Halcrow Group Ltd.


PO Box 360 Dubai UAE
Tel +971 4 3370380 Fax +971 4 3379239
www.halcrow.com
Halcrow Group Ltd has prepared this report in accordance with the instructions of their
client for their sole and specific use. Any other persons who use any information
contained herein do so at their own risk.

Halcrow Group Limited 2006

CALCULATION TITLE SHEET


Project Title

DIFTAH CLOVERLEAF INTERCHANGE

Project Code:

THDCLI / 102

Calculation Title:

Design Calculations

Serial No:

PGS 4313

Project Manager

Manjunatha Malige

No. of Sheets:

Status

Prepared by:

MKB

Schematic

Preliminary

Date:

NOV 2006

Tender

Other (state)

Checked by:

ATQ

Final for Construction

Date:

NOV 2006

Levels of Verification

Approved by:

AWH

Self-check by
originator and
approval

Calculation
Review and
approval

Detailed check
and approval

3B

Comparison with
similar proven designs
and approval

External check and


internal approval

Other verification as
stated in Management
Plan

Alternative
calculations and
approval

3A

Date:
Computer Analysis:
Yes:

YES

No:

Program(s):
LEAP5 CLASSIC,
EXCEL SPREADSHEETS
Hardware:

Contents (continue on calculation sheet if necessary)


1. INTRODUCTION

----------------------------------- A

2. DESIGN CRITERIA

----------------------------------- B

3. GEOMETRY

----------------------------------- C

4. LOADS

----------------------------------- D

5. LEAP INPUT FILE

----------------------------------- E

6. RESULTS SUMMARY

----------------------------------- F

7. SECTION DESIGN

----------------------------------- G

8. BEARING PRESSURE CHECK

------------------------------------ H

9. DESIGN OF WING WALLS & APRON SLAB

------------------------------------ I

10. ANNEXURE 1 - DESIGN CRITERIA

----------------------------------- J

11. ANNEXURE 2 - DRAWINGS

----------------------------------- K

NB: Calculations should state or refer to design input data and methodology
CONTENTS AMENDMENT RECORD
Rev
0

Rev 1

Status

Date
02/11/06

Description

Page
FIRST ISSUE

By
MKB

Chk'd
ATQ

App'd
AWH

121F1

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

A
INTRODUCTION

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

INTRODUCTION

A 1 Rev.

By:

Date:
MKB

Check By:

1-Nov-06
Date:

ATQ
References/Results

INTRODUCTION:
The culvert for diverting the wadi ( water stream) under the Diftah cloverleaf is proposed
to divert a discharge of upto 100 m3/sec from upstream side. The culvert Is proposed
with 3 cells of 3.5m x 3.5m Box with wing walls on both upstream and down stream ends
with a apron for scour protection.
List of Relevant Documents include:
BS 5400 -

Steel, Concrete and Composite Bridges

BS 8002 -

Code of Practice for Earth Retaining Structures

BS 8004 -

Code of Practice for Foundations

BD 37/01 -

Loads for Highway Bridges

BD 31/01 -

The Design of Burried Concrete Box and Portal Frame Structures

BD28/87 -

Early Thermal Cracking of concrete

BA24/87 -

Early Thermal Cracking of concrete

DESCRIPTION OF STRUCTURE:
The length of the culvert is proposed to be of 75m. The culvert carries the embankment of
the cloverleaf which carries a 25m wide carriage way over it. The area consists
predominantly soft rock and the bearing stratum of the culvert could be on a rock strata.
The geotechnical investigation is in progress.
The carriage way consists of 4 lanes of 3.65m wide with a 2.6m median. It contains 2.5m
hard shoulders on either sides and a 1m footpath.

STRUCTURAL ANALYSIS:
A plane frame analysis is carried out for the culvert by using the STAAD PRO software.
The soil support is modelled as discrete springs below the bottom slab. The idealized
model for Culvert is attached in the calculation. The loads considered for the ana

BPG121_F01(Excel)

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

B
DESIGN CRITERIA

CALCULATION SHEET No.


Project:

By:

Diftah Clover Leaf Interchange, Sharjah

Subject:

B1

Check By:

1-Nov-06
Date:

References/Results
Input

DESIGN CRITERIA:
1-

Loading according to BD 37/01 & BD 31/01

2-

Design as recommended by BD 28/87, BS 5400 Part 4

3-

Analysis and Design parameters:


a.

Soil Density

20

KN/m3

b.

Concrete Density

25

KN/m3

c.

Surfacing Density

23

KN/m3

d.

Cover to reinforcement

75

mm in contact with soil

50

mm not in contact with soil

e.

Characteristic strength of concrete


Modulus of Elasticity ( E )

=
=

Yield strength of steel

g.

Crack Width Limitations

N/mm 2

2
31,000,000 KN/m

Table 3, BS5400-4

2
12,916,667 KN/m

Shear Modulus ( G )
f.

40

2
460 N/mm

- Bottom Faces of Base Slab :

0.125 mm

- Inside Faces of Culvert

0.125 mm

- Buried and in contact with ground water or soil :

0.125 mm

- Top Faces of Top Slab

0.125 mm

h.

Bearing Capacity

2
400 KN/m

i.

Modulus of Subgrade Reaction

40,000

Date:
MKB

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Rev.

KN/m3

BPG121_F01(Excel)

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

C
GEOMETRY

ANALYSIS OF BOX CULVERTS No.


Project:
Subject:

Date:
MKB

1-Nov-06

Checked By:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Date:

Section Properties
About Centroidal Axis Parallel to Original Axis
=
0.000 deg
X-dim =
13.5 m
A=
30.75 m^2
Y-dim =
5m
Xcg =
0.000 m
Sx(top) =
41.2 m^3
Ycg =
-2.500 m
Sx(bot) =
41.2 m^3
Ixo =
103.109 m^4
Sy(left) =
80.8 m^3
Iyo =
545.1 m^4
Sy(right)=
80.8 m^3
Ixyo =
0.0 m^4

Nodes Coordinates
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

Rev. 0

By:

Diftah Clover Leaf Interchange, Sharjah

.
Units:

C1

X
0.000
6.75
6.75
4.25
4.25
6
6
6
6
2.5
2.5
2.5
2.5
4.25
4.25
0
0
1.75
1.75
1.75
1.75
-1.75
-1.75
-1.75
-1.75
0
0
-4.25
-4.25
-2.5
-2.5
-2.5
-2.5
-6
-6
-6
-6
-4.25
-4.25
-6.75
-6.75
0
0
0
0
0

Y
0.000
0
-5
-5
-4.25
-4.25
-4.25
-0.75
-0.75
-0.75
-0.75
-4.25
-4.25
-4.25
-5
-5
-4.25
-4.25
-4.25
-0.75
-0.75
-0.75
-0.75
-4.25
-4.25
-4.25
-5
-5
-4.25
-4.25
-4.25
-0.75
-0.75
-0.75
-0.75
-4.25
-4.25
-4.25
-5
-5
0
0
0
0
0
0

1
-8

-6

-4

-2

0
-1 0

-2
-3
-4
-5
-6
-7
-8
-9

Input
Clear cell width
Clear cell height
Number of cells
Web thickness
Top slab thickness
Base slab thickness

3.50
3.50
3
0.75
0.75
0.75

Overall culvert width


Overall culvert depth

13.5 m
5m

Thickness of surfacing
Total Fill Height (including surfacing)

m
m
No.
m
m
m

0m
13 m

File: Culvert All.xls

Page No. C 2

40

41

42 43 44 45 46 47 48 49 50 51 52 53

54

55

56

57 58 59 60 61 62 63 64 65 66 67 68

69

70

71

72 73 74 75 76 77 78 79 80 81 82 83

84

85

K= .469E+04
K= .130E+05K= .111E+05
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .111E+05K= .130E+05
K= .938E+04
K= .130E+05K= .111E+05
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .111E+05K= .130E+05
K= .938E+04
K= .130E+05K= .111E+05
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .543E+04
K= .111E+05K= .130E+05
K= .469E+04

Supports

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

SCALE

STRUCTURE

= 1 TO

60.000

Page No. C 3

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42 43 44 45 46 47 48 49 50 51 52 53

54

55

56

57 58 59 60 61 62 63 64 65 66 67 68

Joint Numbers

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

SCALE

STRUCTURE

= 1 TO

56.000

69

70

71

72 73 74 75 76 77 78 79 80 81 82 83

84

85

Page No. C 4

10

11

12

13

14

15

16

17

18

19

25

31

37

20

26

32

38

21

27

33

39

22

28

34

40

23

29

35

41

24

30
43

44

45 46 47 48 49 50 51 52 53 54 55

56

57

36
58

59

60 61 62 63 64 65 66 67 68 69 70

71

Member Numbers

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

SCALE

STRUCTURE

= 1 TO

56.000

72

42
73

74

75 76 77 78 79 80 81 82 83 84 85

86

87

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

D
LOADS

CALCULATION SHEET No.

D1

By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:
0

Rev.

Date:
1-Nov-06
Date:

References/Results
Applied Loadings:
Self Weight of concrete culvert

1- DEAD LOAD
take

= 25

KN/m3

m thick of asphalt

2- SURFACING
23

KN/m

0.0

3- FILL
13

The fill is

m thick excluding the surfacing

1.733

Figure 3.1, BD31/01

For max. superimposed D.L intensity use


1.733 X

13

20 X

H ;

3.1.2(c), BD31/01

H ;

3.1.2(c), BD31/01

450.7 KN/m

For min. superimposed D.L intensity use


13

20 X

260 KN/m

4- Earth pressure :
=

13

h acting on bottom

h acting top

+
13

+ 0.375 =
0

13.38 m

4.625 =

17.6 m

MAX E.P.

For analysis we consider the following cases:


q = K0 X h X =

MIN E.P.

Ko=

Ko=

2
211.5 KN/m

q = K0 X h X =

2
53.5 KN/m

qo=
q=

0.2

0.6

2
211.5 KN/m
2
53.5 KN/m

Ko=

qo=
q = Ka X h X =

Ka=

2
q= 160.5 KN/m

0.6

qo=

Ko=

TRACTION E.P.

2
160.5 KN/m

2
70.5 KN/m
2
88.3 KN/m

0.33

qo=

qa=

2
116.3 KN/m

0.2

2
70.5 KN/m

2
q= 160.5 KN/m

K=

q = K0.6 X h X =

0.6

2
211.5 KN/m

BPG121_F01(Excel)

D2

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

By:

Rev.

Date:
1-Nov-06

MKB
Check By:
0

Date:

References/Results

5- Live Load Surchage


The following loads shall be used in the different combinations
2
a) Assume a 20 KN/m HB 45 unit Live Load surcharge applied on either of the two sides.

20 x Ko x 1.0=

12.0 KN/m

b) Assume a 12 KN/m2 HB 30 unit Live Load surcharge applied on either of the two sides.
12 x Ko x 1.0=

7.2

KN/m

c) Assume a 10 KN/m2 HA Live Load surcharge applied on either of the two sides.
10 x Ko x 1.0=

6.0

KN/m

6- Live Loading on top:


** HA - live loading on top:
a) L= 13.00 m

3.65 m

& National Lane =

W = 336 x (1 / L)

0.67

W per national lane=

60.3

if L=

KN/m/lane

W=

16.51 KN/m
=

120

b) KEL Live Load =

W=

26

m then,

37.9 KN/m/lane

10.4

KN/m

2.22

KN/m2

32.88 KN

3.65
** HB- Live Loading on top:

a) For Serviceability Limit State use HB 30 unit


1.8
Dispersal of Loads

0.3

1.8

13

0.75

15.9 m

Dispersal of Loads

0.3

3.0

13

0.75

17.1 m

75

KN

1
W=( 300 / 4) =

(per Wheel)

After disperse =

2.22 KN/m2

Use 20 KN/m2

b) For Ultimate Limit State use HB 45 unit


W= (450 / 4) =

112.5 KN/m

(per Wheel)

a)

After disperse =

3.33 KN/m

b)

3.33

KN/m

Use 20 KN/m2
As Fill height is greater than 0.6m, therefore HA udl is replaced by 30 Units of HB.
Further more as the dispersed load of HB comes out to be lesser than 20 kN/m2, therefore
applying 20 kN/m2

D3

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

By:
MKB
Check By:
0

Rev.

Date:
1-Nov-06
Date:

References/Results

7- Longitudinal Load:
ULS HB45
** For ULS
a)

136.4 KN/m

a) The Longitudinal loading acting on the box in case of HA live load


From HA: 8 * L + 250
8 X

13.0

250 =

354.0 KN

354.0

3.65

= 96.99 KN/m

OR
45

unit

From HB: 25% of total nominal HB Load


0.25

Kt =(

13.0 -

HB Traction =

13

X 450.0 = 450.0 KN

)/(

136.4 x

450.0

3.3

= 136.4 KN/m

13.0

0.6

) = 0.04

1.1

0.04 x

1.1

BD 31/01, 3.2.7.e
=

6.395 KN/m

Page No. D 4

Self Weight

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

DEAD -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Page No. D 5

Fill

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

FILL -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Page No. D 6

Maximum Earth Pressuret

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

MAXEP -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Page No. D 7

Minimum Earth Pressure

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

MINEP -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Page No. D 8

Live Load Surcharge

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

SUR_12 -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Page No. D 9

Live Load Placement for Maximum Sagging in Exterior Cell

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

HB20 -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Page No. D 10

Live Load Placement for Maximum Sagging/Hogging in Interior Cell

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

HB20- -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Traction Load

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

TITLE :

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

ULS_TRAC -

SCALE

STRUCTURE

= 1 TO

78.000

MEMBER POINT LINEAR UNIFORM LOADS

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

E
LEAP Input File

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert
$FILENAME 'CULVERT.INP' CREATED BY
$CULVERT ANALYSIS -

MKB

ON

1/Nov/06

"3 CELL, 3.5m x 3.5m, 13 m FILL"

PROMPT OFF
SIFT OFF
ECHO OFF
BRIEF OFF
JOB TITLE

"CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL"

UNITS KN M
STRUCTURE DEFINITION TITLE 'CULVERT ANALYSYS'
STRUCTURE TYPE PLANE FRAME
JOINT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
54
55

COORDINATES
0.375 -0.375
0.75 -0.375
1.415 -0.375
2.5
-0.375
3.585 -0.375
4.25 -0.375
4.625 -0.375
5
-0.375
5.665 -0.375
6.75 -0.375
7.835 -0.375
8.5
-0.375
8.875 -0.375
9.25 -0.375
9.915 -0.375
11
-0.375
12.085
-0.375
12.75 -0.375
13.125
-0.375
0.375 -0.75
4.625 -0.75
8.875 -0.75
13.125
-0.75
0.375 -1.415
4.625 -1.415
8.875 -1.415
13.125
-1.415
0.375 -2.5
4.625 -2.5
8.875 -2.5
13.125
-2.5
0.375 -3.585
4.625 -3.585
8.875 -3.585
13.125
-3.585
0.375 -4.25
4.625 -4.25
8.875 -4.25
13.125
-4.25
0.375 -4.625
0.75 -4.625
1.415 -4.625
UNTIL 53
4.25 -4.625
4.625 -4.625

3.585 -4.625

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert
56
57
69
70
71
72
84
85

5
-4.625
5.665 -4.625
UNTIL 68
8.5
-4.625
8.875 -4.625
9.25 -4.625
9.915 -4.625
UNTIL 83
12.75 -4.625
13.125
-4.625

MEMBER CONNECTIONS
1
1
2
UNTIL
19
1
20
20
20
24
UNTIL
25
7
21
26
21
25
UNTIL
30
37
55
31
13
22
32
22
26
UNTIL
36
38
70
37
19
23
38
23
27
UNTIL
42
39
85
43
40
41
UNTIL

7.835 -4.625

12.085

-4.625

18
24

INC

29

INC

35

INC

41

INC

87

MATERIAL PROPERTIES
'CONC' E 31000000 G 12916666.6666667 NU 0.2 EXPANSION 1.2E-5

MEMBER PROPERTIES MATERIAL 'CONC'


1 TO 18 SECTION 'SLAB'
43 TO 87 SECTION 'BASE'
19 TO 24 37 TO 42 SECTION 'EWEB'
25 TO 36 SECTION 'IWEB'
SECTION PROPERTIES
'SLAB' AX
0.75 IZ
'BASE' AX
0.75 IZ
'EWEB' AX
0.75 IZ
'IWEB' AX
0.50 IZ
JOINT SUPPORTS
40 85 SPRUNG DY
55 70 SPRUNG DY
41 54 56 69 71 84
42 53 57 68 72 83
43 TO 52 58 TO 67
40 FIXED DX

0.03515625
0.03515625
0.03515625
0.01041666

7500
15000
SPRUNG DY
20800
SPRUNG DY
17640
73 TO 82 SPRUNG DY

LOADING 'DEAD'
MEMBER LOADS
1 TO 87 UNIFORM GLOBAL VOLUME FY -25
LOADING 'SURF'
MEMBER LOADS
1 TO 18 UNIFORM GLOBAL FY 0
LOADING 'FILL'
MEMBER LOADS
1 TO 18 UNIFORM GLOBAL FY -260
LOADING 'MAXEP'

8680

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert
MEMBER LOADS
19
LINEAR
20
LINEAR
21
LINEAR
22
LINEAR
23
LINEAR
24
LINEAR
$
37
LINEAR
38
LINEAR
39
LINEAR
40
LINEAR
41
LINEAR
42
LINEAR

GLOBAL
GLOBAL
GLOBAL
GLOBAL
GLOBAL
GLOBAL

FX
FX
FX
FX
FX
FX

160.5 165
165
172.98
172.98
186
186
199.02
199.02
207
207
211.5

GLOBAL
GLOBAL
GLOBAL
GLOBAL
GLOBAL
GLOBAL

FX
FX
FX
FX
FX
FX

-160.5
-165
-165 -172.98
-172.98
-186
-186 -199.02
-199.02
-207
-207 -211.5

LOADING 'MINEP'
MEMBER LOADS
19
LINEAR GLOBAL FX
20
LINEAR GLOBAL FX
21
LINEAR GLOBAL FX
22
LINEAR GLOBAL FX
23
LINEAR GLOBAL FX
24
LINEAR GLOBAL FX
$
37
LINEAR GLOBAL FX
38
LINEAR GLOBAL FX
39
LINEAR GLOBAL FX
40
LINEAR GLOBAL FX
41
LINEAR GLOBAL FX
42
LINEAR GLOBAL FX
$
LOADING 'SUR_12'
MEMBER LOADS
19 TO 24 UNIFORM GLOBAL
37 TO 42 UNIFORM GLOBAL
LOADING 'ULS_TRAC'
MEMBER LOADS
19
LINEAR GLOBAL FX
20
LINEAR GLOBAL FX
21
LINEAR GLOBAL FX
22
LINEAR GLOBAL FX
23
LINEAR GLOBAL FX
24
LINEAR GLOBAL FX
$
37
LINEAR GLOBAL FX
38
LINEAR GLOBAL FX
39
LINEAR GLOBAL FX
40
LINEAR GLOBAL FX
41
LINEAR GLOBAL FX
42
LINEAR GLOBAL FX
$
19 TO 24 UNIFORM GLOBAL
$
JOINT LOAD
1 FX 6.4
$
$
$
$

53.5
55
57.66
62
66.34
69

55
57.66
62
66.34
69
70.5

-53.5 -55
-55
-57.66
-57.66
-62
-62
-66.34
-66.34
-69
-69
-70.5

FX 7.2
FX -7.2

145.65375
149.7375
156.97935
168.795
180.61065
187.8525

149.7375
156.97935
168.795
180.61065
187.8525
191.93625

-160.5
-165
-165 -172.98
-172.98
-186
-186 -199.02
-199.02
-207
-207 -211.5
FX 6.6

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert
$
$
$
$
$
$
$
$
$
$
$
LOADING 'HB20'
MEMBER LOADS
1 TO 6 UNIFORM GLOBAL FY -20
LOADING 'HB20-'
MEMBER LOADS
1 TO 12 UNIFORM GLOBAL FY -20
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
FORM STRUCTURE
SOLVE STRUCTURE
UNIVERSAL RESULTS FILE 'CULVERT.URF'
REPLACE DATABASE ON 'CULVERT.db'
FORM LOAD CASES
SOLVE LOAD CASES

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

F
RESULTS SUMMARY

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

MKB

1 Rev.

Date:
1-Nov-06
Date:

References/Results

Analysis Results
Moments in kN m and Shear in kN

Bottom Slab

Section

Member

43

44

45

51

57

58

65

Node

40

41

42

48

54

55

62

Axial

-21.87

-21.87

-21.87

-21.87

-21.87

-27.95

-27.95

Shear

86.33

61.23

47.53

-4.65

-73.49

67.56

-1.85

Moment

64.90

31.21

-13.66

-45.94

7.44

45.10

-39.23

Axial

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Shear

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Moment

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Axial

-0.83

-0.83

-0.83

-0.83

-0.83

-2.01

-2.01

Shear

436.70

304.78

196.50

-117.37

-566.44

511.00

0.00

Moment

156.75

-7.01

-209.69

-286.92

222.02

427.20

-175.77

Axial

-412.26

-412.26

-412.26

-412.26

-412.26

-410.67

-410.67

Shear

53.01

53.27

52.23

48.19

46.09

-5.82

0.00

Moment

173.93

154.05

118.63

58.77

-18.22

-30.31

-22.85

Axial

-137.42

-137.42

-137.42

-137.42

-137.42

-136.89

-136.89

Shear

17.67

17.76

17.41

16.06

15.36

-1.94

0.00

Moment

57.98

51.35

39.54

19.59

-6.07

-10.10

-7.62

Empty Table

Deapth
Dead

Surf

Fill

Max. E.P.

Min. E.P.

Surcharge Axial

Traction
ULS

-15.25

-15.25

-15.25

-15.25

-15.25

-15.19

-15.19

Shear

2.05

2.06

2.02

1.86

1.78

-0.23

0.00

Moment

6.71

5.94

4.57

2.25

-0.72

-1.18

-0.88

-423.39

-423.39

-423.39

-423.39

-423.39

-417.85

-417.85

Axial
Shear

51.30

50.18

48.31

42.49

38.97

-7.72

-2.37

Moment

157.24

138.01

104.64

50.39

-16.04

-34.35

-22.52

Fill Table

BPG121_F01(Excel)

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

MKB

2 Rev.

Date:
1-Nov-06
Date:

References/Results

Live Load Results


Moments in kN m and Shear in kN

Bottom Slab

Member

43

44

45

51

57

58

65

Mode

40

41

42

48

54

55

62

Axial

-2.38

-2.38

-2.38

-2.38

-2.38

-5.51

-5.51

Shear

37.43

26.01

17.38

-5.15

-30.16

21.68

4.24

Moment

18.64

4.61

-12.69

-21.70

5.58

20.92

-6.69

Load
HB20

HB20-

Axial

3.31

3.31

3.31

3.31

3.31

5.34

5.34

Shear

39.12

25.34

14.53

-15.34

-53.73

39.23

4.24

Moment

6.73

-7.94

-24.79

-26.96

26.09

41.10

-7.34

Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment

Note:
LL results include Gfl factor of 1.2 for HA and 1.1 for HB

BPG121_F01(Excel)

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

Bottom Slab

Member

43

44

45

51

57

58

65

Mode

40

41

42

48

54

55

62

-435.08

-435.08

-435.08

-435.08

-440.94

-440.94

1.208

SDL factor =

SLS

Axial

-435.08

Perm

Shear

641.55

465.00

325.73

-91.43

-678.80

649.40

-1.85

Moment

419.09

177.19

-136.18

-317.13

244.54

506.08

-264.21

Moment

13 m

Fill Height

Combination 1-A

Axial

Date:

References/Results

Moments in kN m and Shear in kN

Live (Max) Shear

Date:
1-Nov-06

MKB

Combinations According to BD 31/01

SLS

-2.38

-2.38

-2.38

-2.38

3.31

5.34

-5.51

37.43

26.01

17.38

-5.15

-53.73

39.23

4.24

18.64

3 Rev.

26.09

41.10

HB20

HB20

4.61

HB20

-12.69

HB20

-21.70

HB20-

HB20-

HB20

-6.69
0

3.31

3.31

-2.38

-5.51

5.34

SLS

Axial

3.31

3.31

Live (Min)

Shear

39.12

25.34

14.53

-15.34

-30.16

21.68

4.24

Moment

6.73

-7.94

-24.79

-26.96

5.58

20.92

-7.34

HB20-

HB20-

HB20-

HB20-

HB20

HB20

HB20-

ULS

Axial

-754.18

-754.18

-754.18

-754.18

-746.77

-750.85

-764.96

(Max)

Shear

913.89

667.49

472.74

-106.11

-941.71

901.95

3.18

Moment

649.70

305.33

-143.80

-418.70

348.30

705.74

-365.27

ULS

Axial

-293.29

-293.29

-293.29

-293.29

-300.69

-313.23

-299.12

(Min)

Shear

857.77

608.03

411.58

-172.36

-961.78

885.53

3.18

Moment

442.90

119.57

-290.01

-490.19

341.68

712.84

-340.98

-434.96

-434.96

-434.96

-440.63

-440.63

Combination 1-B
SLS

Axial

-434.96

-434.96

Perm

Shear

576.04

419.28

296.25

-73.83

-593.84

572.75

-1.85

Moment

395.58

178.24

-104.72

-274.09

211.24

442.00

-237.84

Axial

-15.25

-15.25

-15.25

-15.25

-15.25

-15.19

-15.19

2.05

2.06

2.02

1.86

1.78

-0.23

0.00

6.71

5.94

4.57

2.25

-0.72

-1.18

-0.88

Axial

-744.86

-744.86

-744.86

-744.86

-744.86

-749.35

-749.35

Shear

616.15

459.57

335.76

-37.38

-558.97

568.34

-1.85

Moment

527.07

294.70

-15.06

-229.70

197.41

419.06

-255.13

SLS

Surcharge Shear
Moment
ULS

BPG121_F01(Excel)

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

4 Rev.

Date:
1-Nov-06

MKB

Date:

References/Results

Combinations According to BD 31/01


Moments in kN m and Shear in kN

Bottom Slab

Member

43

44

45

51

57

58

65

Mode

40

41

42

48

54

55

62

Axial

-160.24

-160.24

-160.24

-160.24

-160.24

-167.16

-167.16

Shear

606.20

429.49

290.91

-123.56

-709.53

653.28

-1.85

Moment

303.14

74.49

-215.26

-356.31

256.68

526.28

-248.98

Combination 1-C
SLS
Perm

SLS

Axial

Live (Max) Shear


Moment

-2.38

-2.38

-2.38

-2.38

3.31

5.34

-5.51

37.43

26.01

17.38

-5.15

-53.73

39.23

4.24

26.09

41.10

HB20

18.64

HB20

4.61

HB20

-12.69

HB20

-21.70

HB20-

HB20-

HB20

-6.69
0

3.31

3.31

-2.38

-5.51

5.34

SLS

Axial

3.31

3.31

Live (Min)

Shear

39.12

25.34

14.53

-15.34

-30.16

21.68

4.24

Moment

6.73

-7.94

-24.79

-26.96

5.58

20.92

-7.34

HB20-

HB20-

HB20-

HB20-

HB20

HB20

HB20-

ULS

Axial

-409.92

-409.92

-409.92

-409.92

-402.52

-407.91

-422.03

(Max)

Shear

869.37

622.76

428.88

-146.57

-980.41

906.84

3.18

Moment

503.71

176.03

-243.35

-468.00

363.65

731.20

-346.08

ULS

Axial

-402.52

-402.52

-402.52

-402.52

-409.92

-422.03

-407.91

(Min)

Shear

871.56

621.89

425.17

-159.81

-949.78

884.03

3.18

Moment

488.23

159.73

-259.08

-474.84

336.99

704.96

-346.93

Axial

-455.41

-455.41

-455.41

-455.41

-448.00

-449.32

-463.43

Combination 4
ULS

Shear

872.08

624.11

429.32

-148.26

-983.70

904.45

0.81

Moment

501.52

172.83

-247.45

-471.48

364.31

724.63

-347.65

ULS

Axial

-448.00

-448.00

-448.00

-448.00

-455.41

-463.43

-449.32

(Min)

Shear

874.26

623.25

425.61

-161.50

-953.06

881.64

0.81

Moment

486.04

156.52

-263.18

-478.32

337.65

698.40

-348.50

-409.92

-409.92

-409.92

-409.92

-402.52

-407.91

-422.03

913.89

667.49

472.74

-37.38

-558.97

906.84

3.18

649.70

305.33

-15.06

-229.70

364.31

731.20

-255.13

-744.86

-744.86

-744.86

-744.86

-744.86

-749.35

-749.35

Shear

616.15

459.57

335.76

-172.36

-961.78

568.34

-1.85

Moment

442.90

119.57

-290.01

-490.19

197.41

419.06

-348.50

914
650

667
305

473
290

172
490

984
364

907
731

3
365

(Max)

Design Forces
ULS (Max) Axial
Shear

Moment

ULS (Min) Axial

Design
Shear
Moment

BPG121_F01(Excel)

CALCULATION SHEET No.

By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:

5 Rev.

Date:
1-Nov-06
Date:

References/Results
Bottom Slab
Design Forces
SLS-Perm Axial

-160.24

-160.24

-160.24

-160.24

-160.24

-167.16

(max)

419.09

178.24

-104.72

-274.09

256.68

526.28

-237.84

SLS-Perm Axial

-435.08

-435.08

-435.08

-435.08

-435.08

-440.94

-440.94

(min)

Moment

303.14

74.49

-215.26

-356.31

211.24

442.00

-264.21

SLS-LL

Axial

Moment

-167.16

Moment

-2.38

-2.38

-2.38

-2.38

3.31

5.34

-5.51

(max)

18.64

5.94

4.57

2.25

26.09

41.10

-0.88

SLS-LL

Axial

-15.25

-15.25

-15.25

-15.25

-15.25

-15.19

-15.19

(min)

Moment

6.71

-7.94

-24.79

-26.96

-0.72

-1.18

-7.34

Axial

-435.08

-435.08

-435.08

-435.08

-435.08

-440.94

-440.94

Moment

419.09

178.24

-215.26

-356.31

256.68

526.28

-264.21

Axial

-15.25

-15.25

-15.25

-15.25

-15.25

-15.19

-15.19

Moment

18.64

-7.94

-24.79

-26.96

26.09

41.10

-7.34

Permnent

Live

BPG121_F01(Excel)

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

MKB

6 Rev.

Date:
1-Nov-06
Date:

References/Results

Analysis Results
Moments in kN m and Shear in kN

Walls

Section

10

11

12

13

14

Member

20

21

22

23

24

28

30

Node

20

24

28

32

36

29

37

Axial

-25.48

-37.94

-58.29

-78.63

-91.10

-127.65

-149.52

Shear

-21.87

-21.87

-21.87

-21.87

-21.87

-6.08

-6.08

Moment

-19.85

-5.30

18.43

42.16

56.70

-1.51

9.14

Axial

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Shear

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Moment

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-485.17

-485.17

-485.17

-485.17

-485.17

-1172.33

-1172.33

Empty Table

Deapth
Dead

Surf

Fill

Axial
Shear
Moment

Max. E.P.

Min. E.P.

ULS

-0.83

-0.83

-0.83

-0.83

-1.18

-1.18

154.09

154.99

155.89

156.44

-9.74

-7.67

Axial

-52.42

-52.42

-52.42

-52.42

-52.42

52.42

52.42

Shear

317.21

204.83

10.08

-198.79

-333.79

1.59

1.59

Moment

47.95

-125.92

-243.79

-142.70

34.09

8.58

5.79

Axial

-17.47

-17.47

-17.47

-17.47

-17.47

17.47

17.47

Shear

105.74

68.28

3.36

-66.26

-111.26

0.53

0.53

Moment

15.98

-41.97

-81.26

-47.56

11.36

2.86

1.93

-2.03

-2.03

-2.03

-2.03

-2.03

2.03

2.03

Shear

12.65

7.86

0.05

-7.76

-12.55

0.05

0.05

Moment

1.68

-5.14

-9.44

-5.26

1.50

0.33

0.24

Axial

-51.30

-51.30

-51.30

-51.30

-51.30

47.01

47.01

Shear

302.85

196.48

12.59

-184.13

-311.03

5.54

5.54

Moment

51.43

-114.86

-229.44

-137.54

26.84

8.08

-1.61

Surcharge Axial

Traction

-0.83
153.54

Fill Table

BPG121_F01(Excel)

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

MKB

7 Rev.

Date:
1-Nov-06
Date:

References/Results

Live Load Results


Moments in kN m and Shear in kN

Walls

Member

20

21

22

23

24

28

30

Mode

20

24

28

32

36

29

37

Axial

-41.80

-41.80

-41.80

-41.80

-41.80

-56.13

-56.13

Shear

-2.38

-2.38

-2.38

-2.38

-2.38

-3.13

-3.13

Moment

9.41

11.00

13.58

16.17

17.75

-2.63

2.85

Axial

-44.30

-44.30

-44.30

-44.30

-44.30

-100.38

-100.38

Shear

3.31

3.31

3.31

3.31

3.31

2.03

2.03

Moment

19.57

17.37

13.78

10.18

7.98

-0.82

-4.37

Load
HB20

HB20-

Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment

Note:
LL results include Gfl factor of 1.2 for HA and 1.1 for HB

BPG121_F01(Excel)

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

Walls

Member

20

21

22

23

24

28

30

Mode

20

24

28

32

36

29

37

-668.65

-689.00

-701.47

-1423.41

-1445.28

Fill Height

13 m

SDL factor =

Combination 1-A
SLS

Axial

-635.84

-648.31

Perm

Shear

294.39

182.01

-12.74

-221.61

-356.61

-5.85

-5.85

Moment

204.68

45.98

-47.12

78.73

270.70

-4.13

6.11

Axial

-44.30

-44.30

-44.30

-41.80

-41.80

-100.38

-56.13

3.31

3.31

3.31

-2.38

-2.38

2.03

-3.13

Moment

Date:

References/Results

Moments in kN m and Shear in kN

Live (Max) Shear

Date:
1-Nov-06

MKB

Combinations According to BD 31/01

SLS

8 Rev.

19.57

17.37

13.78

HB20-

HB20-

HB20-

SLS

Axial

-41.80

-41.80

Live (Min)

Shear

-2.38

-2.38

Moment

9.41

11.00

-41.80

16.17
HB20

17.75
HB20

1.208

-0.82

2.85

HB20-

HB20

-100.38

-44.30

-44.30

-56.13

-2.38

3.31

3.31

-3.13

2.03

13.58

10.18

7.98

-2.63

-4.37

HB20

HB20

HB20

HB20-

HB20-

HB20

HB20-

ULS

Axial

-918.39

-934.16

-959.90

-982.38

-998.15

-1979.49

-1949.64

(Max)

Shear

533.58

334.98

-7.83

-381.36

-617.28

-4.08

-10.79

Moment

317.16

27.88

-151.71

61.08

392.64

-2.70

13.83

ULS

Axial

-857.48

-873.25

-898.98

-927.97

-943.74

-1979.63

-2064.82

(Min)

Shear

177.24

102.27

-26.33

-155.29

-242.70

-12.54

-5.83

Moment

251.21

158.11

116.21

210.27

342.44

-14.49

-1.93

-1247.56

-1269.43

Combination 1-B
SLS

Axial

-563.07

-575.54

-595.88

-616.22

-628.69

Perm

Shear

294.51

182.13

-12.61

-221.49

-356.49

-5.68

-5.68

Moment

181.65

22.87

-70.37

55.35

247.23

-2.67

7.26

SLS

-2.03

-2.03

-2.03

-2.03

-2.03

2.03

2.03

12.65

7.86

0.05

-7.76

-12.55

0.05

0.05

1.68

-5.14

-9.44

-5.26

1.50

0.33

0.24

Axial

-602.73

-615.19

-635.54

-655.88

-668.35

-1207.90

-1229.78

Shear

535.49

336.90

-5.91

-372.04

-607.96

-4.49

-4.49

Moment

217.44

-73.12

-254.79

-51.86

273.51

3.82

11.68

Axial

Surcharge Shear
Moment
ULS

BPG121_F01(Excel)

CALCULATION SHEET No.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

9 Rev.

Date:
1-Nov-06

MKB

Date:

References/Results

Combinations According to BD 31/01


Moments in kN m and Shear in kN

Walls

Member

20

21

22

23

24

28

30

Mode

20

24

28

32

36

29

37

-600.90

-613.36

-633.71

-654.05

-666.52

-1458.36

-1480.23

Combination 1-C
SLS
Perm

SLS

Axial
Shear

82.91

45.46

-19.46

-89.08

-134.09

-6.92

-6.92

Moment

172.71

129.93

115.40

173.86

247.97

-9.85

2.25

Axial

-44.30

-44.30

-44.30

-41.80

-41.80

-100.38

-56.13

3.31

3.31

3.31

-2.38

-2.38

2.03

-3.13

Live (Max) Shear


Moment

19.57

17.37

13.78

HB20-

HB20-

HB20-

SLS

Axial

-41.80

-41.80

Live (Min)

Shear

-2.38

-2.38

Moment

9.41

11.00

-41.80

16.17
HB20

17.75
HB20

-0.82

2.85

HB20-

HB20

-100.38

-44.30

-44.30

-56.13

-2.38

3.31

3.31

-3.13

2.03

13.58

10.18

7.98

-2.63

-4.37

HB20

HB20

HB20

HB20-

HB20-

HB20

HB20-

ULS

Axial

-874.36

-890.14

-915.87

-938.35

-954.12

-2023.51

-1993.66

(Max)

Shear

266.16

163.15

-15.37

-214.24

-337.99

-5.40

-12.11

Moment

277.37

134.36

53.02

180.18

363.53

-9.90

8.93

ULS

Axial

-871.11

-886.88

-912.62

-941.60

-957.38

-1965.99

-2051.19

(Min)

Shear

258.76

155.74

-22.77

-206.84

-330.59

-12.11

-5.40

Moment

264.17

126.07

52.77

172.40

350.82

-12.25

-0.46

Axial

-877.61

-893.38

-919.12

-941.60

-957.37

-2024.55

-1994.70

Combination 4
ULS

Shear

278.24

171.87

-12.03

-216.15

-343.05

-1.31

-8.02

Moment

284.85

134.93

47.06

173.45

359.11

-9.68

2.01

ULS

Axial

-874.36

-890.13

-915.86

-944.85

-960.62

-1967.03

-2052.22

(Min)

Shear

270.83

164.46

-19.43

-208.74

-335.64

-8.02

-1.31

Moment

271.64

126.64

46.80

165.66

346.41

-12.03

-7.38

-602.73

-615.19

-635.54

-655.88

-668.35

-1207.90

-1229.78

535.49

336.90

-5.91

-214.24

-337.99

-1.31

-4.49

317.16

134.93

53.02

180.18

392.64

3.82

13.83

-874.36

-890.13

-915.86

-944.85

-960.62

-1979.63

-2064.82

Shear

177.24

102.27

-26.33

-372.04

-607.96

-12.54

-5.83

Moment

217.44

-73.12

-254.79

-51.86

273.51

-14.49

-7.38

535
317

337
158

26
255

381
210

617
393

13
14

12
14

(Max)

Design Forces
ULS (Max) Axial
Shear

Moment

ULS (Min) Axial

Design
Shear
Moment

BPG121_F01(Excel)

CALCULATION SHEET No.

F 10 Rev.

By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:

Date:
1-Nov-06
Date:

References/Results
Walls
Design Forces
SLS-Perm Axial

-563.07

-575.54

-595.88

-616.22

-628.69

-1247.56

(max)

204.68

129.93

115.40

173.86

270.70

-2.67

7.26

SLS-Perm Axial

-635.84

-648.31

-668.65

-689.00

-701.47

-1458.36

-1480.23

(min)

Moment

172.71

22.87

-70.37

55.35

247.23

-9.85

2.25

SLS-LL

Axial

Moment

-1269.43

Moment

-2.03

-2.03

-2.03

-2.03

-2.03

2.03

2.03

(max)

19.57

17.37

13.78

16.17

17.75

0.33

2.85

SLS-LL

Axial

-41.80

-41.80

-41.80

-44.30

-44.30

-56.13

-100.38

(min)

Moment

1.68

-5.14

-9.44

-5.26

1.50

-2.63

-4.37

Axial

-635.84

-648.31

-668.65

-689.00

-701.47

-1458.36

-1480.23

Moment

204.68

129.93

115.40

173.86

270.70

-9.85

7.26

Axial

-41.80

-41.80

-41.80

-44.30

-44.30

-56.13

-100.38

Moment

19.57

17.37

13.78

16.17

17.75

-2.63

-4.37

Permnent

Live

BPG121_F01(Excel)

CALCULATION SHEET No.

F 11 Rev.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

MKB

Date:
1-Nov-06
Date:

References/Results

Analysis Results
Moments in kN m and Shear in kN
Section

15

Top Slab
16

17

18

19

20

21

Member

10

Node

10

Axial

21.87

21.87

21.87

21.87

21.87

27.95

27.95

Shear

-18.44

-11.41

1.06

21.40

54.21

-39.84

0.00

Moment

28.05

33.65

37.09

24.91

-41.25

-48.47

-6.13

Axial

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Shear

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Moment

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Axial

0.83

0.83

0.83

0.83

0.83

2.01

2.01

Shear

-485.17

-387.67

-214.77

67.33

522.33

-552.50

0.00

Moment

-153.23

10.42

210.74

290.72

-225.23

-427.12

159.91

Axial

-378.24

-378.24

-378.24

-378.24

-378.24

-379.83

-379.83

Shear

-52.42

-52.42

-52.42

-52.42

-52.42

0.00

0.00

Moment

-178.40

-158.74

-123.88

-67.01

24.73

32.42

32.42

Axial

-126.08

-126.08

-126.08

-126.08

-126.08

-126.61

-126.61

Shear

-17.47

-17.47

-17.47

-17.47

-17.47

0.00

0.00

Moment

-59.47

-52.91

-41.29

-22.34

8.24

10.81

10.81

Empty Table

Deapth
Dead

Surf

Fill

Max. E.P.

Min. E.P.

-15.35

-15.35

-15.35

-15.35

-15.35

-15.41

-15.41

Shear

-2.03

-2.03

-2.03

-2.03

-2.03

0.00

0.00

Moment

-6.93

-6.17

-4.82

-2.61

0.94

1.25

1.25

-367.11

-367.11

-367.11

-367.11

-367.11

-372.65

-372.65

Surcharge Axial

Traction
ULS

Axial
Shear

-51.30

-51.30

-51.30

-51.30

-51.30

-4.28

-4.28

Moment

-175.90

-156.66

-122.55

-66.89

22.88

22.26

31.37

Fill Table

BPG121_F01(Excel)

CALCULATION SHEET No.

F 12 Rev.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

MKB

Date:
1-Nov-06
Date:

References/Results

Live Load Results


Moments in kN m and Shear in kN

Top Slab

Member

10

Mode

10

Axial

2.38

2.38

2.38

2.38

2.38

5.51

5.51

Shear

-41.80

-33.55

-18.92

4.95

43.45

-4.43

-4.43

Moment

-8.52

5.61

23.05

30.63

-11.71

-20.27

-10.85

Load
HB20

HB20-

Axial

-3.31

-3.31

-3.31

-3.31

-3.31

-5.34

-5.34

Shear

-44.30

-36.05

-21.42

2.45

40.95

-51.18

-4.43

Moment

-20.82

-5.75

13.36

23.65

-14.31

-34.71

24.38

Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment
Axial
Shear
Moment

Note:
LL results include Gfl factor of 1.2 for HA and 1.1 for HB

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

Top Slab

Member

10

Mode

10

-355.42

-355.42

-355.42

-355.42

-349.56

-349.56

Fill Height

SLS

Axial

-355.42

Perm

Shear

-628.81

-509.65

-298.35

46.41

602.47

-675.22

0.00

Moment

-326.57

-113.11

155.56

292.23

-275.54

-507.23

210.19

Moment

13 m

SDL factor =

Combination 1-A

Axial

Date:

References/Results

Moments in kN m and Shear in kN

Live (Max) Shear

Date:
1-Nov-06

MKB

Combinations According to BD 31/01

SLS

2.38

2.38

2.38

2.38

2.38

5.51

-5.34

-41.80

-33.55

-18.92

4.95

43.45

-4.43

-4.43

-8.52
HB20

F 13 Rev.

5.61
HB20

23.05
HB20

SLS

Axial

-3.31

-3.31

-3.31

Live (Min)

Shear

-44.30

-36.05

-21.42

Moment

-20.82

-5.75

13.36

30.63
HB20
-3.31

-11.71
HB20

-20.27
HB20

1.208

24.38
HB20-

5.51

-3.31

-5.34

2.45

40.95

-51.18

-4.43

23.65

-14.31

-34.71

-10.85

HB20-

HB20-

HB20-

HB20-

HB20-

HB20-

HB20

ULS

Axial

-634.30

-634.30

-634.30

-634.30

-634.30

-623.51

-637.62

(Max)

Shear

-906.24

-738.62

-441.36

43.63

825.88

-894.86

-5.76

Moment

-521.63

-213.21

179.13

394.90

-365.92

-679.08

323.63

ULS

Axial

-225.64

-225.64

-225.64

-225.64

-225.64

-219.81

-205.70

(Min)

Shear

-851.83

-684.21

-386.95

98.04

880.29

-955.63

-5.76

Moment

-341.37

-53.36

302.80

459.53

-396.50

-733.52

242.16

-355.54

-355.54

-349.87

-349.87

Combination 1-B
SLS

Axial

-355.54

-355.54

-355.54

Perm

Shear

-556.04

-451.50

-266.14

36.31

524.12

-592.34

0.00

Moment

-303.58

-114.67

123.94

248.63

-241.75

-443.16

186.20

Axial

-15.35

-15.35

-15.35

-15.35

-15.35

-15.41

-15.41

-2.03

-2.03

-2.03

-2.03

-2.03

0.00

0.00

-6.93

-6.17

-4.82

-2.61

0.94

1.25

1.25

Axial

-643.62

-643.62

-643.62

-643.62

-643.62

-639.13

-639.13

Shear

-595.69

-491.16

-305.79

-3.35

484.46

-592.34

0.00

Moment

-438.61

-234.82

30.17

197.88

-223.09

-418.64

210.72

SLS

Surcharge Shear
Moment
ULS

BPG121_F01(Excel)

CALCULATION SHEET No.

F 14 Rev.

Project:

Diftah Clover Leaf Interchange, Sharjah

By:

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Check By:

Date:
1-Nov-06

MKB

Date:

References/Results

Combinations According to BD 31/01


Moments in kN m and Shear in kN

Top Slab

Member

10

Mode

10

Axial

-103.26

-103.26

-103.26

-103.26

-103.26

-96.34

-96.34

Shear

-593.86

-474.71

-263.40

81.35

637.42

-675.22

0.00

Moment

-207.64

-7.28

238.14

336.91

-292.02

-528.85

188.57

Combination 1-C
SLS
Perm

SLS

Axial

Live (Max) Shear


Moment

2.38

2.38

2.38

2.38

2.38

5.51

-5.34

-41.80

-33.55

-18.92

4.95

43.45

-4.43

-4.43

-8.52
HB20

5.61
HB20

23.05
HB20

30.63
HB20
-3.31

-11.71
HB20
-3.31

-20.27
HB20
-5.34

24.38
HB20-

5.51

SLS

Axial

-3.31

-3.31

-3.31

Live (Min)

Shear

-44.30

-36.05

-21.42

2.45

40.95

-51.18

-4.43

Moment

-20.82

-5.75

13.36

23.65

-14.31

-34.71

-10.85

HB20-

HB20-

HB20-

HB20-

HB20-

HB20-

HB20

ULS

Axial

-314.70

-314.70

-314.70

-314.70

-314.70

-302.60

-316.71

(Max)

Shear

-862.21

-694.59

-397.34

87.66

869.91

-894.86

-5.76

Moment

-371.74

-79.84

283.23

451.23

-386.64

-706.31

296.41

ULS

Axial

-322.11

-322.11

-322.11

-322.11

-322.11

-316.71

-302.60

(Min)

Shear

-865.47

-697.84

-400.59

84.41

866.65

-955.63

-5.76

Moment

-387.72

-94.60

270.63

442.16

-390.02

-725.07

250.60

Axial

-335.09

-335.09

-335.09

-335.09

-335.09

-327.07

-341.18

Combination 4
ULS

Shear

-865.46

-697.84

-400.58

84.41

866.66

-899.14

-10.05

Moment

-384.10

-90.98

274.24

445.76

-386.42

-713.76

298.05

ULS

Axial

-342.50

-342.50

-342.50

-342.50

-342.50

-341.18

-327.07

(Min)

Shear

-868.71

-701.09

-403.84

81.16

863.41

-959.92

-10.05

Moment

-400.09

-105.75

261.64

436.69

-389.80

-732.53

252.25

-314.70

-314.70

-314.70

-314.70

-314.70

-302.60

-316.71

-595.69

-491.16

-305.79

87.66

869.91

-592.34

0.00

-79.84

283.23

451.23

-223.09

-418.64

323.63

-643.62

-643.62

-643.62

-643.62

-643.62

-639.13

-639.13

Shear

-868.71

-701.09

-403.84

-3.35

484.46

-959.92

-10.05

Moment

-438.61

-234.82

30.17

197.88

-396.50

-733.52

210.72

906
522

739
235

441
303

98
460

880
397

960
734

10
324

(Max)

Design Forces
ULS (Max) Axial
Shear

Moment -371.74

ULS (Min) Axial

Design
Shear
Moment

BPG121_F01(Excel)

CALCULATION SHEET No.

F 15 Rev.

By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:

Date:
1-Nov-06
Date:

References/Results
Top Slab
Design Forces
SLS-Perm Axial
(max)

-103.26

Moment -207.64

-103.26

-103.26

-103.26

-103.26

-96.34

-96.34

-7.28

238.14

336.91

-241.75

-443.16

210.19

SLS-Perm Axial

-355.54

-355.54

-355.54

-355.54

-355.54

-349.87

-349.87

(min)

Moment

-326.57

-114.67

123.94

248.63

-292.02

-528.85

186.20

SLS-LL

Axial

Moment

2.38

2.38

2.38

2.38

2.38

5.51

-5.34

(max)

-6.93

5.61

23.05

30.63

0.94

1.25

24.38

SLS-LL

Axial

-15.35

-15.35

-15.35

-15.35

-15.35

-15.41

-15.41

(min)

Moment

-20.82

-6.17

-4.82

-2.61

-14.31

-34.71

-10.85

Axial

-355.54

-355.54

-355.54

-355.54

-355.54

-349.87

-349.87

Moment

-326.57

-114.67

238.14

336.91

-292.02

-528.85

210.19

Axial

-15.35

-15.35

-15.35

-15.35

-15.35

-15.41

-15.41

Moment

-20.82

-6.17

23.05

30.63

-14.31

-34.71

24.38

Permnent

Live

BPG121_F01(Excel)

Page No. F 16

-11.727
-22.554
28.516

-64.270
-42.986
-39.780
-26.157
-24.491

21.476

32.606

-15.352

-2.580

18.259

-8.482

-8.483
2.555

-64.270
-42.986
-39.780
-26.157
24.491

-20.899

20.899

-14.530

14.530

59.072

LEGEND

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

DEAD -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
13911.9744 (KNM)

-39.098

-51.870
-50.662
-50.168
-49.349
-47.857
-46.235
-43.719
-41.326
-37.742
-34.625
-29.912
-26.133
-20.212

-16.215
14.381
30.183
45.062
61.277

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

-18.259

-12.624

2.580

-37.389
-37.389
-35.641
-35.641
-32.142
-32.142
-26.891
-26.891
-19.882
-19.882
-11.112
-11.113
16.215
14.381
30.183
45.062
61.277

25.032
59.072

28.516
15.352

-6.254

12.624
-50.662
-50.167
-49.349
-47.857
-46.235
-43.719
-41.326
-37.742
-34.625
-29.911
-26.133
-20.211

32.606

4.138

6.254

51.870

22.554
21.476

-4.138

39.098

-11.727

-59.072
25.032
59.072

Page No. F 17

20.430

.086

40.773

53.24260.273
.000

-12.384
-19.415

-32.813
-39.844

20.344

32.81339.844

-20.344

-40.773

-.086

-19.206

-9.578

-53.242
-60.273
9.578

-19.206

-9.578

9.578

19.206

-19.206

-9.578

9.578

19.206

-19.206

-9.578

9.578

19.206

94.290

-19.206

-19.206

74.269
51.021
41.545
32.148
22.824
13.562
4.356
-8.506
-17.633
-26.735
-35.820
-44.896
-67.156

-9.578

-9.578

-85.334

86.434

68.332
46.305
37.375
28.470
19.585
10.714
1.850
-1.850
-10.714
-19.585
-28.470
-37.375
-46.305
-68.332

9.578
85.334

9.578

-86.434

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

12.38419.415
-20.430

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

DEAD -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
16840.0311 (KN)

19.206

67.156
44.896
35.820
26.735
17.633
8.506
-4.356
-13.562
-22.824
-32.148
-41.545
-51.021
-74.269

19.206

19.206

-94.290

Page No. F 18

-457.605
-423.205

-241.199

-457.605
-423.206

-234.299

-234.299

-241.200

-145.948

-145.948

-34.400

34.400
10.788

15.460

10.787

15.460

52.652

52.652

146.336

-33.709

33.708

-146.336

163.827
211.781
147.025

211.781
285.256
295.582

148.149

-301.728
-298.147
-294.924
-284.188
-277.719
-259.843
-250.086
-225.096
-211.987
-179.918

149.273

-32.482

32.482

-30.482

30.482

-28.481

28.481

-124.276
149.962

-27.255
-58.126

-176.718
-176.718
-166.121
-166.121
-144.920
-144.920
-113.102
-113.102
-70.649
-70.649
-17.539

-11.527

-147.025

285.256
295.582

-148.149

-301.728
-298.148
-294.924
-284.188
-277.720
-259.844
-250.087
-225.096
-211.988

-149.273

-179.919
-124.276
27.255

-149.962
-58.127

-17.539

-11.527

150.350

-150.351

150.350

150.351
237.170

234.684

234.684

425.912
452.474

425.911
452.474

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

FILL -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
16928.4176 (KNM)

237.170

Page No. F 19

625.831
552.501
528.331
479.169
455.000
381.669
355.432
282.101
208.769

73.331
.001

-1.036

-1.844

-73.332

1.844

1.036

-208.769
-1.036

-1.844

1.844

-282.100

1.036
-355.432

-381.669
-455.000
-479.169
-528.332
574.145
1.844

-552.500
-1.844

-1.036

509.941

1.036

-625.832
444.054

431.672
379.281

335.323
301.444
-1.036

-1.844

-1.844

87.212

123.408

107.470

1.844

53.718

34.490
-1.036

-1.844

.000

1.844

-87.212

-107.470

-140.074

-161.288

-176.140

-193.130

-215.199

-229.009

1.036
-34.490

-53.718

-123.408

1.036

70.763
18.149

-18.149
-70.762

1.036

176.140

161.288

140.074

282.059
229.010

215.199

193.130

-1.036

1.844

269.225

-269.225

-282.059

-301.444

-335.323
-379.281
-431.672

-444.054
-509.941
-574.145

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

FILL -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
16840.0311 (KN)

Page No. F 20

-178.747
-158.273

-178.747
-158.273
-121.966

-121.966
-62.729

-62.729
-3.492

178.747

48.532

-124.925

-242.115
-242.354

-140.341

28.224
32.81625.06625.066
53.289
27.479

176.931

25.066

25.066

25.066

-26.159

24.005

-24.005

21.851

-21.851

-22.605
-22.605
-22.170
-22.170
-21.817
-21.817
-21.549
-21.549
-21.369
-21.369
-21.279

6.603
16.569
26.572
36.624
46.737
56.920
67.184
77.532
87.970
98.498
109.112
119.807

-48.532

124.925

242.115
242.354

140.341

-36.865

-176.931

6.603
16.569
26.572
36.624
46.737
56.920
67.183
77.532
87.970
98.497
109.112
119.807
156.340
176.931

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

-178.747

-20.531
-45.781
-26.833
-25.995
-24.605

156.340
176.931

-3.492

25.066
32.816
53.289
-27.479

26.159

20.531
-45.781
-26.833
-25.995
-24.605

36.865

-28.224

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

MAXEP -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
16263.2632 (KNM)

Page No. F 21

54.597

377.615

316.584
-54.597

-54.597

-54.597

-54.597

9.459

54.936
54.216
53.807
53.366
52.911
52.459
52.026
51.624
51.264
50.956
50.706
50.520

.000

.000

.000

1.986

.000

1.986

-1.986

1.986

-1.986

1.986

-1.986

54.59754.597

-316.584

-204.206

-9.459

50.27850.528

1.986
-3.707

-1.986
2.206
1.789
1.357
.911
.458
.000
-.458
-.911
-1.357
-1.789
-2.206
-3.009

3.009 3.707
-1.986

-50.528

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

54.597

.000
-377.615

-1.986

1.986

54.597

-54.597
-54.597

204.206

54.911

.000

54.597

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

MAXEP -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
6000.0000 (KN)

-50.278
-50.520
-50.706
-50.956
-51.264
-51.624
-52.026
-52.459
-52.911
-53.366
-53.807
-54.216

-54.911
-54.936

Page No. F 22

-59.583
-52.758

-40.656

-20.910

59.583

-1.164

9.408
8.356 8.356
10.93917.763

16.178

-41.642

-80.705
-80.785

-46.781

8.356

8.356

8.356

-9.408
8.356 17.76310.939

9.160

-9.160

8.720

-8.720

8.002

-8.002

7.284

-7.284

6.844

12.288

-8.944-15.261
-8.665-8.202

58.977
58.97752.113

-7.535
-7.535
-7.390
-7.390
-7.272
-7.272
-7.183
-7.183
-7.123-7.093
-7.123

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

MINEP -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
15889.5039 (KNM)

-59.583
-52.758
-59.583

-16.178

41.642

80.705
80.785

46.781

-12.288

2.201
5.523
8.857
12.208
15.579
18.974
22.395
25.844
29.324
32.833
36.371
39.936

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

-40.656

-6.844

-20.910

-8.665-8.944
-8.202-15.261

2.201
5.523
8.857
12.208
15.579
18.974
22.395
25.844
29.324
32.833
36.371
39.936

LEGEND

-1.164

-58.977
52.11358.977

Page No. F 23

125.872
-18.199
-18.199

-18.199

-18.199

.000
-18.199
-18.199

105.528

68.069

3.153

-66.472

-111.473
18.304

18.31217.936
18.07217.789
17.637
17.487
17.342
17.208
17.088
16.986
16.902
16.840

-137.629

.000

.000

.000

.000

.662

-.662

.662

-.662

.662

-.662

.662

-.662

.662

-.662

16.76016.843
.662
-1.236

.735
.597
.452
.304
.153
.000
-.153
-.304
-.452
-.597
-.735
-1.003

LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

MINEP -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
16840.0311 (KN)

18.199

1.236
1.003
-.662
-16.843

.000

18.199

18.199

18.199
18.19918.199
-125.872

-105.528

-68.069

-3.153

66.472

111.473

137.629
-16.760
-16.840
-16.902
-16.986
-17.088
-17.208
-17.342
-17.487
-17.637
-17.789
-17.936
-18.072

-18.304
-18.312

Page No. F 24

-6.946-6.153
6.946

-4.747

-2.453

-.159

1.065
.977 .977
1.248
2.041

1.704

.977

.977

.977

-1.065
.977 2.041
1.248

1.041

-2.453

-4.747

-6.153-6.946
-6.946

-1.041

-1.704

-5.103

.999

-.999

5.103

-9.372

.930

-.930

9.372

-5.166

.861

-.861

5.166

.818

-.818

1.602

6.823
6.823 6.026

-1.062-1.795
-1.001 -.947

-.869
-.869
-.852
-.852
-.839
-.839
-.828
-.828
-.821 -.818
-.821

LEGEND

.233
.618
1.005
1.394
1.785
2.179
2.576
2.976
3.380
3.787
4.198
4.612

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

SUR_12 -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
14642.8680 (KNM)

-1.602

-1.795-1.062
-.947 -1.001

.233
.618
1.005
1.394
1.785
2.179
2.576
2.976
3.380
3.787
4.198
4.612

-.159

-6.823
6.026 6.823

Page No. F 25

15.329
-2.115

.000
-2.115

-2.115

-2.115

.000

.000

.000

.000

2.115

2.115

2.115

2.115 2.115
-15.329

12.629

.064

-.064

-12.629

7.841

.064

-.064

-7.841

.029

.064

-.064

-.029

-7.783

.064

-.064

7.783

-12.571

.064

-.064

12.571

2.126

-15.271

2.126
2.098
2.082
2.065
2.047
2.029
2.013
1.997
1.983
1.972
1.962
1.955

1.946 1.956
.064-.145

.086
.070
.053
.036
.018
.000
-.018
-.036
-.053
-.070
-.086
-.118

.145
.118-.064
-1.956

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

.000 2.115

-2.115-2.115

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

SUR_12 -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
16840.0311 (KN)

-1.946
-1.955
-1.962
-1.972
-1.983
-1.997
-2.013
-2.029
-2.047-2.082
-2.065-2.098

15.271
-2.126-2.126

Page No. F 26

-7.671
4.714

19.759

25.319
26.136

7.334

-32.006
-15.327
-14.283
-12.937
-17.723

-10.548

-6.651

-2.754

-7.412-6.133
-.366
8.393
.982

-.168
3.531

7.077
5.798 7.077

8.358

-15.770

6.872

5.958

9.578

-12.307

4.174

3.973

11.567

-6.658

-.229

13.556

-1.008

-4.630

-2.502

-7.328

-4.487

14.776

2.456

15.463
15.463 3.095

-20.358
-20.082
-19.997
-19.150
-19.018
-17.540
-17.440
-15.280
-15.233
-12.556
-12.204
-9.283

4.408
5.401 15.871
20.27912.799

-6.218
-6.214
-6.010
-6.013
-5.634
-5.571
-4.883
-3.929
-2.690
-1.149
.715
2.918

-8.113
-3.246-10.263
-8.850

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

-3.867

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

HB20 -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
17001.6789 (KNM)

.736

-3.927
-2.693
-1.478
-.295
.841
1.915
2.913
3.820
4.623
5.307
5.856
6.255

6.475

-5.606

Page No. F 27

5.726
-29.274
-36.774

27.426

40.72648.226
-3.592

-15.974

-3.592

-3.592

-3.592

-3.592-3.592-3.409

-3.409

-3.409

-3.409-3.409

-5.208

4.057

2.984

-1.834

-5.208

4.057

2.984

-1.834

-5.208

4.057

2.984

-1.834

-5.208

4.057

2.984

4.057

2.984

-1.834

-5.208
32.984

-1.834

23.005
15.351
11.699
8.158
4.726
1.398
-1.830
-4.961
-7.999
-10.948
-13.812
-16.592

19.948
-5.208
-22.080
-27.921

14.858
11.167
9.445
7.815
6.280
4.837
3.486
2.226
1.057
-.024
-1.017
-1.923

4.057
-3.591-4.885-5.734

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

-3.409

-1.834

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

HB20 -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
16840.0311 (KN)

-3.465-2.026
-4.070-2.784
-4.601
-5.059
-5.443
-5.755
-5.994
-6.161
-6.255
-6.296

-.330

2.318
2.984

Page No. F 28

-18.303
-4.609
18.303
12.760

22.111
22.235

7.917

-33.536
-27.789
-17.658
-12.421
5.747

3.584

-5.087-18.272
-3.227
-15.077
19.253
19.573

-3.376

-3.468

-3.525-3.557
-3.557

17.214

4.279

-13.177

-2.899

15.283

1.675

-9.809

-1.733

.171

12.132

-2.573

8.981

-6.821

1.184

2.074

-9.425

4.552

3.240

7.050
-7.361

-27.310
-27.030
-26.670
-25.847
-25.093
-23.775
-22.562
-20.829
-17.021
-12.363
-6.868
-.545

5.961

-10.893
26.35734.17621.298
45.069

-4.313

-8.850
-8.711
-8.458
-8.024
-7.552
-6.769
-6.150
-4.930
-4.267
-2.487
.578
4.285

6.452
5.254 12.484
18.93512.844

Y
LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


O

-3.284

11.378

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

HB20- -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
16250.9727 (KNM)

-3.823-4.103
-3.537-4.006
-3.129
-2.577
-1.865
-.971
.125
1.440
2.996
4.811

-3.981
3.898

Page No. F 29

2.232
-32.768
-40.268

23.932

37.23244.732

-19.468

-38.592
-46.092
3.915

2.905

18.109
-25.292

31.40938.909
.085

.085

.085

.085

.085

-5.066

-1.754

2.905

3.915

-5.066

-1.754

2.905

3.915

-5.066

-1.754

2.905

3.915

-5.066

-1.754

2.905
35.523
2.905

3.915
22.859
12.830
7.992
3.245
-1.417
-5.997
-10.502
-14.936
-19.304
-23.610
-27.858
-32.049

34.342
3.915
-40.454
-49.899

-5.066
25.585
18.787
15.537
12.383
9.324
6.359
3.486
.705
-1.988
-4.592
-7.110
-9.543

LEGEND

-5.066
-14.318
-19.279

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

HB20- -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
16840.0311 (KN)

-1.754
16.245

.085

-3.592

12.079
9.203
7.886
6.668
5.551
4.532
3.614
2.794
2.073
1.450
.924
.495

-1.754
-.184
-.223

Page No. F 30

-174.225
-154.391

-173.501
-153.537
-119.219

-118.133
-61.833

-60.369
-2.605

173.501

49.738

-115.312

37.840
16.560
32.800
52.764
35.147

-4.447
19.461

24.195

28.929

30.371

-227.856
-228.179

-24.050

14.785

-27.602

10.009

31.698

-37.985
-30.670
-28.503
-21.866
162.806

6.826
15.470
24.196
33.017
41.949
51.003
60.192
69.523
79.004
88.639
98.430
108.374

-24.941
-24.014
-23.158
-22.377
-21.677
-21.062
-20.534
-20.096
-19.750
-19.495
-19.331

-29.779
-51.198
-30.518
-20.191
-19.626
-31.007

142.904
162.806

LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


X

127.451

242.558
242.693

138.702

-39.780

-180.566

5.716
16.423
27.120
37.817
48.521
59.241
69.982
80.747
91.535
102.345
113.171
124.001
160.448
180.566

-44.730

-20.498

22.578

-133.921

-174.225

31.83033.46630.725
50.559
-18.321

JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

ULS_TRAC -

SCALE

STRUCTURE

= 1 TO

BENDING

= 1 (M) TO

62.000
14682.5671 (KNM)

Page No. F 31

52.891

358.840
-4.363
300.979
-53.239

-53.239

-53.239

-53.239

-4.363

3.274

7.183

3.274

7.183

3.274

7.183

3.274

43.14542.985
7.183

3.274

7.183
-5.779

-.368
-.828
-1.293
-1.759
-2.221
-2.676
-3.119
-3.548
-3.957
-4.342
-4.699
-5.357

LEGEND

LEAP5 - 6.2.4

TIME - DATE : 15:41:59 - 02/11/2006


JOB

CULVERT DESIGN - 3 CELL, 3.5M X 3.5M, 13 M FILL

STRUCTURE

CULVERT ANALYSYS

LOAD CASE

ULS_TRAC -

SCALE

STRUCTURE

= 1 TO

SHEAR

= 1 (M) TO

62.000
6000.0000 (KN)

-202.286

-7.540

.553 1.506
3.274

52.89152.891

-314.665

-55.146

52.891

-375.696
-4.363-4.363

7.183

10.713

51.925
50.408
49.631
48.843
48.062
47.302
46.576
45.898
45.276
44.718
44.231
43.820

-4.363

52.891

-53.239
-53.239

194.607

53.072

-4.363

52.891

-54.222
-54.225
-54.264
-54.276
-54.342
-54.447
-54.486
-54.567
-54.689
-54.798
-54.876
-54.902

-53.650
-54.806

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

G
SECTION DESIGN

n
G1

CALCULATION SHEET No.


Project:
Subject:

By:

Diftah Clover Leaf Interchange, Sharjah

Date:
MKB

Check By:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Rev.

1-Nov-06
Date:

0
References/Results

Section Analysis at ULS


Section Location

Bottom Slab

Member No
Location along the member

43

44

45

51

57

Wall C/L

Face of wall

d from wall face

Mid Span

Face of wall

For the reference of design


moment and shear values
Wall C/L Mid Span refer Results Summary page -------------58

65

M perm

(kNm)

419.1

178.2

-215.3

-356.3

256.7

526.3

-264.2

M live

(kNm)

18.6

-7.9

-24.8

-27.0

26.1

41.1

-7.3

N (+T / -C)

(kN)

-745

-745

-745

-745

-745

-749

-749

(kN)

914

667

473

172

984

907

(kNm)

650

305

-290

-490

364

731

-349

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

900

750

750

750

750

900

750

cover

(mm)

100

100

75

75

100

100

75

(mm)

768

618

643

663

618

768

663

fcu

(MPa)

40

40

40

40

40

40

40

fy

(MPa)

use r/f
c/c spacing
2

460

460

460

460

460

460

460

T32

T32

T32

T25

T32

T32

T25

125

125

125

125

125

125

125

As Axial

(mm )

As Shear

(mm 2)

1142

834

591

215

1229

1133

As Flaxure

(mm 2)

5292

5600

5843

3712

5205

5301

3923

As Total

(mm2)

6434

6434

6434

3927

6434

6434

3927

(mm)

701

547

569

616

552

701

613

0.174

0.229

0.230

0.142

0.213

0.175

0.150

x/d
MoR

(kNm)

1485

1226

1331

914

1150

1487

962

(MPa)

1.19

1.08

0.74

0.26

1.59

1.18

0.00

av

(mm)
1

2d/av

-ve moments create tension


on top face

(BS 5400, Part 4,


Cl 5.3.3.2)

(BS 5400, Part 4,


Cl 5.3.2.3)

enhanced vc in %b

0.63

0.71

0.69

0.58

0.71

0.63

0.58

vc un-enhance(MPa)

0.63

0.71

0.69

0.58

0.71

0.63

0.58

(BS 5400, Part 4,


Cl 5.3.3.1&2)

0.71

0.69

0.58

0.71

0.63

0.58

tables 7, 8 & 9

%b in which shear enhanceme

vc wt. avg

(MPa)

0.63

Asv/ bsv req =

mm2/mm2

0.00241

0.001924 0.001103

0.003203 0.002387

use

T16

T16

T16

T16

T16

hoz. spacing

250

250

250

250

250

ver. Spacing

250

250

250

250

250

0.003217 0.003217 0.003217

0.003217 0.003217

1.28744

1.28744

1.28744

1.28744

1.28744

VoR = vc + vs (MPa)

1.91

2.00

1.98

0.58

2.00

1.91

0.58

Status

OK

OK

OK

OK

OK

OK

OK

Asv/ bsv prov

mm /mm

vs = 0.87fy*Av/ bsv

(MPa)

BPG121_F01(Excel)

CALCULATION SHEET No.

G2

By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:
0

Rev.
Date:
1-Nov-06
Date:

References/Results

Section Analysis at SLS


Moments in kN m and Axial in kN
Bottom Slab

Section Location
Member No
Location along the member

SLS Parman

Axial
Momen

43

44

45

51

57

58

65

Wall C/L

Face of wall

d from wall face

Mid Span

Face of wall

419

178

-215

-356

257

526

-264

Wall C/L Mid Span

Momen
19
Ignoring Axial Load Effect

-8

-25

-27

26

41

-7

SLS1 LL

Axial

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

900

750

750

750

750

900

750

100

100

75

75

100

100

75

618

768

663

cover
d

(mm)

768

618

643

663

fcu

(Mpa)

40

40

40

40

40

40

40

fy

(Mpa)

460

460

460

460

460

460

460
T25

T32

T32

T32

T25

T32

T32

c/c spacing

(mm)

125

125

125

125

125

125

125

As Total

(mm 2)

6434

6434

6434

3927

6434

6434

3927

Es

(Mpa)

200000

200000

200000

200000

200000

200000

200000

Ec long term

(Mpa)

15500

15500

15500

15500

15500

15500

15500

12.9

12.9

12.9

12.9

12.9

12.9

12.9

283.6

247.9

254.1

213.3

247.9

283.6

213.3

use r/f

modular ratio
dc

(mm)

(+T / -C)
(- Hog / +Sag)

Mom of Inertia (mm 4) 2.71E+10 1.64E+10 1.8E+10 1.35E+10 1.64E+10 2.71E+10 1.35E+10
fs (T = +ve) (Mpa)

101.02

49.44

66.83

165.04

0.000505 0.000247 0.000334 0.000825

82.09
0.00041

130.94

116.93

0.000655 0.000585

fc (C = -ve)

(Mpa)

-4.58

-2.57

-3.38

-6.08

-4.26

-5.94

-4.30

a'

(mm)

865

715

725

725

715

865

725

0.00094

0.000518 0.000786 0.000666

0.000606 0.000312 0.000405

ts

0.000948 0.001593 0.001114 0.000775 0.000902 0.000706 0.001151


-0.00034

-0.00128

cnom

(mm)

65

65

50

50

65

65

50

acr

(mm)

86.3

86.3

74.9

75.9

86.3

86.3

75.9

w (eq 24)

(mm)

0.0000

0.0000

0.0000

0.0342

0.0000

0.0193

0.0000

w (eq 26)

(mm)

0.0000

0.0000

0.0000

0.0375

0.0000

0.0207

0.0000

allowable wcr

(mm)

0.125

0.125

0.125

0.125

0.125

0.125

0.125

allowable fc

(Mpa)

-20

-20

-20

-20

-20

-20

-20

allowable fs

(Mpa)

345

345

345

345

345

345

345

OK

OK

OK

OK

OK

OK

OK

m (eq 25)

Status

-0.00071 0.000165 -0.00038

7.98E-05

-0.00048

BPG121_F01(Excel)

G3

CALCULATION SHEET No.


By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:
0

Rev.
Date:
1-Nov-06
Date:

References/Results

Section Analysis at SLS


Moments in kN m and Axial in kN
Bottom Slab

Section Location
Member No

SLS1 LL

44

45

51

57

58

65

Wall C/L Mid Span

Wall C/L

Face of wall

d from wall face

Mid Span

Face of wall

Axial

-435

-435

-435

-435

-435

-441

-441

(+T / -C)

Momen

419

178

-215

-356

257

526

-264

(- Hog / +Sag)

Axial

-15

-15

-15

-15

-15

-15

-15

-8

-25

-27

26

41

-7

Location along the member

SLS Parman

43

Momen
19
Considering Axial Load Effect
b

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

900

750

750

750

750

900

750

100

100

75

75

100

100

75

768

618

643

662.5

618

768

662.5

40

40

40

cover
d

(mm)

fcu

(Mpa)

fy

(Mpa)

use r/f

40

40

40

40

460

460

460

460

460

460

460

T32

T32

T32

T25

T32

T32

T25

c/c spacing

(mm)

125

125

125

125

125

125

125

As Total

(mm 2)

6434

6434

6434

3927

6434

6434

3927

Es

(Mpa)

200000

200000

200000

200000

200000

200000

200000

Ec long term

(Mpa)

15500

15500

15500

15500

15500

15500

15500

12.9

12.9

12.9

12.9

12.9

12.9

12.9

365.8

402.4

364.2

278.9

335.0

346.6

311.3

modular ratio

The axial force is assumed to


act at CG of gross section
and it produces an
eccentricity with CG of
cracked transform section,
thus causing an additional
moment on the section.

assume dc
CG Ycomp

(mm 2)
(mm)

291.1

272.5

267.7

219.9

257.0

288.2

trsfrm area

(mm2)

448793

485425

447257

329567

418036

429653

ecc. es
M=0

(mm)

-1290

-621

-801

-1139

-871

-1562

dc ignoring axial (mm)


dc modified
(mm)

283.6

247.9

254.1

213.3

247.9

283.6

213.3

By Ghali and Faver

365.8

402.4

364.2

278.9

335.0

346.6

311.3

sec. 6.4

-6.5E-05

-6E-05

-6.5E-05

-8.8E-05

-6.9E-05

-6.8E-05

-8.1E-05

strain at CG

226.6
362010 refer:
-883

Concrete Structures
Stresses and Deformations

Mom of Inertia (mm4) 2.72E+10 1.74E+10 1.84E+10 1.35E+10 1.66E+10 2.72E+10 1.37E+10
curvature

abs

fs (T = +ve) (Mpa)

8.67E-07 4.61E-07 6.73E-07 1.49E-06 8.91E-07 1.17E-06 9.59E-07


69.76

19.86

37.50

114.58

50.40

98.82

67.38

0.000349 9.93E-05 0.000188 0.000573 0.000252 0.000494 0.000337

s
fc (C = -ve)

(Mpa)

-4.92

-2.87

-3.80

-6.46

-4.62

-6.30

a'

(mm)

850

700

740

740

700

850

740

0.00059

0.000411

-4.63

0.00042

0.000137 0.000253 0.000689 0.000325

ts

0.00132

0.003648 0.002036 0.001146 0.001389 0.000902 0.002046

m (eq 25)

-0.0009

-0.00351

-0.00178

-0.00046

-0.00106

-0.00031

cnom

(mm)

50

50

65

65

50

50

65

acr

(mm)

74.9

74.9

86.3

87.1

74.9

74.9

87.1

w (eq 24)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

w (eq 26)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

allowable wcr

(mm)

0.15

0.15

0.125

0.125

0.15

0.15

0.125

allowable fc

(Mpa)

-20

-20

-20

-20

-20

-20

-20

allowable fs

(Mpa)

345

345

345

345

345

345

345

OK

OK

OK

OK

OK

OK

OK

Status

-0.00164

BPG121_F01(Excel)

n
G4

CALCULATION SHEET No.


Project:
Subject:

By:

Diftah Clover Leaf Interchange, Sharjah

Check By:

References/Results
Exterior Wall

Section Location

Location along the member

Interior Wall

20

21

22

23

24

28

Wall C/L

Face of wall

d from wall face

Mid Span

d from wall face

Face of wall

For the reference of design


moment and shear values
Wall C/L refer Results Summary page -------------30

M perm

(kNm)

204.7

129.9

115.4

173.9

270.7

-9.9

7.3

M live

(kNm)

19.6

17.4

13.8

16.2

17.7

-2.6

-4.4

N (+T / -C)

(kN)

-874

-890

-916

-945

-961

-1980

-2065

(kN)

535

337

26

381

617

13

12

(kNm)

317

135

-255

180

393

-14

14

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

750

750

750

750

750

500

500

cover

(mm)

75

75

75

75

75

75

75

(mm)

643

659

659

659

643

413

413

fcu

(MPa)

40

40

40

40

40

40

40

fy

(MPa)

use r/f
c/c spacing
2

460

460

460

460

460

460

460

T32

T32

T32

T32

T32

T25

T25

125

125

125

125

125

125

125

As Axial

(mm )

As Shear

(mm 2)

669

421

33

476

771

16

15

As Flaxure

(mm2)

5765

6013

6401

5958

5663

3911

3912

As Total

(mm2)

6434

6434

6434

6434

6434

3927

3927

(mm)

570

583

578

584

571

363

363

0.227

0.231

0.246

0.229

0.223

0.240

0.240

x/d
MoR

(kNm)

1315

1403

1481

1392

1295

568

568

(MPa)

0.83

0.51

0.04

0.58

0.96

0.03

0.03

av

(mm)
1

2d/av

28-Feb-06
Date:

Section Analysis at ULS

Member No

Date:
MKB

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Rev.

-ve moments create tension


on top face

(BS 5400, Part 4,


Cl 5.3.3.2)

(BS 5400, Part 4,


Cl 5.3.2.3)

enhanced vc in %b

0.69

0.68

0.68

0.68

0.69

0.76

0.76

vc un-enhance(MPa)

0.69

0.68

0.68

0.68

0.69

0.76

0.76

(BS 5400, Part 4,


Cl 5.3.3.1&2)
tables 7, 8 & 9

%b in which shear enhanceme

vc wt. avg

(MPa)

0.69

0.68

0.68

0.68

0.69

0.76

0.76

Asv/ bsv req =

mm2/mm2

0.001347

0.001665

use

T16

T16

hoz. spacing

250

250

ver. Spacing

250

250

0.003217

0.003217

1.28744

1.28744

VoR = vc + vs (MPa)

1.98

0.68

0.68

0.68

1.98

0.76

0.76

Status

OK

OK

OK

OK

OK

OK

OK

Asv/ bsv prov

mm /mm

vs = 0.87fy*Av/ bsv

(MPa)

BPG121_F01(Excel)

CALCULATION SHEET No.

G5

By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:
0

Rev.
Date:
28-Feb-06
Date:

References/Results

Section Analysis at SLS


Moments in kN m and Axial in kN
Exterior Wall

Section Location
Member No
Location along the member

SLS Parman

Axial
Momen

Interior Wall

20

21

22

23

24

28

30

Wall C/L

Face of wall

d from wall face

Mid Span

d from wall face

Face of wall

Wall C/L

(+T / -C)

205

130

115

174

271

-10

(- Hog / +Sag)

20
Momen
Ignoring Axial Load Effect

17

14

16

18

-3

-4

SLS1 LL

Axial

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

750

750

750

750

750

500

500

75

75

75

75

75

75

75

643

413

413

cover
d

(mm)

643

659

659

659

fcu

(Mpa)

40

40

40

40

40

40

40

fy

(Mpa)

460

460

460

460

460

460

460
T25

T32

T32

T32

T32

T32

T25

c/c spacing

(mm)

125

125

125

125

125

125

125

As Total

(mm 2)

6434

6434

6434

6434

6434

3927

3927

Es

(Mpa)

200000

200000

200000

200000

200000

200000

200000

Ec long term

(Mpa)

15500

15500

15500

15500

15500

15500

15500

12.9

12.9

12.9

12.9

12.9

12.9

12.9

254.1

258.0

258.0

258.0

254.1

160.0

160.0

4.6E+09

4.6E+09

8.85

2.05

use r/f

modular ratio
dc

(mm)

Mom of Inertia (mm 4)


fs (T = +ve) (Mpa)
s

1.8E+10 1.91E+10 1.91E+10 1.91E+10 1.8E+10


62.43

39.96

35.04

51.55

80.30

0.000175 0.000258 0.000402 4.43E-05 1.02E-05

0.000312

0.0002

fc (C = -ve)

(Mpa)

-3.16

-1.99

-1.75

-2.57

-4.07

-0.43

-0.10

a'

(mm)

725

725

725

725

725

475

475

0.0003

0.000486 5.52E-05 1.28E-05

0.001219 0.001823 0.002113

0.00148

0.000979 0.007426 0.017413

-0.00084

-0.00159

-0.00191

-0.00118

0.000378 0.000233 0.000204

ts
m (eq 25)

-0.00049

-0.00737

cnom

(mm)

50

50

50

50

50

50

50

acr

(mm)

74.9

74.9

74.9

74.9

74.9

75.9

75.9

w (eq 24)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

w (eq 26)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

allowable wcr

(mm)

0.125

0.125

0.125

0.125

0.125

0.125

0.125

allowable fc

(Mpa)

-20

-20

-20

-20

-20

-20

-20

allowable fs

(Mpa)

345

345

345

345

345

345

345

OK

OK

OK

OK

OK

OK

OK

Status

-0.0174

BPG121_F01(Excel)

G6

CALCULATION SHEET No.


By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:
0

Rev.
Date:
28-Feb-06
Date:

References/Results

Section Analysis at SLS


Moments in kN m and Axial in kN
Exterior Wall

Section Location
21

22

23

24

28

30

Wall C/L

Face of wall

d from wall face

Mid Span

d from wall face

Face of wall

Wall C/L

Axial

-636

-648

-669

-689

-701

-1458

-1480

Momen

205

130

115

174

271

-10

Axial

-42

-42

-42

-44

-44

-56

-100

17

14

16

18

-3

-4

Member No
Location along the member

SLS Parman
SLS1 LL

Interior Wall

20

20
Momen
Considering Axial Load Effect
b

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

750

750

750

750

750

500

500

75

75

75

75

75

75

75

643

659

659

659

643

412.5

412.5

40

40

40

cover
d

(mm)

fcu

(Mpa)

fy

(Mpa)

use r/f

40

40

40

40

460

460

460

460

460

460

460

T32

T32

T32

T32

T32

T25

T25

c/c spacing

(mm)

125

125

125

125

125

125

125

As Total

(mm2)

6434

6434

6434

6434

6434

3927

3927

Es

(Mpa)

200000

200000

200000

200000

200000

200000

200000

Ec long term

(Mpa)

15500

15500

15500

15500

15500

15500

15500

12.9

12.9

12.9

12.9

12.9

12.9

12.9

441.3

561.4

610.0

507.2

411.3

694.9

715.0

modular ratio

(+T / -C)
(- Hog / +Sag)

The axial force is assumed to


act at CG of gross section
and it produces an
eccentricity with CG of
cracked transform section,
thus causing an additional
moment on the section.

assume dc
CG Ycomp

(mm 2)
(mm)

287.5

329.4

347.4

310.6

279.1

351.9

trsfrm area

(mm 2)

524293

644416

693067

590227

494335

745585

ecc. es
M=0

(mm)

-599

-497

-466

-543

-655

-171

dc ignoring axial (mm)


dc modified
(mm)

254.1

258.0

258.0

258.0

254.1

160.0

160.0

By Ghali and Faver

441.3

561.4

610.0

507.2

411.3

694.9

715.0

sec. 6.4

-8.3E-05

-6.9E-05

-6.6E-05

-8E-05

-9.7E-05

-0.00013

-0.00013

strain at CG

361.1
765628 refer:
-164

Concrete Structures
Stresses and Deformations

Mom of Inertia (mm4) 1.96E+10 2.51E+10 2.81E+10 2.26E+10 1.9E+10 2.82E+10 3.06E+10
curvature

abs

fs (T = +ve) (Mpa)

5.42E-07 2.98E-07 2.52E-07 4.08E-07 7.36E-07 3.82E-07 3.76E-07


21.88

5.81

2.47

12.38

34.11

-21.58

0.000109 2.91E-05 1.23E-05 6.19E-05 0.000171 -0.00011

-22.77
-0.00011

fc (C = -ve)

(Mpa)

-3.71

-2.59

-2.38

-3.21

-4.69

-4.11

a'

(mm)

725

725

725

725

725

475

475

-8.4E-05

-9E-05

0.000154 4.87E-05 2.89E-05 8.88E-05 0.000231

ts

0.003365

0.01145

0.025991 0.005823 0.002248 -0.00371

m (eq 25)

-0.00321

-0.0114

-0.02596

-0.00573

-0.00202

-8.4E-05

-4.17

-0.00189
-9E-05

cnom

(mm)

50

50

50

50

50

50

50

acr

(mm)

74.9

74.9

74.9

74.9

74.9

75.9

75.9

w (eq 24)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

w (eq 26)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

allowable wcr

(mm)

0.15

0.15

0.15

0.15

0.15

0.125

0.15

allowable fc

(Mpa)

-20

-20

-20

-20

-20

-20

-20

allowable fs

(Mpa)

345

345

345

345

345

345

345

OK

OK

OK

OK

OK

OK

OK

Status

BPG121_F01(Excel)

n
G7

CALCULATION SHEET No.


Project:
Subject:

By:

Diftah Clover Leaf Interchange, Sharjah

Date:
MKB

Check By:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

Rev.

28-Feb-06
Date:

0
References/Results

Section Analysis at ULS


Section Location

Top Slab

Member No
Location along the member

Wall C/L

Face of wall

d from wall face

Mid Span

Face of wall

For the reference of design


moment and shear values
Wall C/L Mid Span refer Results Summary page -------------7

10

M perm

(kNm)

-326.6

-114.7

238.1

336.9

-292.0

-528.8

210.2

M live

(kNm)

-20.8

-6.2

23.1

30.6

-14.3

-34.7

24.4

N (+T / -C)

(kN)

-644

-644

-644

-644

-644

-639

-639

(kN)

906

739

441

98

880

960

10

(kNm)

-439

-235

283

451

-397

-734

324

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

900

750

750

750

750

900

750

cover

(mm)

75

75

75

75

75

75

75

(mm)

793

643

643

659

643

793

659

fcu

(MPa)

40

40

40

40

40

40

40

fy

(MPa)

use r/f
c/c spacing
2

460

460

460

460

460

460

460

T32

T32

T32

T32

T32

T32

T32

125

125

125

125

125

125

125

As Axial

(mm )

As Shear

(mm 2)

1132

923

551

122

1100

1199

13

As Flaxure

(mm2)

5302

5511

5883

6311

5334

5235

6421

As Total

(mm2)

6434

6434

6434

6434

6434

6434

6434

(mm)

726

573

569

579

576

727

578

0.169

0.217

0.231

0.242

0.210

0.167

0.247

x/d
MoR

(kNm)

1540

1264

1339

1463

1229

1523

1485

(MPa)

1.14

1.15

0.69

0.15

1.37

1.21

0.02

av

(mm)
1

2d/av

-ve moments create tension


on top face

(BS 5400, Part 4,


Cl 5.3.3.2)

(BS 5400, Part 4,


Cl 5.3.2.3)

enhanced vc in %b

0.61

0.69

0.69

0.68

0.69

0.61

0.68

vc un-enhance(MPa)

0.61

0.69

0.69

0.68

0.69

0.61

0.68

(BS 5400, Part 4,


Cl 5.3.3.1&2)

0.61

0.69

0.69

0.68

0.69

0.61

0.68

tables 7, 8 & 9

0.002687

0.00249

%b in which shear enhanceme

vc wt. avg

(MPa)

Asv/ bsv req =

mm2/mm2

0.002321 0.002136

use

T16

T16

T16

T16

T16

hoz. spacing

250

250

250

250

250

ver. Spacing

250

250

250

250

250

0.003217 0.003217 0.003217

0.003217 0.003217

1.28744

1.28744

1.28744

1.28744

1.28744

VoR = vc + vs (MPa)

1.90

1.98

1.98

0.68

1.98

1.90

0.68

Status

OK

OK

OK

OK

OK

OK

OK

Asv/ bsv prov

mm /mm

vs = 0.87fy*Av/ bsv

(MPa)

BPG121_F01(Excel)

CALCULATION SHEET No.

G8

By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:
0

Rev.
Date:
28-Feb-06
Date:

References/Results

Section Analysis at SLS


Moments in kN m and Axial in kN
Top Slab

Section Location
Member No
Location along the member

SLS Parman
SLS1 LL

Axial
Momen
Axial

Wall C/L

Face of wall

d from wall face

Mid Span

Face of wall

10

Wall C/L Mid Span

-327

-115

238

337

-292

-529

210

-21
Momen
Ignoring Axial Load Effect

-6

23

31

-14

-35

24

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

900

750

750

750

750

900

750

75

75

75

75

75

75

75

643

793

659

cover
d

(mm)

793

643

643

659

fcu

(Mpa)

40

40

40

40

40

40

40

fy

(Mpa)

460

460

460

460

460

460

460
T32

T32

T32

T32

T32

T32

T32

c/c spacing

(mm)

125

125

125

125

125

125

125

As Total

(mm 2)

6434

6434

6434

6434

6434

6434

6434

Es

(Mpa)

200000

200000

200000

200000

200000

200000

200000

Ec long term

(Mpa)

15500

15500

15500

15500

15500

15500

15500

12.9

12.9

12.9

12.9

12.9

12.9

12.9

289.2

254.1

254.1

258.0

254.1

289.2

258.0

use r/f

modular ratio
dc

(mm)

Mom of Inertia (mm 4) 2.91E+10 1.8E+10


fs (T = +ve) (Mpa)

77.51

33.64

1.8E+10 1.91E+10 1.8E+10 2.91E+10 1.91E+10


72.71

99.70

85.28

125.74

63.63

0.000388 0.000168 0.000364 0.000498 0.000426 0.000629 0.000318

s
fc (C = -ve)

(Mpa)

-3.45

-1.70

-3.68

-4.97

-4.32

-5.59

-3.17

a'

(mm)

875

725

725

725

725

875

725

0.000581 0.000516 0.000731 0.000371

0.000451 0.000204

ts

0.001232 0.002366 0.001045 0.000767 0.000938 0.000758 0.001168

0.00044

-0.00078

-0.00216

-0.0006

-0.00019

-0.00042

-2.7E-05

cnom

(mm)

50

50

50

50

50

50

50

acr

(mm)

74.9

74.9

74.9

74.9

74.9

74.9

74.9

w (eq 24)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

w (eq 26)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

allowable wcr

(mm)

0.125

0.125

0.125

0.125

0.125

0.125

0.125

allowable fc

(Mpa)

-20

-20

-20

-20

-20

-20

-20

allowable fs

(Mpa)

345

345

345

345

345

345

345

OK

OK

OK

OK

OK

OK

OK

m (eq 25)

Status

(+T / -C)
(- Hog / +Sag)

-0.0008

BPG121_F01(Excel)

G9

CALCULATION SHEET No.


By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

CULVERT DESIGN - 3 CELL, 3.5m x 3.5m, 13 m FILL

MKB
Check By:
0

Rev.
Date:
28-Feb-06
Date:

References/Results

Section Analysis at SLS


Moments in kN m and Axial in kN
Top Slab

Section Location
1

Wall C/L

Face of wall

d from wall face

Mid Span

Face of wall

Axial

-356

-356

-356

-356

-356

-350

-350

(+T / -C)

Momen

-327

-115

238

337

-292

-529

210

(- Hog / +Sag)

Axial

-15

-15

-15

-15

-15

-15

-15

-6

23

31

-14

-35

24

Member No
Location along the member

SLS Parman
SLS1 LL

-21
Momen
Considering Axial Load Effect

10

Wall C/L Mid Span

(mm)

1000

1000

1000

1000

1000

1000

1000

(mm)

900

750

750

750

750

900

750

75

75

75

75

75

75

75

793

643

643

659

643

793

659

40

40

40

cover
d

(mm)

fcu

(Mpa)

fy

(Mpa)

use r/f

40

40

40

40

460

460

460

460

460

460

460

T32

T32

T32

T32

T32

T32

T32

c/c spacing

(mm)

125

125

125

125

125

125

125

As Total

(mm2)

6434

6434

6434

6434

6434

6434

6434

Es

(Mpa)

200000

200000

200000

200000

200000

200000

200000

Ec long term

(Mpa)

15500

15500

15500

15500

15500

15500

15500

12.9

12.9

12.9

12.9

12.9

12.9

12.9

378.9

444.6

335.5

316.8

322.7

342.1

351.1

modular ratio

The axial force is assumed to


act at CG of gross section
and it produces an
eccentricity with CG of
cracked transform section,
thus causing an additional
moment on the section.

assume dc
CG Ycomp

(mm 2)
(mm)

297.9

288.5

262.0

262.4

259.9

292.5

trsfrm area

(mm 2)

461903

527582

418504

399853

405750

425072

ecc. es
M=0

(mm)

-1280

-594

-972

-1275

-1094

-1886

dc ignoring axial (mm)


dc modified
(mm)

289.2

254.1

254.1

258.0

254.1

289.2

258.0

By Ghali and Faver

378.9

444.6

335.5

316.8

322.7

342.1

351.1

sec. 6.4

-5.2E-05

-4.5E-05

-5.7E-05

-6E-05

-5.9E-05

-5.5E-05

-5.4E-05

strain at CG

268.0
434091 refer:
-926

Concrete Structures
Stresses and Deformations

Mom of Inertia (mm4) 2.93E+10 1.97E+10 1.82E+10 1.91E+10 1.81E+10 2.92E+10 1.93E+10
curvature

abs

fs (T = +ve) (Mpa)

6.4E-07
53.00

2.91E-07 7.78E-07
11.53

47.87

1.1E-06
75.16

9.39E-07 1.12E-06 6.53E-07


60.13

100.91

40.25

0.000265 5.77E-05 0.000239 0.000376 0.000301 0.000505 0.000201

s
fc (C = -ve)

(Mpa)

-3.76

-2.00

-4.05

-5.39

-4.70

-5.93

-3.56

a'

(mm)

890

740

725

725

740

890

725

0.000327 8.59E-05 0.000303 0.000448 0.000392 0.000613 0.000244

ts

0.001842

0.00703

0.001571

0.00101

0.001368 0.000967 0.001824

m (eq 25)

-0.00152

-0.00694

-0.00127

-0.00056

-0.00098

-0.00035

cnom

(mm)

65

65

50

50

65

65

50

acr

(mm)

86.3

86.3

74.9

74.9

86.3

86.3

74.9

w (eq 24)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

w (eq 26)

(mm)

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

allowable wcr

(mm)

0.125

0.125

0.15

0.15

0.125

0.125

0.15

allowable fc

(Mpa)

-20

-20

-20

-20

-20

-20

-20

allowable fs

(Mpa)

345

345

345

345

345

345

345

OK

OK

OK

OK

OK

OK

OK

Status

-0.00158

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

MINIMUM REINFORCEMENT CHECK

91

By:

Rev.
Date:

MKB
Check By:

1-Nov-06
Date:

0
References/Results

MINIMUM REINFORCEMENT CHECK

As per BS 5400 Part:4, Clause: 5.8.4

WALL

Vertical main reinforcement

Earth Face
b

As =
As =
Horizontal secondry
reinforcement

As =
As =

bars spacing

Inner Face

(mm)

125

125

(mm)

643

793

(mm) =

120.6

148.7

(mm/mm) =

0.965

1.19

0.15 % b d

bars spacing

(mm)

125

125

(mm)

643

793

(mm) =

96.45

119

(mm/mm) =

0.772

0.952

0.12 % b d

BASE

Bottom

Top

(under wall )

Main transverse reinforcement

As =
As =
Longitudinatal secondry
reinforcement

As =
As =

bars spacing

(mm)

(mm)

125

125

659

934

(mm) =

123.6

175.1

(mm/mm) =

0.989

1.401
140

0.15 % b d

(mm)

140

(mm)

659

934

(mm) =

55.36

78.46

(mm/mm) =

0.395

0.56

bars spacing
0.12 % b d

TOP SLAB

Bottom

Top
(wall top)

Main transverse reinforcement

As =
As =
Longitudinatal secondry
reinforcement

As =
As =

bars spacing

(mm)

125

125

(mm)

793

659

(mm) =

148.7

123.6

(mm/mm) =

1.19

0.989

125

125

0.15 % b d

bars spacing

(mm)

(mm)

793

659

(mm) =

59.48

49.43

(mm/mm) =

0.476

0.395

0.12 % b d

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN CHECK CONCLUSION

94

By:
MKB
Check By:
0

Rev.
Date:
1-Nov-06
Date:

References/Results
MINIMUM REINFORCEMENT CHECK
SUMMARY OF DESIGN CHECK

Min. Reinf. Requirement


BS 5400
Part:4 CL
5.8.4

WALL

BASE

Governing
Criteria

BD 28/87
Earlyther
Cracking

(mm/mm)

criteria

Vertical main reinforcement, on


0.965
earth face

5.688

5.688

BD 28/87
Earlyther
Cracking

Vertical main reinforcement, on


inner face

1.19

5.688

5.688

BD 28/87
Earlyther
Cracking

Horizontal secondry
reinforcement, on each face

0.952

5.688

5.688

BD 28/87
Earlyther
Cracking

Bottom transverse1
reinforcement

0.989

0.467

0.989

BS 5400
Part:4 CL
5.8.4

Bottom transverse2
reinforcement

1.401

0.467

1.401

BS 5400
Part:4 CL
5.8.4

Top transverse reinforcement

1.401

0.364

1.401

BS 5400
Part:4 CL
5.8.4

0.56

0.292

0.56

BS 5400
Part:4 CL
5.8.4

1.19

5.688

5.688

BD 28/87
Earlyther
Cracking

Top transverse 1 reinforcement 0.989

5.688

5.688

BD 28/87
Earlyther
Cracking

Top transverse 2 reinforcement 0.989

5.688

5.688

BD 28/87
Earlyther
Cracking

Longitudinatal secondry
reinforcement, T & B

5.688

5.688

BD 28/87
Earlyther
Cracking

Longitudinatal secondry
reinforcement, T & B

TOP SLAB Bottom transverse


reinforcement

0.476

BPG121_F01(Excel)

EARLY THERMAL CRACKING CALCULATIONS


Project:

Diftah Clover Leaf Interchange, Sharjah

Section
Date:

Footing, Wall & Top Slab


1-Nov-06

Please complete the boxes shaded thus:

Section

Vert_EF
Vert_IF
Hoz_BF

750
750
750

125
125
125

Trans_Bott1
Trans_Bott2
Trans_Top
Long_T&B

750
750
750
750

125
125
125
125

Trans_Bott
Trans_Top1
Trans_Top2
Long_T&B

900
900
900
900

125
125
125
125

Dia of steel in
mm

fct/fb

conc face area crack width in temp T1 in deg temp T2 in deg


in mm2
mm
C
C

Restraint
factor

ult

Area of
steel in
mm2

Area of
steel in
mm/mm

Wall
32
32
32

0.67
0.67
0.67

3.13E+04
3.13E+04
3.13E+04

0.125
0.125
0.125

53
53
53

0
0
0

0.6
0.6
0.6

2.00E-04
2.00E-04
2.00E-04

711
711
711

5.687603
5.687603
5.687603

Base Slab
32
32
25
20

0.67
0.67
0.67
0.67

3.13E+04
3.13E+04
3.13E+04
3.13E+04

0.125
0.125
0.125
0.125

53
53
53
53

0
0
0
0

0.2
0.2
0.2
0.2

2.00E-04
2.00E-04
2.00E-04
2.00E-04

58
58
46
36

0.466534
0.466534
0.36448
0.291584

Top Slab
32
32
32
32

0.67
0.67
0.67
0.67

3.13E+04
3.13E+04
3.13E+04
3.13E+04

0.125
0.125
0.125
0.125

53
53
53
53

0
0
0
0

0.6
0.6
0.6
0.6

2.00E-04
2.00E-04
2.00E-04
2.00E-04

711
711
711
711

5.687603
5.687603
5.687603
5.687603

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN CHECK CONCLUSION

97a

By:
MKB
Check By:
0

Rev.
Date:
1-Nov-06
Date:

References/Results
MINIMUM REINFORCEMENT CHECK
SUMMARY OF DESIGN CHECK

Reinforcement Provided
Bar dia
(mm)

WALL

BASE

spacing
(mm)

Min. Reinf.
Requirement

As
(mm/mm)

(mm/mm)

criteria

Status

Vertical main reinforcement, on


earth face

T32

125

6.434

>

5.688

BD 28/87
Earlyther
Cracking

PASS

Vertical main reinforcement, on


inner face

T32

125

6.434

>

5.688

BD 28/87
Earlyther
Cracking

PASS

Horizontal secondry
reinforcement, on each face

T32

125

6.434

>

5.688

BD 28/87
Earlyther
Cracking

PASS

Bottom transverse1
reinforcement

T32

125

6.434

>

0.989

BS 5400
Part:4 CL
5.8.4

PASS

Bottom transverse2
reinforcement

T32

125

6.434

>

1.401

BS 5400
Part:4 CL
5.8.4

PASS

Top transverse reinforcement

T25

125

3.927

>

1.401

BS 5400
Part:4 CL
5.8.4

PASS

Longitudinatal secondry
reinforcement, T & B

T20

125

2.513

>

0.56

BS 5400
Part:4 CL
5.8.4

PASS

T32

125

6.434

>

5.688

BD 28/87
Earlyther
Cracking

PASS

Top transverse 1 reinforcement

T32

125

6.434

>

5.688

BD 28/87
Earlyther
Cracking

PASS

Top transverse 2 reinforcement

T32

125

6.434

>

5.688

BD 28/87
Earlyther
Cracking

PASS

Longitudinatal secondry
reinforcement, T & B

T32

125

6.434

>

5.688

BD 28/87
Earlyther
Cracking

PASS

TOP SLAB Bottom transverse


reinforcement

BPG121_F01(Excel)

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

H
BEARING PRESSURE CHECK

CALCULATION SHEET No.


Project:
Subject:

H1

By:

Diftah Clover Leaf Interchange, Sharjah

Check By:

7-Mar-06
Date:

References/Results
Base pressure due to water inside the Culvert
Allowable Bearing
Height of Culvert =

3.5

Pressure

3
10.3 kN/m

Density of Water =

Pressure due to water =

400 kN/m2

2
36.05 kN/m

This pressure is added to the support reaction to get the total base pressure

LOADS
Joint Catchmen
ID t width (m)
40

0.1875

Suppo
rt
Type DEAD FILL
2
11.8 48.5

Bearing
Pressure
HB20-

MAXEP

MINEP

SURF

4.7

-0.6

-0.2

0.0

SUR_12

0.0

379.4

41

0.52

32.1

131.9

12.5

-0.3

-0.1

0.0

0.0

375.1

42

0.441

26.2

108.3

9.8

1.0

0.3

0.0

0.0

365.7

43

0.217

12.7

52.9

4.7

0.6

0.2

0.0

0.0

363.0

44

0.217

12.6

52.5

4.6

0.7

0.2

0.0

0.0

360.7

45

0.217

12.4

52.3

4.6

0.7

0.2

0.0

0.0

358.6

46

0.217

12.3

52.1

4.5

0.7

0.2

0.0

0.0

357.0

47

0.217

12.2

52.0

4.4

0.7

0.2

0.0

0.0

355.7

48

0.217

12.1

52.1

4.3

0.7

0.2

0.0

0.0

354.9

49

0.217

12.0

52.2

4.3

0.6

0.2

0.0

0.0

354.5

50

0.217

11.9

52.4

4.2

0.5

0.2

0.0

0.0

354.5

51

0.217

11.9

52.6

4.2

0.4

0.1

0.0

0.0

354.8

52

0.217

11.8

52.9

4.2

0.3

0.1

0.0

0.0

355.4

53

0.441

24.0

108.3

8.4

0.5

0.2

0.0

0.0

356.3

54

0.52

28.1

130.6

9.6

-0.3

-0.1

0.0

0.0

359.2

55

0.375

20.2

94.9

6.7

-0.5

-0.2

0.0

0.0

359.5

56

0.52

27.8

131.5

9.0

-1.1

-0.4

0.0

0.0

357.7

57

0.441

23.2

110.4

7.0

-1.3

-0.4

0.0

0.0

351.8

58

0.217

11.4

54.1

3.4

-0.7

-0.2

0.0

0.0

350.0

59

0.217

11.3

53.9

3.3

-0.7

-0.2

0.0

0.0

348.4

60

0.217

11.3

53.8

3.2

-0.7

-0.2

0.0

0.0

347.0

61

0.217

11.3

53.7

3.1

-0.7

-0.2

0.0

0.0

345.9

62

0.217

11.2

53.6

3.0

-0.7

-0.2

0.0

0.0

345.1

63

0.217

11.2

53.6

2.9

-0.7

-0.2

0.0

0.0

344.6

64

0.217

11.3

53.7

2.8

-0.7

-0.2

0.0

0.0

344.5

65

0.217

11.3

53.8

2.7

-0.7

-0.2

0.0

0.0

344.8

66

0.217

11.3

53.9

2.6

-0.7

-0.2

0.0

0.0

345.3

67

0.217

11.4

54.1

2.5

-0.7

-0.2

0.0

0.0

346.1

68

0.441

23.2

110.4

4.9

-1.3

-0.4

0.0

0.0

347.1

69

0.52

27.8

131.5

5.1

-1.1

-0.4

0.0

0.0

350.2

70

0.375

20.2

94.9

3.4

-0.5

-0.2

0.0

0.0

350.6

Date:
MKB

3 Cell Culvert, Bearing Pressure

Rev.

BPG121_F01(Excel)

H2

CALCULATION SHEET No.


Project:
Subject:

By:

Diftah Clover Leaf Interchange, Sharjah

Check By:

7-Mar-06
Date:

0
References/Results
LOADS

Suppo
Joint Catchmen
rt
ID t width (m)
Type DEAD FILL
70
0.375
2
20.2 94.9

Bearing
Pressure
HB20-

MAXEP

MINEP

SURF

3.4

-0.5

-0.2

0.0

SUR_12

0.0

350.6

71

0.52

28.1

130.6

4.3

-0.3

-0.1

0.0

0.0

349.0

72

0.441

24.0

108.3

2.9

0.5

0.2

0.0

0.0

343.8

73

0.217

11.8

52.9

1.3

0.3

0.1

0.0

0.0

342.3

74

0.217

11.9

52.6

1.2

0.4

0.1

0.0

0.0

341.0

75

0.217

11.9

52.4

1.1

0.5

0.2

0.0

0.0

340.0

76

0.217

12.0

52.2

1.0

0.6

0.2

0.0

0.0

339.3

77

0.217

12.1

52.1

0.9

0.7

0.2

0.0

0.0

338.9

78

0.217

12.2

52.0

0.8

0.7

0.2

0.0

0.0

338.9

79

0.217

12.3

52.1

0.7

0.7

0.2

0.0

0.0

339.4

80

0.217

12.4

52.3

0.6

0.7

0.2

0.0

0.0

340.2

81

0.217

12.6

52.5

0.4

0.7

0.2

0.0

0.0

341.4

82

0.217

12.7

52.9

0.3

0.6

0.2

0.0

0.0

342.8

83

0.441

26.2

108.3

0.5

1.0

0.3

0.0

0.0

344.5

84

0.52

32.1

131.9

-0.2

-0.3

-0.1

0.0

0.0

350.6

85

0.1875

11.8

48.5

-0.2

-0.6

-0.2

0.0

0.0

352.9

Date:
MKB

3 Cell Culvert, Bearing Pressure

Rev.

BPG121_F01(Excel)

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

I
WING WALL & APRON SLAB DESIGN
(U section)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

GEOMETERY

By:

Rev.
Date:

MKB
Check By:

21-Nov-06
Date:

ATQ
References/Results

Clear Height of Wall

Thickness of wall at top

W1

W2

3.500

3.500

0.300

0.300

Thickness of wall at Bottom m

0.750

0.750

Heel from face of wall

0.500

0.500

Length of U b/w walls

15.0

Thickness of base

0.750

20

Ko

0.6

wsls

12

wuls

20

kPa

DL on base slab

20

kPa

subgrade modulus of soil

40000

0.750

kN/m^3
kPa

kN/m^3

BPG121_F01(Excel)

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
STAAD PLANE TROUGH SECTION
START JOB INFORMATION
ENGINEER DATE 12-Dec-06
END JOB INFORMATION
INPUT WIDTH 79
SET NL 12
SET ITERLIM 50
PAGE LENGTH 10000000
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 0.1 0 0; 3 0.2 0 0; 4 0.3 0 0; 5 0.4 0 0; 6 0.5 0 0; 7 0.875 0 0;
8 1.25 0 0; 9 1.588 0 0; 10 1.925 0 0; 11 2.55 0 0; 12 3.175 0 0; 13 3.8 0 0;
14 4.425 0 0; 15 5.05 0 0; 16 5.675 0 0; 17 6.3 0 0; 18 6.925 0 0; 19 7.55 0
0;
20 8.175 0 0; 21 8.8 0 0; 22 9.425 0 0; 23 10.05 0 0; 24 10.675 0 0;
25 11.3 0 0; 26 11.925 0 0; 27 12.55 0 0; 28 13.175 0 0; 29 13.8 0 0;
30 14.425 0 0; 31 15.05 0 0; 32 15.675 0 0; 33 16.3 0 0; 34 16.925 0 0;
35 17.263 0 0; 36 17.6 0 0; 37 17.975 0 0; 38 18.35 0 0; 39 18.45 0 0;
40 18.55 0 0; 41 18.65 0 0; 42 18.75 0 0; 43 18.85 0 0; 44 0.875 0.375 0;
45 0.875 1.025 0; 46 0.875 1.5 0; 47 0.875 1.975 0; 48 0.875 2.45 0;
49 0.875 2.925 0; 50 0.875 3.4 0; 51 0.875 3.875 0; 52 17.975 0.375 0;
53 17.975 1.025 0; 54 17.975 1.5 0; 55 17.975 1.975 0; 56 17.975 2.45 0;
57 17.975 2.925 0; 58 17.975 3.4 0; 59 17.975 3.875 0;
MEMBER INCIDENCES
1 1 2; 2 2 3; 3 3 4; 4 4 5; 5 5 6; 6 6 7; 7 7 8; 8 8 9; 9 9 10; 10 10 11;
11 11 12; 12 12 13; 13 13 14; 14 14 15; 15 15 16; 16 16 17; 17 17 18; 18 18
19;
19 19 20; 20 20 21; 21 21 22; 22 22 23; 23 23 24; 24 24 25; 25 25 26; 26 26
27;
27 27 28; 28 28 29; 29 29 30; 30 30 31; 31 31 32; 32 32 33; 33 33 34; 34 34
35;
35 35 36; 36 36 37; 37 37 38; 38 38 39; 39 39 40; 40 40 41; 41 41 42; 42 42
43;
43 7 44; 44 44 45; 45 45 46; 46 46 47; 47 47 48; 48 48 49; 49 49 50; 50 50 51;
51 37 52; 52 52 53; 53 53 54; 54 54 55; 55 55 56; 56 56 57; 57 57 58; 58 58
59;
***************************************
DEFINE MATERIAL START
ISOTROPIC USER-CONC
E 3.2e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL USER-CONC MEMB 1 TO 58
***************************************
MEMBER PROPERTY BRITISH
1 TO 6 PRIS YD 0.75 ZD 1
37 TO 42 PRIS YD 0.75 ZD 1
7 TO 36 PRIS YD 0.75 ZD 1
50 PRIS YD 0.331 ZD 1
49 PRIS YD 0.392 ZD 1
48 PRIS YD 0.453 ZD 1
47 PRIS YD 0.514 ZD 1
46 PRIS YD 0.575 ZD 1
45 PRIS YD 0.636 ZD 1
44 PRIS YD 0.708 ZD 1
43 PRIS YD 0.75 ZD 1
58 PRIS YD 0.331 ZD 1

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
57 PRIS YD 0.392 ZD 1
56 PRIS YD 0.453 ZD 1
55 PRIS YD 0.514 ZD 1
54 PRIS YD 0.575 ZD 1
53 PRIS YD 0.636 ZD 1
52 PRIS YD 0.708 ZD 1
51 PRIS YD 0.75 ZD 1
***************************************
SUPPORTS
1 FIXED BUT FZ MX MY MZ KFX 200 KFY 2000
2 TO 5 FIXED BUT FZ MX MY MZ KFX 400 KFY 4000
6 FIXED BUT FZ MX MY MZ KFX 950 KFY 9500
7 FIXED BUT FZ MX MY MZ KFX 1500 KFY 15000
8 FIXED BUT FZ MX MY MZ KFX 1425 KFY 14250
9 FIXED BUT FZ MX MY MZ KFX 1350 KFY 13500
10 FIXED BUT FZ MX MY MZ KFX 1925 KFY 19250
11 TO 33 FIXED BUT FZ MX MY MZ KFX 2500 KFY 25000
34 FIXED BUT FZ MX MY MZ KFX 1925 KFY 19250
35 FIXED BUT FZ MX MY MZ KFX 1350 KFY 13500
36 FIXED BUT FZ MX MY MZ KFX 1425 KFY 14250
37 FIXED BUT FZ MX MY MZ KFX 1500 KFY 15000
38 FIXED BUT FZ MX MY MZ KFX 950 KFY 9500
39 TO 42 FIXED BUT FZ MX MY MZ KFX 400 KFY 4000
43 FIXED BUT FZ MX MY MZ KFX 200 KFY 2000
***************************************
LOAD 1 HOZ. EARTH PRESSURE
MEMBER LOAD
43 TRAP GX 46.5 42
44 TRAP GX 42 34.2
45 TRAP GX 34.2 28.5
46 TRAP GX 28.5 22.8
47 TRAP GX 22.8 17.1
48 TRAP GX 17.1 11.4
49 TRAP GX 11.4 5.7
50 TRAP GX 5.7 0
51 TRAP GX -46.5 -42
52 TRAP GX -42 -34.2
53 TRAP GX -34.2 -28.5
54 TRAP GX -28.5 -22.8
55 TRAP GX -22.8 -17.1
56 TRAP GX -17.1 -11.4
57 TRAP GX -11.4 -5.7
58 TRAP GX -5.7 0
***************************************
LOAD 2 VERT. EARTH PRESSURE
MEMBER LOAD
1 TO 6 UNI GY -77.5
37 TO 42 UNI GY -77.5
7 TO 36 UNI GY 0
***************************************
LOAD 3 HOZ. (LLSC 12KPA)
MEMBER LOAD
43 TO 50 UNI GX 7.2
51 TO 58 UNI GX -7.2
***************************************
LOAD 4 VERT. (LLSC 12KPA)
MEMBER LOAD
1 TO 6 UNI GY -12
37 TO 42 UNI GY -12
7 TO 36 UNI GY 0
***************************************

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
LOAD 5 HOZ. (LLSC 20KPA)
MEMBER LOAD
43 TO 50 UNI GX 12
51 TO 58 UNI GX -12
***************************************
LOAD 6 VERT. (LLSC 20KPA)
MEMBER LOAD
1 TO 6 UNI GY -20
37 TO 42 UNI GY -20
7 TO 36 UNI GY 0
***************************************
LOAD 7 SW
SELFWEIGHT Y -1
***************************************
LOAD 8 UPLIFT
MEMBER LOAD
1 TO 6 UNI GY 0
37 TO 42 UNI GY 0
7 TO 36 UNI GY 0
***************************************
PERFORM ANALYSIS
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 101 DL_SLS
REPEAT LOAD
1 1.0 2 1.0 7 1.0 8 1.0
PERFORM ANALYSIS
LOAD LIST 101
PRINT MEMBER FORCES ALL
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 102 (DL+LL))_SLS
REPEAT LOAD
1 1.0 2 1.0 7 1.0 8 1.0 3 1.0 4 1.0
PERFORM ANALYSIS
PRINT SUPPORT REACTION
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 201 DL_ULS
REPEAT LOAD
1 1.65 2 1.32 7 1.265 8 1.21
PERFORM ANALYSIS
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 202 (DL+LL)_ULS
REPEAT LOAD
1 1.65 2 1.32 7 1.265 8 1.21 5 1.65 6 1.32
PERFORM ANALYSIS
LOAD LIST 202
PRINT MEMBER FORCES ALL
***************************************
CHANGE
LOAD COMB 11 LL_SLS

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
101 -1.0 102 1.0
LOAD COMB 12 LL_ULS
201 -1.0 202 1.0
***************************************
PERFORM ANALYSIS
LOAD LIST 11
PRINT MEMBER FORCES ALL
FINISH

Job No

Sheet No

Rev

1
Software licensed to Snow Panther [LZ0]
Job Title

Part
Ref
By

Client

File

Date23-Nov-06

3500-usection.std

Chd

Date/Time

23-Nov-2006 16:33

0 kNm

0 kNm

0.2 kNm

-0.2 kNm

1.7 kNm

-1.7 kNm

5.8 kNm

-5.8 kNm

13.7 kNm

-13.7 kNm

26.8 kNm

-26.8 kNm

46.3 kNm

-46.3 kNm

85.8 kNm
-85.8 kNm
49.7 kNm
49.7 kNm
48.7 kNm
48.7 kNm
47.8 kNm
47.8 kNm
44.2 kNm
44.2 kNm
43.0 kNm
43.0 kNm
39.9 kNm
39.9 kNm
35.8 kNm
35.8 kNm
32.5 kNm
32.5 kNm
30.9 kNm
30.3 kNm
30.3 kNm
30.9 kNm
29.6 kNm
11.8 kNm
11.83.7
kNm
10.3 kNm
10.3 kNm
3.7
kNm
kNm
2.4
kNm
2.4
kNm
0.6
1.3
kNm
kNm
1.3
0.6
kNm
00.1
kNm
116.4
kNm
-116.4
0.1
0kNm
kNm
kNm
kNm
-21.0 kNm
-21.0 kNm
-43.3 kNm
-43.4 kNm
-69.9 kNm
-69.9 kNm
-104.6 kNm
-104.6 kNm

Y
Z

Load 101 : Bending Z


Moment - kNm

Moment Mz DL_SLS

0 kNm

0 kNm

0.8 kNm

-0.8 kNm

3.2 kNm

-3.2 kNm

7.3 kNm

-7.3 kNm

13.0 kNm

-13.0 kNm

20.3 kNm

-20.3 kNm

29.2 kNm

-29.2 kNm

44.1 kNm

-44.1 kNm

5.8kNm
kNm
5.5 kNm
5.8-54.1
kNm
5.3 kNm
5.3 kNm
3.9 kNm
4.8 kNm
4.8 kNm
3.9 kNm
2.6 kNm
2.6 kNm
1.9
kNm
1.9
kNm
0.7
1.2
kNm
kNm
0.8 kNm
0.8 kNm
1.2
0.7
kNm
00.1
kNm
0.3
kNm
kNm
54.1
0.3
0.1
kNm
0kNm
kNm
kNm
kNm
-1.7 kNm
-1.7 kNm
-4.9 kNm
-4.9 kNm
-9.0 kNm
-9.0 kNm
-14.0 kNm
-14.0 kNm
-20.0 kNm
-20.0 kNm
-27.0 kNm
-27.0 kNm
-34.6
kNm
-34.6
kNm
-39.0
kNm
-39.0
kNm
kNm
-43.4
kNmkNm
-48.3-43.4
kNm
-48.3

Y
Z

Load 11 : Bending Z
Moment - kNm

Moment Mz LL_SLS

Print Time/Date: 23/11/2006 16:33

STAAD.Pro for Windows Release 2004

Print Run 1 of 2

Job No

Sheet No

Rev

2
Software licensed to Snow Panther [LZ0]
Job Title

Part
Ref
By

Client

File

Date23-Nov-06

3500-usection.std

Chd

Date/Time

23-Nov-2006 16:33

0 kNm

0 kNm

2.6 kNm

-2.6 kNm

11.8 kNm

-11.8 kNm

29.7 kNm

-29.7 kNm

58.4 kNm

-58.4 kNm

100.1 kNm

-100.1 kNm

156.8 kNm
262.8 kNm
33.0 kNm
10.8
kNm
6.9
kNm
3.9
kNm
1.7
kNm
340.7 kNm
00.4
kNm
kNm

-156.8 kNm

56.9 kNm
57.1 kNm
56.5 kNm
56.5 kNm
57.1 kNm
56.9 kNm
55.8 kNm
55.6 kNm
55.8 kNm
54.8 kNm
54.8 kNm
49.5 kNm
49.5 kNm
39.3 kNm
39.3 kNm
22.3 kNm
22.3 kNm
-3.7 kNm
-3.7 kNm
-40.8 kNm
-40.9 kNm
-91.5 kNm
-91.5 kNm

-157.6 kNm
-200.4 kNm
-248.4 kNm
-307.7 kNm

-262.8 kNm
33.0 kNm
10.8
6.9
kNm
3.9
1.7
kNm
0.4
0kNm
kNm
kNm -340.7 kNm

-157.6 kNm
-200.5 kNm
-248.4 kNm
-307.7 kNm

Y
Z

Load 202 : Bending Z


Moment - kNm

Moment Mz DL+LL (ULS)

0 kN

0 kN

11.6 kN

-11.6 kN

27.7 kN

-27.7 kN

48.3 kN

-48.3 kN

73.4 kN

-73.4 kN

102.9 kN

-102.9 kN

136.8 kN

-136.8 kN

162.7
kN kN
153.8
146.0
kN
138.0
130.9
kN
122.8
kN kN
113.2 kN
98.4 kN 87.6 kN
88.4 kN
-190.6 kN
73.6 kN
66.9 kN
52.1 kN
48.9 kN
46.4
kN
37.9
kN
34.6 kN
34.1 kN
31.2
30.5
kN
29.3
kN
23.7 kN
22.6
20.6
kN
19.8 kN
15.9
kN
14.0
12.0
kN
10.7
kN
8.9
kN
8.4
kN
8.5
kN
7.8
kN
7.1
kN
7.0
kN
7.8
kN
6.4
kN
6.5
kN
5.4
kN
4.1
kN
3.3
1.1
kN
225.4
kN
-225.4
-1.1
kN
-3.3
kN kN
-5.4
kN
-7.8 kN-6.5 kN-6.4 kN-7.0 kN-7.8 kN-8.5 kN-8.4 kN-7.1 kN-4.1 kN
-8.9 kN-23.7 kN
-10.7 kN
-12.0
kN
-14.0
kN
-15.9 kN
-19.8 kN
-20.6
-22.6
kNkN
-29.3
-30.5
-31.2
-34.1 kN
-34.6 kN
-37.9
-46.4kN
kN
-48.9 kN
-52.1 kN
-66.9
kN
-73.6 kN
-87.6 kN -98.4 kN
-88.4 kN
-113.2
kN
-122.9
kN
-130.8 kN
-138.0
kN
-146.0
-153.8
kN
-162.7
kN kN
190.6 kN

Y
Z

Load 202 : Shear Y


Force - kNm

Shear Fy DL+LL (ULS)

Print Time/Date: 23/11/2006 16:33

STAAD.Pro for Windows Release 2004

Print Run 2 of 2

CALCULATION SHEET No.


By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (BASE SLAB DESIGN)

Rev.
Date:

MKB
Check By:

21-Nov-06
Date:

ATQ
References/Results

Section Analysis at ULS


BASE SLAB
Section Location
Member No.
End: Joint No.
M perm
M live
N (+T / -C)
V
M
b
h
cover
d
fcu
fy
use r/f
c/c spacing
As Axial
As Shear
As Flaxure
As Total
z
x/d
MoR
v
av
2d/av

(kNm)
(kNm)
(kN)
(kN)
(kNm)
(mm)
(mm)
(mm)
(mm)
(MPa)
(MPa)

(mm2)
(mm 2)
(mm2)
(mm 2)
(mm)
(kNm)
(MPa)
(mm)

%b in which shear enhancemen

enhanced vc in %b
vc un-enhance (MPa)
vc wt. avg
(MPa)
Asv/ bsv req = mm2/mm2
use
long. spacing (mm)
trans. Spacing (mm)
Asv/ bsv prov
mm2/mm2
vs = 0.87fy*Av/ bsv (MPa)

VoR = vc + vs

Status

(MPa)

W1 L-Face

W1 C/L

W1 R-Face

d frm W1

0.5 L (Mid)

d frm W2

W2 L-Face

W2 C/L

W2 R-Face

6
i: 6

7
i: 7

7
j: 8

9
j: 10

21
j: 22

34
i: 34

36
i: 36

36
j: 37

37
j: 38

-4.8
-1.9
0.0
-37.7
-12.2
1000
750
75
665
40
460
T20
125
0
47
2466
2513
632
0.100
624
0.06

101.4
48.3
0.0
-139.6
303.6
1000
750
75
665
40
460
T20
125
0
174
2339
2513
632
0.100
591
0.21

70.9
43.4
0.0
-148.5
249.6
1000
750
75
665
40
460
T20
125
0
186
2328
2513
632
0.100
589
0.22

27.4
34.6
0.0
-122.0
165.7
1000
750
75
665
40
460
T20
125
0
152
2361
2513
632
0.100
597
0.18

-26.5
-5.5
0.0
-7.3
-51.6
1000
750
75
665
40
460
T20
125
0
9
2504
2513
632
0.100
633
0.01

27.4
34.6
0.0
122.0
165.7
1000
750
75
665
40
460
T20
125
0
152
2361
2513
632
0.100
597
0.18

70.9
43.4
0.0
148.5
249.6
1000
750
75
665
40
460
T20
125
0
186
2328
2513
632
0.100
589
0.22

101.4
48.3
0.0
139.6
303.6
1000
750
75
665
40
460
T20
125
0
174
2339
2513
632
0.100
591
0.21

-4.8
-1.9
0.0
37.7
-12.2
1000
750
75
665
40
460
T20
125
0
47
2466
2513
632
0.100
624
0.06

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

1
0
0.50
0.50
0.50
0

0
0
0.50
OK

0
0
0.50
OK

0
0
0.50
OK

0
0
0.50
OK

0
0
0.50
OK

0
0
0.50
OK

0
0
0.50
OK

0
0
0.50
OK

0
0
0.50
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (BASE SLAB DESIGN)

MKB
Check By:
ATQ

Rev.
Date:
21-Nov-06
Date:

References/Results

Section Analysis at SLS1


Moments in kN m and Axial in kN
BASE SLAB
W1 L-Face
Section Location
Member No.
6
End: Joint No.
i: 6
Axial
0
SLS Parman
Momen
-5
Axial
0
SLS1 LL
Momen
-2
Ignoring Axial Load Effect
b
(mm)
1000
h
(mm)
750
cover
75
d
(mm)
665
fcu
(Mpa)
40
fy
(Mpa)
460
use r/f
T20
(mm)
c/c spacing
125
(mm2)
2513
As Total
(Mpa)
200000
Es
15500
Ec long term (Mpa)
12.9
modular ratio
(mm)
177.8
x1
(mm)
-242.6
x2
(mm)
177.8
dc
4
Mom of Inertia (mm ) 9.571E+09
4.40
fs (T = +ve) (Mpa)
s
2.2E-05
fc (C = -ve) (Mpa)
-0.12
a'
(mm)
725
1
2.471E-05
ts
0.0297746
m (eq 25)
-0.02975
cnom
(mm)
50
acr
(mm)
76.6
w (eq 24)
(mm)
0.0000
w (eq 26)
(mm)
0.0000
allowable wcr (mm)
0.125
allowable fc
(Mpa)
-20
allowable fs
(Mpa)
345
Status
OK

W1 C/L

W1 R-Face

d frm W1

0.5 L (Mid)

d frm W2

W2 L-Face

W2 C/L

W2 R-Face

7
i: 7
0
101
0
48

7
j: 8
0
71
0
43

9
j: 10
0
27
0
35

21
j: 22
0
-27
0
-6

34
i: 34
0
27
0
35

36
i: 36
0
71
0
43

36
j: 37
0
101
0
48

37
j: 38
0
-5
0
-2

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
98.33
0.0004917
-2.78
740
0.0005673
0.0011867
-0.000619
65
87.6
0.0000
0.0000
0.125
-20
345
OK

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
75.08
0.0003754
-2.12
740
0.0004332
0.0011512
-0.000718
65
87.6
0.0000
0.0000
0.125
-20
345
OK

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
40.73
0.0002036
-1.15
740
0.000235
-0.001438
0.000235
65
87.6
0.0572
0.0618
0.125
-20
345
OK

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
21.02
0.0001051
-0.59
725
0.000118
0.0081769
-0.008059
50
76.6
0.0000
0.0000
0.125
-20
345
OK

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
40.73
0.0002036
-1.15
740
0.000235
-0.001438
0.000235
65
87.6
0.0572
0.0618
0.125
-20
345
OK

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
75.08
0.0003754
-2.12
740
0.0004332
0.0011512
-0.000718
65
87.6
0.0000
0.0000
0.125
-20
345
OK

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
98.33
0.0004917
-2.78
740
0.0005673
0.0011867
-0.000619
65
87.6
0.0000
0.0000
0.125
-20
345
OK

1000
750
75
665
40
460
T20
125
2513
200000
15500
12.9
177.8
-242.6
177.8
9.571E+09
4.40
2.2E-05
-0.12
725
2.471E-05
0.0297746
-0.02975
50
76.6
0.0000
0.0000
0.125
-20
345
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (WALLS DESIGN)

By:

Rev.
Date:

MKB
Check By:

21-Nov-06
Date:

ATQ
References/Results

Section Analysis at ULS


Section Location
Member No.
End: Joint No.
M perm
M live
N (+T / -C)
V
M
b
h
cover
d
fcu
fy
use r/f
c/c spacing
As Axial
As Shear
As Flaxure
As Total
z
x/d
MoR
v
av
2d/av

(kNm)
(kNm)
(kN)
(kN)
(kNm)
(mm)
(mm)
(mm)
(mm)
(MPa)
(MPa)

(mm 2)
(mm 2)
(mm 2)
(mm2)
(mm)
(kNm)
(MPa)
(mm)

%b in which shear enhancemen

enhanced vc in %b
vc un-enhance (MPa)
vc wt. avg
(MPa)
Asv/ bsv req = mm2/mm2
use
long. spacing (mm)
trans. Spacing (mm)
Asv/ bsv prov
mm2/mm2
vs = 0.87fy*Av/ bsv (MPa)

VoR = vc + vs

Status

(MPa)

WALL-1

WALL-2

0H (ToB)

0.19H (d frm
base)

0.46 H

0H (ToB)

0.19H (d frm
base)

0.46 H

44
i: 44

44
j: 45

46
j: 47

52
i: 52

52
j: 53

54
j: 55

-85.8
-44.1
0.0
190.6
-262.8
1000
750
75
659
40
460
T32
125
0
238
6196
6434
581
0.238
1440
0.29

-46.3
-29.2
0.0
136.8
-156.8
1000
666
75
575
40
460
T32
125
0
171
6263
6434
496
0.276
1243
0.24

-13.7
-13.0
0.0
73.4
-58.4
1000
544
75
457
40
460
T25
125
0
92
3835
3927
408
0.213
626
0.16

85.8
44.1
0.0
-190.6
262.8
1000
750
75
659
40
460
T32
125
0
238
6196
6434
581
0.238
1440
0.29

46.3
29.2
0.0
-136.8
156.8
1000
666
75
575
40
460
T32
125
0
171
6263
6434
496
0.276
1243
0.24

13.7
13.0
0.0
-73.4
58.4
1000
544
75
457
40
460
T25
125
0
92
3835
3927
408
0.213
626
0.16

1
0
0.68
0.68
0.68
0

1
0
0.74
0.74
0.74
0

1
0
0.72
0.72
0.72
0

1
0
0.68
0.68
0.68
0

1
0
0.74
0.74
0.74
0

1
0
0.72
0.72
0.72
0

0
0
0.68
OK

0
0
0.74
OK

0
0
0.72
OK

0
0
0.68
OK

0
0
0.74
OK

0
0
0.72
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (WALLS DESIGN)

By:
MKB
Check By:
ATQ

Rev.
Date:
21-Nov-06
Date:

References/Results

Section Analysis at SLS1


Moments in kN m and Axial in kN

0H (ToB)
Section Location
Member No.
44
End: Joint No.
i: 44
Axial
0
SLS Parman
Momen
-86
Axial
0
SLS1 LL
Momen
-44
Ignoring Axial Load Effect
b
(mm)
1000
h
(mm)
750
75
cover
(mm)
659
d
(Mpa)
40
fcu
(Mpa)
460
fy
T32
use r/f
(mm)
125
c/c spacing
(mm2)
6434
As Total
(Mpa)
200000
Es
15500
Ec long term (Mpa)
12.9
modular ratio
(mm)
258.0
x1
(mm)
-424.1
x2
(mm)
258.0
dc
4
Mom of Inertia (mm ) 1.907E+10
35.24
fs (T = +ve) (Mpa)
s
0.0001762
fc (C = -ve) (Mpa)
-1.76
a'
(mm)
725
1
0.0002052
ts
0.0011599
m (eq 25)
-0.000955
cnom
(mm)
50
acr
(mm)
74.9
w (eq 24)
(mm)
0.0000
w (eq 26)
(mm)
0.0000
allowable wcr (mm)
0.125
allowable fc
(Mpa)
-20
allowable fs
(Mpa)
345
Status
OK

WALL-1

WALL-2

0.19H (d frm
base)

0.46 H

0H (ToB)

0.19H (d frm
base)

0.46 H

44
j: 45
0
-46
0
-29

46
j: 47
0
-14
0
-13

52
i: 52
0
86
0
44

52
j: 53
0
46
0
29

54
j: 55
0
14
0
13

1000
666
75
575
40
460
T32
125
6434
200000
15500
12.9
236.9
-403.0
236.9
1.392E+10
23.66
0.0001183
-1.28
641
0.0001414
0.0011566
-0.001015
50
74.9
0.0000
0.0000
0.125
-20
345
OK

1000
544
75
457
40
460
T25
125
3927
200000
15500
12.9
170.3
-271.6
170.3
5.797E+09
17.01
8.505E-05
-0.78
519
0.0001036
0.0002951
-0.000191
50
75.9
0.0000
0.0000
0.125
-20
345
OK

1000
750
75
659
40
460
T32
125
6434
200000
15500
12.9
258.0
-424.1
258.0
1.907E+10
35.24
0.0001762
-1.76
740
0.0002118
0.0011971
-0.000985
65
86.3
0.0000
0.0000
0.125
-20
345
OK

1000
666
75
575
40
460
T32
125
6434
200000
15500
12.9
236.9
-403.0
236.9
1.392E+10
23.66
0.0001183
-1.28
656
0.0001466
0.0011995
-0.001053
65
86.3
0.0000
0.0000
0.125
-20
345
OK

1000
544
75
457
40
460
T25
125
3927
200000
15500
12.9
170.3
-271.6
170.3
5.797E+09
17.01
8.505E-05
-0.78
534
0.0001081
0.0003078
-0.0002
65
87.1
0.0000
0.0000
0.125
-20
345
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

GEOMETERY

By:

Rev.
Date:

MKB
Check By:

21-Nov-06
Date:

ATQ
References/Results

W1

W2

Clear Height of Wall

6.500

6.500

Thickness of wall at top

0.300

0.300

0.750

0.750
0.500

Thickness of wall at Bottom


Heel from face of wall

0.500

Length of U b/w walls

15.0

Thickness of base

0.750

20

Ko

0.6

wsls

12

wuls

20

kPa

DL on base slab

20

kPa

subgrade modulus of soil

40000

0.750

kN/m^3
kPa

kN/m^3

BPG121_F01(Excel)

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
STAAD PLANE TROUGH SECTION
START JOB INFORMATION
ENGINEER DATE 12-Dec-06
END JOB INFORMATION
INPUT WIDTH 79
SET NL 12
SET ITERLIM 50
PAGE LENGTH 10000000
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 0.1 0 0; 3 0.2 0 0; 4 0.3 0 0; 5 0.4 0 0; 6 0.5 0 0; 7 0.875 0 0;
8 1.25 0 0; 9 1.588 0 0; 10 1.925 0 0; 11 2.55 0 0; 12 3.175 0 0; 13 3.8 0 0;
14 4.425 0 0; 15 5.05 0 0; 16 5.675 0 0; 17 6.3 0 0; 18 6.925 0 0; 19 7.55 0
0;
20 8.175 0 0; 21 8.8 0 0; 22 9.425 0 0; 23 10.05 0 0; 24 10.675 0 0;
25 11.3 0 0; 26 11.925 0 0; 27 12.55 0 0; 28 13.175 0 0; 29 13.8 0 0;
30 14.425 0 0; 31 15.05 0 0; 32 15.675 0 0; 33 16.3 0 0; 34 16.925 0 0;
35 17.263 0 0; 36 17.6 0 0; 37 17.975 0 0; 38 18.35 0 0; 39 18.45 0 0;
40 18.55 0 0; 41 18.65 0 0; 42 18.75 0 0; 43 18.85 0 0; 44 0.875 0.375 0;
45 0.875 1.025 0; 46 0.875 2 0; 47 0.875 2.975 0; 48 0.875 3.95 0;
49 0.875 4.925 0; 50 0.875 5.9 0; 51 0.875 6.875 0; 52 17.975 0.375 0;
53 17.975 1.025 0; 54 17.975 2 0; 55 17.975 2.975 0; 56 17.975 3.95 0;
57 17.975 4.925 0; 58 17.975 5.9 0; 59 17.975 6.875 0;
MEMBER INCIDENCES
1 1 2; 2 2 3; 3 3 4; 4 4 5; 5 5 6; 6 6 7; 7 7 8; 8 8 9; 9 9 10; 10 10 11;
11 11 12; 12 12 13; 13 13 14; 14 14 15; 15 15 16; 16 16 17; 17 17 18; 18 18
19;
19 19 20; 20 20 21; 21 21 22; 22 22 23; 23 23 24; 24 24 25; 25 25 26; 26 26
27;
27 27 28; 28 28 29; 29 29 30; 30 30 31; 31 31 32; 32 32 33; 33 33 34; 34 34
35;
35 35 36; 36 36 37; 37 37 38; 38 38 39; 39 39 40; 40 40 41; 41 41 42; 42 42
43;
43 7 44; 44 44 45; 45 45 46; 46 46 47; 47 47 48; 48 48 49; 49 49 50; 50 50 51;
51 37 52; 52 52 53; 53 53 54; 54 54 55; 55 55 56; 56 56 57; 57 57 58; 58 58
59;
***************************************
DEFINE MATERIAL START
ISOTROPIC USER-CONC
E 3.2e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL USER-CONC MEMB 1 TO 58
***************************************
MEMBER PROPERTY BRITISH
1 TO 6 PRIS YD 0.75 ZD 1
37 TO 42 PRIS YD 0.75 ZD 1
7 TO 36 PRIS YD 0.75 ZD 1
50 PRIS YD 0.334 ZD 1
49 PRIS YD 0.402 ZD 1
48 PRIS YD 0.469 ZD 1
47 PRIS YD 0.537 ZD 1
46 PRIS YD 0.604 ZD 1
45 PRIS YD 0.672 ZD 1
44 PRIS YD 0.728 ZD 1
43 PRIS YD 0.75 ZD 1
58 PRIS YD 0.334 ZD 1

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
57 PRIS YD 0.402 ZD 1
56 PRIS YD 0.469 ZD 1
55 PRIS YD 0.537 ZD 1
54 PRIS YD 0.604 ZD 1
53 PRIS YD 0.672 ZD 1
52 PRIS YD 0.728 ZD 1
51 PRIS YD 0.75 ZD 1
***************************************
SUPPORTS
1 FIXED BUT FZ MX MY MZ KFX 200 KFY 2000
2 TO 5 FIXED BUT FZ MX MY MZ KFX 400 KFY 4000
6 FIXED BUT FZ MX MY MZ KFX 950 KFY 9500
7 FIXED BUT FZ MX MY MZ KFX 1500 KFY 15000
8 FIXED BUT FZ MX MY MZ KFX 1425 KFY 14250
9 FIXED BUT FZ MX MY MZ KFX 1350 KFY 13500
10 FIXED BUT FZ MX MY MZ KFX 1925 KFY 19250
11 TO 33 FIXED BUT FZ MX MY MZ KFX 2500 KFY 25000
34 FIXED BUT FZ MX MY MZ KFX 1925 KFY 19250
35 FIXED BUT FZ MX MY MZ KFX 1350 KFY 13500
36 FIXED BUT FZ MX MY MZ KFX 1425 KFY 14250
37 FIXED BUT FZ MX MY MZ KFX 1500 KFY 15000
38 FIXED BUT FZ MX MY MZ KFX 950 KFY 9500
39 TO 42 FIXED BUT FZ MX MY MZ KFX 400 KFY 4000
43 FIXED BUT FZ MX MY MZ KFX 200 KFY 2000
***************************************
LOAD 1 HOZ. EARTH PRESSURE
MEMBER LOAD
43 TRAP GX 82.5 78
44 TRAP GX 78 70.2
45 TRAP GX 70.2 58.5
46 TRAP GX 58.5 46.8
47 TRAP GX 46.8 35.1
48 TRAP GX 35.1 23.4
49 TRAP GX 23.4 11.7
50 TRAP GX 11.7 0
51 TRAP GX -82.5 -78
52 TRAP GX -78 -70.2
53 TRAP GX -70.2 -58.5
54 TRAP GX -58.5 -46.8
55 TRAP GX -46.8 -35.1
56 TRAP GX -35.1 -23.4
57 TRAP GX -23.4 -11.7
58 TRAP GX -11.7 0
***************************************
LOAD 2 VERT. EARTH PRESSURE
MEMBER LOAD
1 TO 6 UNI GY -137.5
37 TO 42 UNI GY -137.5
7 TO 36 UNI GY 0
***************************************
LOAD 3 HOZ. (LLSC 12KPA)
MEMBER LOAD
43 TO 50 UNI GX 7.2
51 TO 58 UNI GX -7.2
***************************************
LOAD 4 VERT. (LLSC 12KPA)
MEMBER LOAD
1 TO 6 UNI GY -12
37 TO 42 UNI GY -12
7 TO 36 UNI GY 0
***************************************

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
LOAD 5 HOZ. (LLSC 20KPA)
MEMBER LOAD
43 TO 50 UNI GX 12
51 TO 58 UNI GX -12
***************************************
LOAD 6 VERT. (LLSC 20KPA)
MEMBER LOAD
1 TO 6 UNI GY -20
37 TO 42 UNI GY -20
7 TO 36 UNI GY 0
***************************************
LOAD 7 SW
SELFWEIGHT Y -1
***************************************
LOAD 8 UPLIFT
MEMBER LOAD
1 TO 6 UNI GY 0
37 TO 42 UNI GY 0
7 TO 36 UNI GY 0
***************************************
PERFORM ANALYSIS
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 101 DL_SLS
REPEAT LOAD
1 1.0 2 1.0 7 1.0 8 1.0
PERFORM ANALYSIS
LOAD LIST 101
PRINT MEMBER FORCES ALL
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 102 (DL+LL))_SLS
REPEAT LOAD
1 1.0 2 1.0 7 1.0 8 1.0 3 1.0 4 1.0
PERFORM ANALYSIS
PRINT SUPPORT REACTION
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 201 DL_ULS
REPEAT LOAD
1 1.65 2 1.32 7 1.265 8 1.21
PERFORM ANALYSIS
***************************************
CHANGE
SPRING COMPRESSION
1 TO 43 KFY
LOAD 202 (DL+LL)_ULS
REPEAT LOAD
1 1.65 2 1.32 7 1.265 8 1.21 5 1.65 6 1.32
PERFORM ANALYSIS
LOAD LIST 202
PRINT MEMBER FORCES ALL
***************************************
CHANGE
LOAD COMB 11 LL_SLS

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert (Wing Walls & Apron Slab)
101 -1.0 102 1.0
LOAD COMB 12 LL_ULS
201 -1.0 202 1.0
***************************************
PERFORM ANALYSIS
LOAD LIST 11
PRINT MEMBER FORCES ALL
FINISH

Job No

Sheet No

Rev

1
Part

Software licensed to Snow Panther [LZ0]


Job Title

Ref
By

Client

File

Date23-Nov-06
Date/Time

6500-usection.std

0 kNm

0 kNm

1.9 kNm

-1.9 kNm

14.8 kNm

-14.8 kNm

50.1 kNm

118.6 kNm

-118.6 kNm

-231.7 kNm

400.4 kNm

549.3 kNm
649.9 kNm

23-Nov-2006 16:40

-50.1 kNm

231.7 kNm

Chd

-400.4 kNm

47.1 kNm
15.7
kNm
10.1
kNm
5.7
kNm
2.6
kNm
kNm
00.6
kNm

85.9 kNm
85.0 kNm
85.0 kNm
82.2 kNm
82.2 kNm
76.7 kNm
76.7 kNm
67.3 kNm
67.3 kNm
52.6 kNm
52.6 kNm
47.1 kNm
30.7 kNm
30.7 kNm
15.7
10.1
kNm
5.7
kNm
2.6
kNm
0.6
kNm
0kNm
-0.8 kNm
-0.8 kNm
-44.1 kNm
-44.1 kNmLoad 101 : Bending Z
-101.7 kNm
-101.7 kNm Moment - kNm
-175.7 kNm
-175.7 kNm
-267.7 kNm

-549.3 kNm
-649.9 kNm

-267.7 kNm

-378.3 kNm
-445.5 kNm
-517.7 kNm

-378.4 kNm
-445.7 kNm
-517.7 kNm

-602.8 kNm

-602.8 kNm

Moment Mz DL (SLS)

0 kNm

0 kNm

3.4 kNm

-3.4 kNm

13.7 kNm

-13.7 kNm

30.8 kNm

-30.8 kNm

54.8 kNm

-54.8 kNm

85.6 kNm

-85.6 kNm

123.2 kNm

-123.2 kNm

152.1 kNm

-152.1 kNm

14.3 kNm
13.6 kNm
13.6 kNm
12.74.3
kNm
11.4 kNm
11.4 kNm
7.5 kNm
7.5 kNm
kNm
2.8
kNm
1.9 kNm
1.9 kNm
1.6
0.7
kNm
0.2
-170.2
0kNm
kNm
kNmkNm
-5.8 kNm
-5.8 kNm
-15.8 kNm
-15.7 kNm
-28.1 kNm
-28.1 kNm
-43.1 kNm
-43.1 kNm
-60.6 kNm
-60.6 kNm
-80.3 kNm
-80.3 kNm
-101.8 kNm
-101.8 kNm
-123.9
kNm
-123.9
kNm
-135.5
kNm
-135.5
kNm
-146.5
-146.5
kNmkNm
-157.5
kNmkNm
-157.5

12.7 kNm
4.3
kNm
2.8
kNm
1.6
kNm
0.7
kNm
0170.2
0.2
kNm
kNm
kNm

Y
Z

Load 11 : Bending Z
Moment - kNm

Moment Mz LL (SLS)

Print Time/Date: 23/11/2006 16:40

STAAD.Pro for Windows Release 2004

Print Run 1 of 2

Job No

Sheet No

Rev

2
Software licensed to Snow Panther [LZ0]
Job Title

Part
Ref
By

Client

File

Date23-Nov-06

6500-usection.std

Chd

Date/Time

0 kNm

0 kNm

12.5 kNm

-12.5 kNm

62.1 kNm

-62.1 kNm

167.3 kNm

23-Nov-2006 16:40

-167.3 kNm

346.3 kNm

-346.3 kNm

617.6 kNm

-617.6 kNm

999.5 kNm

-999.5 kNm

1.3e+003 kNm
88.7
29.0
kNmkNm
18.5
kNm
10.4
kNm
4.6
kNm
1.5e+003
01.2
kNm
kNm
kNm

-1.32e+003 kNm
159.2 kNm
154.1 kNm
154.1 kNm
138.4 kNm
138.4 kNm
110.8 kNm
110.8 kNm
88.729.0
kNm
69.3 kNm
69.3 kNm
kNm
18.5
11.3 kNm
11.3 kNm
10.4
4.6
kNm
1.2
0kNm
kNm
kNm-1.54e+003 kNm
-66.4 kNm
-166.8 -66.4
kNm kNm
-166.8 kNm
-292.6 kNm
-292.6 kNm
-445.7 kNm
-445.7 kNm
-626.5 kNm
-626.5 kNm
-832.8 kNm
-832.8 kNm
-1.06e+003 kNm
-1.06e+003 kNm
-1.19e+003 kNm
-1.19e+003 kNm
-1.31e+003 kNm
-1.31e+003 kNm
-1.45e+003 kNm
-1.45e+003
kNm
Load 202 : Bending
Z
Moment - kNm

Y
Z

Moment Mz DL+LL (ULS)

0 kN

0 kN

28.7 kN

-28.7 kN

76.3 kN

-76.3 kN

142.6 kN

-142.6 kN

227.8 kN

-227.8 kN

331.8 kN

-331.8 kN

454.6 kN

378.7
380.7
kN
kN
374.6
kN kN -454.6 kN
372.7
370.6
369.6 kN
365.7
354.8
kN
337.5 kN
322.7 kN
296.7 kN
281.8 kN
252.4 kN
237.6 kN
208.7 kN
202.7 kN
193.9 kN
168.0 kN
153.2 kN
131.7
kN
116.8
kN
115.8
kN -547.0 kN
100.3kN
kN
92.6
kN
85.5 kN
73.8 kN
kN
69.5
kN
59.0
51.6
46.3
kN
36.7
32.5
kN
23.2
17.7 kN
kN
15.6
604.1 kN
0-23.2
kN kN
0.7 kN
0 kNkN-604.1 kN
-0.7
-15.6kN
kN
-17.7
-32.5kN
kN
-36.7
kN
-46.3
kN
-51.6 kN
kN
-59.0
kN
-69.5
kN
-73.8
-85.5
kN
-92.6
kNkN
-100.3
kN kN
-115.8
-116.8
kN
-131.7
kN
kN
kN
-193.9 -153.2
kN -168.0
-202.7 kN
-208.7
kN
-237.6 -252.4
kN
kN
-281.8
kN
kN
-322.7
kN -296.7
kN
-354.8
kN
-365.7
kN
kN
-370.7
-372.7
-374.6
kN
-378.6
kN -337.5
-380.7
kN -369.6
547.0 kN

Y
Z

Load 202 : Shear Y


Force - kNm

Shear Fy DL+LL (ULS)

Print Time/Date: 23/11/2006 16:40

STAAD.Pro for Windows Release 2004

Print Run 2 of 2

CALCULATION SHEET No.


By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (BASE SLAB DESIGN)

Rev.
Date:

MKB
Check By:

25-Jul-06
Date:

ATQ
References/Results

Section Analysis at ULS


BASE SLAB
Section Location
Member No.
End: Joint No.
M perm
M live
N (+T / -C)
V
M
b
h
cover
d
fcu
fy
use r/f
c/c spacing
As Axial
As Shear
As Flaxure
As Total
z
x/d
MoR
v
av
2d/av

(kNm)
(kNm)
(kN)
(kN)
(kNm)
(mm)
(mm)
(mm)
(mm)
(MPa)
(MPa)

(mm2)
(mm 2)
(mm 2)
(mm 2)
(mm)
(kNm)
(MPa)
(mm)

%b in which shear enhancemen

enhanced vc in %b
vc un-enhance (MPa)
vc wt. avg
(MPa)
Asv/ bsv req = mm2/mm2
use
long. spacing (mm)
trans. Spacing (mm)
Asv/ bsv prov
mm2/mm2
vs = 0.87fy*Av/ bsv (MPa)

VoR = vc + vs

Status

(MPa)

W1 L-Face

W1 C/L

W1 R-Face

d frm W1

0.5 L (Mid)

d frm W2

W2 L-Face

W2 C/L

W2 R-Face

6
i: 6

7
i: 7

7
j: 8

9
j: 10

21
j: 22

34
i: 34

36
i: 36

36
j: 37

37
j: 38

-17.7
-3.3
0.0
-115.8
-29.0
1000
750
50
690
40
460
T20
125
0
145
2369
2513
656
0.100
621
0.17

596.9
159.2
0.0
-319.6
1451.6
1000
750
75
656
40
460
T38
125
0
399
8436
8836
550
0.325
1855
0.49

519.5
148.8
0.0
-328.5
1330.1
1000
750
75
656
40
460
T38
125
0
410
8425
8836
550
0.325
1853
0.50

390.2
126.8
0.0
-344.5
1103.0
1000
750
75
656
40
460
T38
125
0
430
8405
8836
550
0.324
1850
0.52

-80.1
-14.0
0.0
-17.0
-144.0
1000
750
50
690
40
460
T20
125
0
21
2492
2513
656
0.100
654
0.02

390.2
126.8
0.0
344.5
1103.0
1000
750
75
656
40
460
T38
125
0
430
8405
8836
550
0.324
1850
0.52

519.5
148.8
0.0
328.5
1330.1
1000
750
75
656
40
460
T38
125
0
410
8425
8836
550
0.325
1853
0.50

596.9
159.2
0.0
319.6
1451.6
1000
750
75
656
40
460
T38
125
0
399
8436
8836
550
0.325
1855
0.49

-17.7
-3.3
0.0
115.8
-29.0
1000
750
50
690
40
460
T20
125
0
145
2369
2513
656
0.100
621
0.17

1
0
0.49
0.49
0.49
0

1
0
0.76
0.76
0.76
0

1
0
0.76
0.76
0.76
0

1
0
0.76
0.76
0.76
0

1
0
0.49
0.49
0.49
0

1
0
0.76
0.76
0.76
0

1
0
0.76
0.76
0.76
0

1
0
0.76
0.76
0.76
0

1
0
0.49
0.49
0.49
0

0
0
0.49
OK

0
0
0.76
OK

0
0
0.76
OK

0
0
0.76
OK

0
0
0.49
OK

0
0
0.76
OK

0
0
0.76
OK

0
0
0.76
OK

0
0
0.49
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


By:

Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (BASE SLAB DESIGN)

MKB
Check By:
ATQ

Rev.
Date:
25-Jul-06
Date:

References/Results

Section Analysis at SLS1


Moments in kN m and Axial in kN
BASE SLAB
W1 L-Face
Section Location
Member No.
6
End: Joint No.
i: 6
Axial
0
SLS Parman
Momen
-18
Axial
0
SLS1 LL
Momen
-3
Ignoring Axial Load Effect
b
(mm)
1000
h
(mm)
750
cover
50
d
(mm)
690
fcu
(Mpa)
40
fy
(Mpa)
460
use r/f
T20
(mm)
c/c spacing
125
(mm2)
2513
As Total
(Mpa)
200000
Es
15500
Ec long term (Mpa)
12.9
modular ratio
(mm)
181.6
x1
(mm)
-246.4
x2
(mm)
181.6
dc
4
Mom of Inertia (mm ) 1.038E+10
13.27
fs (T = +ve) (Mpa)
s
6.637E-05
fc (C = -ve) (Mpa)
-0.37
a'
(mm)
750
1
7.42E-05
ts
0.0139002
m (eq 25)
-0.013826
cnom
(mm)
50
acr
(mm)
76.6
w (eq 24)
(mm)
0.0000
w (eq 26)
(mm)
0.0000
allowable wcr (mm)
0.125
allowable fc
(Mpa)
-20
allowable fs
(Mpa)
345
Status
OK

W1 C/L

W1 R-Face

d frm W1

0.5 L (Mid)

d frm W2

W2 L-Face

W2 C/L

W2 R-Face

7
i: 7
0
597
0
159

7
j: 8
0
520
0
149

9
j: 10
0
390
0
127

21
j: 22
0
-80
0
-14

34
i: 34
0
390
0
127

36
i: 36
0
520
0
149

36
j: 37
0
597
0
159

37
j: 38
0
-18
0
-3

1000
750
75
656
40
460
T38
125
8836
200000
15500
12.9
289.3
-517.3
289.3
2.342E+10
152.86
0.0007643
-9.34
725
0.0009075
0.0002927
0.0006148
50
74.2
0.1238
0.1368
0.125
-20
345
OK

1000
750
75
656
40
460
T38
125
8836
200000
15500
12.9
289.3
-517.3
289.3
2.342E+10
135.11
0.0006755
-8.25
725
0.0008021
0.0003222
0.0004799
50
74.2
0.0966
0.1068
0.125
-20
345
OK

1000
750
75
656
40
460
T38
125
8836
200000
15500
12.9
289.3
-517.3
289.3
2.342E+10
104.52
0.0005226
-6.39
725
0.0006205
0.000394
0.0002265
50
74.2
0.0456
0.0504
0.125
-20
345
OK

1000
750
50
690
40
460
T20
125
2513
200000
15500
12.9
181.6
-246.4
181.6
1.038E+10
59.48
0.0002974
-1.65
750
0.0003325
0.0031465
-0.002814
50
76.6
0.0000
0.0000
0.125
-20
345
OK

1000
750
75
656
40
460
T38
125
8836
200000
15500
12.9
289.3
-517.3
289.3
2.342E+10
104.52
0.0005226
-6.39
725
0.0006205
0.000394
0.0002265
50
74.2
0.0456
0.0504
0.125
-20
345
OK

1000
750
75
656
40
460
T38
125
8836
200000
15500
12.9
289.3
-517.3
289.3
2.342E+10
135.11
0.0006755
-8.25
725
0.0008021
0.0003222
0.0004799
50
74.2
0.0966
0.1068
0.125
-20
345
OK

1000
750
75
656
40
460
T38
125
8836
200000
15500
12.9
289.3
-517.3
289.3
2.342E+10
152.86
0.0007643
-9.34
725
0.0009075
0.0002927
0.0006148
50
74.2
0.1238
0.1368
0.125
-20
345
OK

1000
750
50
690
40
460
T20
125
2513
200000
15500
12.9
181.6
-246.4
181.6
1.038E+10
13.27
6.637E-05
-0.37
750
7.42E-05
0.0139002
-0.013826
50
76.6
0.0000
0.0000
0.125
-20
345
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (WALLS DESIGN)

By:

Rev.
Date:

MKB
Check By:

21-Nov-06
Date:

ATQ
References/Results

Section Analysis at ULS


Section Location
Member No.
End: Joint No.
M perm
M live
N (+T / -C)
V
M
b
h
cover
d
fcu
fy
use r/f
c/c spacing
As Axial
As Shear
As Flaxure
As Total
z
x/d
MoR
v
av
2d/av

(kNm)
(kNm)
(kN)
(kN)
(kNm)
(mm)
(mm)
(mm)
(mm)
(MPa)
(MPa)

(mm 2)
(mm 2)
(mm 2)
(mm2)
(mm)
(kNm)
(MPa)
(mm)

%b in which shear enhancemen

enhanced vc in %b
vc un-enhance (MPa)
vc wt. avg
(MPa)
Asv/ bsv req = mm2/mm2
use
long. spacing (mm)
trans. Spacing (mm)
Asv/ bsv prov
mm2/mm2
vs = 0.87fy*Av/ bsv (MPa)

VoR = vc + vs

Status

(MPa)

WALL-1

WALL-2

0H (ToB)

0.1H (d frm
base)

0.4 H

0H (ToB)

0.1H (d frm
base)

0.4 H

44
i: 44

44
j: 45

46
j: 47

52
i: 52

52
j: 53

54
j: 55

-549.3
-152.1
0.0
547.0
-1324.5
1000
750
75
656
40
460
T38
125
0
683
8152
8836
553
0.314
1805
0.83

-400.4
-123.2
0.0
454.6
-999.5
1000
705
75
611
40
460
T38
125
0
568
8268
8836
507
0.342
1676
0.74

-118.6
-54.8
0.0
227.8
-346.3
1000
570
75
483
40
460
T25
125
0
285
3642
3927
436
0.191
636
0.47

549.3
152.1
0.0
-547.0
1324.5
1000
750
75
656
40
460
T38
125
0
683
8152
8836
553
0.314
1805
0.83

400.4
123.2
0.0
-454.6
999.5
1000
705
75
611
40
460
T38
125
0
568
8268
8836
507
0.342
1676
0.74

118.6
54.8
0.0
-227.8
346.3
1000
570
75
483
40
460
T25
125
0
285
3642
3927
436
0.191
636
0.47

1
0
0.76
0.76
0.76
0.001178

1
0
0.79
0.79
0.79
0

1
0
0.70
0.70
0.70
0

1
0
0.76
0.76
0.76
0.001178

1
0
0.79
0.79
0.79
0

1
0
0.70
0.70
0.70
0

0
0
0.76
NG

0
0
0.79
OK

0
0
0.70
OK

0
0
0.76
NG

0
0
0.79
OK

0
0
0.70
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

DESIGN OF U SECTION (WALLS DESIGN)

By:
MKB
Check By:
ATQ

Rev.
Date:
21-Nov-06
Date:

References/Results

Section Analysis at SLS1


Moments in kN m and Axial in kN

0H (ToB)
Section Location
Member No.
44
End: Joint No.
i: 44
Axial
0
SLS Parman
Momen
-549
Axial
0
SLS1 LL
Momen
-152
Ignoring Axial Load Effect
b
(mm)
1000
h
(mm)
750
75
cover
(mm)
656
d
(Mpa)
40
fcu
(Mpa)
460
fy
T38
use r/f
(mm)
125
c/c spacing
(mm2)
8836
As Total
(Mpa)
200000
Es
15500
Ec long term (Mpa)
12.9
modular ratio
(mm)
289.3
x1
(mm)
-517.3
x2
(mm)
289.3
dc
4
Mom of Inertia (mm ) 2.342E+10
141.80
fs (T = +ve) (Mpa)
s
0.000709
fc (C = -ve) (Mpa)
-8.66
a'
(mm)
725
1
0.0008418
ts
0.0003111
m (eq 25)
0.0005307
cnom
(mm)
50
acr
(mm)
74.2
w (eq 24)
(mm)
0.1069
w (eq 26)
(mm)
0.1181
allowable wcr (mm)
0.125
allowable fc
(Mpa)
-20
allowable fs
(Mpa)
345
Status
OK

WALL-1

WALL-2

0.1H (d frm
base)

0.4 H

0H (ToB)

0.1H (d frm
base)

0.4 H

44
j: 45
0
-400
0
-123

46
j: 47
0
-119
0
-55

52
i: 52
0
549
0
152

52
j: 53
0
400
0
123

54
j: 55
0
119
0
55

1000
705
75
611
40
460
T38
125
8836
200000
15500
12.9
276.3
-504.4
276.3
1.982E+10
114.15
0.0005708
-7.30
680
0.0006879
0.0003463
0.0003416
50
74.2
0.0683
0.0760
0.125
-20
345
OK

1000
570
75
483
40
460
T25
125
3927
200000
15500
12.9
176.2
-277.5
176.2
6.577E+09
104.20
0.000521
-4.64
545
0.0006273
0.0005334
9.393E-05
50
75.9
0.0189
0.0214
0.125
-20
345
OK

1000
750
75
656
40
460
T38
125
8836
200000
15500
12.9
289.3
-517.3
289.3
2.342E+10
141.80
0.000709
-8.66
725
0.0008418
0.0003111
0.0005307
50
74.2
0.1069
0.1181
0.125
-20
345
OK

1000
705
75
611
40
460
T38
125
8836
200000
15500
12.9
276.3
-504.4
276.3
1.982E+10
114.15
0.0005708
-7.30
680
0.0006879
0.0003463
0.0003416
50
74.2
0.0683
0.0760
0.125
-20
345
OK

1000
570
75
483
40
460
T25
125
3927
200000
15500
12.9
176.2
-277.5
176.2
6.577E+09
104.20
0.000521
-4.64
545
0.0006273
0.0005334
9.393E-05
50
75.9
0.0189
0.0214
0.125
-20
345
OK

BPG121_F01(Excel)

CALCULATION SHEET No.


Project:

Diftah Clover Leaf Interchange, Sharjah

Subject:

MINIMUM REINFORCEMENT CHECK

By:

Rev.
Date:

HK
Check By:

25-Jul-06
Date:

ATQ
References/Results

MINIMUM REINFORCEMENT CHECK


(Retaining Wall Height 3500mm)
As per BS 5400 Part:4, Clause: 5.8.4
STEM WALL
Vertical main reinforcement,
on earth face

At Base
b

As =
As =
Vertical secondry
reinforcement, on outer face

As =
As =
Horizontal secondry
reinforcement, on each face

As =
As =

bars spacing

125

125

(mm) =
0.15 % b d (mm) =
(mm/mm) =

669

667

125.3

125.1

1.003

1.001

125

125

(mm) =
0.12 % b d (mm) =
(mm/mm) =

669

667

50.14

50.05

0.401

0.4

125

125

(mm) =
0.12 % b d (mm) =
(mm/mm) =

669

667

50.14

50.05

0.401

0.4

bars spacing

bars spacing

(mm)

(mm)

(mm)

BASE
Main transverse
reinforcement

Bottom
b

As =
As =
Longitudinatal secondry
reinforcement

As =
As =

At Curtail

bars spacing

125

125

665

665

124.7

124.7

0.998

0.998

125

125

(mm)

(mm)

0.12 % b d (mm) =
(mm/mm) =

(BS 5400, Part 4,


Cl 5.8.4.2)

Top

(mm) =
0.15 % b d (mm) =
(mm/mm) =
bars spacing

(mm)

(BS 5400, Part 4,


Cl 5.8.4.1)

665

665

49.88

49.88

0.399

0.399

(BS 5400, Part 4,


Cl 5.8.4.1)

(BS 5400, Part 4,


Cl 5.8.4.2)

BPG121_F01(Excel)

EARLY THERMAL CRACKING CALCULATIONS


Project:

Diftah Clover Leaf Interchange, Sharjah

Section
Date:

Retaining wall
21-Nov-06

750 125
750
Please complete the boxes shaded thus:

Section

Vert_Base_EF
Vert_Base_OF
Hoz_Base_BF
Vert_Curtail_EF
Vert_Curtail_OF
Hoz_Curtail_BF

751
751
751
751
751
751

125
125
125
125
125
125

Trans_Bott
Trans_Top
Long_Bott
Long_Top

750
750
750
750

125
125
125
125

Dia of steel in
mm

temp T1 in
deg C

temp T2 in
deg C

Restraint
factor

ult

Area of
steel in
mm2

Area of
steel in
mm/mm

fct/fb

conc face crack width in


area in mm2
mm

Stem Wall
32
32
32
32
32
32

0.67
0.67
0.67
0.67
0.67
0.67

3.13E+04
3.13E+04
3.13E+04
3.13E+04
3.13E+04
3.13E+04

0.125
0.125
0.125
0.125
0.125
0.125

53
53
53
53
53
53

0
0
0
0
0
0

0.6
0.6
0.6
0.6
0.6
0.6

2.00E-04
2.00E-04
2.00E-04
2.00E-04
2.00E-04
2.00E-04

711
711
711
711
711
711

5.687603
5.687603
5.687603
5.687603
5.687603
5.687603

Base Slab
20
16
16
16

0.67
0.67
0.67
0.67

3.13E+04
3.13E+04
3.13E+04
3.13E+04

0.125
0.125
0.125
0.125

53
53
53
53

0
0
0
0

0.2
0.2
0.2
0.2

2.00E-04
2.00E-04
2.00E-04
2.00E-04

36
29
29
29

0.291584
0.233267
0.233267
0.233267

10

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

J
ANNEXURE 1 DESIGN CRITERIA

PGS 4313- Culvert for Diftah Cloverleaf


INTRODUCTION
The culvert for diverting the wadi ( water stream) under the Diftah cloverleaf is proposed to divert a
discharge of upto 100 m3/sec from upstream side. The culvert. Is proposed with 3 cells of 3.5m x 3.5m
Box with wing walls on both upstream and down stream ends with a apron for scour protection.
The length of the culvert is proposed to be of 75m. The culvert carries the embankment of the cloverleaf
which carries a 25m wide carriage way over it. The area consists predominantly soft rock and the
bearing stratum of the culvert could be on a rock strata. The geotechnical investigation is in progress.
The carriage way consists of 4 lanes of 3.65m wide with a 2.6m median. It contains 2.5m hard
shoulders on either sides and a 1m footpath.

DESIGN CRITERIA:
1-

Loading according to BD 37/01 & BD 31/01

2-

Design as recommended by BD 28/87, BS 5400 Part 4

3-

Analysis and Design parameters:

a.

Soil
Density

20

KN/m

b.

Concrete Density

25

KN/m

c.

Surfacing Density

22.6

KN/m

d.

Cover to reinforcement

75

mm in contact with soil

50

mm not in contact with soil

e.

Characteristic strength of concrete


Modulus of Elasticity ( E )

40

31,000,000

KN/m

12,916,667

KN/m

Shear Modulus ( G )
f.

Yield strength of steel

g.

Crack Width
Limitations

460

N/mm

N/mm

- Above ground level, unprotected :

0.175

mm

- Above ground level, protected :

0.200

mm

- Buried and in contact with ground water or soil :

0.125

mm

- Buried above ground water :

0.150

mm

h.

Bearing Capacity

400

i.

Modulus of Subgrade Reaction

40,000

KN/m

-To be confirmed

KN/m

-To be
confirmed

Diftah Clover Leaf Interchange, Sharjah


3 Cell RC Box Culvert

K
ANNEXURE 2 - DRAWINGS