Академический Документы
Профессиональный Документы
Культура Документы
16 November 2012
53-1001273-06
*53-1001273-06*
Asia-Pacific Headquarters
Brocade Communications Systems China HK, Ltd.
No. 1 Guanghua Road
Chao Yang District
Units 2718 and 2818
Beijing 100020, China
Tel: +8610 6588 8888
Fax: +8610 6588 9999
E-mail: china-info@brocade.com
European Headquarters
Brocade Communications Switzerland Srl
Centre Swissair
Tour B - 4me tage
29, Route de l'Aroport
Case Postale 105
CH-1215 Genve 15
Switzerland
Tel: +41 22 799 5640
Fax: +41 22 799 5641
E-mail: emea-info@brocade.com
Asia-Pacific Headquarters
Brocade Communications Systems Co., Ltd. (Shenzhen WFOE)
Citic Plaza
No. 233 Tian He Road North
Unit 1308 13th Floor
Guangzhou, China
Tel: +8620 3891 2000
Fax: +8620 3891 2111
E-mail: china-info@brocade.com
2 of 10
Document History
Title
Publication number
Summary of changes
Date
53-1000171-01
New document.
February 2006
53-1000171-02
June 2008
53-1001273-01
March 2009
53-1001273-02
July 2009
53-1001273-03
August 2009
53-1001273-04
April 2011
53-1001273-05
December 2011
53-1001273-06
November 2012
3 of 10
Contents
This document provides instructions to install a 1U, 1.5U, or 2U switch (or SAN Router) in a telecommunications
(Telco) rack using the Mid-Mount Rack Kit. The document is organized as follows:
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tool requirements and parts list. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
4
5
6
Introduction
The supported switches are listed in Table 1.
TABLE 1
Supported switches
Switch height
Switch model
1U
Brocade 300
Brocade 6505
Brocade 6510
Brocade 7800
Brocade 8000
Brocade VA-40FC
Brocade VDX 6710-54
2U
Brocade 5300
Brocade 6520
ATTENTION
The brackets supplied with the Brocade 6510 and Brocade 6505 are slightly slimmer than those supplied for the
other switches in this list due to the greater width of those two switches. Otherwise, they look the same and are
mounted the same. Do not use the standard brackets because they will not fit with the Brocade 6510 and Brocade
6505.
Installation requirements
Allow 15 to 30 minutes to complete this procedure. Note the following requirements to ensure correct installation
and operation:
Verify that the additional weight of the switch does not exceed the rack weight limits.
4 of 10
Ensure that an electrical branch circuit with the following characteristics is available:
- Required voltage and frequency as indicated in the hardware reference manual (200-240 VAC is always
preferred).
Ensure that all equipment installed in the rack is grounded through a reliable branch circuit connection. Do not
rely on a secondary connection to a branch circuit, such as a power strip.
NOTE
Not all parts may be used with certain installations depending on the switch type.
5 of 10
FIGURE 1
ATTENTION
For the Brocade 6505, Brocade 6510, and Brocade 6520 Mid-Mount Rack Kit, there will only be front left and front
right brackets.
Installation procedure
ATTENTION
The switch must be turned off and disconnected from the fabric during this procedure.
NOTE
Although this document describes how to install a 1U, 1.5U, and 2U switch, the illustrations show a 2U switch as a
typical installation.
Complete these tasks to install the switch in a rack:
6 of 10
2
1
FIGURE 2
7 of 10
1
1
FIGURE 3
8 of 10
2
3
FIGURE 4
9 of 10
1
1
FIGURE 5
10 of 10