Академический Документы
Профессиональный Документы
Культура Документы
BUILDING
OWNER:
Mrs. Bhum Kumari Poudel and Mr. Ganesh Prasad Sharma
Gaidakot-8, Nawalparasi
Submitted By:
Submitted To:
Gaidakot Municipality
Bharatpur, Chitwan
Nawalparasi, Nepal
January 2016
CERTIFICATION
This Certificate is submitted with reference to the detail structural design of multi storied
building of the following detail.
Owner
: Mrs. Bhum Kumari Poudel and Mr. Ganesh Prasad Sharma
Address
: Gaidakot-8, Nawalparasi
No. of Storey
: G+3
Size of Column : (12"x12")
Size of Beam
: (12"x16")
Concrete Grade : M20
Rebar
: Fe 415
Other details are attached in the design documents.
All the designs are done as per the design criteria specified in NBC 000:1994 to 114:1994,
NBC 205:2012, IS 456:2000, IS:875 and relevant other Indian design codes.
The referenced calculations were prepared by us / under our supervision and comply with all
applicable structural provisions of the Construction Codes.
We hereby certify that the design is structurally adequate and economic. However, during
construction the use of construction materials and workmanship is to be carried out under the
supervision of qualified and certified technical person.
The designer is not responsible for the violence of the specifications provided.
Analysed By :
Checked By :
On behalf of :
Expert Engineering Solution
Bharatpur, Chitwan
(Structure Engineer)
+977-9841547347
CONTENTS
1.0 INTRODUCTION
2.0 DESIGN PHILOSOPHY
3.0 LOADING AND LOAD COMBINATIONS
3.1
3.2
3.3
3.4
1.0 INTRODUCTION
G+3 Storey
The structural system chosen is Moment Resisting RCC Frames. Columns and beams have been
laid out in plan in coordination with architectural and services planning that acts jointly support and
transmit to the ground those forces arising from earthquake motions, gravity and live load. The
structure is designed by carrying out the space frame analysis.
A three dimensional mathematical model of the physical structure represents the spatial distribution
of the mass and stiffness of the structure. Thus, the essential requirements for the analytical model
are the conclusion of sufficient details of geometry, material, loading and support such that it
reflects the near true behavior of the physical structure for the structural modelling of the present
building SAP 2000 V-14 software was used.
The analysed structure is found to be safe against the all the load combinations and designed for
the governing load combination. The load combinations considered for the designing of structure
using limit state method are listed in this report.
M20 grade concrete is used for all RC members of super-structure and sub structure. The steel
grade for all the structural elements is Fe415
The Design of the total structure is based on the Limit State method of design as envisaged in Nepal
National Building Codes (NBC) and Indian Standard codes of practice. Structure is designed for
Dead loads, Imposed loads (floor finishes), service loads, taking into consideration of the relevant
codes and load combination specified in the codes.
The structure is designed using individual footings under the columns designed for a safe bearing of
2
175KN/m . The Strata is in general stiff clay having the above strength and is available at most of
the places at a depth of 2.0m below naturural ground level. In case such strata is not available at
this depth, foundations are taken deeper to required strata.
0.125
x
=
25.00
3.125
KN/m
1.00
KN/m
b) Roof level
Floor Finishes
1.00
KN/m
=
=
2.00
3.00
KN/m
2
KN/m
b) Roof level
Live Load (accessible)
Live Load (Non-accessible)
=
=
1.50
1.00
KN/m
2
KN/m
3.00
KN/m
c) Stair
Live Load
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.99
1.00
1.00
12.19m
9.75m
13.77m
0.35 sec
0.30 sec
II
0.08
0.08
0.08
3969.22
314.36
Wi*Hi
Fi=V*(WiHi/WiHi)
1771.33
9931.88
8344.74
4172.37
24220.31
22.99
128.91
108.31
54.15
314.36
Load Comb
Description
1)
Comb 1
2)
Comb 2
3)
Comb 3
4)
Comb 4
5)
Comb 5
6)
Comb 6
7)
Comb 7
8)
Comb 8
9)
Comb 9
10 )
Comb 10
11 )
Comb 11
12 )
Comb 12
13 )
S. WT
Note:
SL
S. WT
Dead Load
=
=
=
=
x
0.23
20
x
=
0.115
20
x
=
Say
=
Say
2.65
12.18
8.53
2.65
6.09
4.87
x
KN/m
KN/m
x
KN/m
KN/m
2
=
=
2.00
3.00
KN/m
2
KN/m
4.13
KN/m
2.65
6.09
4.26
2.65
6.09
4.87
x
KN/m
KN/m
x
KN/m
KN/m
=
=
2.00
3.00
KN/m
2
KN/m
=
=
=
4.13
1.50
1.00
KN/m
2
KN/m
2
KN/m
x
=
1.00
2.30
x
KN/m
=
x
0.12
20
x
=
0.115
20
x
=
Say
=
Say
c) Roof level
Dead load
=
Self weight of the Slab + SIDL
=
3.125
+
1.00
Live Load (accessible)
Live Load (Non-accessible)
=
(considering 1000mm height)
0.115
20
For analysys of the structure,. The height of the structure is as per the approved architectural
drawings.
The total building height above ground level is 12.2m and below ground level is considered 2.0m
The floor heights are as follows.
Stair Cover
3.048
Third floor
3.048
Second floor
12.2m
3.048
First floor
3.048
Ground floor
The sketches showing the model created for the analysis are shown in the following pages.
10
0.00
11
300
300
) mm
M 20
Fy 415
3.048
=
=
0.707
2.155
2.155
/
0.3
7.2
<
12
Hence this is Short column
=
=
=
=
=
900 KN
41.94 KNm
-10.25 KNm
900
KN ,
2
Sqrt ( My + Mz )
43
KNm
=
=
Mu
2
fck.B.D
20
900
x
x
300
43.17
x
x
300
0.16
18.00 KNm
10
300
0.500
20
0.0800
d'
D
48
300
p
fck
0.085
12
10
x
300
0.085
Ac
90000
1.7
Ast- req
Minimum % of reinforcement
Provide
4 nos.
20
1.7 %
x
100
90000
1530 mm
90000
mm
0.8/100
720
mm
Tor 16
Ast Provided
Maximum % of reinforcement
=
=
4/100
3600
4 nos.
Tor 16
1608 mm )
(=
x
90000
mm
Reinforcement Provided for the section is more than mimimum and less than maximum
Hence safe
Diameter of lateral Ties
Dia. of tie not less than
Provide
Tor -
mm,
Provide
256
links
Tor -
mm
mm
150
c/c
2154.936
500
+
=
300
30
14.3
0.048
<
0.05
mm
2154.936
500
+
=
300
30
14.3
0.048
<
0.05
mm
Hence the following formula can be used for calculating load carrying capacity of the column
Pu
0.4
+
1167 KN
x
0.67
20
x
x
415
>
1.000
x
900 KN
13
x
1608
Hence safe
90000
)
900
900
1.5
43
1.5
Mu
0.020
43.17
1.5
S.B.C
175
Footing area
600.1
Min.
M
kN
Mu =
43
kNm
600.1 KN
29 KNm
900
18 KNm
28.78 KNm
2
KN/m
x
175
1.88
0.30
1.00
x
x
1.88
0.30
3.43 m
m
m
3.53 m )
(
300
400
15 no.s Tor -
12
15 no. s Tor-
12
100
1880
1880
100
600.1
1.88 x 1.88
169.79
4.76
174.55
or
165.02
B
L
=
=
1880
1880
400
50
332
100
28.78
1.88
<
x
x
S.B.C of Soil
1.1
1.88
175 KN/m
Hence Safe
mm
mm
-
mm
14
12
12
2
174.55
102
= sqrt. {
Ast
1.88
KNm
1.5
0.133
x
x
175 mm
102
20
<
1.5
x
1880
0.79
2
=
Mu/bd
x
x
1.00E+06 ) }
1880
Hence Safe
332 mm
102.40
x
1880
10
332
0.74
0.23
100
332
2
1436 mm
=
Provide
15
nos. Tor -
12
174.55
102
( =
1696 mm )
= sqrt. {
1.5
0.133
175 mm
Ast
1.88
KNm
1.5
x
x
102
20
<
x
1880
=
=
Mu/bd
0.79
2
x
x
1.00E+06 ) }
1880
Hence Safe
332 mm
102.40
x
1880
10
332
0.74
0.23
100
332
=
Provide
15
nos. Tor -
12
( =
15
1436 mm
1696 mm )
332
300
1880
458
In Short Span Direction
Vu
=
1.5
x
225.4
1880
x
x
Percentage of reinforcement
x
1.88
174.55
400
400
332
1.00E+03
332
0.361
1696
1880
x
x
100
332
0.458
225.4 KN
mm
62
12
2
mm
Mpa
0.272
8.54
c
0.372
>
0.361
Safe in shear
Mpa
632
300
632
16
300
1880
400
=
Vu
1.5
820.8 KN
2528 mm
where, ks
mm
62
12
2
174.55
x (
3.53
x
0.63
0.632
)
632
632
1.00E+03
332
820.8
2528
c =
0.25
=
x
x
400
332 mm
sqrt
ks . cc
(
20
0.5
300
300
1.000
1.12
1.12
0.5
>
0.98 Mpa
0.98
=
+
Mpa
17
1.12 Mpa
1.50
Hence Safe
>
1.0
300
300
) mm
M 20
Fy 415
3.048
=
=
0.707
2.15
2.15
/
0.3
7.2
<
12
Hence this is Short column
=
=
=
=
=
620.20 KN
51.35 KNm
0.26 KNm
620
KN ,
2
Sqrt ( My + Mz )
51
KNm
=
=
Mu
2
fck.B.D
620
x
x
300
51.35
x
x
300
0.16
20
20
12.40 KNm
10
300
0.345
20
0.0951
d'
D
48
300
p
fck
0.065
0.065
Ac
90000
mm
18
10
6
2
300
1.3 %
Ast- req
1.3
x
100
0.8/100
720
Minimum % of reinforcement
Provide
4 nos.
90000
mm
Tor 16
Ast Provided
Maximum % of reinforcement
=
=
1170 mm
90000
4/100
3600
4 nos.
Tor 12
1257 mm )
(=
mm
90000
Reinforcement Provided for the section is more than mimimum and less than maximum
Hence safe
Diameter of lateral Ties
Dia. of tie not less than
Provide
Tor -
mm,
Provide
192
links
Tor -
mm
mm
150 mm
c/c
2154.936
500
+
=
300
30
14.3
0.048
<
0.05
mm
2154.936
500
+
=
300
30
14.3
0.048
<
0.05
mm
Hence the following formula can be used for calculating load carrying capacity of the column
Pu
0.4
+
1069 KN
x
0.67
20
x
x
415
>
1.000
x
620 KN
19
x
1257
Hence safe
90000
)
620
620
1.5
51
1.5
Mu
0.020
51.35
1.5
S.B.C
175
Footing area
413.5
Min.
M
kN
Mu =
51
kNm
413.5 KN
34 KNm
620
12 KNm
34 KNm
KN/m
x
175
1.60
0.30
x
x
1.00
1.60
0.30
2.36 m
m
m
2.56 m )
(
300
400
10 no.s Tor -
12
10 no. s Tor-
12
100
1600
1600
100
413.5
1.6 x 1.6
161.51
9.19
170.70
or
152.32
B
L
=
=
1600
1600
400
50
332
100
34.23
1.60
<
x
x
S.B.C of Soil
1.1
1.60
175 KN/m
Hence Safe
mm
mm
-
mm
20
12
12
2
170.70
58
= sqrt. {
Ast
1.60
KNm
1.5
0.133
x
x
143 mm
58
20
<
1.5
x
1600
0.65
2
=
Mu/bd
x
x
1.00E+06 ) }
1600
Hence Safe
332 mm
57.70
x
1600
332
10
0.49
0.17
100
332
903 mm
=
Provide
10
nos. Tor -
12
170.70
58
( =
1131 mm )
= sqrt. {
1.5
0.133
143 mm
Ast
1.60
KNm
1.5
x
x
58
20
<
x
1600
=
=
Mu/bd
0.65
2
x
x
1.00E+06 ) }
1600
Hence Safe
332 mm
57.70
x
1600
332
10
0.49
0.17
100
332
=
Provide
10
nos. Tor -
12
( =
21
903 mm
1131 mm )
332
300
1600
318
In Short Span Direction
Vu
=
1.5
x
130.3
1600
x
x
Percentage of reinforcement
x
1.60
170.70
400
400
332
1.00E+03
332
0.245
1131
1600
x
x
100
332
0.318
130.3 KN
mm
62
12
2
mm
Mpa
0.213
10.91
c
0.335
>
0.245
Safe in shear
Mpa
632
300
632
22
300
1600
400
=
Vu
1.5
553.2 KN
2528 mm
where, k s
mm
62
12
2
170.70
x (
2.56
x
0.63
0.632
)
632
632
1.00E+03
332
553.2
2528
c =
0.25
=
x
x
400
332 mm
sqrt
ks . cc
(
20
0.5
300
300
1.000
1.12
1.12
0.5
>
0.66 Mpa
0.66
=
+
Mpa
23
1.12 Mpa
1.50
Hence Safe
>
1.0
300
300
) mm
M 20
Fy 415
3.048
=
=
0.707
2.15
2.15
/
0.3
7.2
<
12
Hence this is Short column
=
=
=
=
=
422.97 KN
45.51 KNm
0.85 KNm
423
KN ,
2
Sqrt ( My + Mz )
46
KNm
=
=
Mu
2
fck.B.D
423
x
x
300
45.52
x
x
300
0.15
20
20
8.46 KNm
10
300
0.235
20
0.0843
d'
D
46
300
p
fck
0.045
0.045
Ac
90000
mm
24
10
6
2
300
0.9 %
Ast- req
0.9
x
100
0.8/100
720
Minimum % of reinforcement
Provide
4 nos.
90000
mm
Tor 12
Ast Provided
Maximum % of reinforcement
=
=
810 mm
90000
4/100
3600
4 nos.
Tor 12
905 mm )
(=
mm
90000
Reinforcement Provided for the section is more than mimimum and less than maximum
Hence safe
Diameter of lateral Ties
Dia. of tie not less than
Provide
Tor -
mm,
Provide
192
links
Tor -
mm
mm
150 mm
c/c
2154.936
500
+
=
300
30
14.3
0.048
<
0.05
mm
2154.936
500
+
=
300
30
14.3
0.048
<
0.05
mm
Hence the following formula can be used for calculating load carrying capacity of the column
Pu
0.4
+
x
0.67
972 KN
20
x
x
415
>
1.000
x
423 KN
25
x
905
Hence safe
90000
)
423
423
1.5
46
1.5
Mu
0.020
45.52
1.5
S.B.C
175
Footing area
282.0
Min.
M
kN
Mu =
46
kNm
282.0 KN
30 KNm
423
8 KNm
30 KNm
KN/m
x
175
1.33
0.30
x
x
1.00
1.33
0.30
1.61 m
m
m
1.77 m )
(
300
400
8 no.s Tor -
12
8 no. s Tor-
12
100
1330
1330
100
282.0
1.33 x 1.33
159.41
14.19
173.60
or
145.22
B
L
=
=
1330
1330
400
50
332
100
30.35
1.33
<
x
x
S.B.C of Soil
1.1
1.33
175 KN/m
Hence Safe
mm
mm
-
mm
26
12
12
2
173.60
31
= sqrt. {
Ast
1.33
KNm
1.5
0.133
x
x
114 mm
31
20
<
1.5
x
1330
0.52
2
=
Mu/bd
x
x
1.00E+06 ) }
1330
Hence Safe
332 mm
30.62
x
1330
332
10
0.31
0.17
100
332
751 mm
=
Provide
nos. Tor -
12
173.60
31
( =
905 mm )
= sqrt. {
1.5
0.133
114 mm
Ast
1.33
KNm
1.5
x
x
31
20
<
x
1330
=
=
Mu/bd
0.515
2
x
x
1.00E+06 ) }
1330
Hence Safe
332 mm
30.62
x
1330
332
10
0.31
0.17
100
332
=
Provide
nos. Tor -
12
( =
27
751 mm
905 mm )
332
300
1330
183
In Short Span Direction
Vu
=
1.5
x
63.4
1330
x
x
Percentage of reinforcement
x
1.33
173.60
400
400
332
1.00E+03
332
0.144
905
1330
x
x
100
332
0.183
63.4 KN
mm
62
12
2
mm
Mpa
0.205
11.33
c
0.330
>
0.144
Safe in shear
Mpa
632
300
632
28
300
1330
400
=
Vu
1.5
356.6 KN
2528 mm
where, k s
mm
62
12
2
173.60
x (
1.77
x
0.63
0.632
)
632
632
1.00E+03
332
356.6
2528
c =
0.25
=
x
x
400
332 mm
sqrt
ks . cc
(
20
0.5
300
300
1.000
1.12
1.12
0.5
>
0.42 Mpa
0.42
=
+
Mpa
29
1.12 Mpa
1.50
Hence Safe
>
1.0
Span
Assuming
3.963
125
mm
4.421
M 20
Fe 415
15
mm
clear cover
loads
Self weight
0.125
25.00
3.13
KN/m
Live Load
2.00
KN/m
Floor Finishes
1.00
KN/m
6.13
KN/m
9.19
KN/m
1.12
Total load
Factored load
1.50
End condition :
6.13
for ly/lx
At continuous edge
2
Maximum BM, Mu
=
( In short span direction )
0.0530
9.19
=
x
7.65
3.963
KNm
Maximum BM, Mu
( In long span direction )
0.047
9.19
=
x
6.78
3.963
KNm
Maximum BM, Mu
=
( In short span direction )
0.040
9.19
=
x
5.77
3.963
KNm
Maximum BM, Mu
( In long span direction )
0.035
9.19
=
x
5.05
3.963
KNm
125
15
8
98
mm
15
106
mm
At mid span
Provided
(for long span)
Provided
(for short span)
8 / 2
=
125
8 / 2
30
7.65
1000
x
x
0.264
pt
10
106
0.12
Ast
106
Provide
0.264
100
1000
150
6.78
1000
x
x
0.280
Tor -
0.68
280
mm
mm c/c
( =
335
mm )
at top in short span direction
pt
10
98
0.12
Ast
98
Provide
0.280
100
1000
150
5.77
1000
x
x
0.187
Tor -
0.71
274
mm
mm c/c
( =
335
mm )
at top in long span direction
pt
10
106
0.12
Ast
106
Provide
0.187
100
Tor -
0.51
1000
150
31
198
mm
mm c/c
( =
335
mm )
at bottom In short span direction
pt
5.05
1000
x
x
0.203
10
98
0.12
Ast
98
0.203
100
Provide
Tor -
0.53
1000
150
199
mm
mm c/c
( =
335
mm )
at bottom in long span direction
pt
0.280
(span)
(d)
37.4
1.3
dreq.
3963
48.61
81.5
<
98
32
mm
48.60792
Hence Safe
19.35
KNm
At supports
=
54.52
( At face of the column )
KNm
i). At midspan
X
d
d
Mu
x
2
38.3
400
361.7
33.0
361.7
0.09
x
x
pt
0.452
Ast
0.452
Nos. Tor -
ii). At supports
X
10
361.7
300
100
16
( =
+
515
Nos. Tor -
300
100
16
( =
Mu
x
2
x
1
49
400
38.3
0.49
361.7
6
2
+
+
mm
19.35
300
Provide
KNm
33
Asc
19.35
Mu
2
bd
Provide
+
515
54.52
33
1
Nos. Tor 12
2
mm ) ------- Bottom steel
x
33
361.7
0
mm
1
Nos. Tor 2
mm ) ------- Top steel
12
KNm
+
+
42.6
490
2
mm
x
3
49
=
=
400
357.4
54.52
300
33
d
d
33
357.4
pt
0.672
Ast
0.672
Nos. Tor -
Mu
2
bd
Provide
Asc
Provide
x
x
10
357.4
400
42.6
1.42
0.09
300
100
357.4
6
2
16
( =
mm
+
741
Nos. Tor -
3
Nos. Tor 2
mm ) ------- Top steel
300
100
16
( =
+
515
357.4
720
2
mm
12
0
mm
1
Nos. Tor 12
2
mm ) ------- Bottom steel
Shear Design
At effective depth d,
100 Ast
bd
Vu
100
300
63.29
x
x
741
357.4
Pt
0.550
<
Vus
Vu -
c.b.d
63285
4.31
Spacing
0.69
c,max
KN
0.69
( Pt )
3.1
N/mm
)
2
KN
0.87 . fy . Asv . d
Vus
34
300
357.4
0.87
3007
Provide
2L
101
4.3
x
x
415
1000
150
357.4
mm
Tor -
Stirrups
c/c
7.2 Design of Beam - floor level @ Z=3.048m and 6.096m (Remaining Beam)
(
300
400
M 20
Fe 415
13.82
KNm
At supports
=
46.40
( At face of the column )
KNm
i). At midspan
X
d
d
Mu
x
2
38.3
400
361.7
0.09
x
x
pt
0.452
Ast
0.452
Nos. Tor -
0.460
Nos. Tor -
Provide
+
+
33.0
361.7
13.82
300
KNm
33
Asc
13.82
Mu
2
bd
Provide
x
1
49
400
38.3
0.35
361.7
mm
10
361.7
6
2
;
x
16
( =
x
16
( =
300
100
+
515
300
100
+
515
35
490
2
mm
1
Nos. Tor 12
2
mm ) ------- Bottom steel
x
361.7
1
Nos. Tor 2
mm ) ------- Top steel
12
499
2
mm
ii). At supports
X
Mu
x
2
41.0
400
359.0
46.40
300
33
d
d
33
359.0
pt
0.482
Ast
0.482
Nos. Tor -
0.452
Nos. Tor -
Mu
2
bd
Provide
Asc
Provide
46.40
KNm
33
+
+
x
x
10
359.0
x
2
49
400
41.0
1.20
359.0
mm
0.09
300
100
6
2
16
( =
x
+
628
2
Nos. Tor 2
mm ) ------- Top steel
300
100
16
( =
+
515
359.0
519
2
mm
12
486
2
mm
1
Nos. Tor 12
2
mm ) ------- Bottom steel
Shear Design
At effective depth d,
100 Ast
bd
Vu
100
300
58.17
x
x
628
359.0
Pt
0.495
<
Vus
Vu -
c.b.d
58170
4.86
0.58
c,max
KN
0.58
( Pt )
3.1
N/mm
)
2
KN
36
300
359.0
Spacing
0.87 . fy . Asv . d
Vus
0.87
2682
Provide
2L
101
4.9
x
x
415
1000
150
359.0
mm
Tor -
Stirrups
c/c
300
400
M 20
Fe 415
7.38
KNm
At supports
=
21.32
( At face of the column )
KNm
i). At midspan
X
d
d
Mu
x
2
38.3
400
361.7
0.09
x
x
pt
0.452
Ast
0.452
Nos. Tor -
0.452
Nos. Tor -
Provide
+
+
33.0
361.7
7.38
300
KNm
33
Asc
7.38
Mu
2
bd
Provide
x
1
49
400
38.3
0.19
361.7
mm
10
361.7
6
2
;
x
16
( =
x
16
( =
300
100
+
515
300
100
+
515
37
490
2
mm
1
Nos. Tor 12
2
mm ) ------- Bottom steel
x
361.7
1
Nos. Tor 2
mm ) ------- Top steel
12
490
2
mm
ii). At supports
X
Mu
x
2
41.0
400
359.0
21.32
300
33
d
d
33
359.0
pt
0.482
Ast
0.482
Nos. Tor -
0.452
Nos. Tor -
Mu
2
bd
Provide
Asc
Provide
21.32
KNm
33
+
+
x
x
10
359.0
x
2
49
400
41.0
0.55
359.0
mm
0.09
300
100
6
2
16
( =
x
+
628
2
Nos. Tor 2
mm ) ------- Top steel
300
100
16
( =
+
515
359.0
519
2
mm
12
486
2
mm
1
Nos. Tor 12
2
mm ) ------- Bottom steel
Shear Design
At effective depth d,
100 Ast
bd
Vu
100
300
48.90
x
x
628
359.0
Pt
0.495
<
Vus
Vu -
c.b.d
48900
0.10
0.58
c,max
KN
0.58
( Pt )
3.1
N/mm
)
2
KN
38
300
359.0
Spacing
0.87 . fy . Asv . d
Vus
=
Provide
0.87
101
0.1
x
x
415
1000
150
Tor -
Stirrups
39
c/c
359.0
8. DESIGN OF STAIR
M 20
Fe 415
Tread =
Riser =
260
180
mm
mm
=
=
4.570 m
2.846 m
2500
3041
1800
100
2500
N/m
2
N/m
2
N/m
2
N/m
2
N/m
9941
N/m
Dead Load
=
Weight of Finishning w** =
Live Load Lv
=
2500
100
2500
N/m
2
N/m
2
N/m
5100
N/m
Total Load WS
125
mm
Total Load WL
9941 N/m
2550 N/m
L1
F1
=
=
1.067
2.17
3.24
B 1.067 m
2.17 m
Fig - 1 Loading
RA =
=
RB =
=
2
1
x [ ((0.5 x WL) x (0.5 x L1 ))+(WS x F1 x ((0.5 x L1)+ F1)))]
L
14789.257 N
2
1
x [ (0.5 X (WS x F1 ))+ ((0.5 x WL) x L1 x (L-(0.5 X L1)))]
L
9502.8066 N
40
SF is Zero at XA =
M max
1.5
Depth d
m from A
1.10E+07 N-mm
=
=
785
Using bars of
12
mm
144.00
mm
125
mm
Spacing
Adopt Spacing =
No of Bars Required
130
115 mm
mm
2
mm
A =
1067
125
965
mm
1.5D
9
2
113.097
mm
Nos
OK
195
mm
Nominal Shear tv =
0.13
<
0.51
Safe in Shear
9941 N/m
2550 N/m
L1 =
L2 =
F2 =
1.067
1.067
0.93
m
m
m
L =
3.06
RC=RB =
1.067 m
0.930 m
1.067 m
M max
2550 N/m
7343.253 N
=
=
41
Depth d
=
=
612
Using bars of
12
mm
184.69
mm
125
mm
Spacing
Adopt Spacing =
No of Bars Required
130
100 mm
mm
2
mm
A =
1067
125
965
mm
9
2
113.097
Nos
OK
1.5D
42
195
mm
mm
6). SP : 16 - 1980
43
Column ID
Type
Size
83 Square
84 Square
85 Square
86 Square
87 Square
89 Square
12" x 12"
12" x 12"
12" x 12"
12" x 12"
12" x 12"
12" x 12"
91 Square
92 Square
93 Square
95 Square
12" x 12"
12" x 12"
12" x 12"
12" x 12"
97
98
99
100
101
102
103
105
Square
Square
Square
Square
Square
Square
Square
Square
12" x 12"
12" x 12"
12" x 12"
12" x 12"
12" x 12"
12" x 12"
12" x 12"
12" x 12"
Ground floor
8-12
4-16 + 4-12
4-16 + 4-12
8-12
8-16
8-16
4-16 + 4-12
4-16 + 4-12
8-16
8-16
4-16 + 4-12
4-16 + 4-12
4-16 + 4-12
4-16 + 4-12
4-16 + 4-12
8-12
8-12
8-12
Reinforcement detail
1st and 2nd floor
8-12
4-16 + 4-12
4-16 + 4-12
8-12
8-16
8-16
4-16 + 4-12
4-16 + 4-12
8-16
8-16
4-16 + 4-12
4-16 + 4-12
4-16 + 4-12
4-16 + 4-12
4-16 + 4-12
8-12
8-12
8-12
2-16 + 3-12
2-16 + 1-12
2-16 + 1-12
2-16 + 1-12
At Support
At Midspan
At Z= 3.048m and 6.096m (Grid ID-(2 A-B, 2 C-D, 3 A-B, 4 A-B, A 2-3, D 4-5)
2-16 + 2-12
2-16 + 1-12
2-16 + 1-12
2-16 + 1-12
At Support
At Midspan
At Z= 3.048m, 6.096m and Z=9.144m (All Remaining Beam)
44
3rd floor
8-12
8-12
8-12
8-12
4-16 + 4-12
4-16 + 4-12
8-12
8-12
4-16 + 4-12
4-16 + 4-12
8-12
8-12
8-12
8-12
8-12
8-12
8-12
8-12
1. General:
Number of Storey
G+3
Total height of structure
12.19m
Structure system
Load Bearing .
If Computer Aided Design
(CAD) is used, please state the name
of the package
Frame
Others .
Coarse Aggregates
Fine Aggregates (Sand) ........ Building Lime
Bricks
Tick the listed materials that
........ Natural building stones
will be used in the construction
Timber
........ Tiles
Structural steel
........ Metal frames
Other
In what manner / way have
you used NBC 101 ?
2.3 NBC 102-1994 Unit Weight of Materials
Where do you plan to apply
NBC 102 ?
Specify the design unit weight of
materials
Steel
Brick
RCC
Brick Masonry
Design Calculation
.. Specifications
.. Bill of Quantity
BOQ .
Design Calculation
.
3
25 KN/m
3
19 KN/m
3
25 KN/m
3
20 KN/m
45
40
106m
Condition of beams
CantiSimply
lever
supported
One side
Continuous
Both side
continuous
11.05
4419 mm
400 mm
300 mm
7.2
300 mm
Load Combinations:
1:
2:
3:
4:
46
Simple connection
Semi-rigid connection
Fully rigid connection
Pipe
Webs of
Standard size
Yes
No
Yes
No
Yes
No
Yes
No
..
Safety belt
First aid facility
47
Composite
section