

2004

Certified

PMI Cab.Rembang

2008

Certified

DISKESNAKERTRANS
Provincy Mid Java

2008

Certified

Certificate Of Medical First Aid Of Palang Merah


Indonesia.Kab.Rembang.Mid Java

Certificate Of Copentency HSE.Prop.Jawa Tengah


As ( Contruction Safety Engineer )

Ability

Good knowledge and skills in Safety Management


Having strong leadership.
Good in problem solving and analizing.
Organized way of thinking and using approaching system in solving
problems.

Good personality, easy to interact and able to work in a team.


Experiences
Period
01 January

2008
To Present

25 Oct 2007
To 26 Des
2007

Name of Company &


Position
PT.Berdikari Pondasi
perkasa.
-01 jan 08 to 31 August
08
>Coal Fire Power plan
project 2x(300400)Mw.Rembang.Mid
Ja
va.
PT.Berdikari Pondasi
Perkasa.
-01 august 08 to 10 jan
09
>Repairing Break Water
Cell 14.TPPI
Project.East
Java.
PT.Berdikari Pondasi
Perkasa.
-13 Jan 09 to 10 marc 09
>Lengthening of Jetty In
Coal-Fire Power
Plan.Sura
laya,merak,Banten
PT.Berdikari pondasi
Perkasa
12 Marc o9 to present
Is employed to head
office
PT.DESCONA YASA
ENGINEERING
> Total Project 1x 60 MW
Geothermal. Pertamina.
Kamojang. Bandung.Ina

Job Description
As Safety Officer(ContructionSafety
Engineer)
Conduct daily safety inspection.
Assist weekly tool box meeting.
Assist weekly safety coordination

meeting.
Assist weekly emergency response

plan training.
Supervise site jobs based on JSA (Job

Safety Analysis).
Monitors site jobs on night works.
Promote environmental issues.
Monitors housekeeping

implementation program.
Supervise safety implementation

programs through all sub contractors.


Improve safety performance to reach

Zero Accident.
Improve Safety Procedures.
Accidents investigation.
Conducts daily safety inspection.
P To report occupational health &
safety performances to the General
Manager
Investigates any accidents/incidents
that occured.
promote safety issues.

As Safety Officer
Improve safety performance to reach

Zero Accident.
Improve Safety Procedures.
Accidents investigation.
Conducts daily safety inspection.
Promote safety issues.
Conduct daily safety inspection.
Assist weekly tool box meeting.
Assist weekly safety coordination

meeting.
Assist weekly emergency response

plan training.
Supervise site jobs based on JSA (Job

Safety Analysis).
Monitors site jobs on night works.

24 Marc 2007 PT.SINAR ADYA PRATAMA


To 31 August > EPC Total Project 1x 60 MW
Geothermal. Pertamina.
2007
Kamojang. Bandung.Ina

As Safety Supervisor
Conduct daily safety inspection.
Assist weekly tool box meeting.

Period

Name of Company &


Position

Job Description
Assist weekly safety coordination

meeting.
Assist weekly emergency response

plan training.
Supervise site jobs based on JSA (Job

Safety Analysis).
Monitors site jobs on night works.
Promote environmental issues.

Monitors
housekeeping

implementation program.
To report occupational health &
safety performances to the General
Manager
Investigates any accidents/incidents
that occured.
.
As Safety Supervisor
Conduct daily safety inspection.
Assist weekly tool box meeting.
Assist weekly safety coordination
meeting.
Assist weekly emergency response
plan training.
Supervise site jobs based on JSA (Job
Safety Analysis).
Monitor site jobs at off shore Work
Conduct Daily,weekly and monthly
Heavy
Equipment Inspection.

10 July 2006 To PENTA OCEAN CONT.CO LTD


20 Marc 2007 > Tangguh LNG Project BP
migas.Teluk Bintuni.West
Papua.Indonesia

19 Dec 2005
To 02 marc
2006

PT.Tathong Indonesia
> Darajat Phase III
Geothermal Project.Cevron
Texaco.Garut.West
java.Indonesia

31 May 2005 To PT.TATHONG INDONESIA


18 Dec 2005
> Work Shop PT.Tathong
Indonesia Jl.Cakung-cilincing
No 200.North
jakarta.Indonesia

As Rigging Coordinator
Arranging employees in walk of life
Hold responsible to give best service to
user of appliance
.
Giving Tool meeting box every day before
strarting [job/activity]
Giving report work of monthly to Project
Manager
Following weekly meetng with manage
ment of is project of and safety
Taking care of the condition of so that
always on the site
Owning Password and intention to be is
free of accident.
As Rigging Foreman
Arranging To unload tide of Carane
Hold responsible appliance mobilization
and equipments of pool to job area
Environmental keep cleaning in Area
[job/activity]
Coordinating employees in assisting
entire/all Work of site
Arranging Loading a unloading equipment

Period

Name of Company &


Position

5 Dec 2004 To PT. AGUNG SURYA MAKMUR


> ASL Ship Yard PTE
25 May 2005
LTD.Tanjung
Uncang.Batam.Indonesia

20 A prl 2004 To YEW CHOON PRIVATE


20 Nop 2004
LIMITED
> BCD Migas Project .Petro
China Jabung Site
Office.Jambi.Indonesia

23 May 2003 To WAKHACIKU CONT.CO.LTD


18 August 2003 > Hitadhoo Port Project.
Republic Of Maldives.

20 Jan 2000 To ANG SIN LIU SHIP YARD


30 Marc 2003. PTE.LTD
>Jurong-Sakra-&Tuas Island
Reclamation Phase IV
.Republic Of Singapore

01 Dec 1996 To YEW CHOON PRIVATE LIMITED


> Cement Gresik Project
31 Oct 1997
Phase II.Tuban.East
Java.Indonesia.

Job Description
As Rigger ofshore
having membership in work of installation
and unloading of crane
Can work better and meekly [at] the
foreman
Cooperate in one strong team
Obeying all regulation of peroyek
Following Tool meeting box each;every
day,before start work
As Mechanical Rigger
Team Installation of still Structure
Team Installation of Boiller,Turbine,Vesel,
Generator others
Team Loading and unloading material of
trailer or Cometo
Team Installation and unloading of Crane
Team Mobilization equipments.
As Chief Engineer Of Tug Boats
Arranging employees above Barge
Improve;Repairing and take care of machin
of tug boats
Follow to take care of and give Clarification
about safety
As Assist of Barge Master
AS Rigger Of shore,A/B,Winch man and
Hydrolic crane operator
As Team installation of Pipe under sea
As jobs anchore team
As boats service team
owning some certificate of offshore
Have [in] training in operation of sea risk
Educative as Team benefactor of wrec
kage.
And others
As Rigging Foreman
Team Installation of still Structure
Team Installation of Boiller,Turbine,Vesel,
Generator others
Team Loading and unloading material of
trailer or Cometo
Team Installation and unloading of Crane
Team Mobilization equipments
Arranging To unload tide of Carane
Hold responsible appliance mobilization
and equipments of pool to job area
Environmental keep cleaning in Area
[job/activity]
Coordinating employees in assisting
entire/all Work of site
Arranging Loading ang unloading
equipment

Period

Name of Company &


Position
10 Nop 1995 ToYEW CHOON PRIVATE
August 1996
LIMITED
> Indo Rayon Project.
Porsea.Prapat.North
Sumatera.

Job Description
As Mechanical Rigger
Team Installation of still Structure
Team Installation of Boiller,Turbine,Vesel,
Generator others
Team Loading and unloading material of
trailer or Cometo
Team Installation and unloading of Crane
Team Mobilization equipment

Вам также может понравиться