Form Name
Form No.
FIXED ASSETS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Detail of Lands
Details of Buildings
Details of Bridge/Flyover/Tunnel/Subways
Details of Road/Street
Details of Railway Tracks
Details of Track Components
Details of Furniture and Fixtures
Details of Office Equipments
Details of Vehicles
Details of Plant, Machinery & Equipment
Details of Computers and Peripherals
Details of Medical Equipments
Details of Loco/Coach/Wagons
Details of Capital work in Progress
Details of Plant, Machinery & Equipment(Signal)
Details of Plant, Machinery & Equipment(Telecom)
Details of Electrical Equipment & Fittings
Details of Intangible Assets
FA-1
FA-2
FA-3
FA-4
FA-5
FA-5A
FA-6
FA-7
FA-8
FA-9
FA-10
FA-11
FA-12
FA-13
FA-14
FA-15
FA -16
FA -17
Details of Lands
11
12
13
14
10
Area
Length
Specify if Leasehold/Freehold
Dimension of Land
Chainage in Kms)
Town/village
District
Location
State
Particular/Description of Land
Plots
S.No.
15
16
17
18
19
20
Total
Prepared by:
Notes:
1
2
Details of all Land belonging to the Ajmer Division, irrespective of the fact, whether it is vacant or any structure has been constructed on that, should be included here.
Specify if land is Industrial/Agriculture/Residential.
where the date/year of acquisition is ascertainable but the cost as well as the original documents are not available , valuation can be done using the 'Guidance Value' prescribed under the Stamp Duty Act for the location, type of land and date. If the 'G
particular year/date, transaction value of a similar plot in the similar area around the estimated year of transaction can be adopted as the transaction rate for valuation purposes.
If any other thing is required to be mention regarding land, then same may be shown in 'Remark Column'.
Remarks
Form: FA- 1
21
22
23
24
25
26
location, type of land and date. If the 'Guidance Value' is also not available for that
S.No.
Description
1
2
3
1
2
5
6
7
11
12
13
14
Total
Prepared by:
Note:
Buildings should be categorized into Ajmer division offices, residential quarters, godowns, hospitals, workshops etc.
Each building should be identified separately.
16
15
Improvement (If
any)
Total cost
Cost of
Improvement
cost of
acquisition/construction
10
Year of
Improvement
year of
acquisition/construction(if
known), Earlier than (if not
known)
Dimension of
building
No. of floors
Breadth
Town/Village
Length
District
Location
State
Details of Buildings
17
18
19
20
21
22
23
24
25
26
14
15
16
17
18
Total
Prepared by:
Note:
1
2
3
4
5
19
20
21
22
Improvement (If
any)
Year of improvement
13
Cost of construction
12
Date of construction
11
10
SP-3
TownVillage
No. Of span-3
District
SP-2
State
No. Of span-2
Chainage (KMs)
SP-1
No. Of span-1
Dimension of structure
Length
Location
S.No.
Details of Bridges/Flyover/Tunnel/Subways
Indian Railways - Ajmer Division
23
Total cost
Rate of depreciation
Remarks
mprovement (If
any)
Cost of improvement
Form: FA- 3
24
25
26
27
28
29
30
31
32
33
Checked by:
Details of Roads/Streets
Indian Railways - Ajmer Division
Total cost
Rate of depreciation
WDV as on 31.03.2014
Remarks
10
Cost of improvement
Year of improvement
Town/village
8
Repair Frequency
District
7
Cost of construction
State
6
Date of construction
Station
Breadth
17
18
19
20
21
22
23
24
25
26
27
improvement (If
any)
Dimension of roads
Length
Location
S.No.
Form: FA- 4
11
12
13
14
15
16
Total
Prepared by:
Note:
1
2
3
4
5
Here improvement means conversion of the road from one type of construction to another type of construction. E.g. Conversion of a tar road into a concrete road. It may also include extension of road.
Each road should be identified separately.
If any road is not in used, then same also may be included here.
If actual date of construction is not available but the year of construction is available, then year may be given in relevant column.
If any other detail is required to be given in respect of road, then same may be mentioned in 'Remark Column'.
Checked by:
WDV as on 31.03.2014
Remarks
15
14
Rate of depreciation
13
12
11
10
Total cost
Cost of improvement
Improvement (If
any)
Date of improvement
To
Cost of construction
From
Date/year of laying
To KM
From KM
Between two
stations
Sleeper Density
Location (KM)
S.No.
Type of Track
Form: FA- 5
16
17
18
19
20
21
22
23
24
25
Total
Prepared by:
Note:
1
2
3
4
5
Here improvement means conversion of Broad Gauge (BG) to Meter Gauge (MG).
Each track between all stations should be identified separately.
If any track is not in used and lying idle then same will also be included here.
All Railway siding given by IR to third parties should also be mention here.
If any other detail is required to be given in respect of track, then same may be mentioned in 'Remark Column'.
Checked by:
60 Kg
52 Kg
90 R
1
Rail
75 R
60 R
50 R
Others
PSC - 6
PSC -5
Sleeper
CST - 9
Steel
Wooden
Gludge Joints
SEJ
Turnout
Switches
12
13
14
15
16
17
18
19
20
Cost
Total cost
per unit
21
22
Remarks
Accumulated
depreciation till
31.03.2014
11
No of
Units
Year
Depreciation rate
10
Replacement due
Month
No of year
component is in
use
Total cost
No of units
Date of laying
Codal Life
Year of Manufacturing
Drag No.
Make
Location
S.No.
Form : 5A
23
CMS xings
T/out Sleepers
Ballast
10
Fatening
11
Rubber pads
Total
Prepared by:
Note:
No depreciation will be charged on component lying in stores. Depreciation is to be charged only on those component which is used on track
S.NO.
Description
Location
Date of
acquisition/construction
Total no of units
Total Cost of
acquisition/construction
Rate of depreciation
Remarks
Form:- FA-6
10
11
12
13
14
Prepared by:-
Checked by:-
Notes:-
1. Furniture includes tables, chairs, cupboards, almirah, fans, coolers, air conditioner, UPS, Refrigerator, TV, invertors etc.
2. Whereas possible, prepare a separate list for each class of furniture.
3. Assets reference number denotes any numbering/coding given to each piece of asset.
4. Details of the furniture & fixtures should be collected department/section/location wise.
5. If actual date of construction/acquisition is not available but the year of acquisition/construction is available, then year may be given in relevant column.
Description
Location
Date of acquisition
Total no of units
Total cost of
acquisition/installation
Rate of depreciation
Accumulated depreciation
till 31.03.2014
Remarks
Form:- FA-7
S.NO.
Department/Station:- ________________________________________________
10
11
12
13
14
Prepared by:-
Checked by:-
Notes:1. Office equipments include Fax Machine, Xerox Machine, Type writer, projector etc.
2. If possible, prepare a separate list for each class of office equipment.
3. Assets reference number denotes any numbering/coding given to each piece of asset.
4. If actual date of construction/installation is not available but the year of acquisition/construction is available, then year may be given in relevant column.
Details of Vehicles
Ajmer Division, Indian Railways
Department/Station:- ________________________________________________
Prepared by:-
Rate of depreciation
Date
Cost
10
Checked by:-
Notes:1. In Column 2, kindly specify the description of vehicles specifying whether it is car, jeeps, trucks, ambulance etc.
2. Also mention present use of vehicle in the remark column.
3. If actual date of acquisition is not available but the year of acquisition is available, then year may be given in relevant column.
4. Improvement of vehicles includes extension of body or otherwise.
Cost of acquisition
Date of acquisition
Chasis number
Engine number
Registration number
Location
Remarks
11
12
13
14
15
16
17
18
19
Details of
improvements
Description of vehicles
S.NO.
Form:- FA-8
14
Prepared by:-
15
16
Checked by:-
Notes:1. Details of any improvements to the plant and machinery, which has resulted into increasing the capacity of the plant and machinery, should be mentioned separately.
2. Also specify the general nature of machinery in relevant column.
3. Plant, machinery & equipment used in workshop for the purpose of repair & maintenance of Loco/Coach/Wagon will also be covered here.
4. If actual date of installation/acquisition is not available but the year of acquisition/installation is available, then year may be given in relevant column.
Remarks
13
Whether Surplus
No of shifts in use
12
Condition
Date of commencement of
operation
11
Date of
acquisition/installation
10
Cost of
acquisition/installation
Name of Supplier
Rate of depreciation
Capacity
No of years machinery is in
use
Description of Machine
Category of Machine
Location
Total cost
Station
Cost
Unit
17
18
19
20
21
22
23
24
25
26
27
28
Details of
improvements
Date
Form:- FA-9
S.NO.
Department/Station:- ________________________________________________
S. No.
Description
Location
Reference number
Date of
acquisition/installation
Total no of units
Rate of depreciation
Accumulated depreciation
till date 31.03.2014
Form:- FA-10
Remarks
10
11
12
13
14
Prepared by:-
Checked by:-
S.NO.
Description
Location
Reference number
Date of acquisition/installation
Total no of units
Rate of Depreciation
Form:- FA-11
Remarks
10
11
12
13
14
Prepared by:-
Checked by:-
Notes:1. Medical equipments includes all equipment which are using in hospitals maintained by Indian Railways.
2. If possible, prepare a separate list for each type of item.
3. Assets reference number denotes any numbering/coding given to each piece of asset.
4. If actual date of construction/acquisition is not available but the year of acquisition/construction is available, then year may be given in relevant column.
Details of Loco/Coach/Wagon
Ajmer Division, Indian Railways
Total quantity
10
11
12
13
Remarks
Date of acquisition/construction
Location
Description
Rate of Depreciation
Type of wagon/coach/loco
Group code
Total Cost
Department
Cost
16
17
18
19
20
21
22
23
Details of
improvement
Date
S.NO.
Form:- FA-12
14
15
S.NO.
Description of Work
Location
Estimated Cost
of work
Estimated date of
completion of the work
Remarks
Prepared by:-
Checked By:-
Notes:1. whereas possible please provide the separate details of every type of work in progress.
S.NO.
Description of Machinery
Specification/nature of
machine
Location/Station
Capacity
Date of
acquisition/installation
Date of commencement of
operation
Total Cost of
acquisition/installation
No of years machinery is in
use
Rate of depreciation
Remarks
Department/Station:- ________________________________________________
Prepared by:-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Checked by:-
Notes:-
1. If actual date of installation/acquisition is not available but the year of acquisition/installation is available, then year may be given in relevant column.
S.NO.
Description of Machinery
Specification/nature of
machine
Capacity
Date of
acquisition/installation
Date of commencement of
operation
Total Cost of
acquisition/installation
No of years machinery is in
use
Rate of depreciation
Remarks
Department/Station:- ________________________________________________
Prepared by:-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Checked by:-
Notes:-
1. If actual date of installation/acquisition is not available but the year of acquisition/installation is available, then year may be given in relevant column.
Prepared by:-
Notes:-
1. Assets reference number denotes any numbering/coding given to each piece of asset.
2. If actual date of construction/installation is not available but the year of acquisition/construction is available, then year may be given in relevant column.
3. All electrical fitting and electrical equipment should be covered here such as power station, water pump etc.
12
Remarks
11
10
Rate of depreciation
To
7
From
6
Total cost of
acquisition/installation
cost
Location
Date
Stock Holder
Details of
Improvement
Date of
acquisition/installation
Description
Length/No of units
S.NO.
Form:- FA-16
13
14
15
16
17
18
19
S.NO.
Description
Date of
acquisition/develop
ment/installation
Cost of
acquisition/
development/
installation
Location
Checked by:-
Accumlated
no of year
depreciation/a
for which Amortization/de
mortization
license is preciation Rate
value till
obtained
31.03.2014
Net Book
Value as on
31.03.2014
(Rs.)
Remarks