Академический Документы
Профессиональный Документы
Культура Документы
Task: Description:
1 Research into various types of systems and differences
2 Research into materials certain components are generally made
from and why
3 Research into control systems used for controlling production, flow
and regulation of compressed air including safety features.
4 Research into legislation governing certain requirements for all
parts of system
5 Meet with workplace mentor and explain about WBEP and discuss
plan
6 Inspect full system on board including all components in
compressed air system
7 Trace out Start air, Service Air and Control Air systems noting all
components and purposes
8 Meet with workplace mentor to confirm system design on board
and any other questions about compressed air system or WBEP
9 Read through ships manuals to find any usefull info on air system
and take notes (including maintenance procedure & PMS)
10 Inspect Air start system, how it works and why. Noting any instantly
visible problems or areas for possible improvement
11 Inspect Service air system how it works and why. Noting any
instantly visible problems or areas for possible improvement
12 Inspect Control Air system how it works and why. Noting any
instantly visible problems or areas for possible improvement
13 Collect Notes from thorough inspections
14 Review notes with mentor and ask for any feedback or notable
things missing
15 Start to compile report from knowledge gained from research
before joining and inspection of the system once on board
16 Compare report to project spec plan ensuring it includes topics
specified in technical specification
17 Review Initial draft with mentor noting feedback and discussing
content of report and any parts missing or unnecessary
18 Write Intro to report
19 Continue to finish main body
20 Write conclusion & recommendations
21 Draw up all sketches and systems tracings in neat (ongoing)
22 Review final draft with mentor ensuring no drastic errors
23 Analyse report and compare with project plan & spec and marking
scheme and compile final report
25 Finish formatting including contents page, referencing,
bibliography, appendices, title page etc.
Learning Outcome
K1
K1
K2
K1,K2
T1
K1,K2,C1
C1
C1
K1,K2,C2
C1
C1
C1
C1,C2
P1,P2
T3,T4,T5
T1,P1
T3
T1,T2,T3
T1,T2,T3
T1,T2,T3
T1,T2,T3
T2,T3,T4
T2,T4
T2,T3,T4
8/10/2015
8/17/2015
8/24/2015
Onboard Vessel
8/31/2015
9/7/2015
9/14/2015
9/21/2015
9/28/2015
10/5/2015 Description:
Research into various types of systems and differences
Research into materials certain components are generally made from and why
Research into control systems used for controlling production, flow and
regulation of compressed air including safety features.
Research into legislation governing certain requirements for all parts of system
Meet with workplace mentor and explain about WBEP and discuss plan
Inspect full system on board including all components in compressed air system
Trace out Start air, Service Air and Control Air systems noting all components
and purposes
Meet with workplace mentor to confirm system design on board and any other
questions about compressed air system or WBEP
Read through ships manuals to find any usefull info on air system and take
notes
Inspect Air start system, how it works and why. Noting any instantly visible
problems or areas for possible improvement
Inspect Service air system how it works and why. Noting any instantly visible
problems or areas for possible improvement
Inspect Control Air system how it works and why. Noting any instantly visible
problems or areas for possible improvement
Collect Notes from thorough inspections
Review notes with mentor and ask for any feedback or notable things missing
Start to compile report from knowledge gained from research before joining
and inspection of the system once on board
Compare report to project spec plan ensuring it includes topics specified in
technical specification
Review Initial draft with mentor noting feedback and discussing content of
report and any parts missing or unnecessary
Write Intro to report
Continue to finish main body
Write conclusion & recommendations
Draw up all sketches and systems tracings in neat (ongoing)
Review final draft with mentor ensuring no drastic errors
Analyse report and compare with project plan & spec and marking scheme
Finish formatting including contents page, referencing, bibliography,
appendices, title page etc.
10/12/2015
10/19/2015
10/26/2015
11/2/2015
11/9/2015
11/16/2015
11/23/2015
11/30/2015
12/7/2015
12/14/2015
GANTT CHART
Task: Description:
1 Research into various types of systems and differences
2 Research into materials certain components are generally made
from and why
3 Research into control systems used for controlling production, flow
and regulation of compressed air including safety features.
4 Research into legislation governing certain requirements for all
parts of system
5 Meet with workplace mentor and explain about WBEP and discuss
plan
6 Inspect full system on board including all components in
compressed air system
7 Trace out Start air, Service Air and Control Air systems noting all
components and purposes
8 Meet with workplace mentor to confirm system design on board
and any other questions about compressed air system or WBEP
9 Read through ships manuals to find any usefull info on air system
and take notes
10 Inspect Air start system, how it works and why. Noting any instantly
visible problems or areas for possible improvement
11 Inspect Service air system how it works and why. Noting any
instantly visible problems or areas for possible improvement
12 Inspect Control Air system how it works and why. Noting any
instantly visible problems or areas for possible improvement
13 Collect Notes from thorough inspections
14 Review notes with mentor and ask for any feedback or notable
things missing
15 Start to compile report from knowledge gained from research
before joining and inspection of the system once on board
16 Compare report to project spec plan ensuring it includes topics
specified in technical specification
17 Review Initial draft with mentor noting feedback and discussing
content of report and any parts missing or unnecessary
18 Write Intro to report
19 Continue to finish main body
20 Write conclusion & recommendations
21 Draw up all sketches and systems tracings in neat (ongoing)
22 Review final draft with mentor ensuring no drastic errors
23 Analyse report and compare with project plan & spec and marking
scheme
24 Final review with mentor and correct any suggestions
25 Finish formatting including contents page, referencing,
bibliography, appendices, title page etc.
7/20/2015
7/27/2015
8/3/2015
Onboard Vessel
8/10/2015
8/17/2015
8/24/2015
8/31/2015
9/7/2015
9/14/2015
Description:
Research into various types of systems and differences
Research into materials certain components are generally made from and why
Research into control systems used for controlling production, flow and
regulation of compressed air including safety features.
Research into legislation governing certain requirements for all parts of system
Meet with workplace mentor and explain about WBEP and discuss plan
Inspect full system on board including all components in compressed air
system
Trace out Start air, Service Air and Control Air systems noting all components
and purposes
Meet with workplace mentor to confirm system design on board and any other
questions about compressed air system or WBEP
Read through ships manuals to find any usefull info on air system and take
notes
Inspect Air start system, how it works and why. Noting any instantly visible
problems or areas for possible improvement
Inspect Service air system how it works and why. Noting any instantly visible
problems or areas for possible improvement
Inspect Control Air system how it works and why. Noting any instantly visible
problems or areas for possible improvement
Collect Notes from thorough inspections
Review notes with mentor and ask for any feedback or notable things missing
Start to compile report from knowledge gained from research before joining
and inspection of the system once on board
Compare report to project spec plan ensuring it includes topics specified in
technical specification
Review Initial draft with mentor noting feedback and discussing content of
report and any parts missing or unnecessary
Write Intro to report
Continue to finish main body
Write conclusion & recommendations
Draw up all sketches and systems tracings in neat (ongoing)
Review final draft with mentor ensuring no drastic errors
Analyse report and compare with project plan & spec and marking scheme
Final review with mentor and correct any suggestions
Finish formatting including contents page, referencing, bibliography,
appendices, title page etc.
9/21/2015
9/28/2015
11/2/2015
12/7/2015