OF
PACK HOUSE WITH FRUIT & VEGETABLE GRADING
UNIT
Installed Capacity/Hr.
Promoters Share
Term Loan
Proposed Subsidy
Total Project Cost
:
:
:
:
:
500 kg.
1.50 Lakhs
.........
1.50 Lakhs
3.00Lakhs
1.
2.
Objectives
3.
4.
Sl.
No
.
Cost of Project
Name of the
structure
i.
Land
ii.
Civil structure
iii.
iv.
v.
vi.
vii.
Office furniture
and misc. items
viii. Crates
ix. Packaging Machine
including of
Washing Unit,
Grader for
vegetables, Strip
packing Machine &
Weighing Machine
Total (Rs. In Lacs)
Details
Qty.
Rate/
Unit(Rs)
5000 sqft.
20x10 with
flooring &
Roof
Levelling land
and to make
it motor able
inside the
premises.
1000 Lit.
Capacity
Capacity 500
kg/Hr
Beneficiary
contribution up
to Sl. No.
(i-viii) (Rs.)
200 sqft.
800
Promoters
ownland
1,60,000
3000sqft.
15000
15000
1 set
25000
25000
25000
1 set
1 no.
5000
7500
5000
7500
5000
7500
1 set
10000
10000
10000
15nos
1 set
350
150000
5250
150000
5250
150000
Rs. 3,77,750.00
82250
Rs. 3,00,000.00
5.
Means of Finance
a) Promoter Share
b) Bank Term Loan
c) Subsidy
8.
9.
10.
11.
:
:
:
:
1.50 lakhs
1.50 lakhs
3.00 lakhs
Detailed list of plant & machinery / others utensils is as follows:
Potato grading line/vegetable grading, washing, waxing line,
minimal processing equipments, utensils, knives set, working
table, washing tanks, packing machine, Plastic barrels, Plastic
crates (200 nos.), water storage facilities.
Abundant quantity of Mango, amla, papaya, guava & all
vegetables/ spices available in the district as well as in
surrounding area throughout the year.
The promoter also itself engaged in production of
fruits/vegetables as well as having good contacts with the
progressive farmers of their area. The beneficiary has already its
own raw materials for sorting, grading, washing & minimal
processing as per the demand of market. Moreover number of
other farmers willing to provide their raw materials for same
purpose.
Due to the shortage of availability of primary produce as sorted,
graded, washed & minimal processing for ultimate use of tertiary
/ final processing unit for converting these produce to final
finished products to be sale in local/domestic/export market. The
processors have to go faraway places for procuring desired
quantity to other states/places at higher rates of semi-finished
produce. Thus there is ample of potential for more low
preservation units in that area.
Approx. 100 farmers to be benefitted.
Strength :
There is a abundant availability of raw materials such as
guava, mango, amla, papaya, vegetables, ornamental
plants & spices in proposed area of district.
The functional infrastructure unit is situated in
fruits/vegetable growing belt and having good network of
growers.
Vast domestic market.
Weakness :
Low availability of adequate infrastructural facilities.
Lack of adequate quality control & testing methods.
Inefficient supply chain due to a large number of
intermediaries.
High requirement of working capital.
Seasonality of raw material.
12.
13.
Opportunity:
Large crop and material base offering a vast potential for
agro processing activities.
Rising income levels and changing consumption patterns.
Favourable demographic profile and changing lifestyles.
Opening of global markets.
Availability of capital subsidy from NHM to start a business
opportunity in local areas by converting their raw
materials to value added products as per the local
demands of the consumers/market.
Threat:
Affordability and preferences of fresh food.
High inventory carrying cost.
High packaging cost.
Natural Calamity.
The proposed unit has a local market demand oriented basis the
unit shall be run very successfully by converting fresh ungraded
fruits/vegetables to graded, washed value added produce which
is directly ready to consume products. The unit has great
advantage for more profitability. Since the proposed unit has a
very low investment and there is an ample scope to enhance their
profitability within stipulated course of time.
The brief detail project report about availability of raw material,
utilities, miscellaneous assets, other information elaborated as:
DETAILS OF THE PROPOSED PROJECT
Building
The construction / arrangement of building with electrification for
value addition shall be of about 1500sq ft. area for working shed
followed by storage and packing facilities. The anticipated
expenditure is Rs. 2,00,000.00 which is limited Rs. 1,22,250.00
towards beneficiary contribution.
Machinery: A detailed list of machinery is already furnished. The
anticipated expenditure is Rs. 1,50,000.00
Miscellaneous Assets: A provision of Rs 27,750.00 would take
care of the needs towards beneficiary contribution.
Preliminary & Pre-operative Expenses: It is estimated that
registration and establishment expenses and other preproduction expenses like trial runs etc. shall be burn by supplier
of machineries.
Working Capital Requirement: Working capital is a pre-requisite
for the success of any project. However, in view of very small
scale of activities and typical nature of customers, the bank would
hesitate to provide post sales facilities. Hence, it is assumed that
the promoter will arrange their own fund resources as unsecured
loans from relatives / friends or bank if agree of Rs.1,00,000/-.
Raw Material: The all-important raw materials shall be sound,
uniform texture, and unripe but fully grown bigger sized. Other
raw materials like food grade colours and flavours and citric acid
shall be required in small quantity. Similarly, polythene bags are
also readily available.
14.
15.
16.
**************************