14 October 2012
53-1002727-01
*53-1002727-01*
Asia-Pacific Headquarters
Brocade Communications Systems China HK, Ltd.
No. 1 Guanghua Road
Chao Yang District
Units 2718 and 2818
Beijing 100020, China
Tel: +8610 6588 8888
Fax: +8610 6588 9999
E-mail: china-info@brocade.com
European Headquarters
Brocade Communications Switzerland Srl
Centre Swissair
Tour B - 4me tage
29, Route de l'Aroport
Case Postale 105
CH-1215 Genve 15
Switzerland
Tel: +41 22 799 5640
Fax: +41 22 799 5641
E-mail: emea-info@brocade.com
Asia-Pacific Headquarters
Brocade Communications Systems Co., Ltd. (Shenzhen WFOE)
Citic Plaza
No. 233 Tian He Road North
Unit 1308 13th Floor
Guangzhou, China
Tel: +8620 3891 2000
Fax: +8620 3891 2111
E-mail: china-info@brocade.com
Document History
Title
Publication number
2 of 8
Summary of changes
Date
New document.
October 2012
Introduction
This document provides instructions to install a Brocade 5100, 5300, or 6520 switch in a 19-inch (48.3 cm) EIA rack
using the Non-port Side Fixed Rack Mount Kit (24). The document is organized as follows:
Installation requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Time and items required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Parts list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3
3
4
4
The supported switches are listed in Table 1. The rack kit is designed so that the switch is installed with the non-port
side flush with the front posts of the rack. A single height (1U) switch is shown for illustration purposes. The double
height (2U) installation is similar.
TABLE 1
Supported switches
Switch height
Switch model
1U
Brocade 5100
2U
Installation requirements
Allow 15 to 30 minutes to complete this procedure. Note the following requirements to ensure correct installation
and operation:
Provide space in a 19-inch (48.3 cm) EIA rack, as required for the switch type, with a minimum distance of 24
inch (60.96 cm) and a maximum distance of 32 inch (81.28 cm) between the front and back uprights.
Verify that the additional weight of the switch does not exceed the racks equipment load rating.
Ensure that an electrical branch circuit with the following characteristics is available:
- Required voltage and frequency as indicated in the hardware reference manual (200-230 VAC is always
preferred).
Ensure that all equipment installed in the rack is grounded through a reliable branch circuit connection. Do not
rely on a secondary connection to a branch circuit, such as a power strip.
3 of 8
Parts list
Ensure that the items listed in Figure 1 are included in the kit.
FIGURE 1
Installation procedure
ATTENTION
The switch must be turned off and disconnected from the fabric during the installation procedure.
4 of 8
NOTE
Although this document describes how to install both single height (1U) and double height (2U) switches, single
illustrations may show either switch type as examples. The only significant difference between single-height and
double-height installation is that the double-height installation uses five screws to attach the front bracket to the
switch.
Complete these tasks to mount the switch:
FIGURE 2
5 of 8
FIGURE 3
6 of 8
FIGURE 4
7 of 8
FIGURE 5
8 of 8