Confidential
Telefonica UK
SYSTEM TEST EXIT REPORT
CD42260 IPHONE PRE
ORDER BACKORDER FILES
FOR BUSINESS ESSENTIALS
INFOGIX
Executive Summary & Recommendation
Script pulled the file from internal test server and performed
operation like (decryption and decompression and finally *.csv file
moved to required incoming location.
Recommend Acceptance
Page 1 of 13
Telefonica (UK)
Confidential
This is an unpublished work. No part of this document may be copied, photocopied, reproduced, translated or
reduced to any electronic or machine-readable form without the prior permission of O2
DOCUMENT INFORMATION
Document name:
Brief description:
Document Author:
Owner while
current:
1 Year
CHANGE HISTORY
Template
used
Activity_Test_Exit_Report_Template.doc
Versio
n
Date
Changed by
Changes
0.1
24-08-2015
0.2
26-08-2015
1.0
26-08-2015
Initial Version
RELATED DOCUMENTS
Name
Versi
on
Date
Attachment
Hyperlink
TUK_CD42260_Iphone pre
order backorder files for
business
essentials_Infogix_System_Te
st_Approach_V1.0
1.0
24082015
TUK_CD42260_Iphone pre
order backorder files for
TUK_CD42260_Ipho business
essentials_Infogix_System_Te
ne pre order backorder
files for business essentials_Infogix_System_Test_App
st_Approach_V1.0
TUK_CD40837_KENTUCKY_FIL
E_TRANSFER_INFOGIX_DD_V
17
1.0
24082015
TUK_CD40837_KENTUCKY_FIL
E_TRANSFER_INFOGIX_DD_V
TUK_CD40837_KENT 1 7
UCKY_FILE_TRANSFER_INFOGIX_DD_V 1 7.docx
Philip Heeds
Project Manager
Neill Lovell
Sanjeeb K
Satapathy
Accenture Manager
Kishor
Toshniwal
Project Designer
Brian Mattey
Quality Assurance
Tiny Thomas
Sanjeet Kumar
Accenture
Development
Page 2 of 13
Telefonica (UK)
Confidential
SIGN-OFF
It is important that the sign off authority is inserted in the document together with
document file path (SOX compliance)
Name:
Philip Heeds
Role
:
Project Manager
Tiny Thomas
Role
:
Brian Mattey
Role
:
Quality Assurance
Graham Kenworthy
Role
:
Sign Off
Authority
Sign off
Document
File Path
Name:
Sign Off
Authority
Sign off
Document
File Path
Name:
Sign Off
Authority
Sign off
Document
File Path
Name:
Sign Off
Authority
Sign off
Document
File Path
As a minimum the test lead should seek the following as a minimum level of
approval
o
Operations representative
Design Authority
Page 3 of 13
Telefonica (UK)
Confidential
CONTENTS
1
INTRODUCTION.......................................................................................................................................5
1.1
1.2
BACKGROUND.........................................................................................................................................5
OBJECTIVES.............................................................................................................................................5
IN SCOPE................................................................................................................................................5
OUT OF SCOPE.......................................................................................................................................5
TEST RESULTS.........................................................................................................................................6
5.1
5.2
TOTAL NUMBER OF DEFECTS RAISED DURING TEST EXECUTION OF THE ACTIVITY (PRIORITY AND
STATUS)................................................................................................................................................................7
6.2
ROOT CAUSE ANALYSIS OF DEFECTS RAISED DURING TEST EXECUTION FOR THE ACTIVITY..........7
6.3
TEST PROCESS LIFE CYCLE ACTIVITY...................................................................................................7
7
OUTSTANDING RISKS..........................................................................................................................7
CONCLUSION............................................................................................................................................7
APPENDIX A..............................................................................................................................................8
Page 4 of 13
Telefonica (UK)
Confidential
INTRODUCTION
As part of CD42260 Kentucky Project, there is requirement to transfer files from SFDC
to Infogix Landing strip server using SFTP/FTP protocol. The encrypted input files
should be decrypted also using gpg before sending it to destination directories. This
testing will be performed to confirm whether the newly introduced script meets all
the functional requirements.
1.1 Objectives
The objectives of this document are to:
Report on the conformity against what was defined in the System Test
Approach.
Re-iterate the scope of testing and the exit criteria for System Test.
Consolidate and report the results of testing from this test activity as defined
in the ST Test Approach.
Provide to the project and the test community any recommendations for
future test activities.
Page 5 of 13
Telefonica (UK)
Confidential
None
Page 6 of 13
Telefonica (UK)
Confidential
Functionality of SFTP
PRT
Page 7 of 13
Telefonica (UK)
Confidential
The following table details compliance against the project test exit criteria detailed
in the Activity Test Approach.
Test Exit Criteria
Criteria
Met?
NA
NA
NA
NA
Page 8 of 13
Telefonica (UK)
Confidential
TEST RESULTS
Number of
Test basis
items
Identified
Number
of Test
basis
items
Passed
Number
of Test
Basis
items
Failed
Test cases
Number
of Test
Basis
items
Deferre
d
0
Within ACN
Within TUK
TUK_CD42260_Ipho
ne pre order backorder files for business essentials_Infogix_System_Test_Results_V1.0.docx
Page 9 of 13
Telefonica (UK)
Confidential
3.5 Total Number of Defects Raised during Test Execution of the activity
(priority and status)
None
3.6 Root Cause Analysis of Defects Raised during Test Execution for the
activity.
None
Page 10 of 13
Telefonica (UK)
Confidential
OUTSTANDING RISKS
None
Page 11 of 13
Telefonica (UK)
Confidential
CONCLUSION
The System testing for CD42260_Iphone pre order backorder files for business
essentials has been carried out successfully for all the test cases executed and the
exit criteria have been met. All functional targets met and changes are
recommended to be deployed in live.
Page 12 of 13
Telefonica (UK)
Confidential
APPENDIX A
ROOT CAUSE ANALYSIS
Vendor software - Where a fault occurs as a result of an error in the code requiring
a patch or rebuild to address the issue. Applies to external or 3rd party software.
Vendor Hardware - Where an unexpected issue occurs on a physical or virtual
hardware element e.g. disk failure or interface card. Applies to external or 3rd party
hardware.
Vendor Documentation - Omissions for the release notes or documentation or
Method of Procedure leading to faults or mistakes).
Vendor Implementation - Incorrect Implementation or configuration of the design
leading to faults (including incorrect reference data). E.g. where a vendor creates
the implementation plan and runs the MOP.
O2 developed software - Where a fault occurs as a result of an error in the code
requiring a patch or rebuild to address the issue. Applies to internal development
teams e.g. Wholesale development teams, GAS team.
O2 design - Omissions, ambiguities or lack of detail from the design leading to
faults that require additional configuration or software to address.
O2 implementation and configuration of design - Incorrect Implementation or
configuration of the design leading to faults (including incorrect reference data). E.g.
where an O2 project manager creates the implementation plan.
Test environment, planning and execution - Incorrect implementation of the test
environment leading to faults including physical cabling/build, incorrect reference
data, incorrect Test Cases and faults raised in error.